amd 0002.pdf

PDF 21 KB Posted

Attached to
Recovery - Z - Bank Protection, Disposal Area 14B
Solicitation number
W912HN-09-B-0026
Issued by

About this file

SF 30 - Summary of Changes.

View the file

Other files

File Type Posted
abstract 9-23-09.xls XLS spreadsheet
D-08 SITE PLAN AREA 14B1 STA 0 00 TO 13 75.pdf PDF
amd 0004.pdf PDF
amd 0004 conform.pdf PDF
amd 0003.pdf PDF
amd 0003 conform.pdf PDF
amd 0002 conform.pdf PDF
amd 0001 conform _2_.pdf PDF
14B_RockRevet_Plans_amd1.pdf PDF
amdt001_09-B-26DisposalArea14B_.pdf PDF
SAS_14BRockRev_Plans.pdf PDF
SPECIFICATIONS.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation No. W912HN-09-B-0026, Disposal Area 14B, Rock Revetment, Jasper County, South Carolina

This amendment is being issued to correct the Disclosure of Magnitude of Construction in Block 10 of the Standard Form 1442 to read: The estimated price range for this project is betw een $5,000,000 and $10,000,000.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-09-B-0026

X 9B. DATED (SEE ITEM 11)

24-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2009

CODE

US ARMY ENGINEER DISTRICT SAVANNAH

100 W OGLETHORPE AVENUE

SAVANNAH GA 31401-3640

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-09-B-0026

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required performance has changed from STIMULUS FUNDS WILL BE USED TO ACCOMPLISH

THIS WORK IN ACCORDANCE WITH THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA).

DISPOSAL AREA 14B, ROCK REVETMENT, JASPER COUNTY, SOUTH CAROLINAThe Solicitation is 100% HubZone Set-Aside. SEE SECTION 00800, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.Disclosure of Magnitude of Construction (FAR 36.204 and DFARS 236.204)The estimated price range for this project is between $10,000,000 and $25,000,000.Contractors must be registered in the Central Contractor Registration (CCR) database in order to receive award from this solicitation. See DFARS Clause 252.204-7004 Alt A in Section 00700 for more information. You must be registered in ORCA in order to receive an award for this solicitation.NAICS Code is 237990. Size Standard is $20,000,000.Contract Specialist: Sandy Meyers, (912) 652- 5324email: sandra.b.meyers@usace.army.mil to STIMULUS FUNDS WILL BE USED TO ACCOMPLISH THIS

WORK IN ACCORDANCE WITH THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA).

DISPOSAL AREA 14B, ROCK REVETMENT, JASPER COUNTY, SOUTH CAROLINAThe Solicitation is 100% HubZone Set-Aside. SEE SECTION 00800, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.Disclosure of Magnitude of Construction (FAR 36.204 and DFARS 236.204)The estimated price range for this project is between $5,000,000 and $10,000,000.Contractors must be registered in the Central Contractor Registration (CCR) database in order to receive award from this solicitation. See DFARS Clause 252.204-7004 Alt A in Section 00700 for more information. You must be registered in ORCA in order to receive an award for this solicitation.NAICS Code is 237990. Size Standard is $20,000,000.Contract Specialist: Sandy Meyers, (912) 652- 5324email: sandra.b.meyers@usace.army.mil.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

52.236-4011 Disclosure of Magnitude of Construction (FAR 36.204 and DFARS 236.204)

The estimated price range for this project is between $5,000,000 and $10,000,000.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .