abstract 9-23-09.xls
XLS spreadsheet 2 MB Posted
- Solicitation number
- W912HN-09-B-0026
About this file
Bid Abstract
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D-08 SITE PLAN AREA 14B1 STA 0 00 TO 13 75.pdf | ||
| amd 0004.pdf | ||
| amd 0004 conform.pdf | ||
| amd 0003.pdf | ||
| amd 0003 conform.pdf | ||
| amd 0002 conform.pdf | ||
| amd 0002.pdf | ||
| amd 0001 conform _2_.pdf | ||
| 14B_RockRevet_Plans_amd1.pdf | ||
| amdt001_09-B-26DisposalArea14B_.pdf | ||
| SAS_14BRockRev_Plans.pdf | ||
| SPECIFICATIONS.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOTAL 0001-0018
| IFB NO: W912HN-09-B-0026 | BID ABSTRACT | ||||||||||||||||
| Bid Opening Date: 23 Sep 2009 10:00 a.m. / PROJECT: Disposal Area 14B, Rock Revetment, Jasper County, SC | GRAND | COREY | |||||||||||||||
| IGE | CONSTRUCTION | ICES-CAROLINAS | ENTERPRISES | ASHRIDGE, INC | WECC, INC | ||||||||||||
| ITEM NO | SUPPLIES/SERVICES | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | EST QTY | ITEM NO | SUPPLIES/SERVICES | U/P | TOTAL | U/P | TOTAL | U/P | TOTAL |
| 0001 | Site 14B-1 Deliver, Stockpile, and Place Armor Stone | 0001 | Site 14B-1 Deliver, Stockpile, and Place Armor Stone | ||||||||||||||
| 0001AA | Deliver and Stockpile Armor Stone, First 3,480 tons | 3,480 | ton | $ 50.00 | $ 174,000.00 | $ 53.00 | $ 184,440.00 | $ 64.92 | $ 225,921.60 | 0001AA | Deliver and Stockpile Armor Stone, First 3,480 tons | $88.60 | $308,328.00 | $43.12 | $150,057.60 | $86.00 | $299,280.00 |
| 0001AB | Deliver and Stockpile Armor Stone, All over 3,480 tons | 350 | ton | $ 50.00 | $ 17,500.00 | $ 53.00 | $ 18,550.00 | $ 64.92 | $ 22,722.00 | 0001AB | Deliver and Stockpile Armor Stone, All over 3,480 tons | $88.60 | $31,010.00 | $43.12 | $15,092.00 | $86.00 | $30,100.00 |
| 0001BA | Armor Stone Template Placement, First 3,480 tons | 3,480 | ton | $ 59.00 | $ 205,320.00 | $ 57.00 | $ 198,360.00 | $ 69.91 | $ 243,286.80 | 0001BA | Armor Stone Template Placement, First 3,480 tons | $20.40 | $70,992.00 | $25.00 | $87,000.00 | $37.00 | $128,760.00 |
| 0001BB | Armor Stone Template Placement, All over 3,480 tons | 350 | ton | $ 59.00 | $ 20,650.00 | $ 57.00 | $ 19,950.00 | $ 69.91 | $ 24,468.50 | 0001BB | Armor Stone Template Placement, All over 3,480 tons | $20.40 | $7,140.00 | $1.00 | $350.00 | $46.00 | $16,100.00 |
| 0002 | Site 14B-1 Deliver, Stockpile, and Place Type 1 Riprap | 0002 | Site 14B-1 Deliver, Stockpile, and Place Type 1 Riprap | $0.00 | $0.00 | ||||||||||||
| 0002AA | Deliver & Stockpile Type 1 Riprap Underlayer, First 780 tons | 780 | ton | $ 50.00 | $ 39,000.00 | $ 47.00 | $ 36,660.00 | $ 57.72 | $ 45,021.60 | 0002AA | Deliver & Stockpile Type 1 Riprap Underlayer, First 780 tons | $83.70 | $65,286.00 | $38.37 | $29,928.60 | $75.00 | $58,500.00 |
| 0002AB | Deliver & Stockpile Type 1 Riprap Underlayer, All over 780 tons | 80 | ton | $ 50.00 | $ 4,000.00 | $ 47.00 | $ 3,760.00 | $ 57.72 | $ 4,617.60 | 0002AB | Deliver & Stockpile Type 1 Riprap Underlayer, All over 780 tons | $83.70 | $6,696.00 | $38.37 | $3,069.60 | $76.00 | $6,080.00 |
| 0002BA | Type 1 Riprap Template Placement, First 780 tons | 780 | ton | $ 48.00 | $ 37,440.00 | $ 57.00 | $ 44,460.00 | $ 69.91 | $ 54,529.80 | 0002BA | Type 1 Riprap Template Placement, First 780 tons | $22.20 | $17,316.00 | $35.00 | $27,300.00 | $39.00 | $30,420.00 |
| 0002BB | Type 1 Riprap Template Placement, All over 780 tons | 80 | ton | $ 48.00 | $ 3,840.00 | $ 57.00 | $ 4,560.00 | $ 69.91 | $ 5,592.80 | 0002BB | Type 1 Riprap Template Placement, All over 780 tons | $22.20 | $1,776.00 | $1.00 | $80.00 | $40.00 | $3,200.00 |
| 0003 | Site 14B-1 Deliver, Stockpile, and Place GADOT #4 | 0003 | Site 14B-1 Deliver, Stockpile, and Place GADOT #4 | $0.00 | |||||||||||||
| 0003AA | Deliver & Stockpile GADOT#4 Bedding Stone, First 550 tons | 550 | ton | $ 44.00 | $ 24,200.00 | $ 33.00 | $ 18,150.00 | $ 41.10 | $ 22,605.00 | 0003AA | Deliver & Stockpile GADOT#4 Bedding Stone, First 550 tons | $67.90 | $37,345.00 | $28.62 | $15,741.00 | $52.00 | $28,600.00 |
| 0003AB | Deliver & Stockpile GADOT#4 Bedding Stone, All over 550 tons | 85 | ton | $ 44.00 | $ 3,740.00 | $ 33.00 | $ 2,805.00 | $ 41.10 | $ 3,493.50 | 0003AB | Deliver & Stockpile GADOT#4 Bedding Stone, All over 550 tons | $67.90 | $5,771.50 | $28.62 | $2,432.70 | $52.00 | $4,420.00 |
| 0003BA | GADOT #4 Bedding Stone Template Placement, First 550 tons | 550 | ton | $ 31.00 | $ 17,050.00 | $ 57.00 | $ 31,350.00 | $ 69.91 | $ 38,450.50 | 0003BA | GADOT #4 Bedding Stone Template Placement, First 550 tons | $20.70 | $11,385.00 | $35.00 | $19,250.00 | $31.00 | $17,050.00 |
| 0003BB | GADOT #4 Bedding Stone Template Placement, All over 550 tons | 85 | ton | $ 31.00 | $ 2,635.00 | $ 57.00 | $ 4,845.00 | $ 69.91 | $ 5,942.35 | 0003BB | GADOT #4 Bedding Stone Template Placement, All over 550 tons | $20.70 | $1,759.50 | $1.00 | $85.00 | $52.00 | $4,420.00 |
| 0004 | Site 14B-1 Deliver, Stockpile, and Place GADOT #4 Top of Slope | 0004 | Site 14B-1 Deliver, Stockpile, and Place GADOT #4 Top of Slope | $0.00 | |||||||||||||
| 0004AA | Deliver & Stockpile GADOT #4 Filter Stone, First 150 tons | 150 | ton | $ 44.00 | $ 6,600.00 | $ 33.00 | $ 4,950.00 | $ 41.10 | $ 6,165.00 | 0004AA | Deliver & Stockpile GADOT #4 Filter Stone, First 150 tons | $77.90 | $11,685.00 | $28.62 | $4,293.00 | $52.00 | $7,800.00 |
| 0004AB | Delivery & Stockpile GADOT #4 Filter Stone, All over 150 tons | 15 | ton | $ 44.00 | $ 660.00 | $ 33.00 | $ 495.00 | $ 41.10 | $ 616.50 | 0004AB | Delivery & Stockpile GADOT #4 Filter Stone, All over 150 tons | $77.90 | $1,168.50 | $28.62 | $429.30 | $52.00 | $780.00 |
| 0004BA | GADOT #4 Filter Stone Template Placement, First 150 tons | 150 | ton | $ 31.00 | $ 4,650.00 | $ 57.00 | $ 8,550.00 | $ 69.91 | $ 10,486.50 | 0004BA | GADOT #4 Filter Stone Template Placement, First 150 tons | $20.70 | $3,105.00 | $35.00 | $5,250.00 | $31.00 | $4,650.00 |
| 0004BB | GADOT #3 Filter Stone Template Placement, All over 150 tons | 15 | ton | $ 31.00 | $ 465.00 | $ 57.00 | $ 855.00 | $ 69.91 | $ 1,048.65 | 0004BB | GADOT #3 Filter Stone Template Placement, All over 150 tons | $20.70 | $310.50 | $1.00 | $15.00 | $31.00 | $465.00 |
| 0005 | Site 14B-1 Install SCDOT Type A Silt Fencing | 0005 | Site 14B-1 Install SCDOT Type A Silt Fencing | $0.00 | |||||||||||||
| 0005AA | Silt Fence Type A, First 300 linear feet | 300 | LF | $ 3.30 | $ 990.00 | $ 6.00 | $ 1,800.00 | $ 1.38 | $ 414.00 | 0005AA | Silt Fence Type A, First 300 linear feet | $2.75 | $825.00 | $2.00 | $600.00 | $2.00 | $600.00 |
| 0005AB | Silt Fence Type A, All over 300 linear feet | 45 | LF | $ 3.40 | $ 153.00 | $ 6.00 | $ 270.00 | $ 1.38 | $ 62.10 | 0005AB | Silt Fence Type A, All over 300 linear feet | $2.75 | $123.75 | $2.00 | $90.00 | $2.00 | $90.00 |
| 0006 | Grassing Site 14B-1 | 1 | AC | $ 2,535.00 | $ 2,535.00 | $ 2,660.00 | $ 2,660.00 | $ 1,154.50 | $ 1,154.50 | 0006 | Grassing Site 14B-1 | $4,750.00 | $4,750.00 | $1,450.00 | $1,450.00 | $1,947.00 | $1,947.00 |
| 0007 | Agricultural Lime Site 14B-1 | 3 | tz | $ 110.00 | $ 330.00 | $ 320.00 | $ 960.00 | $ 785.00 | $ 2,355.00 | 0007 | Agricultural Lime Site 14B-1 | $55.00 | $165.00 | $65.00 | $195.00 | $87.00 | $261.00 |
| 0008 | Fertilizer, Nitrogen Site 14B-1 | 0.1 | ton | $ 830.00 | $ 83.00 | $ 8,600.00 | $ 860.00 | $ 923.50 | $ 92.35 | 0008 | Fertilizer, Nitrogen Site 14B-1 | $770.00 | $77.00 | $380.00 | $38.00 | $818.00 | $81.80 |
| 0009 | Fertilizer, Mixed Grade Site 14B-1 | 0.6 | ton | $ 740.00 | $ 444.00 | $ 1,600.00 | $ 960.00 | $ 808.00 | $ 484.80 | 0009 | Fertilizer, Mixed Grade Site 14B-1 | $880.00 | $528.00 | $500.00 | $300.00 | $818.00 | $490.80 |
| 0010 | Site 14B-2 Deliver, Stockpile, and Place Armor Stone | 0010 | Site 14B-2 Deliver, Stockpile, and Place Armor Stone | ||||||||||||||
| 0010AA | Deliver & Stockpile Armor Stone, First 86,240 tons | 86,240 | ton | $ 50.00 | $ 4,312,000.00 | $ 53.00 | $ 4,570,720.00 | $ 64.92 | $ 5,598,700.80 | 0010AA | Deliver & Stockpile Armor Stone, First 86,240 tons | $88.60 | $7,640,864.00 | $42.00 | $3,622,080.00 | $81.00 | $6,985,440.00 |
| 0010AB | Deliver & Stockpile Armor Stone, All over 86,240 tons | 8,630 | ton | $ 50.00 | $ 431,500.00 | $ 53.00 | $ 457,390.00 | $ 64.92 | $ 560,259.60 | 0010AB | Deliver & Stockpile Armor Stone, All over 86,240 tons | $88.60 | $764,618.00 | $42.00 | $362,460.00 | $81.00 | $699,030.00 |
| 0010BA | Armor Stone Template Placement, First 86,240 tons | 86,240 | ton | $ 64.00 | $ 5,519,360.00 | $ 57.00 | $ 4,915,680.00 | $ 69.91 | $ 6,029,038.40 | 0010BA | Armor Stone Template Placement, First 86,240 tons | $20.40 | $1,759,296.00 | $24.00 | $2,069,760.00 | $36.00 | $3,104,640.00 |
| 0010BB | Armor Stone Template Placement, All over 86,240 tons | 8,630 | ton | $ 64.00 | $ 552,320.00 | $ 57.00 | $ 491,910.00 | $ 69.91 | $ 603,323.30 | 0010BB | Armor Stone Template Placement, All over 86,240 tons | $20.40 | $176,052.00 | $0.00 | $0.00 | $36.00 | $310,680.00 |
| 0011 | Site 14B-2 Deliver, Stockpile, and Place Type 1 Riprap | 0011 | Site 14B-2 Deliver, Stockpile, and Place Type 1 Riprap | ||||||||||||||
| 0011AA | Deliver & Stockpile Type 1 Riprap Underlayer, First 19,340 tons | 19,340 | ton | $ 50.00 | $ 967,000.00 | $ 47.00 | $ 908,980.00 | $ 57.72 | $ 1,116,304.80 | 0011AA | Deliver & Stockpile Type 1 Riprap Underlayer, First 19,340 tons | $83.70 | $1,618,758.00 | $38.37 | $742,075.80 | $69.00 | $1,334,460.00 |
| 0011AB | Deliver & Stockpile Type 1 Riprap Underlayer, All over 19,340 tons | 1,940 | ton | $ 50.00 | $ 97,000.00 | $ 47.00 | $ 91,180.00 | $ 57.72 | $ 111,976.80 | 0011AB | Deliver & Stockpile Type 1 Riprap Underlayer, All over 19,340 tons | $83.70 | $162,378.00 | $38.37 | $74,437.80 | $69.00 | $133,860.00 |
| 0011BA | Type 1 Riprap Template Placement, First 19,340 tons | 19,340 | ton | $ 53.00 | $ 1,025,020.00 | $ 57.00 | $ 1,102,380.00 | $ 69.91 | $ 1,352,059.40 | 0011BA | Type 1 Riprap Template Placement, First 19,340 tons | $22.20 | $429,348.00 | $25.00 | $483,500.00 | $34.00 | $657,560.00 |
| 0011BB | Type 1 Riprap Template Placement, All over 19,340 tons | 1,940 | ton | $ 53.00 | $ 102,820.00 | $ 57.00 | $ 110,580.00 | $ 69.91 | $ 135,625.40 | 0011BB | Type 1 Riprap Template Placement, All over 19,340 tons | $22.20 | $43,068.00 | $25.00 | $48,500.00 | $34.00 | $65,960.00 |
| 0012 | Site 14B-2 Deliver, Stockpile, and Place GADOT #4 | 0012 | Site 14B-2 Deliver, Stockpile, and Place GADOT #4 | $0.00 | |||||||||||||
| 0012AA | Deliver & Stockpile GADOT #4 Bedding Stone, First 16,170 tons | 16,170 | ton | $ 44.00 | $ 711,480.00 | $ 33.00 | $ 533,610.00 | $ 41.10 | $ 664,587.00 | 0012AA | Deliver & Stockpile GADOT #4 Bedding Stone, First 16,170 tons | $67.90 | $1,097,943.00 | $27.62 | $446,615.40 | $51.00 | $824,670.00 |
| 0012AB | Deliver & Stockpile GADOT #4 Bedding Stone, All over 16,170 tons | 2,430 | ton | $ 44.00 | $ 106,920.00 | $ 33.00 | $ 80,190.00 | $ 41.10 | $ 99,873.00 | 0012AB | Deliver & Stockpile GADOT #4 Bedding Stone, All over 16,170 tons | $67.90 | $164,997.00 | $27.62 | $67,116.60 | $51.00 | $123,930.00 |
| 0012BA | GADOT #4 Bedding Stone Template Placement, First 16,170 tons | 16,170 | ton | $ 37.00 | $ 598,290.00 | $ 57.00 | $ 921,690.00 | $ 69.91 | $ 1,130,444.70 | 0012BA | GADOT #4 Bedding Stone Template Placement, First 16,170 tons | $20.70 | $334,719.00 | $25.00 | $404,250.00 | $30.00 | $485,100.00 |
| 0012BB | GADOT #4 Bedding Stone Template Placement, All over 16,170 tons | 2,430 | ton | $ 37.00 | $ 89,910.00 | $ 57.00 | $ 138,510.00 | $ 69.91 | $ 169,881.30 | 0012BB | GADOT #4 Bedding Stone Template Placement, All over 16,170 tons | $20.70 | $50,301.00 | $1.00 | $2,430.00 | $30.00 | $72,900.00 |
| 0013 | Site 14B-2 Deliver, Stockpile, and Place GADOT #4 Top of Slope | 0013 | Site 14B-2 Deliver, Stockpile, and Place GADOT #4 Top of Slope | ||||||||||||||
| 0013AA | Deliver & Stockpile GADOT #4 Filter Stone, First 4,070 tons | 4,070 | ton | $ 44.00 | $ 179,080.00 | $ 33.00 | $ 134,310.00 | $ 41.10 | $ 167,277.00 | 0013AA | Deliver & Stockpile GADOT #4 Filter Stone, First 4,070 tons | $77.90 | $317,053.00 | $27.62 | $112,413.40 | $54.00 | $219,780.00 |
| 0013AB | Deliver & Stockpile GADOT #4 Filter Stone, All over 4,070 tons | 410 | ton | $ 44.00 | $ 18,040.00 | $ 33.00 | $ 13,530.00 | $ 41.10 | $ 16,851.00 | 0013AB | Deliver & Stockpile GADOT #4 Filter Stone, All over 4,070 tons | $77.90 | $31,939.00 | $28.62 | $11,734.20 | $52.00 | $21,320.00 |
| 0013BA | Template Placement GADOT #4 Filter Stone, First 4,070 tons | 4,070 | ton | $ 37.00 | $ 150,590.00 | $ 57.00 | $ 231,990.00 | $ 69.91 | $ 284,533.70 | 0013BA | Template Placement GADOT #4 Filter Stone, First 4,070 tons | $20.70 | $84,249.00 | $35.00 | $142,450.00 | $43.00 | $175,010.00 |
| 0013BB | Template Placement GADOT #4 Filter Stone, All over 4,070 tons | 410 | ton | $ 37.00 | $ 15,170.00 | $ 57.00 | $ 23,370.00 | $ 69.91 | $ 28,663.10 | 0013BB | Template Placement GADOT #4 Filter Stone, All over 4,070 tons | $20.70 | $8,487.00 | $1.00 | $410.00 | $31.00 | $12,710.00 |
| 0014 | Site 14B-2 Install SC DOT Silt Fencing | 0014 | Site 14B-2 Install SC DOT Silt Fencing | ||||||||||||||
| 0014AA | Silt Fence, First 6,500 linear feet | 6,500 | LF | $ 3.30 | $ 21,450.00 | $ 3.00 | $ 19,500.00 | $ 1.38 | $ 8,970.00 | 0014AA | Silt Fence, First 6,500 linear feet | $2.75 | $17,875.00 | $2.00 | $13,000.00 | $2.00 | $13,000.00 |
| 0014AB | Silt Fence, All over 6,500 linear feet | 975 | LF | $ 3.40 | $ 3,315.00 | $ 3.00 | $ 2,925.00 | $ 1.38 | $ 1,345.50 | 0014AB | Silt Fence, All over 6,500 linear feet | $2.75 | $2,681.25 | $2.00 | $1,950.00 | $2.00 | $1,950.00 |
| 0015 | Grassing Site 14B-2 | 12 | AC | $ 2,535.00 | $ 30,420.00 | $ 1,474.00 | $ 17,688.00 | $ 1,154.50 | $ 13,854.00 | 0015 | Grassing Site 14B-2 | $4,750.00 | $57,000.00 | $1,450.00 | $17,400.00 | $1,620.00 | $19,440.00 |
| 0016 | Agricultural Lime Site 14B-2 | 36 | ton | $ 110.00 | $ 3,960.00 | $ 86.00 | $ 3,096.00 | $ 785.00 | $ 28,260.00 | 0016 | Agricultural Lime Site 14B-2 | $65.00 | $2,340.00 | $65.00 | $2,340.00 | $87.00 | $3,132.00 |
| 0017 | Fertilizer, Nitrogen Site 14B-2 | 1.2 | ton | $ 830.00 | $ 996.00 | $ 800.00 | $ 960.00 | $ 923.50 | $ 1,108.20 | 0017 | Fertilizer, Nitrogen Site 14B-2 | $380.00 | $456.00 | $380.00 | $456.00 | $818.00 | $981.60 |
| 0018 | Fertilizer, Mixed Grade Site 14B-2 | 7.2 | ton | $ 740.00 | $ 5,328.00 | $ 800.00 | $ 5,760.00 | $ 785.00 | $ 5,652.00 | 0018 | Fertilizer, Mixed Grade Site 14B-2 | $500.00 | $3,600.00 | $500.00 | $3,600.00 | $818.00 | $5,889.60 |
| TOTAL | $ 15,508,254.00 | $ 15,366,199.00 | $ 18,848,120.45 | $ 15,355,565.00 | $ 8,992,026.00 | $15,915,538.80 | |||||||||||
| Difference between IGE and bidder | -0.92% | 21.54% | -0.98% | -42.02% | 2.63% |