W912GY25Q0002 Solicitation.pdf
PDF 969 KB Posted
- Attached to
- Automotive Service
- Solicitation number
- W912GY25Q0002
About this file
This is a solicitation (W912GY25Q0002) for automotive diagnostic, repair and parts services at Sierra Army Depot in Herlong, California. The contract will be awarded as a Time & Materials contract using simplified acquisition procedures under FAR parts 12.6 and 13.5.
The solicitation is set aside 100% for small businesses under NAICS code 811111 with a size standard of $9 million. Performance is expected to begin around April 1, 2025, with a base period of 12 months and two 12-month option periods. The scope includes providing automotive equipment diagnostic services, repairs, and repair parts with required factory certified maintenance technicians. The contractor must acknowledge diagnostic requests within 24 hours and perform services within 4 business days, provide quotes for repairs within 4 business days, and restore equipment to fully mission capable condition per manufacturer specifications. Work will be performed at Sierra Army Depot's Motor Pool facilities or in the field. Questions must be submitted in writing to Heidi Young no later than 7 days before the solicitation closes on February 24, 2025 at 10:00 AM. The Department of the Army Materiel Command Contracting Command Detroit Arsenal (ACC Warren) is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912GY25Q0002 22-Jan-2025
b. TELEPHONE NUMBER
571-588-9470
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 24 Feb 2025
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912GY9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
HEIDI YOUNG
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W62G2W419800T9
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
SIERRA ARMY DEPOT
CONTRACTING OFFICE
74 C STREET BUILDING 60
HERLONG CA 96113
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W62G2W 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF BASE SUPPORT
MOTORPOOL
SIERRA ARMY DEPOT
HERLONG CA 96113
TEL: 530-827-4257 FAX:
530-827-4722FAX:
TEL: 530-827-5126 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$9,000,000
NAICS:
811111
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF42
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912GY25Q0002
Section SF 1449 - CONTINUATION SHEET
ADDENDUM TO 52.212-1
ADDENDUM TO 52.212-1 – INSTRUCTIONS TO OFFERORS
This action is being conducted using simplified acquisition procedures for commercial items/services in accordance with FAR 12.6 and 13.5.
In accordance with FAR 52.212-1 (g) The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government reserves the right to reject any or all quotes at any time prior to award.
1. Quotes shall consist of:
A. Contractor Information Sheet at Attachment 1 – Consisting of:
a. Registered Business Name; Doing Business as (if applicable); Address; City; State;
Zip+4; UEI; CAGE; Tax Identification Number and how long the quote is valid through (please make for at least 60 days for administrative lead time).
i. NOTE: Contractor must be registered in the System of Award Management (SAM) (https://sam.gov) at time of Award.
B. Filled in and Completed Attachment 2 – Rates and Pricing Sheet
a. Please read and utilize the instructions found on the last page.
b. Prices must be provided to the nearest cent (i.e. $100.94).
c. Price all lines. If there is no charge, please price as $0.00
C. Property Management Plan (PMP) (See attachment for more information)
Quotes that do not provide ALL of the above will be considered as non-conforming to the requirements of the solicitation and may not be considered for award, unless determined to be in the best interest of the Government.
It is encouraged for vendors to submit quotes as early as possible. Due to the nature of electronic business it is also encouraged for vendors to follow up and ensure their quote was received.
Questions Concerning the Solicitation If an Offeror has any questions concerning this solicitation, it is recommended that they be submitted in writing no later than 7 calendar days prior to the closing date of the solicitation. Phone calls will not be accepted. Questions received after that time may not receive a response.
ADDENDUM TO 52.212-2
ADDENDUM TO 52.212-2 – EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors, in order of importance, shall be used to evaluate offers:
PRICE and PAST PERFORMANCE where Price and Past Performance are of EQUAL importance.
PRICE: The quote should contain the vendor’s best terms from a price standpoint. The Government will evaluate FOR AWARD PURPOSES by adding the price(s) for all “Labor” line items from the pricing sheet at Attachment 2 for a total price. All “Materials” (i.e. parts) required for this requirement will be negotiated by the Contracting Officer prior to issuance of any notice to proceed. This includes all option years.
Unbalanced or unrealistic pricing (i.e., buying in or frontloading) may not be considered for award. Please note the evaluated price will differ from the award price due to the fact this is a T&M type contract, and the dollars allocated at award will be an estimate for the base year requirement. Evaluation of options shall not obligate the Government to exercise the option(s).
Past Performance: This factor will be used to assess an Offeror’s likelihood of performing successfully on this order. Past performance will be assessed for demonstrated recent and relevant record of performance. For this factor the Government shall review available past performance data found in the Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov/; and the System for Award Management (SAM) at www.sam.gov will be reviewed for accurate and correct vendor registration.
The following table will be utilized to establish the Performance Confidence Assessment Rating:
Adjectival Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
In the case of offerors for which there is no information on past contract performance or where past contract performance information is not available, the offeror may not be evaluated favorably or unfavorably on the factor of past contract performance. In this case, the offeror’s past performance is unknown and assigned a performance confidence rating of “neutral.”
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Automotive Equipment Diagnostic, Repair, & Repair Parts
Part 1
General Information
1. GENERAL: This is a non-personal service contract to provide automotive equipment (AE) diagnostics, AE repairs, and AE repair parts to assist the Motor Pool at Sierra Army Depot in the event the required capabilities or expertise does not exist in order to perform certain repairs, diagnostics and/or provide repair parts that may be needed to restore the AE back to fully functioning condition. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and any other non-personal items required to perform the services of AE diagnostic, AE repairs and provision of AE repair parts as defined in this Performance Work Statement, except those that are specified for government personnel. The contractor shall perform to the standards in this contract.
1.2 Background: Sierra Army Depot located in Herlong, California north of Reno, Nevada on highway 395 has a wide variety of material handling equipment that is critical to the depot’s needs and mission requirements. Due to the complexities of newer equipment types and proprietary software systems it is necessary to enhance, but not to replace the current capabilities of the motor pool for issues that arise beyond the capability or expertise of the government to perform such as electrical diagnostics, software programming, mechanical diagnostic, repairs and/or provide the motor pool with repair parts.
1.3 Objectives: When a determination is made and a written justification for services requested from the motor pool has been submitted to the COR, the contractor shall provide upon request the following services or any combination of the following services. A listing of material handling equipment shall be provided to the contractor and as an attachment to the contract (Technical Exhibit 2).This list of equipment is subject to change upon old equipment being replaced with new equipment. This listing of current material handling equipment at a minimum will be reviewed by the COR for newly acquired equipment and retired equipment annually and provide the contractor with an updated list.
Provide diagnostic testing of mechanical, electrical, and software systems pertaining to the equipment being requested for.
Provide software resets to include read and clear diagnostic and error codes.
Provide/Load software upgrades or re-program equipment per manufacturers specifications.
Perform certain mechanical or electrical repairs on a limited basis that are beyond the capabilities of the motor pool to perform.
Supply AE repair parts as requested by the COR.
1.4 Period of Performance: period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years. The Period of Performance reads as follows:
Base Year – Contract Award Through Day 364
Option Year I – Day 365 Through Day 729 Option Year II – Day 729 Through Day 1,094
1.5.1 General Information
1.5.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.5.3 Recognized Holidays: The contractor will not be required to perform any serviceson the following federal holidays New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Juneteenth National Independence Day Thanksgiving Day Independence Day Christmas Day
1.5.4 Hours of Operation: The contractor is responsible for conducting business for onsite repairs or diagnostics, between the hours of 0630 to 1130 and 1200 to 1700 Monday thru Thursday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. The government will not pay for overtime, unless performed at the request of the Contracting Officer.
1.5.5 Place of Performance: The work to be performed under this contract will be performed at Sierra Army Depot, Herlong, California, possible worksites include Motor Pool Facilities or equipment based out in the field unless transported to the contractors facility.
1.5.6 Type of Contract: The government will award a Time & Materials contract.
1.5.7 Security Requirements: Access and General Protection/Security Policy and Procedures: the contractor and all associated sub-contractor employees shall provide all information required by the installation Directorate of Risk Management for background checks (also known as vetting) in order to meet installation access requirements.
Contractor personnel performing work under this contract must have the vetting process complete and individual contractor approved for access to the installation at time of the notice to proceed and must maintain the ability to pass the vetting process with a favorable determination required for the life of the contract. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.5.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use when repairs or diagnostics are being performed at Sierra Army Depot.
1.5.7.2 Key Control: N/A
1.5.7.3 Lock Combinations: N/A
1.5.8 Special Qualifications: Factory certified maintenance technician is required to perform any work under this contract. The factory certified maintenance technician shall also be qualified as an equipment operator and have weld certification in which the technician is capable to restore the equipment to original or greater than manufactures load capacity specifications.
1.5.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor’s performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.5.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.5.11 Key Personnel: The follow personnel are considered key personnel by the government: Project Manager and repair technicians. The contractor shall provide a project manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The project manager or alternate shall be available between 6:30 a.m. to 4:30p.m, Monday thru Thursday except Federal holidays or when the government facility is closed for administrative reasons.
1.5.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.5.13 Contractor Travel: Travel related expenses including labor costs shall be included and factored in when submitting quotes for diagnostic and repair services.
1.5.14 Other Direct Costs: Equipment rentals or other related tools and equipment required to perform these repair services shall be the contractor’s responsibility. The contractor shall pay all fees, permits and/or costs required by Local, County, State or Federal representatives.
1.5.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6 Environmental Requirements
1.6.1 Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state,and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), aswell as Major Subordinate Command (MSC) and Sierra Army Depot (SIAD) regulation, policy, Host Tenant Agreement,Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report anyconflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of ArmyRegulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).
1.6.2 Compliance with Green Procurement Requirements: Refer to applicable provisions and clauses.
1.6.3 Compliance with License and Certification Requirements: N/A
1.6.4 Notification of Federal and State Regulators: Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, local and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from above mentioned environmental regulatory agencies.
1.6.5 Inspections of Work Sites: N/A
1.6.6 Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance withapplicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.
1.6.7 Verification of National Environmental Policy Act Documents: N/A
1.6.8 Conformance with Environmental Management System: Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment. SIAD currently operates and maintains an International Organization of Standards (ISO) 14001 certified program, “Fence to Fence”. Contractor shall comply with all EMS program requirements.
1.6.9 Assignment of Environmental Compliance Designee (ECD): N/A
1.6.10 Competency Training for Contractor Personnel: Contractor shall not allow personnel to perform any activitiesand/or tasks on AMC installations (SIAD) without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.
1.6.11 Generation of Solid Waste: Contractor shall dispose of all solid waste generated, which cannot be recycled, into the appropriately marked solid waste containers and roll-offs provided. Contractor shall comply with the SIAD Integrated Solid Waste Management Plan.
1.6.11.1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.
1.6.11.2. The Contractor shall coordinate with the installation Qualified Recycling Program (QRP) and Solid Waste Managers, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream.
1.6.11.3. Submit in writing the quantities of waste removed and recycled to the DGR and/or COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled, and the quantities of materials disposed/recycled by weight or volume.
1.6.11.4. The Contractor shall promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.
1.6.11.5. The Contractor shall make maximum effort to reduce and prevent waste.
1.6.12 Generation of Hazardous Waste: N/A
1.6.13 Use of Hazardous Materials: N/A
1.6.14 Prevention of Storm Water Pollution: N/A
1.6.15 Storm Water Management Low Impact Design/Development (LID): N/A
1.6.16 Use of Pesticides: N/A
1.6.17 Protection of Work Site Resources: N/A
1.6.18 Prevention of Spills: Contractor shall adopt the installation’s Spill Prevention Control and Countermeasures Plan(SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).
1.6.19 Protection of Sensitive Areas: Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:
1.6.20 Corrective Action for Noncompliance: Contractor shall when given a verbal and/or written notice of environmentalnoncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.
1.6.21 Noise: N/A
1.6.22 Mercury: Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps andfluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition to the Hazardous Waste Storage facility, B. 380 as required by SIAD. Immediately report to the DGR and COR instances of breakage or mercury spillage.
Clean mercury spill area to the satisfaction of the Contracting Officer and Environmental Office.Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.
1.6.23 Universal Waste / e-Waste Management: Universal waste including but not limited to some mercury containingbuilding products such florescent lamps, mercury vapor lamps, high pressure sodium lamps, CRTs, batteries, aerosol paint containers, electrical equipment containing PCBs, and consumed electronic devices, shall be managed in accordance with applicable environmental law and SIAD Hazardous Waste Management Plan. Consult the Environmental Office for assistance.
1.6.24 Pollution Prevention / Hazardous Waste Minimization: Minimize the use of hazardous materials and thegeneration of hazardous waste. Consult with the Environmental Office for suggestions from the installation’s pollution prevention/hazardous waste minimization plan for supporting waste minimization goals.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER’S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.
2.1.14. FULLY MISSION CAPABLE (FMC). A status condition where fully operational equipment or systems are safe and correctly configured as designed by the manufacturer. Equipment is FMC when it can perform all of its functions without endangering the lives of crews and operators.
2.1.15. NON MISSION CAPABLE (NMC). A status condition indicating that a system and equipment are not capable of performing any of their functions because of maintenance requirements. Does not count times spent on regularly scheduled maintenance services and inspections.
2.1.16. PARTIALLY MISSION CAPABLE (PMC). A status condition of an equipment indicating that that it can perform at least one but not all of its functions because of existing maintenance requirements that does not endanger the lives of crews or operators.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer’s Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer’s Technical Representative COTS Commercial Off the Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit MHE Material Handling Equipment FMC Fully Mission Capable PMC Partially Mission Capable NMC Non Mission Capable.
CME Construction Machinery Equipment AE Automotive Equipment
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: N/A
3.2 Facilities: Work may be performed in the motor pool area on Sierra Army Depot or out in the field where equipment is located at the time of request. A dedicated facity for the contractor is not authorized.
3.3 Utilities: N/A
3.4 Equipment: Refer to Technical exhibit 2
3.5 Materials: N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS. The work to be performed under this contract will be performed at Sierra Army Depot, Herlong, California, possible worksites include Motor Pool Facilities or equipment based out in the field unless transported to the contractors facility
4.2 Secret Facility Clearance: N/A
4.3. Materials: The contractor shall furnish all materials, supplies, necessary to meet the requirements under this
PWS.
4.4. Equipment: The contractor shall furnish all equipment necessary to meet the requirements under this PWS.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.0 Upon request from the COR, the contractor shall provide AE diagnostic services, AE repairs and AE repair parts for equipment listed in Technical Exhibit 2. The Technical Exhibit at a minimum will be updated annually and delivered to the contractor to include new AE equipment acquired during the year and old equipment retired and removed from the list of equipment.
5.1. AE Diagnostic Services. The contractor shall provide AE equipment Diagnostic Services: When requested by the COR, the contractor shall acknowledge diagnostic request within 24 hours and perform the diagnostic service within four business days of acknowlegement. The contractor will be responsible for supplying all labor, travel, and equipment to perform diagnostic services on AE equipment utilizing the technician’s expertise and/or common or specialized equipment, either onsite at Sierra Army Depot or on the contractor’s premises whichever is mutually determined to be more convenient or efficient for the Government. A diagnostic report shall be submitted to the COR upon completion of the diagnostic service within four business days after completion of the diagnostic service.
CDRL A0001 A listing of Common Diagnostic services that may be required are listed below, this list is not all inclusive, other diagnostics may be requested dependent on the needs of the Government.
5.1.1 – Electrical systems diagnostics.
5.1.2 – Software systems diagnostics (including reading and clearing repair/service codes)
5.1.3 – Fuel management systems and emissions diagnostics.
5.1.4 – Mechanical systems diagnostics.
5.1.5 – Hydraulic systems diagnostics.
5.2. AE Repair Services: When a written justification for AE repair services has been submitted to the COR, repair services under this contract may be obtained.
5.2.1 Upon Request from the COR the contractor shall provide a quote for repairs to be submitted to the COR. The Quote for repairs shall detail the work to be performed, parts that are needed for the repair, labor hours required to perform the repair or repairs, cost of repair parts, cost of labor hours and estimated time to completion of the repair, and location of repair. The quote for AE equipment repairs shall be due within 4 business days after request for quote has been sent by the COR.
5.2.2 Once the quote for repair has been accepted by the government the contractor will schedule with the COR for the repair or repairs to be made within 4 business days of quote acceptance. Once the contractor is onsite the contractor shall check in and out with the COR daily until the repairs are complete.
5.2.3 The contractor shall be responsible for supplying all labor, travel, equipment, and any repair parts to perform onsite or offsite repairs on AE requested by the COR. The contractor shall restore the AE to fully mission capable condition (FMC) per the manufactures specifications and capability as designed by the manufacturer.
Exceptions may be made depending on AE criticality of the equipment or mission requirements to allow the AE to be restored to partially mission capable (PMC) condition if it is an option to do so while waiting on parts to restore the AE to FMC condition. Repairs to AE shall be completed in a timely and expedient manner as agreed upon by the COR and outlined in the contractor provided quote for repairs. Any delays in restoring AE to FMC condition shall be reported to the COR as soon as the condition is known to the contractor. Should the contractor discover further damage or parts have not shipped on time to complete the schedule in the written estimate, the contractor shall document the findings and notify the government for an extension of services and if necessary, a new proposal. Any items found during a repair that are determined to be deficient or unserviceable shall be brought to the attention of the COR.
5.3. Contractor Supplied Warranty of Repairs: Upon completion of any repair performed by the contractor, the actual repair performed shall be warrantied from defects in materials and workmanship for a period of at least 90 days or as long as the manufacturer’s warranty lasts whichever is greater for the repair part supplied or as negotiated by the Contracting Officer at time of contract award. Repairs required for AE that were previous repairs made that are defective in materials or workmanship within the 90-day contractor supplied warranty period or manufacturer supplied warranty period whichever is greater shall not be billed to the government unless the repeat repair was due to government abuse or negligence.
5.4. Equipment Additions or Modifications: Any additions or modifications made to any equipment shall be made, provided the addition or modification is necessary to ensure the equipment meets the criteria for which it was originally designed, so long as it does not violate OSHA 29 CFR 1926.601/602, and only after Contracting Officer’s approval of the modifications.
5.5. Contractor Supplied AE Parts: When requested by the COR, the contractor shall supply AE parts that do not require repair services from the contractor. The contractor shall facilitate any warranty issues caused by defective material or parts received from the contractor unless determined to be of government abuse or negligence as reason for the part or material failure. Parts preference shall be OEM parts from the manufacturer or distributor for that manufacturer, Remanufactured parts may be accepted when approved by the COR.
5.6. Quotes and Warranty
5.6.1. The quote for parts submitted to the COR shall detail the cost of parts requested, shipping and/or freight costs and include estimated time of delivery and shall be submitted to the COR within 4 business days after receipt of request. CDRL A002
5.6.2 The contractor shall honor and facilitate manufacturer supplied warranty of parts provided to Sierra Army Depot under this contract providing the cause of the failure was not due to government abuse or negligence.
5.7. Non Standard hours / Emergency after hours service calls: Upon request the contractor shall provide diagnostic and repair support after standard business hours including Saturday and Sunday if deemed necessary referencing paragraph 1.6.4.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
6.1.1 SIAD Regulation 420-7 (Fire Prevention and Protection)
6.1.2 SIAD Regulation 385-1 (Safety)
6.1.3 All local, state and federal laws
6.1.4 OSHA requirement – 29 CFR 1926.601
6.1.5 OSHA requirement – 29 CFR 1926.602
6.2 Performance Requirements Summary
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS # 1
The contractor shall restore the AE to fully mission capable condition (FMC)
PWS Para 5.2.3
Restored to working condition per the manufactures specifications and capability as designed by the manufacturer.
100% Customer Feedback
PRS # 2
When requested by the COR the contractor shall acknowledge diagnostic request within 24 hours.
PWS Para 5.1
Respond to diagnostic request within 24 hours.
95% 100% Inspection
6.3 Deliverables Schedule
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies
Medium/Format Submit To Diagnostic Reports PWS Para 5.1
At the time of request for diagnostic
1 Electronic file by e-mail as an MS Word attachment.
COR and KO
Deliverable Frequency # of Copies
Medium/Format Submit To Quote for Parts PWS Para 5.6.1
At the time of request for parts quote
1 Electronic file by e-mail as an MS Word attachment.
COR
CONTRACT DATA REQUIREMENT LIST
DD FORM 1423, FEB 2001
CONTRACT DATA REQUIREMENT LIST Form Approval OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002 D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.: W912GY25Q0002
C. CATEGORY: TDP ____ TM ____ OTHER __X__ F. CONTRACTOR:
1. DATA ITEM NO: A001
2. TITLE: Diagnostic Report
3. SUBTITLE:
4. AUTHORITY: Contractor Format
5. CONTRACT REFERENCE: PWS paragraph 5.1.
6. REQUIRING OFFICE: Sierra Army Depot – Motor Pool
7. DD250 REQ: NO
8. APP CODE:
9. DIST. STATEMENT REQ:
10. FREQUENCY: After completion of the diagnostic service
11. AS OF DATE: Contract Award
12. DATE OF FIRST SUBMISSION: TBD
13. DATE OF SUBS. SUBMISSION:
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES:
DRAFT:
FINAL:
REG: 1 REPRO:
15. TOTAL COPIES: 1
16. REMARKS: The contractor shall acknowledge a diagnostic request within 24 hours and perform within 4 business days. For required information see PWS para 5.1.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE: Not Separately Priced (NSP)
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
J: DATE:
DD FORM 1423, FEB 2001
CONTRACT DATA REQUIREMENT LIST Form Approval OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002 D. SYSTEM/ITEM:
B. EXHIBIT: E. CONTRACT/PR NO.: W912GY25Q0002
C. CATEGORY: TDP ____ TM ____ OTHER __X__ F. CONTRACTOR:
1. DATA ITEM NO: A002
2. TITLE: Quote for Parts
3. SUBTITLE:
4. AUTHORITY: Contractor Format
5. CONTRACT REFERENCE: PWS paragraph 5.6.1.
6. REQUIRING OFFICE: Sierra Army Depot – Motor Pool
7. DD250 REQ: NO
8. APP CODE:
9. DIST. STATEMENT REQ:
10. FREQUENCY: As Needed
11. AS OF DATE: Contract Award
12. DATE OF FIRST SUBMISSION: TBD
13. DATE OF SUBS. SUBMISSION:
14. DISTRIBUTION:
A. ADDRESSEE: COR
B. COPIES: 1 each
DRAFT:
FINAL:
REG: REPRO: 2
15. TOTAL COPIES: 2
16. REMARKS: The contractor shall submit a written estimate of repairs within 4 business days to the COR. For required information see PWS para. 5.6.1.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE: Not Separately Priced (NSP)
G. PREPARED BY:
H: DATE:
I: APPROVED BY:
J: DATE:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Automotive Diagnostic, Repair and Parts
T&M Automotive Diagnostic, Repair and Parts Services IAW the attached PWS (Base Year) FOB: Destination
PURCHASE REQUEST NUMBER: W62G2W419800T9
PSC CD: J023
TOT ESTIMATED PRICE
CEILING PRICE
0002 1 Lot Contract Data Requirement List (CDRL)
T&M Contract Data Requirement List A001 and A002 in accordance with the attached Performance Work Statement (PWS). These CDRL's are NOT SEPARATELY
PRICED.
FOB: Destination
1001 1 Lot OPTION Automotive Diagnostic, Repair and Parts
T&M Automotive Diagnostic, Repair and Parts Services IAW the attached PWS (Option Year 1)
2001 1 Lot OPTION Automotive Diagnostic, Repair and Parts
T&M Automotive Diagnostic, Repair and Parts Services IAW the attached PWS (Option Year 2)
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-APR-2025 TO
30-MAR-2026
N/A DIRECTORATE OF BASE SUPPORT
MOTORPOOL
SIERRA ARMY DEPOT
HERLONG CA 96113
530-827-4257
W62G2W
0002 POP 01-APR-2025 TO
30-MAR-2028
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-APR-2026 TO
30-MAR-2027
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-APR-2027 TO
30-MAR-2028
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.204-7 System for Award Management NOV 2024 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
NOV 2021
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment
NOV 2021
52.212-1 Instructions to Offerors--Commercial Products and Commercial Services
SEP 2023
52.212-2 Evaluation - Commercial Items NOV 2021 52.212-3 Offeror Representations and Certifications--Commercial
Products and Commercial Services
MAY 2024
52.212-3 Alt I Offeror Representations and Certifications--Commercial Products and Commercial Services (MAY 2024) Alternate I
FEB 2024
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
NOV 2023
52.212-4 Alt I Contract Terms and Conditions--Commercial Products and Commercial Services (NOV 2023) Alternate I
NOV 2021
52.216-31 Time-and-Materials/Labor-Hour Proposal Requirements-- Commercial Acquisition
NOV 2021
52.217-5 Evaluation Of Options JUL 1990
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts.
MAY 2024
52.223-3 Hazardous Material Identification And Material Safety Data FEB 2021 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024 52.223-23 Sustainable Products and Services. MAY 2024 52.232-25 Prompt Payment JAN 2017 52.233-1 Disputes MAY 2014 52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.243-3 Changes--Time-And-Material Or Labor-Hours SEP 2000 52.245-1 Government Property SEP 2021 52.245-9 Use And Charges APR 2012 52.246-6 Inspection--Time-And-Material And Labor-Hour MAY 2001 52.249-14 Excusable Delays APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .