SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
01/21
PART 1 GENERAL
PAYMENT TYPES
The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 0001).
Single Job Payment Items
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SCHEDULE OF ITEMS: BASE ITEMS
Base Item 0001: Two-Story Portion Exterior Renovation
Unit of Measure: Job.
Payment will be made for costs associated with the renovation of existing two-story portion of the orphanage which includes installation of exterior insulation finish system (EIFS), replacement of the exterior stairwell and new associated lighting, replacement of the exterior windows and doors and associated interior minor patch work as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0002: Two-Story Portion Roof Replacement
Unit of Measure: Job.
Payment will be made for costs associated with the renovation of existing two-story portion of the orphanage which includes replacement of the roof and insulation, as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
SCHEDULE OF ITEMS: OPTION ITEMS
Awarding of Options
The Government reserves the right to award any option or combination of options in any order and the exercise of any option will not commit the Government to award any other option(s).
Option 1: Interior Renovations
Unit of Measure: Job.
Payment will be made for costs associated with the renovation of existing two-story which includes the electrical supply, minor plumbing repairs, and new mechanical ventilation system and associated minor patch work, as indicated in the SECTION 01 10 10 and shown on the conceptual layout. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Option 2: Item 0004: One-Story Portion Exterior Renovation
Unit of Measure: Job.
Payment will be made for costs associated with the renovation of existing one-story portion of the orphanage which includes installation of exterior insulation finish system (EIFS), replacement of the exterior windows and doors and associated interior minor patch work as indicated in SECTION 01 10 10 and the conceptual layout.
Option 3: Item 0005: One-Story Portion Roof Replacement
Unit of Measure: Job.
Payment will be made for costs associated with the renovation of existing two-story portion of the orphanage which includes replacement of the roof and insulation, as indicated in SECTION 01 10 10 and the conceptual layout.
Option 4: Item 0006: Basement Exterior Waterproofing
Unit of Measure: Job.
Payment will be made for costs associated with the exterior waterproofing of basement walls as indicated in SECTION 01 10 10 and the conceptual layout.
Option 5: Item 0007: Exterior Improvements
Unit of Measure: Job.
Payment will be made for costs associated with the exterior lightning protection, sanitary line replacement, and installation of 2 new hose bibs, as indicated in SECTION 01 10 10 and the conceptual layout.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section - V7 Aug 2020 SECTION 01 22 00 Page 3