AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this post-closing amendment is to provide a revised bid schedule and price and payment procedures for the project. The proposal due date is extended to 10 AM CEST on 16 September 2021.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB21Q0010

X 9B. DATED (SEE ITEM 11)

23-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Sep-2021

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187 GERMANY

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

andrene.a.alexander@usace.army.milEMAIL:(+49)(0)611-9744-2798TEL:

ANDRENE A ALEXANDER / ADDED BY UPASS

W912GB21Q0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 26-Aug-2021 05:00 PM to 16-Sep-2021 05:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

PRICE SCHEDULE

PRICE SCHEDULE

RENOVATE ORPHANAGE

JOGEVA, ESTONIA

07 September 2021

Offerors shall provide pricing for all base and option items.

The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Solicitation. It also includes preparation of all documents, submittals, and schedules;

inspections; and compliance with all technical, quality control, administrative, and safety requirements.

All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.

Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Solicitation for the period of performance for all base and option items.

Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Solicitation for the liquidated damages for all base and option items.

Option Items: The Government reserves the right to award the options up to 90 calendar days from contact award. Exercising the options will not extend the base period of performance. See Section 01 22 00 for additional information regarding the award of options.

Item No. Title Quantity Unit Unit Price Amount

BASE ITEMS

2-Story Portion Exterior

Renovation 1 Job $ $

2-Story Portion Roof

Replacement 1 Job $ $

Total of Base Items 0001 - 0002 $

OPTION ITEMS

0003 Interior Renovations 1 Job $ $

1-Story Portion Exterior

Renovation 1 Job $ $

Item No. Title Quantity Unit Unit Price Amount

1-Story Portion Roof

Replacement 1 Job $ $

Basement Exterior

Waterproofing 1 Job $ $

0007 Exterior Improvements 1 Job $ $

Total of Option Items 0003 - 0007 $

Total of all Base and Option Items

EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government.

In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

-- END OF PROPOSAL SCHEDULE --

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

01/21

PART 1 GENERAL

1.1 PAYMENT TYPES

The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 0001).

1.1.1 Single Job Payment Items

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

1.3 SCHEDULE OF ITEMS: BASE ITEMS

1.3.1 Base Item 0001: Two-Story Portion Exterior Renovation

Unit of Measure: Job.

Payment will be made for costs associated with the renovation of existing two-story portion of the orphanage which includes installation of exterior insulation finish system (EIFS), replacement of the exterior stairwell and new associated lighting, replacement of the exterior windows and doors and associated interior minor patch work as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

1.3.2 Base Item 0002: Two-Story Portion Roof Replacement

Unit of Measure: Job.

Payment will be made for costs associated with the renovation of existing two-story portion of the orphanage which includes replacement of the roof and insulation, as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

1.4 SCHEDULE OF ITEMS: OPTION ITEMS

1.4.1 Awarding of Options

The Government reserves the right to award any option or combination of options in any order and the exercise of any option will not commit the Government to award any other option(s).

1.4.2 Option 1: Interior Renovations

Payment will be made for costs associated with the renovation of existing two-story which includes the electrical supply, minor plumbing repairs, and new mechanical ventilation system and associated minor patch work, as indicated in the SECTION 01 10 10 and shown on the conceptual layout. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

1.4.3 Option 2: Item 0004: One-Story Portion Exterior Renovation

Payment will be made for costs associated with the renovation of existing one-story portion of the orphanage which includes installation of exterior insulation finish system (EIFS), replacement of the exterior windows and doors and associated interior minor patch work as indicated in SECTION 01 10 10 and the conceptual layout.

1.4.4 Option 3: Item 0005: One-Story Portion Roof Replacement

Payment will be made for costs associated with the renovation of existing two-story portion of the orphanage which includes replacement of the roof and insulation, as indicated in SECTION 01 10 10 and the conceptual layout.

1.4.5 Option 4: Item 0006: Basement Exterior Waterproofing

Payment will be made for costs associated with the exterior waterproofing of basement walls as indicated in SECTION 01 10 10 and the conceptual layout.

1.4.6 Option 5: Item 0007: Exterior Improvements

Payment will be made for costs associated with the exterior lightning protection, sanitary line replacement, and installation of 2 new hose bibs, as indicated in SECTION 01 10 10 and the conceptual layout.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section -

(End of Summary of Changes)

File details come from the government source that posted it. Updated .