About this file
This document contains an experience information sheet attachment for a federal solicitation. The solicitation will award multiple indefinite-delivery, indefinite-quantity construction management at risk contracts for real property repair, maintenance, design build, environmental work, and force protection services in Latvia and Lithuania. Offerors must provide details on at least five past projects demonstrating relevant experience, including project name, role, cost, location, completion date, and a description of construction work performed. Projects must be at least 50% complete by the closing date. The solicitation number is W912GB20R0015 and is issued by the Department of the Army European Command to provide construction services for U.S. forces and facilities in the region.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
Fiscal Year 2020 Latvia and Lithuania DB DBB MATOC W912GB20R0015
EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 (project number is taken from column 1 on Attachment 1) Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name:
Experience:
1. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).
2. The final cost of this project: $_________________________
3. The location the work was performed is: ___________________________________
4. The day, month, and year work was completed: _______________
5. Is this project more than 50% complete by the closing date of this solicitation? ____ Yes ____ No
6. Work involves Design Build or Design Bid Build work ____ Yes ____ No (see RFP Section 00 22 00 for further details)
7. Describe the nature of the work. Do not provide a listing of existing or previous contracts, but rather provide detailed information of the construction work.
(Continue typing if required to provide more information)
ATTACHMENT 2
Fiscal Year 2020 Latvia and Lithuania DB DBB MATOC W912GB20R0015
ATTACHMENT 2 - EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2