B.08.03.2_Amendment_0002_W912GB19R0050.pdf

PDF 371 KB Posted

Attached to
Range Control Building and Non-Ballistic Shoot House in Thies, Senegal
Solicitation number
W912GB19R0050
Issued by

About this file

W912GB19R0050 Amendment 0002

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to provide revised SOW dated 12 July 2015 for the Non-Ballistic Shoot House project. Tracked changes are provided w ithin the document.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912GB19R0050

X 9B. DATED (SEE ITEM 11)

26-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2019

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB19R0050

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The following have been modified:

TABLE OF CONTENTS

TABLE OF CONTENTS

SECTION 00 00 00 Procurement and Contract Requirements SECTION 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule SECTION 00 21 00 Instructions - Submission Requirements SECTION 00 21 16 Instructions to Proposers SECTION 00 43 00 Bid Bond Form SECTION 00 45 00 Representations and Certifications - Clauses SECTION 00 70 00 Conditions of the Contract – Contract Clauses

SOLICITATION ATTACHMENTS

ATTACHMENT 1 – A.02.16 ar122a_Range Control_011010_30MAY2019 ATTACHMENT 1.1 – A.02.16 ar122_Att 1_Location Map ATTACHMENT 1.2 – A.02.16 ar122_Att 2_Conceptual Site Plans ATTACHMENT 1.3 – A.02.16 ar122_Att 3_Conceptual Floor Plans ATTACHMENT 1.4 – A.02.16 ar122_Att 4_Room Data Sheets ATTACHMENT 1.5 – A.02.16 ar122_Att 5_Structural Calculations Guideline ATTACHMENT 1.6 – A.02.16 ar122_Att 6_Shoothouse Demolition ATTACHMENT 2 – A.02.16 ar122b_Shoot House_011010_12JUL2019 (Revised via Amendment 0002) ATTACHMENT 3 – Price and Payment Procedures ATTACHMENT 4 – Past Performance Questionnaire – 19R0050 ATTACHMENT 5 – Bank Letter of Assurance Template – 19R0050 ATTACHMENT 6 – Bank Letter of Guaranty Template – 19R0050 ATTACHMENT 7 – Specifications Binder – 19R0050 ATTACHMENT 8 – Experience Information Sheet – 19R0050 ATTACHMENT 9 – Experience Overview Sheet – 19R0050 ATTACHMENT 10 – Preproposal Conference Attendee Sheet – 19R0050

Includes the following Specifications:

00 74 00 - SPECIAL CONDITIONS

00 74 02 - TIME EXTENSIONS FOR UNUSUALLY SEVERE WATHER (NAU)

01 30 00 - GENERAL REQUIREMENTS (NAU)

01 32 01 - PROJECT SCHEDULE (NAU)

01 32 16 - SMALL PROJECT PROGRESS SCHEDULES (NAU)

01 33 00 - SUBMITTAL PROCEDURES (NAU)

01 33 16 - DESIGN AFTER AWARD (NAU)

01 35 26 - SAFETY REQUIREMENTS (NAU)

01 45 00 - QUALITY CONTROL (NAU)

01 45 01 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) (NAU)

01 45 05 - CONTRACTOR SITE PERSONNEL REQUIREMENTS (NAU)

01 45 10 - DESIGN QUALITY CONTROL (NAU)

01 45 35 - SPECIAL INSPECTIONS (NAU)

01 78 00 - CLOSEOUT SUBMITTALS (NAU)

01 78 23 - OPERATION AND MAINTENANCE DATA (NAU)

W912GB19R0050

Construction Signs (EN)

(End of Summary of Changes)

File details come from the government source that posted it.