US Army Corps of Engineers Europe District
APO AE 09049
ar122a
Statement of Work
IAF-18-0014 (A)
Range Control Building Thies, Senegal
Prepared by:
Design Section
Engineering Branch 30 May 2019
011010 Statement of Work Range Control Building - Thies, Senegal
3-Jun-19 Page 2 of 47
SECTION 011010
STATEMENT OF WORK
SECTION TABLE OF CONTENTS;
1 GENERAL
2 CIVIL AND GEOTECHNICAL
3 ARCHITECTURAL
4 STRUCTURAL
5 ELECTRICAL AND COMMUNICATIONS
6 MECHANICAL
ATTACHMENTS
Att. # 1 Location Map Att. # 2 Conceptual Site Plan Att. # 3 Conceptual Floor Plan Att. # 4 Room Data Sheets
Att. # 5 Structural Calculations Guideline Att. # 6 Shoot House Demolition (Not Applicable to this SOW)
1.0 GENERAL
1.1 PROJECT DESCRIPTION
The Request for Proposal (RFP) is for a design-build project of a single story range control building with an approximate gross area of 360 m2 having concrete and masonry walls and a sloped metal roof located in Thies, Senegal.
The project includes the following general items of work, detailed requirements are contained elsewhere in this Statement of Work (Refer to Attachment #2 “Conceptual Site Plan”):
a. Clear, grub, and grade site;
b. Construct new range control building;
c. Connect new range control building to existing electrical utilities and water supply line;
d. Provide new septic system;
e. Provide site improvements;
f. Provide new generator pad, conduit, and automatic transfer switch (ATS); and
g. Provide new generator.
1.2 GENERAL REQUIREMENTS
The Contractor must deliver fully functional, turnkey type facilities (without furniture) as described in this document. The work includes - but is not limited to - design, demolition, fabrication, delivery, installation, construction, and site work. The facility and the installed equipment must be permanent construction.
The facility in this project must be complete and usable to meet codes and technical and functional requirements per this Statement of Work (SOW). The proposal price must include all design, calculations, approvals, certificates, fees, labor, material, equipment, direct overhead, indirect overhead, general and administrative expenses (G&A) and general conditions to complete this project as described in the SOW.
These design and product requirements are minimum requisites. Compliance with the provisions of this section by subcontractors is the responsibility of the Contractor.
3-Jun-19 Page 3 of 47
1.2.1 BASE ITEMS AND OPTIONAL ITEMS
This Statement of Work addresses the technical requirements necessary to complete all work associated with this project. For information and requirements regarding the allocation of pricing between elements of the work, refer to Specification Section 01 22 00 PRICE AND PAYMENT PROCEDURES. The Schedule of Items identifies the breakdown between the individual base items and optional items for all work identified in this Statement of Work, associated drawings, and attachments. All work as described in these documents is included in either the Base or Optional Items. Consider all items not specifically identified in the Optional Items as part of the Base Items.
1.3 FUNCTIONAL AREAS AND SPACE ADJACENCIES
Refer to the attached drawings for a depiction of the required functional areas and spatial adjacencies for the site and new facilities/structures.
1.4 SUBMITTALS
Government approval is required for submittals with “G” designation; submittals not having a “G” are for Contractor Quality Control approval. When used, a designation following the “G” designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Pre-construction Submittals
Inspection Plan; G
SD-05 Design Data
65% Pre-Final Design; G, DO
95% Final Design; G, DO
100% Corrected Final Design; G, DO
SD-06 Test Reports
Test Results and Reports; FIO
1.4.1 DESIGN SUBMITTALS
Provide a complete design package at each milestone, as described in Specification Section 01 33 16 DESIGN AFTER AWARD. The milestones for this project are indicated above in Section 1.4 SUBMITTALS. The specific requirements of each milestone are described in each discipline-specific section of this Specification.
Submit all documents in electronic format (.pdf for text and calculations, .pdf and .dwg (AutoCAD, latest version) for drawings). See Specification 01 33 00 SUBMITTAL PROCEDURES for additional information.
1.4.2 TEST REPORTS
Provide all test results and reports identified in this SOW to the Government as a submittal in accordance with Specification Section 01 33 00 SUBMITTAL PROCEDURES.
Submittals will be considered for information only (FIO) submittals unless specifically identified as a submittal requiring government approval. Coordinate with the COR after award for the specific items to be included in the submittal register.
1.5 MATERIALS AND EQUIPMENT
Materials and products used must be durable, heavy duty, industry standard. The equipment must be the manufacturer’s standard quality and must be compatible with
3-Jun-19 Page 4 of 47 all other equipment and materials within the system or assembly. Equipment and materials must include all connections and accessories necessary to ensure operability and correct installation according to manufacturer’s requirements.
Provide a nameplate secured to each major piece of equipment. Each nameplate must have the manufacturer’s name, address, contact information, type or style, model or serial number, and catalog number. The definition of a “major piece of equipment” is at the discretion of the COR.
1.5.1 LIFE-SPAN
Construction must have an expected life span of 25 years.
1.5.2 MAINTAINABILITY
Provide low maintenance materials and systems appropriate for the project climate and location.
1.5.3 OPERABILITY
Systems (including but not limited to architectural, electrical, communications, and mechanical systems) must be simple to operate and easy to maintain.
1.5.4 STANDARDIZATION
Provide standardized materials, products, equipment, and systems to minimize the requirements for replacement parts, storage facilities, and service requirements.
1.5.5 SOURCING
Use materials, products, equipment, and systems that can be replaced, repaired, maintained, and/or serviced locally in Senegal.
1.6 DESIGN DIMENSIONS
The design must be developed using the metric system.
1.7 DESIGN CRITERIA
Project design, site facilities, utility systems and material standards must be in accordance with the latest editions of the Host Nation building codes. In the absence of Host Nation building codes, use the International Building Code (IBC) and codes, technical standards, and regulations referenced in this RFP.
While this RFP references various source standards and specifications, all design documents must meet Host Nation codes and requirements. It is the designer's responsibility to demonstrate that the Host Nation standard is equal to the cited standard or specifications being supplanted. Apply the more restrictive standards when conflicts arise between the requirements of this RFP and any referenced or other applicable codes, standards or regulations. If equivalency cannot be met, use the more stringent requirement and quote both codes verbatim in correspondence to the COR. The designer is responsible to determine the required material and execution standards where specific standards are not indicated.
Provide an electronic copy of the local Host Nation standards and building codes in their original language as related to facility design and construction.
1.8 DESIGN CONFERENCES AND MEETINGS
The Contractor and the entire design team are required to participate in a design review conference for each design submittal. The Contractor may request a review conference, but the Government is under no obligation to conduct or participate in a review conference unless specifically identified in the contract documents. The Contractor must bring the personnel that developed the design submittal to any review conference.
3-Jun-19 Page 5 of 47
All design review conferences must be held via teleconference or be reviewed and comments resolved via email.
The Contractor is responsible for taking meeting minutes during each design review conference and submitting to the COR for information and approval.
The Contractor is responsible for evaluating all Government comments prior to each design review conference. The Contractor is responsible for resolving all Government comments from each design phase. The Contractor must provide annotated responses to each design review comment with the subsequent design submittal packages. Construction may not begin until all Government comments from all design phases have been resolved.
1.9 SPECIAL CONSTRUCTION REQUIREMENTS
1.9.1 THIRD PARTY INSPECTION SERVICES
Furnish independent 3rd party inspection services to inspect the electrical and structural construction features of the project. The 3rd party must not be the same company responsible for the electrical or structural installation. This is in addition to the Contractor Site Personnel Requirements contained in 01 45 05 CONTRACTOR SITE PERSONNEL REQUIREMENTS. All testing is at the expense of the Contractor. Submit a plan for third party services to the COR. The inspection plan must be approved by the COR prior to construction.
1.9.1.1 GENERAL REQUIREMENTS
3rd Party inspectors must submit professional reports directly to the COR, without coordination with the Contractor, within 48 hours of the actual inspection. The report must contain the following at a minimum: names of all persons present for activity, listing and approval of all related materials, description of observed activity, and 10 photos (minimum resolution: 1504x1000) of the observed activity
1.9.1.2 THIRD PARTY ELECTRICAL INSPECTOR REQUIREMENTS
The electrical inspector must be a certified Master electrician or licensed degreed Electrical Engineer and have a minimum of 10 years' experience, 5 years in the country where the project work is performed. Submit the inspector’s CV (Resume) to the COR for Government approval.
The following inspections must be conducted at a minimum: all outlets, off-cover inspection of all panels, verify that GFCI is present on all panels, municipal power connections, lightning protection installations, and generator installations.
Submit a plan and schedule to be part of the QC Plan or a separate submittal to be tracked via the submittal register, indicating the inspection plan and timing.
1.9.1.3 THIRD PARTY STRUCTURAL ENGINEER INSPECTOR REQUIREMENTS
The structural inspector must be a licensed graduate engineer with 10 years of experience, 5 years in the country where the project work is performed. Required experience includes, but is not limited to, inspecting concrete moment frame, concrete foundations, roof system and rebar and form work. Submit the inspector’s CV (Resume) to the COR for Government approval.
Submit an inspection plan and schedule of inspections to be part of the QC Plan or a separate submittal to be tracked via the submittal register, indicating the inspection plan and timing.
The following inspections must be conducted at a minimum: Bearing capacity of foundation soils, formwork and rebar of foundations, concrete placement of foundations. Formwork, rebar and concrete pour of moment frame. No concrete may be
3-Jun-19 Page 6 of 47 placed in forms without a preceding rebar inspection report and verification of functioning vibration equipment.
The inspector must review concrete test results and sign off on strength approvals.
END OF SECTION
3-Jun-19 Page 7 of 47
2.0 CIVIL AND GEOTECHNICAL
Provide and perform civil engineering design and construction services as required to provide a complete, accessible, functional and usable project. The Contractor is required to extensively coordinate civil design and construction work with the scope of the other disciplines described in this SOW.
2.1 SCOPE SUMMARY
Civil works for this project include, but are not limited to, site survey, geotechnical investigation, site layout, demolition, earthwork, storm system, sanitary system, water system, and pavement. Refer to the bid schedule for which of these are base bid or optional.
2.2 EXISTING CONDITIONS
The proposed project is located approximately 10km northwest of Thies, Senegal.
(Latitude 14°51’16.67“N, Longitude 17°00’25.90“W). See Attachment#1-Location Map
The property boundary, existing structures, and existing vegetation on the site are shown on Att#2-Conceptual Site Plan. There is no known topographic survey, as-built, or geotechnical information for the site. There are no known environmental protection areas or archeological preservation areas on the project site. The site is relatively flat.
There is no available information on water, sanitary, or storm systems on the site. However, it is assumed that a water connection to a pressurized water system exists within 100 meters of the proposed building location.
Prior to bid, investigate the general and local conditions which can affect the work and/or its cost, including but not limited to:
a. Location, size, material, and condition of existing structures, utilities, pavement, vegetation, and any other features. Site information provided to the Contractor by the Government is not to be considered accurate Site Survey information;
b. Weather, river stages, tides, or similar physical conditions at the site;
c. Surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site and due diligence research.
d. Mobilization and staging.
2.2.1 HAZARDOUS MATERIALS AND CONTAMINATION
There is no prior knowledge of any hazardous materials in the site’s soil.
However, it is possible that hazardous material may be found during excavation.
If hazardous materials are discovered, secure the area per Host Nation requirements, and notify the COR for further instruction.
2.2.2 UNEXPLODED ORDINANCE (UXO) CLEARANCE
There is no knowledge of any UXO material on the available site. If any ordnance material is unexpectedly discovered though, the Contractor must immediately notify the COR, cease work and perform all measures he is required for as per applicable laws and regulations. Once notified of ordnance material, the COR will notify the appropriate authority which will then engage required measures for UXO clearance and unblock the concerned area for further construction work after clearance.
2.3 DESIGN SUBMITTALS
Provide civil design submittals in accordance with RFP Section 01 33 16, DESIGN AFTER AWARD and SOW Section 1.0 – GENERAL. The submittals required for this project are stated in SOW Section 1.0 – GENERAL. Below are the contents required for each submittal.
65% Design Submittal:
3-Jun-19 Page 8 of 47
a. Preliminary Design Analysis of civil features.
b. Final Site Survey (include in the Design Analysis).
c. Final Geotechnical Report (include in the Design Analysis).
d. Final Existing Conditions Plan.
e. Pre-Final Demolition Plan.
f. Pre-Final Site Layout Plans - Indicate existing and proposed Civil features.
Include other disciplines’ features (faded back) that affect the Civil Design (buildings, mechanical structures, electrical utilities, etc).
g. Pre-Final Grading Plans, Profiles, Cross Sections, and Details, including contours, spot grades, slopes and finish floor elevations.
h. Pre-Final Pavement Plans, Profiles, Cross Sections, and Details
i. Pre-Final Utility (Storm, Sanitary, and Water) Plans, Profiles, Cross
Sections, and Details.
j. Pre-Final Fencing and Outdoor Furnishings Plans
k. Pre-Final Civil Specifications.
95% Design Submittal:
Update all items from the 65% Design Submittal to 95% (Final) Design. Incorporate all 65% design comments.
100% Submittal:
The 100% Submittal provides a complete and final set of contract documents ready for construction. Update all Final submittals from 95% to a corrected Final submittal. Address all previous government review comments before submitting.
2.3.1 DESIGN ANALYSIS
Provide a Design Analysis for all Civil features that documents significant design choices and substantiates design compliance with contract requirements, applicable codes and standards. Documentation includes narrative, calculations, photographs, sketches, and catalog cut sheets. Reference all applicable regulations, standards, and criteria for the design. Reference sources are subject to Government approval. Provide design assumptions. For design choices, discuss alternative systems considered, and provide rationale for the selected alternative.
The Design Analysis includes but is not limited to:
a. Discussion of Site Layout constraints and design decisions, including but not limited to, land use, vehicle and pedestrian access, orientation of features on-site, setbacks from site features, minimizing utility lengths, minimizing earthwork and tree removal, and future expansion.
b. Discussion of Demolition constraints and design decisions. Include discussion on how access will be provided during construction, and how each utility will be maintained and operated during construction.
c. Discussion of Earthwork and Site Grading constraints and design decisions.
Provide cut and fill calculations. Provide retaining wall calculations.
Provide slope stability calculations for slopes steeper than 2H:1V or slopes supporting proposed structures. Include pertinent geotechnical information that affects earthwork. Provide documentation for the 100 year flood elevation determination.
d. Discussion of Sanitary system constraints and design decisions. For each section of pipe, include analyses indicating pipe size, friction factor, length, elevations at each end of pipe, slope, design flow (Q), maximum flow capacity, design depth of flow, design percentage full, and design flow velocity. Provide calculations for sizing of structures, including, septic tanks and infiltration structures. Provide calculations on the pipe’s structural capacity if the pipe is shallower than required in section 2.10- Utilities. Include pertinent geotechnical information that affects the sanitary system.
3-Jun-19 Page 9 of 47
e. Discussion of Water system constraints, design decisions and source. Provide calculations to demonstrate water system meets project requirements, including demand, water pipe sizing, design water pressure and flow rates at the building. Provide calculations on the pipe’s structural capacity if the pipe is shallower than required in section 2.10-Utilities.
f. Discussion of Pavement constraints and design decisions. Include pertinent geotechnical information that affects the pavement design.
g. Site Survey as an appendix.
h. Geotechnical Investigation and Report as an appendix.
2.3.2 DESIGN DRAWINGS
Provide Civil design drawings of sufficient detail to address the requirements of each design submittal. Civil drawings include plans, profiles, cross sections, and details of Civil features for the project. Design drawings include all necessary information (labeling, dimensioning, legend, details, notes, etc.) to allow for complete understanding and constructability of all proposed features. Provide comprehensible differentiation between features that are proposed, existing, future, or proposed to be demolished by use of appropriate choice of line styles, line weights, and/or colors. Reference USACE A/E/C Graphics Standard for graphic requirements.
2.3.3 SPECIFICATIONS
Provide Civil specifications of sufficient detail to address the requirements of each design submittal. Specifications, when combined with the design drawings, allow for complete understanding and constructability of all proposed Civil features. Specifications may be notes on the Civil design drawings as an alternative to a separate specifications document.
2.4 DESIGN CRITERIA
Provide civil design in accordance with Host Nation codes. In the absence of Host Nation codes, use the latest release of the International Building Code (IBC) and the following codes and technical standards:
a. Uniform Facility Criteria (UFC) 3-201-01, Civil Engineering
b. UFC 3-220-01, Geotechnical Engineering
c. UFC 3-230-01 Water Storage, Distribution, and Transmission
d. UFC 3-240-01 Wastewater Collection
e. USACE A/E/C Graphics Standard (ERDC/ITL TR-12-1)
f. USACE AED Design Requirements: Sanitary Sewer & Septic System
g. World Health Organization (WHO) Fact Sheet 3.9 – Septic Tanks
2.5 GEOTECHNICAL INVESTIGATION AND REPORT
Perform a geotechnical investigation and assessment of the project site to determine the subsurface conditions and geotechnical parameters for foundation, grading, and utility design. Perform the necessary amount of testing, borings and test pits at depths suitable for the project improvements. Include geotechnical investigation in areas where borrow material will be used. The Geotechnical work must be performed under the supervision of a professional geotechnical engineer registered with the jurisdiction having authority, and the report must be signed by the Geotechnical Engineer. In the absence of Host Nation codes, perform the geotechnical investigation and report per UFC 3-220-01, Geotechnical Engineering and IBC.
Coordinate testing locations with the COR to avoid impact to existing utilities and facility operations. Utility locates, permits, pavement removal and vegetation clearing is the Contractor’s responsibility. Repair disturbed areas with a concrete patch in paved areas, and compacted soil in non-paved areas. The repaired area must be flush with the adjacent surface. Following restoration, stake and flag each of the hole locations with boring identification numbers. In
3-Jun-19 Page 10 of 47 paved areas, use white paint on the paved surface to mark hole locations. Provide a map indicating the borehole and test pit locations.
2.5.1 REPORT
Include, as a minimum, the following information:
a. Description of field work completed and equipment used; names, signatures and stamps of licensed professionals involved; name of drilling company.
b. A description of site subsurface conditions, regional geology, and seismic conditions at the site.
c. Site map of borehole and test pit locations.
d. High resolution color digital photographs of each borehole and test pit location.
e. Test pit logs with classification of all subsurface materials. The logs must distinguish fill materials from native materials, include all in‐s i t u t es t results, and include groundwater depth information, if groundwater is encountered. Distinguish between bedrock and rock boulders.
f. Reports of all the field and laboratory testing.
g. Recommendations for allowable bearing capacity, expected settlement, type of foundation, minimum footing and grade beam dimensions, lateral earth pressure parameters, and minimum depth of foundation for footing and grade beams.
h. Recommendations for preparation, placement, and compaction of onsite soils, borrow material, soil replacement, soil amendment/treatment, structural fill, topsoil, and trench backfill. Include dewatering and temporary retaining structure needs.
i. Recommendations for pavement design and construction.
j. Recommendations for the storm and septic systems involving infiltration.
k. Calculations to support conclusions and recommendations
2.5.2 DESIGN DRAWINGS AND SPECIFICATIONS
On the design drawings and/or specifications, include geotechnical information that affect the design of the project, including but is not limited to, boring locations, boring logs, groundwater and frost depths, and any details that convey requirements for site preparation.
2.6 SITE SURVEY
Provide a topographic survey from a licensed surveyor that includes all existing site information needed to design and construct the project. Include x, y, and z coordinates to the nearest 0.005 meters, dimensions, material, and basic characteristics of all features within the project site limits, as well as all features outside of the project site limits that will affect the design and construction of the project. Research record drawings to obtain utility and pavement information that is not visible from the surface. Provide notes indicating the sources and any limitations or assumptions of the data. Provide a copy of the survey in CAD, in addition to the paper/electronic requirements of the Design Analysis. Locate and show on the topographic survey the following information:
a. Property boundary, public right of way, and easements. Include the address numbers, street names, and easement records.
b. Survey monuments and benchmarks. Include description.
c. Spot elevations covering the entire survey limits showing high points, low points, grade changes, and at sufficient intervals to represent the general character of the terrain.
d. Contours in intervals of 0.25 meters.
e. Buildings and other miscellaneous structures. Provide finish floor elevation.
f. Pavements. Include pavement type, thicknesses, joint patterns, and pavement markings.
g. Surface Drainage Features. Indicate normal water level for water bodies.
3-Jun-19 Page 11 of 47
h. Utility lines and structures. Include rim elevations and invert elevations for utility structures; identification of lines as underground or aboveground;
pipe sizes and materials.
i. Fences. Include height, material, direction of outrigger, gate locations and types.
j. Signs. Include sign text.
k. Trees/Woods. Locate trees over 150 millimeter diameter at chest height, and include tree species, diameter at chest height, and dripline diameter.
l. Geotechnical boring locations.
m. North arrow and scale of drawing.
n. Legend depicting the symbols and abbreviations used on the drawing.
o. Horizontal and vertical coordinate systems, date of survey, licensed surveyor name and license number.
Site information provided to the Contractor by the Government is not to be considered accurate Site Survey information. Utility field locates and as-built research are the responsibility of the Contractor.
Reference UFC 3-201-01, Civil Engineering, Section 2-2.2-SURVEYING for survey requirements. In the absence of the Host Nation’s horizontal and vertical coordinate system, use the Universal Transverse Mercator (UTM) coordinate system, and base vertical coordinates on sea level.
2.7 SITE LAYOUT
Locate the proposed building and other improvements as indicated on Attachment #2
– Conceptual Site Plan. Amend the site layout as determined by the site-specific constraints, the owner’s preferences, accessibility, future expansion, and opportunities that are identified and evaluated as part of the Contractor’s scope of work. Locate the proposed building a minimum of 3 meters away from existing buildings. Locate the proposed building outside the dripline of existing trees.
Align the proposed building on the same axis as adjacent buildings and property lines.
The Contractor is responsible for all aspects of the project whether they are shown on the conceptual plan or not.
2.8 DEMOLITION
Remove existing structures, utilities, pavement, vegetation, and any other features to construct the proposed improvements. Any contaminated soils discovered will require special testing and disposal per Host Nation requirements.
2.8.1 CONSTRUCTION LIMITS
Do not disturb the project site beyond necessary for installation of proposed construction. Do not disturb any areas past the site’s property line. Show demolition work and limits of disturbance in the drawings. Stake-out the limits of disturbance on-site with temporary fencing before beginning construction.
2.8.2 ITEMS TO REMAIN IN PLACE WITHIN CONSTRUCTION LIMITS
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the COR. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded.
Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the COR prior to performing said work.
2.8.3 TREE DEMOLITION
Unless otherwise noted on Att#2-Conceptual Site plan, protect trees larger than 150mm diameter at chest height within the project site which might be damaged
3-Jun-19 Page 12 of 47 during construction, with a 1.8 m high fence around the dripline of the tree(s), which is assumed to be the extent of the tree’s roots. Mitigate for tree removal per Host Nation requirements.
2.8.4 UTILITY DEMOLITION
Any existing utilities encountered within the site boundary that are impacted by this project must be protected, or relocated if protection is not feasible.
Relocate existing utility mains outside the structural zone of influence of proposed buildings and structures. Utilities impacted by this project that require decommissioning, or that are already out of service, must be removed up to the utility main and capped. Manholes or underground structures to be abandoned must be removed to a minimum depth of 50 centimeters below finish grade. Fill abandoned manhole or structure per Section 2.9-EARTHWORK requirements.
2.8.5 DUST, DEBRIS, AND EROSION CONTROL
Prevent the spread of dust, debris, and erosion from the project site. Install erosion control measures before beginning construction. Sweep pavements as often as necessary to control the spread of debris. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, erosion, or pollution. Remove snow, dust, dirt, and debris from work areas daily.
Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
Reference RFP Section 00 74 00-SPECIAL CONDITIONS and 01 30 00-GENERAL REQUIREMENTS for additional demolition, protection, and permitting requirements.
2.9 EARTHWORK
Perform all earth work necessary for the installation of the proposed improvements.
The Contractor is responsible for defining earthwork requirements in the plans and specifications. Include requirements for satisfactory material, borrow material, structural fill, topsoil, utility trenches, replacement and improvement of on-site soils, soil compaction (for subgrades of structures, paving, and landscaped areas), compaction for utility trenches, maximum lift depths, density testing frequency, maximum temporary and permanent slopes, and engineered support systems.
The earthwork requirements must not conflict with the recommendations in the Contractor-provided Geotechnical Report.
Remove and save topsoil (approximately first 20 centimeters of excavation). When restoring the site to finish grade, place topsoil back in excavated areas that do not include proposed paving or structures. Excavated material (below topsoil), if satisfactory for reuse per the Geotechnical Report, may be used on the project site where fill is required. Unsatisfactory material may be disposed of on-site in a location approved by the COR. Borrow material may be required for construction from sources off site. Borrow materials are to be free of hazardous materials and contaminants. Any soil brought in from off-site sources must be certified clean.
In the absence of Host Nation requirements and geotechnical recommendations, fill and backfill must be placed in layers of 20 centimeters loose thickness and compacted to a minimum 95% of the maximum dry density as determined by Host Nation test method equivalent to ASTM D-1557 (Modified Proctor test). Provide density tests on all lifts at a frequency of 1 test per 40 square meters for foundations and parking, and 1 test per 30 meters of road and utility trench. Round up to nearest whole number (i.e. a 25 square meter foundation requires one test). The location of all tests must be selected by the Contractor’s geotechnical engineer, and copies of all test results must be furnished to the COR. All structure foundation excavations must be inspected and approved by the Contractor’s
3-Jun-19 Page 13 of 47
Geotechnical Engineer prior to placing concrete. Repair earthwork areas as recommended by the Contractor’s Geotechnical Engineer, and approved by the COR.
Provide engineered soil support systems (i.e. shoring) as required for the construction of the proposed improvements. The Contractor is responsible for all dewatering necessary for earthwork.
2.9.1 SITE GRADING
Provide site grading that directs storm water runoff away from buildings and structures either by drainage systems or by grading as follows:
a. Finished grades of earth/grass/gravel surfaces adjacent to buildings and structures must slope away from all exterior edges with a minimum slope of 5% for the first 2 meters.
b. Finished grades of paved surfaces adjacent to buildings and structures must slope away from all exterior edges with a minimum slope of 2% for the first 2 meters.
c. Finished grades must not create stagnating water or ponding anywhere on the project site, nor create ponding on adjacent properties. Provide storm improvements if ponding is unavoidable.
d. Set finished floor elevations a minimum of 15 centimeters above finished grade at the perimeter of the building, with the exception of finished grade at entry points.
e. Set building finish floor elevations at a minimum of 30 centimeters above the local 100 year flood level.
The Contractor must limit proposed landscape slopes to a maximum 4H:1V.
2.10 UTILITIES
This section applies to all project underground utilities located outside the building, including but not limited to, sanitary sewer, water supply, storm drainage, electrical, communications, gas, liquid fuel, and heat.
Provide utility main alignments a minimum of 3 meters outside the footprint of proposed structures. Provide utility line depths, bedding, and backfill as required by applicable requirements and geotechnical recommendations. Minimum cover over pipes is 0.6 meters; greater than frost penetration; or sufficient to support imposed dead and live loads for the pipe materials used; whichever is more stringent. Place plastic warning tape along the route of the buried pipe after installation at a height of 0.3 meters above the pipe.
Coordinate all required installation, relocation, improvement and protection of utilities held by third party (e.g. public or private utility). This includes coordination of any work to be performed by the utility owner. Choice of materials and products for utility installation must be coordinated with the utility owner (customer or third party) to ensure proper integration and compliance with existing systems and allow for easy maintenance and repair of the utilities in the future.
Provide corrosion protection for utilities that provides the minimum life expectancy specified in GENERAL Section 1.0. Any piping or equipment exposed to sunlight must be coated with protective coatings suitable for UV exposure with a minimum expected coating life of 10 years before recoating.
2.10.1 STORM SYSTEM
Connect the proposed building roof gutters and downspouts to a gravity storm drainage system that directs runoff away from improvements, does not cause erosion, and eliminates ponding. The proposed storm system may discharge offsite to an approved location, or to an on-site infiltration system if the Geotechnical Report supports infiltration. Locate infiltration facility a minimum of 3 meters
3-Jun-19 Page 14 of 47 from buildings and the dripline of trees. A pump system is not allowed. In the absence of host nation standards, design the storm drainage system per UFC 3-201- 01, Chapter 3-Storm Drainage Systems.
2.10.2 SANITARY SYSTEM
Provide a septic system with tank, drainfield, piping, and all appurtenances.
Size the system based on the occupancy and a 5 year maintenance schedule of pumping of the septic tank. Provide geotechnical fabric between soil and drainfield to prevent clogging of the drainfield. Locate the sanitary system to allow for maintenance and cleaning. The system must have the ability to be monitored and pumped out. Locate the septic tank a minimum of 1.5 meters from buildings. Locate the drainfield a minimum of 3 meters from the septic tank, structures, and outside the dripline of trees. The system must work by gravity.
A pump system is not allowed. In the absence of Host Nation requirements, design the sanitary system per IBC, UFC 3-240-01, Wastewater Collection and WHO Fact Sheet 3.9 and USACE AED Design Requirements: Sanitary Sewer & Septic System.
After installation, test sanitary lines and structures for leakage and deflection per local codes. Provide test results to the COR. Locate and repair any sections failing to pass the required tests. Repeat the specified tests and inspections on the repaired sections.
See SOW Section 6.0 – MECHANICAL for indoor sanitary scope.
2.10.3 WATER SYSTEM
Provide a water system to connect the proposed building to the site’s existing water system as shown in Att#2-Conceptual Site Plan. Design the system to meet all flow requirements of the facility. Provide a meter at the water connection point that is accessible by a third party utility. In the absence of Host Nation requirements, design the water system per the IBC and UFC 3-230-01, Water Storage, Distribution, and Transmission.
After installation, test water supply lines according to local codes for leakage.
Before the water supply line is put into final operation, disinfect the line, and then flush the line to remove traces of the sterilization agent. Test treated line for coliform bacteria. Provide test results to the COR. Locate and repair any sections failing to pass the required tests. Repeat the specified tests and inspections on the repaired sections.
See SOW Section 6.0 – MECHANICAL for indoor water scope.
2.11 PAVEMENT
Provide minimum 1 meter wide, 10 centimeter thick portland cement concrete (PCC) building apron around the entire building. Install concrete over minimum 10 centimeters aggregate. Install the top of the apron a minimum of 10 centimeters above the adjacent ground. Increase thickness of concrete at edge with adjacent ground so that there is a minimum of 10 centimeters of bury on the concrete.
Provide expansion joint between building and apron. Provide medium broom finish
Provide PCC slab for use as a generator pad for proposed generator discussed in Section 5-Electrical. Provide medium broom finish.
For PCC, reference SOW Section 4.0 - STRUCTURAL for concrete requirements.
Perform subgrade tests for all pavements as described in Section 2.9 - EARTHWORK.
2.15 MOBILIZATION / STAGING / PERMITS
Locate mobilization and staging within the footprint indicated on Attachment #2 – Conceptual Site Plan. Locate mobilization and staging to areas that do not
3-Jun-19 Page 15 of 47 disrupt operations at the installation. Reference RFP Section 00 74 00-SPECIAL CONDITIONS for other mobilization, access, and permit requirements.
3-Jun-19 Page 16 of 47
3.0 ARCHITECTURAL
3.1 PROJECT DESCRIPTION
Design and construction work of a new single-story concrete and masonry range control building with sloped roof in Thies, Senegal. Refer to Attachment #3 “Conceptual Floor Plan” and Attachment #4 “Room Data Sheets” for the functional, spatial, finish, and equipment requirements of this facility.
Extensive coordination will be required between the architectural work and the civil, geotechnical, structural, electrical, and mechanical requirements of this project.
3.1.1 DESIGN
Provide a design and construction package that uses the space allocations, functional adjacencies, design details, and features given or referenced in this RFP. The design must incorporate all referenced codes and regulations. The Contractor is responsible for creating additional details as required to complete a full design. All details must conform to the requirements of this RFP and are subject to the approval of the COR. A schematic design has been attached for reference. The schematic plans are provided for diagrammatic purposes only and do not necessarily represent an approved floor plan or design. The Contractor is responsible for providing a design that meets all requirements of the User and the codes and criteria referenced in this Statement or Work.
3.1.2 DESIGN SUBMITTALS
Provide all architectural submittals after contract award in accordance with Section 01 33 16 DESIGN AFTER AWARD and Section 01 33 00 SUBMITTAL PROCEDURES.
Prepare and submit the documents listed below at the submittals indicated.
3.1.2.1 65% DESIGN SUBMISSION
Include the following drawings and reports as applicable to the project:
a. Code Summary – Provide a tabular life safety code compliance summary;
b. Life Safety Plans – Provide plans depicting smoke/fire resistance ratings, egress routes, dead-end corridors, exist, and other aspects of life safety pertaining to the design;
c. Floor Plans – Provide all floor plans, indicating room names and basic dimensions;
d. Ceiling Plans – Provide reflected ceiling plans for all rooms, indicating ceiling materials and fixtures;
e. Building Elevations – Provide all building elevations indicating all exterior materials;
f. Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage;
g. Building Section – Indicate heights of critical building elements;
h. Wall Sections – Provide a typical interior and exterior wall section describing wall materials;
i. Room Finish Schedule – Provide intended wall, floor, and ceiling finishes for all rooms in the project;
j. Furniture/Equipment Plan – Provide plans showing all intended furniture/equipment (both GFCI and CFCI) and dimension clearances between furniture/equipment and the structure;
k. Outline Specifications – Provide outline specifications for all work and materials; and
l. Preliminary Design Analysis – Provide a narrative indicating how the design and materials meet the requirements of this SOW.
3.1.2.2 95% DESIGN SUBMISSION
The 95% Submittal provides a complete and final set of contract documents essentially ready for construction by the D/B Contractor. All previous government
3-Jun-19 Page 17 of 47 review comments must have been addressed. Include the following drawings and reports as applicable to the project:
a. All documents from the 65% submittal updated to incorporate 65% review comments;
b. Section and Plan Details – Provide enlarged details of critical intersections indicating all materials (roof details, exterior wall details, wall intersections, etc.);
c. Interior Elevations – Provide enlarged interior elevations indicating all materials, finishes, and coordination with other building systems. At a minimum, provide interior elevations for all toilet and shower rooms;
d. Interior Details – Provide details for casework, equipment mounting, ceilings, floor finishes, etc.;
e. Window, Door, and Hardware Schedule – Provide size, function, and material for all windows and doors in the project;
f. Window and Door Details – Provide enlarged details of door and window head, jamb, and sills;
g. Color Board – Provide a material and color board;
h. Detailed Specifications – Provide detailed specifications with line items for all work and materials; and
i. Final Design Analysis – Provide a narrative indicating how the design and materials meet the requirements of this SOW. Include product specific manufacturer information (brochures, technical information, cut sheets) for all materials and products provided/installed.
3.1.2.3 100% DESIGN SUBMISSION
The 100% Submittal provides a complete and final set of contract documents ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include all drawings, specifications and calculations from the 95% Submittal updated to incorporate all previous review comments.
3.2 TECHNICAL CRITERIA AND STANDARDS
Design and construct the project in accordance with the requirements outlined in Section 1.7 DESIGN CRITERIA.
3.2.1 LIFE SAFETY REQUIREMENTS
The Design must meet all Host Nation and local Fire Suppression System codes and requirements.
All structures to be provided must have exits and means of egress that comply with current Host Nation codes and standards, or in accordance with US codes and standards.
In the absence of Host Nation codes and standards, for individual concerns of Life Safety the Contractor must follow appropriate US codes and standards, including the International Building Code (IBC).
3.2.2 HANDICAPPED ACCESSIBILITY REQUIREMENTS
All facilities must meet applicable Host Nation handicapped accessibility requirements. Design the facility to meet the requirements of the Architectural Barriers Act (ABA) to the maximum extent practicable, but full compliance is not required. At a minimum, comply with the following provisions of the ABA:
a. All changes in level must meet the requirements of Section 303 of the U.S.
ADA-ABA Guidelines, 2004.
b. All doors must be designed to meet the door clear width and maneuvering clearance requirements (assume front approach for all doors) of Section 404 of the U.S. ADA-ABA Guidelines, 2004.
c. All toilet rooms must be designed with toilet location and grab bars meeting the requirements of Section 604 of the U.S. ADA-ABA Guidelines, 2004.
3-Jun-19 Page 18 of 47
3.3 GENERAL SCOPE OF WORK
Design the architectural elements of this facility to withstand all site-specific environmental conditions such as wide seasonal temperature swings, local wind, rain, snow and earthquake conditions. All architectural features must be appropriately braced for anticipated seismic activity. The Contractor may propose alternate building materials to meet the facility’s requirements, but final selection of materials is subject to the approval of the COR. Consider economics not only in the initial acquisition, but also in the future maintenance of the materials, when selecting materials and building systems to be incorporated into the project. When requested, the Contractor must provide documentation demonstrating that a chosen alternative material is life cycle cost effective.
3.3.1 RANGE CONTROL BUILDING
Provide a one-story, reinforced concrete and masonry Range Control Building with a sloped, gabled metal roof. Exterior finishes include plastered and painted exterior walls and insulated metal panel roofing. Provide all spaces listed below in accordance with the requirements of this Scope of Work and Attachment #4 “Room Data Sheets.” Refer to Attachment #3 “Conceptual Floor Plan” for a conceptual layout.
Room # Room Name Function Approximate
Size (m2) 101 Entrance
Vestibule Controlled entry into building 12
102 Corridor Circulation space 37 103 Range Operations Open office work area for 16 persons 131 103A Secure Storage High-security secure storage room 12 104 Training Room Meeting room for 14 persons 42 105 Men’s Toilet Single-user toilet 5 106 Women’s Toilet Single-user toilet 5 107 Janitor’s Closet Janitorial and cleaning supply storage 7 108 Office Office for 1 person 17 109 Office Office for 1 person 17 110 Office Office for 1 person 17 111 Electrical Electrical service and distribution for facility
112 Mechanical Mechanical service and distribution for facility
The completed facility must have a gross footprint of approximately 360 m2.
3.4 DETAILED SCOPE OF WORK
The Contractor is responsible for the following specific tasks required for the construction of this facility.
3.4.1 DEMOLITION
The Contractor is responsible for all required demolition as indicated in this scope. Demolition for this project is limited to the demolition scope within Section 2.0 CIVIL AND GEOTECHNICAL.
3.4.1.1 DEMOLITION AND DISPOSAL
All demolished materials must be abated and disposed of in accordance with local laws, codes and regulations. The Contractor is responsible for all required testing before, during and after demolitions as well as for all required compliance with safety standards.
3.4.2 BUILDING SYSTEM AND MATERIALS
3-Jun-19 Page 19 of 47
The intent of this RFP is to allow the Contractor the maximum flexibility to design and construct this facility in an economical manner without sacrificing good engineering practices, quality materials and systems. The Government requires low or no maintenance finish materials to the greatest extent possible. Building materials as described herein for roofing, walls, ceilings, doors, windows and floors are minimum requirements and may require revision based on code compliance and criteria.
Design the architectural elements of this facility to withstand all site-specific environmental conditions such as wide seasonal temperature swings, local wind, rain, snow and earthquake conditions. All architectural features must be appropriately braced for anticipated seismic activity. The Contractor may propose alternate building materials to meet the facility’s requirements, but final selection of materials is subject to the approval of the COR. Consider economics not only in the initial acquisition, but also in the future maintenance of the materials, when selecting materials and building systems to be incorporated into the project. When requested, the Contractor must provide documentation demonstrating that a chosen alternative material is life cycle cost effective.
3.4.2.1 FIRE PROTECTION RATINGS OF INTERIOR FINISHES
All interior finishes must conform to Host Nation fire protection standards/requirements or equivalent US standards/requirements.
3.4.2.2 ACOUSTICAL DESIGN
Doors, walls, floors, and ceilings must meet the minimum sound protection per Host Nation requirements. For all offices and training rooms, and where indicated in Attachment #4 “Room Data Sheets,” provide wall and ceiling construction meeting the requirements for a Sound Transmission Class of 50 (STC-50) with door assemblies rated for STC-35.
3.4.2.3 THERMAL INSULATION
Provide systems meeting the most stringent thermal insulation requirements in accordance with this SOW and HN and local energy and sustainability codes. Minimum R-values and maximum U-factors required by this SOW must be considered minimally acceptable levels of thermal insulation.
3.4.3 EXTERIOR CONSTRUCTION WORK
Provide the following exterior architectural systems.
3.4.3.1 EXTERIOR WALLS
Design and construct new exterior walls in accordance with (IAW) the…