B.08.02.07.03_Att_3_Floor_Plans.pdf
PDF 339 KB Posted
- Solicitation number
- W912GB19R0048
About this file
Attachment 7.3 Floor Plans
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 5
4 6
A
B
C
E
F
G
3.200 6.400 3.200 1.200
1.
3.
4.
4.
0.
3.200 6.400 0.620 3.780
UP
UP
5.8 m²
ELECTRICAL
19.1 m²
STAIR
13.6 m²
SPECIAL
CLOTHING ROOM
18.1 m²
MECHANICAL
11.2 m²
CORRIDOR
19.6 m²
BREAK
ROOM/GYM
2.7 m²
ARCHIVE
1.4 m²
LAVATORY
1.4 m²
TOILET
3.3 m²
SHOWER
009 20.3 m²
DRESSING ROOM
2.1 m²
LAUNDRY
20 20 20 20
22 22
1 : 65A-101
1 SALCININKAI FIRE AND RESCUE STATION - BASEMENT PLAN
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-101
BA
SE
M
EN
T
PL
AN
SA
LC
IN
IN
KA
I F
IR
E
AN
D
R
ES
C U
E
ST
AT
IO
N
SA
LC
IN
IN
KA
I, LI
TH
U
AN
IA
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
ATTACHMENT #3: ANNOTATED DRAWINGS
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE
FOR PROVIDING A DESIGN THAT MEETS ALL APPLICABLE
CODES AND REQUIREMENTS OF THE SOW.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
N
# NOTE
14 DEMOLISH EXISTING DOWNSPOUT. CONSTRUCT NEW TO
DRAIN DIRECT TO NEW STORM WATER MANAGEMENT
SYSTEM.
15 DEMOLISH EXISTING ROOF DRAIN, INSTALL NEW WITH
NEW ROOF MEMBRANE.
16 DEMOLISH EXISTING PARAPET FLASHING. INSTALL NEW
METAL PARAPET CAP FLASHING.
17 EXISTING ELECTRICAL PANEL.
18 CONSTRUCT NEW ANTENNA PLATFORM. PROVIDE
CONDUIT FOR EXISTING COMMUNICATIONS CABLES
FROM ROOM 109.
19 EXCAVATE PERIMETER DRAIN AROUND FACILITY.
CONNECT TO MUNICIPAL STORM SEWER OR DRAINAGE
SWALE.
20 DEMOLISH EXISTING WINDOW AND SILL. INSTALL NEW
INSULATED WINDOW AND SILL.
21 INSTALL NEW EIFS OVER EXISTING EXTERIOR WALL
FINISHES.
22 DEMOLISH INTERIOR DOOR. PROVIDE NEW GLAZED
INTERIOR WOOD DOORS AND STEEL FRAMES.
23 DEMOLISH INTERIOR DOOR. PROVIDE NEW FLUSH PANEL
INTERIOR WOOD DOORS AND STEEL FRAMES.
24 RENOVATE EXISTING SHOWER.
# NOTE
1 EXISTING EXTERIOR STEEL CHIMNEY
2 EXISTING EXHAUST FAN
3 EXISTING PRIMARY BOILER (THERMONA THERM 55 EX/B)
4 DEMOLISH EXISTING BACKUP BOILER (SIME FAMILY) AND
PROVIDE NEW TO MATCH EXISTING PRIMARY BOILER
5 DEMOLISH EXISTING HOT WATER STORAGE TANKS (2 x
200 L) AND EXPANSION TANKS, PROVIDE NEW
6 EXISTING 36V POWER PANEL WITH SCHUKO RECEPTACLE
7 EXISTING WATER DAMAGE AND MOLD GROWTH UP TO 1.0
M ABOVE FINISHED FLOOR (TYPICAL IN BASEMENT).
DEMOLITION ALL INTERIOR FINISHES, REMOVE ALL MOLD
WITH CHEMICAL MOLDICIDE, AND INSTALL NEW FINISHES.
8 DEMOLISH WALLS AND DOOR TO COMBINE ROOMS
9 DEMOLISH EXISTING SHOWER AND INSTALL WATER
CLOSET AND LAV.
10 DEMOLISH EXISTING STEEL PIPE RADIATORS AND
INSTALL NEW EFFICIENT EQUIPMENT
11 DEMOLISH FLAT ROOF AND ANTENNA TOWER.
CONSTRUCT SLOPED HIPPED METAL ROOF
12 DEMOLISH EXISTING ROOF COVERING TO STRUCTURE.
INSTALL NEW INSULATION, ROOF MEMBRANE, AND
FLASHING.
13 DEMOLISH CAP FLASHING ON EXISTING ROOF CHIMNEYS,
INSTALL NEW.
WALLS TO BE DEMOLISHED
3 5
4 6
A
B
C
E
F
G
H
D
5.0 m²
VESTIBULE
19.8 m²
STAIR
19.6 m²
CLASSROOM
12.4 m²
KITCHEN
28.6 m²
LIVING ROOM
17.0 m²
CORRIDOR
14.9 m²
WATCH ROOM
15.1 m²
COMMUNICATIONS
12.4 m²
GUARD ROOM
15.9 m²
CORRIDOR
12.8 m²
TECHNICAL
17.9 m²
HOSE STORAGE
10.7 m²
Room
11.1 m²
HOSE DRYING
TOWER
1.4 m²
LAVATORY
1.4 m²
TOILET
226.2 m²
EQUIPMENT
GARAGE
10.8 m²
STORAGE
10.6 m²
INVENTORY
UP
UP
UP
DN
3.200 6.400 3.200 1.200 4.200
1.
3.
4.
4.
0.
3.200 6.400 0.620 3.780 4.200 21.500
.8
10 10
202020
202020
20 20 20 20
22 22
22 22
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-102
1S T
FL
O
O R
P
LA
N
SA
LC
IN
IN
KA
I F
IR
E
AN
D
R
ES
C U
E
ST
AT
IO
N
SA
LC
IN
IN
KA
I, LI
TH
U
AN
IA
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
D es ig ne r
Au th or
C he ck er
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1 : 65A-102
1 SALCININKAI FIRE AND RESCUE STATION - 1ST FLOOR PLAN
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE
FOR PROVIDING A DESIGN THAT MEETS ALL APPLICABLE
CODES AND REQUIREMENTS OF THE SOW.
N
ATTACHMENT #3: ANNOTATED DRAWINGS
# NOTE
14 DEMOLISH EXISTING DOWNSPOUT. CONSTRUCT NEW TO
DRAIN DIRECT TO NEW STORM WATER MANAGEMENT
SYSTEM.
15 DEMOLISH EXISTING ROOF DRAIN, INSTALL NEW WITH
NEW ROOF MEMBRANE.
16 DEMOLISH EXISTING PARAPET FLASHING. INSTALL NEW
METAL PARAPET CAP FLASHING.
17 EXISTING ELECTRICAL PANEL.
18 CONSTRUCT NEW ANTENNA PLATFORM. PROVIDE
CONDUIT FOR EXISTING COMMUNICATIONS CABLES
FROM ROOM 109.
19 EXCAVATE PERIMETER DRAIN AROUND FACILITY.
CONNECT TO MUNICIPAL STORM SEWER OR DRAINAGE
SWALE.
20 DEMOLISH EXISTING WINDOW AND SILL. INSTALL NEW
INSULATED WINDOW AND SILL.
21 INSTALL NEW EIFS OVER EXISTING EXTERIOR WALL
FINISHES.
22 DEMOLISH INTERIOR DOOR. PROVIDE NEW GLAZED
INTERIOR WOOD DOORS AND STEEL FRAMES.
23 DEMOLISH INTERIOR DOOR. PROVIDE NEW FLUSH PANEL
INTERIOR WOOD DOORS AND STEEL FRAMES.
24 RENOVATE EXISTING SHOWER.
# NOTE
1 EXISTING EXTERIOR STEEL CHIMNEY
2 EXISTING EXHAUST FAN
3 EXISTING PRIMARY BOILER (THERMONA THERM 55 EX/B)
4 DEMOLISH EXISTING BACKUP BOILER (SIME FAMILY) AND
PROVIDE NEW TO MATCH EXISTING PRIMARY BOILER
5 DEMOLISH EXISTING HOT WATER STORAGE TANKS (2 x
200 L) AND EXPANSION TANKS, PROVIDE NEW
6 EXISTING 36V POWER PANEL WITH SCHUKO RECEPTACLE
7 EXISTING WATER DAMAGE AND MOLD GROWTH UP TO 1.0
M ABOVE FINISHED FLOOR (TYPICAL IN BASEMENT).
DEMOLITION ALL INTERIOR FINISHES, REMOVE ALL MOLD
WITH CHEMICAL MOLDICIDE, AND INSTALL NEW FINISHES.
8 DEMOLISH WALLS AND DOOR TO COMBINE ROOMS
9 DEMOLISH EXISTING SHOWER AND INSTALL WATER
CLOSET AND LAV.
10 DEMOLISH EXISTING STEEL PIPE RADIATORS AND
INSTALL NEW EFFICIENT EQUIPMENT
11 DEMOLISH FLAT ROOF AND ANTENNA TOWER.
CONSTRUCT SLOPED HIPPED METAL ROOF
12 DEMOLISH EXISTING ROOF COVERING TO STRUCTURE.
INSTALL NEW INSULATION, ROOF MEMBRANE, AND
FLASHING.
13 DEMOLISH CAP FLASHING ON EXISTING ROOF CHIMNEYS,
3 5
4 6
A
B
C
E
F
G
H
D
19.1 m²
STAIR
16.9 m²
FIRE
DEPARTMENT
CHIEF
15.1 m²
INSPECTOR'S
OFFICE
14.6 m²
CORRIDOR
23.9 m²
BOOK KEEPING
13.6 m²
SECRETARY
4.4 m²
STORAGE
23.8 m²
INSTRUCTOR'S
OFFICE
19.8 m²
CHIEF
INSPECTOR
1.4 m²
W LAV.
1.4 m²
W WC
1.4 m²
M LAV.
1.4 m²
M WC
10.8 m²
HOSE DRYING
TOWER
5.8 m²
CASH
1.
3.
4.
4.
0.
3.200 6.400 3.200 1.200 4.200
DN
EQUIPMENT GARAGE ROOF BELOW
SEE SHEET A-105 FOR ROOF SCOPE
1202020
20 20 20 20
22 22
3.200 6.400 0.620 3.780 4.200 21.500
.8
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-103
2N D
F
LO
O R
P
LA
N
SA
LC
IN
IN
KA
I F
IR
E
AN
D
R
ES
C U
E
ST
AT
IO
N
SA
LC
IN
IN
KA
I, LI
TH
U
AN
IA
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
D es ig ne r
Au th or
C he ck er
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1 : 65A-103
1 SALCININKAI FIRE AND RESCUE STATION - 2ND FLOOR PLAN
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE
FOR PROVIDING A DESIGN THAT MEETS ALL APPLICABLE
CODES AND REQUIREMENTS OF THE SOW.
N
# NOTE
14 DEMOLISH EXISTING DOWNSPOUT. CONSTRUCT NEW TO
DRAIN DIRECT TO NEW STORM WATER MANAGEMENT
SYSTEM.
15 DEMOLISH EXISTING ROOF DRAIN, INSTALL NEW WITH
NEW ROOF MEMBRANE.
16 DEMOLISH EXISTING PARAPET FLASHING. INSTALL NEW
METAL PARAPET CAP FLASHING.
17 EXISTING ELECTRICAL PANEL.
18 CONSTRUCT NEW ANTENNA PLATFORM. PROVIDE
CONDUIT FOR EXISTING COMMUNICATIONS CABLES
FROM ROOM 109.
19 EXCAVATE PERIMETER DRAIN AROUND FACILITY.
CONNECT TO MUNICIPAL STORM SEWER OR DRAINAGE
SWALE.
20 DEMOLISH EXISTING WINDOW AND SILL. INSTALL NEW
INSULATED WINDOW AND SILL.
21 INSTALL NEW EIFS OVER EXISTING EXTERIOR WALL
FINISHES.
22 DEMOLISH INTERIOR DOOR. PROVIDE NEW GLAZED
INTERIOR WOOD DOORS AND STEEL FRAMES.
23 DEMOLISH INTERIOR DOOR. PROVIDE NEW FLUSH PANEL
INTERIOR WOOD DOORS AND STEEL FRAMES.
24 RENOVATE EXISTING SHOWER.
# NOTE
1 EXISTING EXTERIOR STEEL CHIMNEY
2 EXISTING EXHAUST FAN
3 EXISTING PRIMARY BOILER (THERMONA THERM 55 EX/B)
4 DEMOLISH EXISTING BACKUP BOILER (SIME FAMILY) AND
PROVIDE NEW TO MATCH EXISTING PRIMARY BOILER
5 DEMOLISH EXISTING HOT WATER STORAGE TANKS (2 x
200 L) AND EXPANSION TANKS, PROVIDE NEW
6 EXISTING 36V POWER PANEL WITH SCHUKO RECEPTACLE
7 EXISTING WATER DAMAGE AND MOLD GROWTH UP TO 1.0
M ABOVE FINISHED FLOOR (TYPICAL IN BASEMENT).
DEMOLITION ALL INTERIOR FINISHES, REMOVE ALL MOLD
WITH CHEMICAL MOLDICIDE, AND INSTALL NEW FINISHES.
8 DEMOLISH WALLS AND DOOR TO COMBINE ROOMS
9 DEMOLISH EXISTING SHOWER AND INSTALL WATER
CLOSET AND LAV.
10 DEMOLISH EXISTING STEEL PIPE RADIATORS AND
INSTALL NEW EFFICIENT EQUIPMENT
11 DEMOLISH FLAT ROOF AND ANTENNA TOWER.
CONSTRUCT SLOPED HIPPED METAL ROOF
12 DEMOLISH EXISTING ROOF COVERING TO STRUCTURE.
INSTALL NEW INSULATION, ROOF MEMBRANE, AND
FLASHING.
13 DEMOLISH CAP FLASHING ON EXISTING ROOF CHIMNEYS,
ATTACHMENT #3: ANNOTATED DRAWINGS
3 5
4 6
A
B
C
E
F
G
H
D
10.8 m²
HOSE DRYING
TOWER
EQUIPMENT GARAGE ROOF BELOW
SEE SHEET A-105 FOR ROOF SCOPE
ADMINISTRATIVE AREA ROOF BELOW
SEE SHEET A-105 FOR ROOF SCOPE
3.200 6.400 0.620 3.780 4.200 21.500
.8
3.200 6.400 3.200 1.200 4.200
1.
3.
4.
4.
0.
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-104
3R D
F
LO
O R
P
LA
N
SA
LC
IN
IN
KA
I F
IR
E
AN
D
R
ES
C U
E
ST
AT
IO
N
SA
LC
IN
IN
KA
I, LI
TH
U
AN
IA
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
D es ig ne r
Au th or
C he ck er
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1 : 65A-104
1 SALCININKAI FIRE AND RESCUE STATION - 3RD FLOOR PLAN
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE
FOR PROVIDING A DESIGN THAT MEETS ALL APPLICABLE
CODES AND REQUIREMENTS OF THE SOW.
N
# NOTE
14 DEMOLISH EXISTING DOWNSPOUT. CONSTRUCT NEW TO
DRAIN DIRECT TO NEW STORM WATER MANAGEMENT
SYSTEM.
15 DEMOLISH EXISTING ROOF DRAIN, INSTALL NEW WITH
NEW ROOF MEMBRANE.
16 DEMOLISH EXISTING PARAPET FLASHING. INSTALL NEW
METAL PARAPET CAP FLASHING.
17 EXISTING ELECTRICAL PANEL.
18 CONSTRUCT NEW ANTENNA PLATFORM. PROVIDE
CONDUIT FOR EXISTING COMMUNICATIONS CABLES
FROM ROOM 109.
19 EXCAVATE PERIMETER DRAIN AROUND FACILITY.
CONNECT TO MUNICIPAL STORM SEWER OR DRAINAGE
SWALE.
20 DEMOLISH EXISTING WINDOW AND SILL. INSTALL NEW
INSULATED WINDOW AND SILL.
21 INSTALL NEW EIFS OVER EXISTING EXTERIOR WALL
FINISHES.
22 DEMOLISH INTERIOR DOOR. PROVIDE NEW GLAZED
INTERIOR WOOD DOORS AND STEEL FRAMES.
23 DEMOLISH INTERIOR DOOR. PROVIDE NEW FLUSH PANEL
INTERIOR WOOD DOORS AND STEEL FRAMES.
24 RENOVATE EXISTING SHOWER.
# NOTE
1 EXISTING EXTERIOR STEEL CHIMNEY
2 EXISTING EXHAUST FAN
3 EXISTING PRIMARY BOILER (THERMONA THERM 55 EX/B)
4 DEMOLISH EXISTING BACKUP BOILER (SIME FAMILY) AND
PROVIDE NEW TO MATCH EXISTING PRIMARY BOILER
5 DEMOLISH EXISTING HOT WATER STORAGE TANKS (2 x
200 L) AND EXPANSION TANKS, PROVIDE NEW
6 EXISTING 36V POWER PANEL WITH SCHUKO RECEPTACLE
7 EXISTING WATER DAMAGE AND MOLD GROWTH UP TO 1.0
M ABOVE FINISHED FLOOR (TYPICAL IN BASEMENT).
DEMOLITION ALL INTERIOR FINISHES, REMOVE ALL MOLD
WITH CHEMICAL MOLDICIDE, AND INSTALL NEW FINISHES.
8 DEMOLISH WALLS AND DOOR TO COMBINE ROOMS
9 DEMOLISH EXISTING SHOWER AND INSTALL WATER
CLOSET AND LAV.
10 DEMOLISH EXISTING STEEL PIPE RADIATORS AND
INSTALL NEW EFFICIENT EQUIPMENT
11 DEMOLISH FLAT ROOF AND ANTENNA TOWER.
CONSTRUCT SLOPED HIPPED METAL ROOF
12 DEMOLISH EXISTING ROOF COVERING TO STRUCTURE.
INSTALL NEW INSULATION, ROOF MEMBRANE, AND
FLASHING.
13 DEMOLISH CAP FLASHING ON EXISTING ROOF CHIMNEYS,
3 5
4 6
A
B
C
E
F
G
H
D
13 1313
13 13
3.200 6.400 0.620 3.780 4.200 21.500
.8
1.
3.
4.
4.
0.
3.200 6.400 3.200 1.200 4.200
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
A-105
R O
O F
PL
AN
SA
LC
IN
IN
KA
I F
IR
E
AN
D
R
ES
C U
E
ST
AT
IO
N
SA
LC
IN
IN
KA
I, LI
TH
U
AN
IA
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
D es ig ne r
Au th or
C he ck er
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1 : 65A-105
1 SALCININKAI FIRE AND RESCUE STATION - ROOF PLAN
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE
FOR PROVIDING A DESIGN THAT MEETS ALL APPLICABLE
CODES AND REQUIREMENTS OF THE SOW.
N
# NOTE
14 DEMOLISH EXISTING DOWNSPOUT. CONSTRUCT NEW TO
DRAIN DIRECT TO NEW STORM WATER MANAGEMENT
SYSTEM.
15 DEMOLISH EXISTING ROOF DRAIN, INSTALL NEW WITH
NEW ROOF MEMBRANE.
16 DEMOLISH EXISTING PARAPET FLASHING. INSTALL NEW
METAL PARAPET CAP FLASHING.
17 EXISTING ELECTRICAL PANEL.
18 CONSTRUCT NEW ANTENNA PLATFORM. PROVIDE
CONDUIT FOR EXISTING COMMUNICATIONS CABLES
FROM ROOM 109.
19 EXCAVATE PERIMETER DRAIN AROUND FACILITY.
CONNECT TO MUNICIPAL STORM SEWER OR DRAINAGE
SWALE.
20 DEMOLISH EXISTING WINDOW AND SILL. INSTALL NEW
INSULATED WINDOW AND SILL.
21 INSTALL NEW EIFS OVER EXISTING EXTERIOR WALL
FINISHES.
22 DEMOLISH INTERIOR DOOR. PROVIDE NEW GLAZED
INTERIOR WOOD DOORS AND STEEL FRAMES.
23 DEMOLISH INTERIOR DOOR. PROVIDE NEW FLUSH PANEL
INTERIOR WOOD DOORS AND STEEL FRAMES.
24 RENOVATE EXISTING SHOWER.
# NOTE
1 EXISTING EXTERIOR STEEL CHIMNEY
2 EXISTING EXHAUST FAN
3 EXISTING PRIMARY BOILER (THERMONA THERM 55 EX/B)
4 DEMOLISH EXISTING BACKUP BOILER (SIME FAMILY) AND
PROVIDE NEW TO MATCH EXISTING PRIMARY BOILER
5 DEMOLISH EXISTING HOT WATER STORAGE TANKS (2 x
200 L) AND EXPANSION TANKS, PROVIDE NEW
6 EXISTING 36V POWER PANEL WITH SCHUKO RECEPTACLE
7 EXISTING WATER DAMAGE AND MOLD GROWTH UP TO 1.0
M ABOVE FINISHED FLOOR (TYPICAL IN BASEMENT).
DEMOLITION ALL INTERIOR FINISHES, REMOVE ALL MOLD
WITH CHEMICAL MOLDICIDE, AND INSTALL NEW FINISHES.
8 DEMOLISH WALLS AND DOOR TO COMBINE ROOMS
9 DEMOLISH EXISTING SHOWER AND INSTALL WATER
CLOSET AND LAV.
10 DEMOLISH EXISTING STEEL PIPE RADIATORS AND
INSTALL NEW EFFICIENT EQUIPMENT
11 DEMOLISH FLAT ROOF AND ANTENNA TOWER.
CONSTRUCT SLOPED HIPPED METAL ROOF
12 DEMOLISH EXISTING ROOF COVERING TO STRUCTURE.
INSTALL NEW INSULATION, ROOF MEMBRANE, AND
FLASHING.
13 DEMOLISH CAP FLASHING ON EXISTING ROOF CHIMNEYS,
| Infrastructure Emergency Medicle Vehicles option.rvt - Sheet - A-101 - BASEMENT PLAN |
| Sheets |
| A-101 - BASEMENT PLAN |
| A-102 - 1ST FLOOR PLAN |
| A-103 - 2ND FLOOR PLAN |
| A-104 - 3RD FLOOR PLAN |
| A-105 - ROOF PLAN |
| Infrastructure Emergency Medicle Vehicles option.rvt - Sheet - A-102 - 1ST FLOOR PLAN |
| Sheets |
| A-101 - BASEMENT PLAN |
| A-102 - 1ST FLOOR PLAN |
| A-103 - 2ND FLOOR PLAN |
| A-104 - 3RD FLOOR PLAN |
| A-105 - ROOF PLAN |
| Infrastructure Emergency Medicle Vehicles option.rvt - Sheet - A-103 - 2ND FLOOR PLAN |
| Sheets |
| A-101 - BASEMENT PLAN |
| A-102 - 1ST FLOOR PLAN |
| A-103 - 2ND FLOOR PLAN |
| A-104 - 3RD FLOOR PLAN |
| A-105 - ROOF PLAN |
| Infrastructure Emergency Medicle Vehicles option.rvt - Sheet - A-104 - 3RD FLOOR PLAN |
| Sheets |
| A-101 - BASEMENT PLAN |
| A-102 - 1ST FLOOR PLAN |
| A-103 - 2ND FLOOR PLAN |
| A-104 - 3RD FLOOR PLAN |
| A-105 - ROOF PLAN |
| Infrastructure Emergency Medicle Vehicles option.rvt - Sheet - A-105 - ROOF PLAN |
| Sheets |
| A-101 - BASEMENT PLAN |
| A-102 - 1ST FLOOR PLAN |
| A-103 - 2ND FLOOR PLAN |
| A-104 - 3RD FLOOR PLAN |
| A-105 - ROOF PLAN |
File details come from the government source that posted it.