A 01.38 - Attachment 7 - Work Order History WO List 2017-2018.xls
XLS spreadsheet 2 MB Posted
- Attached to
- Amendment 2 Federal contract opportunity
- Solicitation number
- W912GB19R0030
About this file
This document is a presolicitation notice for a single award task order indefinite-delivery, indefinite-quantity contract for construction and preventative maintenance services at various Department of Defense Education Activity schools in Italy. The U.S. Army Corps of Engineers intends to issue a solicitation for a hybrid firm-fixed-price and cost-plus-fixed-fee IDIQ contract with a period of performance of five years and a total contract value not to exceed $49.9 million. The solicitation will include requirements for facility inspection, preventative maintenance, repair work, and general renovation. Interested firms must submit qualification documentation by April 1st to be considered a qualified contractor. A pre-proposal conference and site visits are scheduled for mid-April. The anticipated solicitation release date is April 5th, with award planned for shortly after.
Work Order Historical Data
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Order Search Listing
| Exhibit T - DoDEA Italy - Work Order History | |||||||||||||||
| No | WOID | Status | Descriptions | ActionTaken | Request Date | Completion Date | Requester | AssignedTo | Location | Building | Area Type | Area Number | Equipment | Craft | |
| 1 | 41790 | Closed Work Orders | Light is flickering on the middle back light section Time Available: after school | The light fixture was disassembled, burnt lamp and starter were replaced, light fixture was reassembled and tested. | 12/1/17 | 12/11/17 | verdell island | Aviano, Technician | Aviano ES | 151 | Classroom | E82 | Lighting (Indoor) | ||
| 2 | 41791 | Closed Work Orders | THE AUTOMATIC DOOR GOING OUTSIDE FROM SUPPLY KEEP STAYING OPEN AND WON'T CLOSE. | ||||||||||||
| Time Available: TODAY | the automatic door was removed, repaired and reinstalled | 12/1/17 | 12/11/17 | Annamaria Barzan | Aviano, Technician | Aviano MHS | HS 151 | 1st Floor | DOOR OUTSIDE SUPPLY | Doors and Hardware | |||||
| 3 | 41792 | Closed Work Orders | Window in the bathroom does not close Time Available: 15:00 | the window closure was repaired | 12/1/17 | 12/11/17 | Stefania Dell'Agnolo | Aviano, Technician | Aviano MHS | HS 151 | 1st Floor | S21 | Windows | ||
| 4 | 41793 | Closed Work Orders | Is it possible to have COAT HOOKS installed for my class IN THE HALLWAY under my WHTIE BULLETIN BOARD like the 2nd floor now has? I have wanted those ever since I have been here, but have never put in for them. I saw the ones in the 4th and 5th Grade hallway, and was hoping I could have the same thing installed MY 3rd grade hallway for my class. Time Available: Any time | three wooden board were sanded, painted with two coats of paint and hang/fixed to the wall as a support for the coat hooks, the plexiglass coat hooks were mounted on these wooden supports | 12/1/17 | 3/15/18 | Ann Eilert | Aviano, Technician | Aviano ES | Hallway/Corridor | 187 | Doors and Hardware | |||
| 5 | 41794 | Closed Work Orders | Please take down the projector so the supply technician can replace the bulb. Time Available: 0730 | the projector was taken down and reinstalled after bulb replacement | |||||||||||
| as agreed with KO, to be furtherly discussed if this task is included in the SOW, due to the urgency, this work will be accomplished | 12/1/17 | 12/11/17 | Michael Gros | Aviano, Technician | Aviano ES | 151 | Classroom | 245 E | Lighting (Indoor) | ||||||
| 6 | 41795 | Closed Work Orders | Safety door handle levers to be fixed/replaced (near Bus Office) Time Available: ANY | anti-panic hardware was disassembled, repaired, reinstalled and tested | 12/1/17 | 12/11/17 | Martina Cristante | Aviano, Technician | Aviano ES | 151 | Stairway | N/A | Doors and Hardware | ||
| 7 | 41797 | Closed Work Orders | Install chain next to side gate. See Dan Shelor for instructions. | two hooks for the chain were installed as per Mr. Shelor's instructions | 12/1/17 | 12/13/17 | david rudy | Vicenza, Technician | Vicenza HS | 309 | Miscellaneous | ||||
| 8 | 41800 | Closed Work Orders | The SmartBoard and projector need to be replaced in the teaching and presentation area of the library. There is currently an all-in-one system there, and it is no longer operational. Time Available: any time | smart board and projector were disconnected and disassembled from the wall, new SB and projector were mounted, fixed to the wall, new connections were run, final tests were conducted. packed and old proj and sm. board were packed and brought to supply | 12/1/17 | 2/7/18 | Amy Herk | Aviano, Technician | Aviano ES | 151 | Library | Library, teaching area | Miscellaneous | ||
| 9 | 41801 | Closed Work Orders | Heat is not working as it should throughout building. Principal's office was 17 degrees this morning when arrived for work Time Available: now | the heating system was checked - being particulary cold at this time of winter the system takes a couple of hours to reach the appropriate temperature | 12/1/17 | 12/5/17 | Crystal Hardin | Vicenza, Technician | Vicenza MS | Bldg 700 | Various | whole building | Heating/Ventilation /Air Conditioning | ||
| 10 | 41817 | Closed Work Orders | remove old desk and cabinetry that is built into the floor and walls. Per Mr Andler- this IS and Maintenance Contractor function! | ||||||||||||
| Time Available: 0800 | the work was performed as requested | 12/2/17 | 1/4/18 | Lilia McGee | Aviano, Technician | Aviano ES | 151 | Administration Area | Admin Office | Carpentry | |||||
| 11 | 41819 | Closed Work Orders | battery light is low and won't open the door Time Available: now | the electronic lock was disassembled, lubricated and reassembled, then it was reprogrammed with Cisa palmtop | 12/4/17 | 12/5/17 | Trina Downey | Vicenza, Technician | Vicenza ES | Bldg 700 | 2nd Floor | 1074 | Doors and Hardware | ||
| 12 | 41820 | Closed Work Orders | Re-attach the molding on the large map outside of the cafeteria. Thank you! | as agreed with KO, to be furtherly discussed if this task is included in the SOW, due to the urgency, this work will be accomplished. | |||||||||||
| The molding was re-attached with new nails. | 12/4/17 | 12/8/17 | Cheryl Tibbs | Vicenza, Technician | Vicenza HS | 309 | 1st Floor | Display Boards | |||||||
| 13 | 41821 | Closed Work Orders | Install two small cork boards in the front lobby. I have them in my office. | as agreed with KO, to be furtherly discussed if this task is included in the SOW. due to the urgency, this work will be accomplished. | 12/4/17 | 12/11/17 | Vanda Waller | Aviano, Technician | Aviano ES | 151 | Hallway/Corridor | Display Boards | |||
| 14 | 41822 | Closed Work Orders | Substitute teacher reported that the heating is not working and that students are cold Time Available: 15:00 | the set point of the vents was increased, the water filters were disassembled, cleaned and reinstalled - heating system was tested in the room and from DDC | 12/4/17 | 12/11/17 | Stefania Dell'Agnolo | Aviano, Technician | Aviano MHS | HS 151 | 1st Floor | c011 | Climate Control | ||
| 15 | 41823 | Closed Work Orders | In the dishroom the sprayer hose is leaking water | the sprayer hose was disassembled, gaskets were replaced, hose was reassembled | 12/4/17 | 12/11/17 | David Andler | Aviano, Technician | Aviano ES | 151 | Kitchen | AAFES | Kitchen Equipment | ||
| 16 | 41824 | Closed Work Orders | The cold display closest to the stage has the fan inside making a lot of noise. | motor crankcase and vent protections were removed - vents were adjusted and put back in axis - motor was reassembled | 12/4/17 | 12/11/17 | David Andler | Aviano, Technician | Aviano ES | 151 | Kitchen | AAFES | Kitchen Equipment | ||
| 17 | 41829 | Closed Work Orders | Lamp has been already replaced on the projector but it still doesn't work. |
Please replace it with a new one. Time Available: TODAY
| Maintenance Contractor to demount and remount new projector only. TJH | Maintenance Contractor to demount and remount new projector only. TJH | |||||||||||||
| as agreed with KO, to be furtherly discussed if this task is included in the SOW, due to the urgency, this work has been accomplished | 12/4/17 | 12/11/17 | Annamaria Barzan | Aviano, Technician | Aviano MHS | HS 151 | 1st Floor | room S042 | Electrical | |||||
| 18 | 41832 | Closed Work Orders | Please check the heater as the whole complex is cold. | heating system was checked and reset | 12/5/17 | 12/13/17 | Alisa Pehrson | Vicenza, Technician | Vicenza ES | Bldg 700 | 1st Floor | All ES and MS | Air Conditioning | |
| 19 | 41833 | Closed Work Orders | Italian flag on the flagpole has come loose from the anchoring cord. Needed to be pulled down from about 30 ft in the air. | This WO has been opened after a request on friday. Flagpole has been repaired. | 12/5/17 | 12/1/17 | Alisa Pehrson | Technicians, SKE | Vicenza ES | Bldg 700 | Parking Lot | Miscellaneous | ||
| 20 | 41837 | Closed Work Orders | Our thermostat is already on it's highest setting and it's still only 14.5 degrees. It's way too cold for these small children in here. Time Available: anytime | heating system was checked and reset | 12/5/17 | 12/13/17 | Karin Haug | Vicenza, Technician | Vicenza ES | Bldg 700 | 1st Floor | Room 327 | Heating/Ventilation /Air Conditioning | |
| 21 | 41839 | Closed Work Orders | freezing cold in preschool classroom at 17C. Button to increase heat not working. Problem has been reported but not fixed. Time Available: any | heating system was checked and reset | 12/5/17 | 12/13/17 | Vicki Roloff | Vicenza, Technician | Vicenza ES | Bldg 700 | 1st Floor | 319 | Climate Control | |
| 22 | 41841 | Closed Work Orders | no heat in the AAFES office | heating system was checked and reset | 12/5/17 | 12/6/17 | David Andler | Aviano, Technician | Aviano ES | 151 | Kitchen | AAFES Office | Kitchen Equipment | |
| 23 | 41843 | Closed Work Orders | The display board that holds the library cards has fallen down. It needs to be put back up. Time Available: anytime | Not part of Maintenance Contractor maintenace contract. WO sent to Mr. Hagen in order to discuss it and coordinate on how to proceed. | ||||||||||
| Maintenance Contractor please provide estimate | 12/5/17 | 1/22/18 | Amy Herk | Hagen, Terry | Aviano ES | 151 | Library | Library | Display Boards | |||||
| 24 | 41846 | Closed Work Orders | Would like the pencil sharpener hung/attached the wall in the main classroom so that students can use it to sharpen their pencils. Time Available: any | the pencil sharpener was mounted on the wall | ||||||||||
| wo has been performed but it needs to be furtherly discussed with the COR since it is out of contract scope. | 12/5/17 | 12/7/17 | Theresa Urquilla | Vicenza, Technician | Vicenza HS | 309 | 1st Floor | 59 | Doors and Hardware | |||||
| 25 | 41850 | Closed Work Orders | Air conditioner is leaking water. Time Available: any | the A/C unit was inspected - it will have to be checked during the summer when the air conditioner is working at full capacity | 12/5/17 | 12/7/17 | Mark Sansone | Vicenza, Technician | Vicenza HS | 309 | Classroom | 108 | Heating/Ventilation /Air Conditioning | |
| 26 | 41851 | Closed Work Orders | cover outlets (4) in workspace in back left corner of classroom Time Available: after 230 pm | the outlet covers for children safety were installed | 12/5/17 | 12/11/17 | Vicki Roloff | Vicenza, Technician | Vicenza ES | Bldg 700 | 1st Floor | 319 | Electrical | |
| 27 | 41866 | Closed Work Orders | as reported from kitchen personnel, tilting pan is not working properly today, please troubleshoot and fix, this morning if possible. KV045 | the tilting pan setting was reset, date and hour were re-programmed | 12/6/17 | 12/6/17 | Vicenza, Technician | Vicenza ES | Bldg 700 | 1st Floor | Kitchen | Kitchen Equipment | ||
| 28 | 41869 | Closed Work Orders | I need some bulletin boards moved and shelves hung up in my office. Time Available: varies, please contact me | white board and bulletin boards were relocated and two shelves installed | 12/6/17 | 2/9/18 | Jonathan Daniels | Vicenza, Technician | Vicenza ES | Bldg 700 | Administration Area | 224 | Display Boards | |
| 29 | 41872 | Closed Work Orders | Please remove the old Dell projector from the ceiling and put up the new projector. Time Available: anytime | Maintenance Contractor to demount and mount projector. TJH |
To be furtherly discussed with KO if this task is included in the SOW, due to the urgency, this work will be accomplished.
| The projector was demounted and remounted | 12/6/17 | 12/13/17 | Leslie Rabine | Vicenza, Technician | Vicenza HS | 309 | 2nd Floor | 131 | Display Boards |
| 30 | 41874 | Closed Work Orders | Request the installation of an exhaust fan (Ventilation system) in the staff bathroom across from rooms 238, 242, and 244 and the bathroom next to room 223. Time Available: 0700 | Maintenance Contractor, bathroom has exhaust fan installed. however, it does not appear to be drawing sufficient amount of air. Check fan operation and repair as necessary. TJH | |||||
| fan operation was tested, it is working properly | 12/6/17 | 12/21/17 | Oren EDDIE | Vicenza, Technician | Vicenza ES | Bldg 700 | Restroom (Staff) | Staff Office Area | General Maintenance |
| 31 | 41877 | Closed Work Orders | Bank of lights is blinking. Just one section, not the entire row. Time Available: anytime | Light fixtures were disassembled, burnt lamp and starter were replaced, light fixtures were reassembled and tested. |
| sost. 1x 36w neon e S10 | 12/7/17 | 12/11/17 | Sheryl Frascht | Aviano, Technician | Aviano ES | 151 | 1st Floor | 71 | Lighting (Indoor) | |||||
| 32 | 41878 | Closed Work Orders | Simon Voss key terminal is outside of front office, bolted in a steel case to the wall. It is not showing up on our network according to David Andler. A technician will need to unmount it and verify network settings with our Simon Voss people. Please coordinate this. | appoinment with Simons Voss technician on the 21st of December. | ||||||||||
| Terminal transponder has been reprogrammed and tested, Simons Voss technician has been supported by the electrician for the testing. Now all the 5 terminals are working properly. | 12/7/17 | 12/22/17 | David Andler | Technicians, SKE | Aviano ES | 151 | Administration Area | SV terminal | Miscellaneous | |||||
| 33 | 41884 | Closed Work Orders | Nurse Offices - Rm 0257 door touches the floor and is hard to open. Hinges need to be adjusted. Manuela Time Available: 08:00 | the door hinges were adjusted and the door lock was lubricated | 12/7/17 | 12/8/17 | Manuela DeMuri | Vicenza, Technician | Vicenza ES | Bldg 700 | 1st Floor | 0257 | Doors and Hardware | |
| 34 | 41886 | Closed Work Orders | My door does not open with the card. I have to use the actual key to open it. At times it will open with the card after waiting an hour or so but then it does not work again and I have to use the key. Time Available: Any | the electronic card reader was reprogrammed with Cisa Palmtop | 12/7/17 | 12/8/17 | Danielle Skinner | Vicenza, Technician | Vicenza ES | Bldg 700 | 2nd Floor | 1096 | Doors and Hardware | |
| 35 | 41888 | Closed Work Orders | b.218 - hallways l.200 - as per DWT inspection, all clocks on this floor have been found stopped: troubleshoot and fix | 08-12-2017 - master clock has been inspected and reset to restore proper timing | 12/8/17 | 12/8/17 | Presti, Giusy | Sigonella ES | Bldg 218 | Hallway/Corridor | l.200 | Clocks/Bells | ||
| 36 | 41889 | Closed Work Orders | b.220 - attic - as per DWT inspection, the EF 5.1 is not working properly: troubleshoot and fix | 08-12-2017 - after different test and inspection it has been identified that the problem was related to a damaged capacitor. it has been replaced and the EF now is working properly | 12/8/17 | 12/8/17 | Presti, Giusy | Sigonella MHS | Bldg 220 | Attic | Heating/Ventilation /Air Conditioning | |||
| 37 | 41890 | Closed Work Orders | b.220 - attic - as per DWT inspection, the EF 5.2 is not working properly, belts have to be replaced | 11-12-2017 - problem was related to a damaged belt that has been replaced with a new one | 12/8/17 | 12/11/17 | Presti, Giusy | Sigonella MHS | Bldg 220 | Attic | Heating/Ventilation /Air Conditioning | |||
| 38 | 41891 | Closed Work Orders | b.220 - r.239c - as per DWT inspection, n.2 burnt fluorescent bulbs need to be replaced | 11-12-2017 - n.2 fluorescent bulbs 36w replaced | 12/8/17 | 12/11/17 | Presti, Giusy | Sigonella MHS | Bldg 220 | Classroom | r.239 | Lighting (Indoor) | ||
| 39 | 41892 | Closed Work Orders | b.218 - attic - as per DWT inspection, in the EF 8.1, belts have been found damaged and need to be replaced | 11-12-2017 - n.1 damaged belt properly replaced with a new one | 12/8/17 | 12/11/17 | Presti, Giusy | Sigonella ES | Bldg 218 | Attic | Heating/Ventilation /Air Conditioning | |||
| 40 | 41893 | Closed Work Orders | b.216 - underground level - as per DWT inspection, in the AHU 3, belts have been found burnt and need to be replaced | 12-12-2017 - n.2 damaged belts properly replaced with new ones | 12/8/17 | 12/12/17 | Presti, Giusy | Sigonella MHS | Bldg 216 | underground level | Heating/Ventilation /Air Conditioning | |||
| 41 | 41894 | Closed Work Orders | b.218 - exterior door near r.229 - as reported by custodian crew, the panic hardware of the doors so as the hinges have been found seriously damaged and need to be fixes asap | 08-12-2017 - panic hardware has been dismounted setup back in original conditions and reinstalled. hinges have been realigned, lubricated and fixed | 12/8/17 | 12/8/17 | Presti, Giusy | Sigonella ES | Bldg 218 | exit door l.200 | Doors and Hardware | |||
| 42 | 41895 | Closed Work Orders | b.211 - exterior door near music room - as per DWT inspection, the panic hardware of the door has been found damaged and need to be fixes asap | 12-12-2017 - the damaged hardware has been reassembled and reinstalled | 12/8/17 | 12/12/17 | Presti, Giusy | Sigonella MHS | Bldg 211 | exit door l.000 | Doors and Hardware | |||
| 43 | 41896 | Closed Work Orders | b.218 - admin area and r.104 - as reported by ES Principal, it seems to be cold inside the rooms, please troubleshoot and fix the problem. thank you! | 08-12-2017 - faulty set point adjusted with DDC | 12/8/17 | 12/8/17 | Presti, Giusy | Sigonella ES | Bldg 218 | Administration Area | Heating/Ventilation /Air Conditioning | |||
| 44 | 41897 | Closed Work Orders | b.218 - restrooms near r.229 - as reported by QAE, there are some damaged lock inside the restroom stalls to be repaired/replaced. thank you! | 11-12-2017 - damaged lock (found disassembled on the floor) has been properly reinstalled | 12/8/17 | 12/11/17 | Presti, Giusy | Sigonella ES | Bldg 218 | Administration Area | Doors and Hardware | |||
| 45 | 41898 | Closed Work Orders | b.220 - girls locker room - as reported by QAE, there is a broken mirror inside the room. to exclude danger, please remove it asap. thank you! | 08-12-2017 - the broken mirror has been safely removed | 12/8/17 | 12/8/17 | Presti, Giusy | Sigonella MHS | Bldg 220 | girls locker room | Miscellaneous | |||
| 46 | 41904 | Closed Work Orders | no electricity for the shredder & copier By Debbie Ashton office Time Available: anytime | the shredder and the printer were tested, the printer cable was replaced - power was reset | 12/8/17 | 12/11/17 | Richard Kabonick | Vicenza, Technician | DSO South | Bldg 307 | 1st Floor | Lower ISS hallway | Electrical | |
| 47 | 41905 | Closed Work Orders | Several sinks are clogged in science room Time Available: Any time | three sink drains were unclogged, they were filled with soil | 12/8/17 | 12/11/17 | Anna Sansone | Vicenza, Technician | Vicenza MS | Bldg 700 | 2nd Floor | 1028 | Plumbing | |
| 48 | 41906 | Closed Work Orders | Toilet seat to be fixed / replaced (Nurse's office) Time Available: ANY | the toilet seat was repaired, screws were replaced | 12/8/17 | 12/12/17 | Martina Cristante | Aviano, Technician | Aviano ES | 151 | Nurse's Office | E25 | General Maintenance | |
| 49 | 41908 | Closed Work Orders | The sink in the children's bathroom will not drain. Time Available: any | the sink drain was unclogged | 12/8/17 | 12/12/17 | Lilia McGee | Aviano, Technician | Aviano ES | 151 | 1st Floor | E30 | General Maintenance | |
| 50 | 41910 | Closed Work Orders | broken light switch Time Available: 0750-1520 | the light switch was disassembled and inspected, the relay was stuck and it was restarted, the light switch was reassembled and tested | 12/8/17 | 12/13/17 | Michela Ambruoso | Vicenza, Technician | Vicenza HS | 309 | Classroom | 115 | Electrical | |
| 51 | 41911 | Closed Work Orders | Classroom door is wedged closed. Time Available: any | the door was repaired | 12/8/17 | 12/12/17 | Lilia McGee | Aviano, Technician | Aviano ES | 151 | 1st Floor | E89 | General Maintenance | |
| 52 | 41914 | Closed Work Orders | My door will still not open. | |||||||||||
| In the morning it would open with the key but this afternoon it won't. The problem has not been resolved. Time Available: any | the door lock was disassembled and repaired, the lock release motor was lubricated and the lock was reassembled | 12/9/17 | 12/12/17 | Danielle Skinner | Vicenza, Technician | Vicenza ES | Bldg 700 | 2nd Floor | 1096 | Doors and Hardware | ||||
| 53 | 41917 | Closed Work Orders | As per daily walk thru inspection it has been detected that the big green awning in the courtyard is broken and detached due to the weight of the snow. Please in order to prevent safety issues, the area need to be fenced so nobody would walk under the coverage. The green tent should be removed, since in case of additional weight (rain or snow) it could fall down. | Remove the canvas after the snow has melted off. TJH | ||||||||||
| Area has been fenced and at first all the accumulated water has been removed. The day after, canvas has been removed in order to avoid safety issues. | 12/11/17 | 12/15/17 | Technicians, SKE | Vicenza HS | 309 | 1st Floor | courtyard behind the bldg. | Miscellaneous | ||||||
| 54 | 41919 | Closed Work Orders | sprayers in the kitchen not working | sprayers were disassembled, cleaned from calcium deposits and reassembled | 12/11/17 | 12/12/17 | David Andler | Aviano, Technician | Aviano ES | 151 | Kitchen | AAFES | Kitchen Equipment | |
| 55 | 41920 | Closed Work Orders | as per daily walk thru inspection it has been detected that one AC split board is not working properly. please troubleshoot and fix | a scaffolding was mounted, and dismounted after completion of work, in order to reach the A/C split and repair it, the split board was replaced (it was vampirized from an old unused unit) | 12/11/17 | 12/20/17 | Vicenza, Technician | Vicenza HS | 309 | Classroom | 140 | Air Conditioning | ||
| 56 | 41922 | Closed Work Orders | need to place a work order urgent for the rod that came off from the serving that needs to be weld. We have applied tape in the meanwhile to avoid children getting hurt. | the serving line was repaired, the rod was welded, the work was done by specialized technician escorted and supported by Maintenance Contractor technician | 12/11/17 | 1/3/18 | Alisa Pehrson | Vicenza, Technician | Vicenza ES | Bldg 700 | Cafeteria | Miscellaneous | ||
| 57 | 41923 | Closed Work Orders | Front sink on left side of room is slowly leaking water and there is a puddle on the floor. Time Available: now | the sink drain pipe was fixed to the wall and water on the floor was dried | 12/11/17 | 12/15/17 | Crystal Hardin | Vicenza, Technician | Vicenza MS | Bldg 700 | 2nd Floor | 1044 | Plumbing | |
| 58 | 41925 | Closed Work Orders | Please ONLY dismount the projector from the ceiling. This will ensure that a new bulb can be placed in the projector | |||||||||||
| Time Available: anytime | to be furtherly discussed if this task is included in the SOW, due to the urgency, this work will be accomplished. | |||||||||||||
| The projector was dismounted and remounted after the new light bulb was replaced. | 12/12/17 | 12/12/17 | Jennifer Martin | Vicenza, Technician | Vicenza ES | Bldg 700 | 1st Floor | 196 | Display Boards | |||||
| 59 | 41926 | Closed Work Orders | as per daily walk thru inspection it has been detected that socket on the ground is not working properly. please troubleshoot and fix. | 110v outlet and plastic support were replaced | 12/12/17 | 12/13/17 | Vicenza, Technician | Vicenza HS | 309 | Classroom | 109 | Electrical | ||
| 60 | 41929 | Closed Work Orders | locker # 402 needs lubrication/maintenance, it runs very roughly and it hard to move.thank you Time Available: any | lock was disassembled, lubricated and reassembled | 12/12/17 | 12/14/17 | Paola Battaiola | Vicenza, Technician | Vicenza HS | 309 | 1st Floor | near rm 18 | Locker Repair | |
| 61 | 41936 | Closed Work Orders | Bldg. 700 - Room 294 | |||||||||||
| During daily walk thru inspection it has been detected that a toilet drain is leaking. | the toilet drain was repaired, a plastic pipe sleeve was replaced, the flusher fill valve clamp and a drain gasket were replaced | 12/12/17 | 12/13/17 | Vicenza, Technician | Vicenza ES | Bldg 700 | Restroom | Room 294 | ||||||
| 62 | 41937 | Closed Work Orders | Toilet does not flush. Time Available: any | the toilet flusher was repaired | 12/13/17 | 12/16/17 | Lilia McGee | Aviano, Technician | Aviano ES | 151 | Restroom (Girls) | 2nd floor | General Maintenance | |
| 63 | 41938 | Closed Work Orders | Came in to my room today and something exploded from the ceiling in the corner...there is black stuff all over my bookshelf/poster, wall and floor. Not sure why or what it is... Time Available: ant | the affected wall was repainted | 12/13/17 | 12/21/17 | Theresa Urquilla | Vicenza, Technician | Vicenza HS | 309 | 1st Floor | 59 | Heating/Ventilation /Air Conditioning | |
| 64 | 41940 | Closed Work Orders | Heater leaked after it was turned on. Time Available: any | the affected walls were touched up | 12/13/17 | 12/21/17 | Ryan Goodfellow | Vicenza, Technician | Vicenza HS | 309 | 2nd Floor | 141 | Climate Control | |
| 65 | 41941 | Closed Work Orders | Smelling smoke in the Kinder classroom wing | Kinder wing was evacuated to MPR due to strong smell; ultimately, the source was found- teacher burnt food in microwave | ||||||||||
| The area has been surveyed, no anomalies, no electrical issues were detected - the source of strong smell was found to be burnt chocolate in the microwave, the smell had been propagated through the corridors by the ventilation system | 12/13/17 | 12/14/17 | Alisa Pehrson | Vicenza, Technician | Vicenza ES | Bldg 700 | 1st Floor | 294 | Miscellaneous | |||||
| 66 | 41946 | Closed Work Orders | Ceiling Light is flashing.....needs replaced before I have a seizure. Time Available: Any | The light fixture was disassembled, burnt lamp was replaced, light fixture was reassembled and tested. | 12/13/17 | 12/16/17 | Tina lake | Aviano, Technician | Aviano MHS | HS 151 | Library | S151 Library Office | Lighting (Indoor) | |
| 67 | 41947 | Closed Work Orders | as per daily walk thru inspection, the diffuser is falling down, please troubleshoot and fix | the fan coil diffuser was repaired and reinstalled | 12/14/17 | 12/15/17 | Vicenza, Technician | DSO South | Bldg 307 | 1st Floor | room 208 | Miscellaneous | ||
| 68 | 41949 | Closed Work Orders | Urinal water will not shut off. Second from left | the urinal flusher was disassembled, cleaned, lubricated, adjusted and reinstalled | 12/14/17 | 12/14/17 | Terry Hagen | Vicenza, Technician | DSO South | Bldg 309 Annex | Restroom (Boys) | Plumbing | ||
| 69 | 41951 | Closed Work Orders | Cabinet door is falling off Time Available: any | is it a kitchen cabinet?COR | ||||||||||
| Yes, it is a kitchen cabinet, the cabinet door hinges have been fixed. | 12/14/17 | 12/15/17 | Terry H | Vicenza, Technician | DSO South | Bldg 307 | Kitchen | Breakroom | General Maintenance | |||||
| 70 | 41953 | Closed Work Orders | b.218 - attic - as per DWT inspection, the AHU n.6 has been found stopped and need to be reset. | 14-12-2017 - the AHU has been reset and properly restarted | 12/14/17 | 12/14/17 | Presti, Giusy | Sigonella ES | Bldg 218 | Attic | Heating/Ventilation /Air Conditioning | |||
| 71 | 41954 | Closed Work Orders | b.216 - kitchen - as per DWT inspection, the handle of the walk-in KS011 is loose and need to be fixed | 14-12-2017 - the handle has been fixed | 12/14/17 | 12/14/17 | Presti, Giusy | Sigonella MHS | Bldg 216 | Kitchen | Kitchen Repair | |||
| 72 | 41955 | Closed Work Orders | For some strange reason all of a sudden we had no more hot water. I think the boiler knocked itself off. | the boiler was inspected, no electrical issues were detected but the boiler had broken part - a specialty technician was needed in order to replace the boiler thermocouple, after the replacement the boiler was tested to make sure that it was working properly | 12/14/17 | 12/15/17 | Alisa Pehrson | Vicenza, Technician | Vicenza ES | Bldg 700 | Cafeteria | Plumbing | ||
| 73 | 41956 | Closed Work Orders | Light bulb of entrance exterior lights are burnt, please replace them. | Light fixtures were disassembled, burnt lamps were replaced, light fixtures were reassembled and tested. | 12/15/17 | 12/15/17 | Vicenza, Technician | Vicenza HS | 309 | 1st Floor | Main entrance | Electrical | ||
| 74 | 41961 | Closed Work Orders | Move approx. (16) hallway bulletin boards to various locations identified by ES principal. | as agreed with KO, to be furtherly discussed if this task is included in the SOW, due to the urgency, this work WO will be accomplished and it will be highlighted in order to be discussed in January. |
| 21-12-2017 - on 20 December the 16 bulletin boards have been moved as per ES Principal original request. during the intervention the ES Principal requested to move additional bulletin boards all around b.218 hallways: for a total of 29 bulletin boards definitely re-installed. (materials: anchors, etc. already in our hands) | 12/15/17 | 12/21/17 | Thomas Budny | Presti, Giusy | Sigonella ES | Bldg 218 | Hallway/Corridor | Corridors | Display Boards | |||||
| 75 | 41962 | Closed Work Orders | As per daily walk thru inspection, key card reader on Asma office's door is not working properly. probably battery is low. | card reader batteries were replaced, card reader was tested to make sure that was working properly | 12/15/17 | 12/18/17 | Vicenza, Technician | Vicenza HS | 309 | 1st Floor | Supply room | Doors and Hardware | ||
| 76 | 41965 | Closed Work Orders | window blinds don't work Time Available: any | the window blinds were repaired | 12/15/17 | 12/21/17 | Richard Kabonick | Vicenza, Technician | DSO South | Bldg 307 | 2nd Floor | 221 | Glass\Window Repairs | |
| 77 | 41966 | Closed Work Orders | I need to place a work order for one of the warmers in the front kitchen. Lights green but it doesn’t warm up. | the food warmer was repaired, the thermo-regulator was replaced - | ||||||||||
| the replacement was done by specialized technicians, escorted and supported by Maintenance Contractor technician | 12/15/17 | 1/3/18 | Alisa Pehrson | Vicenza, Technician | Vicenza ES | Bldg 700 | Cafeteria | Cafeteria Serving Line | Kitchen Equipment | |||||
| 78 | 41967 | Closed Work Orders | Water fountain keeps running - flooded floor Time Available: ANY | the water fountain was disassembled, cleaned, lubricated and reassembled, the water flow was adjusted | 12/15/17 | 12/21/17 | Martina Cristante | Aviano, Technician | Aviano ES | 151 | Classroom | E253 | Plumbing | |
| 79 | 41969 | Closed Work Orders | IN the large Motor room (Ms. Hayes), the large light panel along the wall has a leak. It is the ceiling near the wall that abuts the series of white closets. | |||||||||||
| Water is leaking onto a mat, and it is being held within the covering of the light fixture. Time Available: all | one of the light fixture had water inside that had penetrated inside the fixture due to a water leak, it was disassembled, water was removed and fixture was reassembled | 12/15/17 | 12/21/17 | Gina Marquez | Vicenza, Technician | Vicenza ES | Bldg 700 | Classroom | Large OT motor room | Water Leaks | ||||
| 80 | 41970 | Closed Work Orders | Posters need to be hung on the wall in room 39 Time Available: anytime | as agreed with KO, to be furtherly discussed if this task is included in the SOW, due to the urgency, this work will be accomplished | ||||||||||
| New paints have been hung up close to the televisions. | 12/15/17 | 12/22/17 | clitta frigo | Vicenza, Technician | Vicenza HS | 309 | 1st Floor | 39 | Miscellaneous | |||||
| 81 | 41972 | Closed Work Orders | The paper towel hanger in room 38 nurse 's office is damaged. | |||||||||||
| Replace? Time Available: anytime | as agreed with KO/COR, to be furtherly discussed if this task is included in the SOW. This work order will be accomplished and it will be discussed in January. |
the paper towel dispenser was replaced on Dec. 21 portacarta rotto rimosso e sostituito con uno nuovo
| OLIVIERO | 12/15/17 | 12/21/17 | clitta frigo | Vicenza, Technician | Vicenza HS | 309 | 1st Floor | 38 | General Maintenance | |||||
| 82 | 41976 | Closed Work Orders | Please check the AT room door as soon as possible as there are many valuable thing in that room. Time Available: 0800-1700 | the key card had been swiped twice on the reader, when you do so the door remains always open - the electronic lock was lubricated and reset | 12/16/17 | 12/18/17 | ASMAOU SIDI-DALMEIDA | Vicenza, Technician | Vicenza HS | 309 | 2nd Floor | 128 | Doors and Hardware | |
| 83 | 41978 | Closed Work Orders | Bldg. 700 - Bathroom R | |||||||||||
| During daily walk thru inspection 2 clogged toilets have been detected | 2 toilet drains were unclogged and the floor drains were cleaned | 12/15/17 | 12/15/17 | Technicians, SKE | Vicenza ES | Bldg 700 | Restroom | R | Plumbing | |||||
| 84 | 41980 | Closed Work Orders | Bldg. 700 - Corridor in front of room 347 | |||||||||||
| During daily walk thru inspection it has been detected that a drinking fountain is not working properly. | the drink fountain water pressure was adjusted and the button was lubricated | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza ES | Bldg 700 | Hallway/Corridor | In front of room 347 | Plumbing | |||||
| 85 | 41981 | Closed Work Orders | Bldg. 700 - Bathroom Q | |||||||||||
| During daily walk thru inspection 1 clogged toilet drain has been detected. | the toilet was unclogged | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza ES | Bldg 700 | Restroom | Q | Plumbing | |||||
| 86 | 41982 | Closed Work Orders | Bldg. 700 - MPR | |||||||||||
| During daily walk thru inspection it has been detected that a the back door won't open with the card key. | the card reader was disassembled, repaired and reinstalled | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza MS | Bldg 700 | Multi-purpose Room | General Maintenance | ||||||
| 87 | 41983 | Closed Work Orders | Bldg. 700 - Bathroom K | |||||||||||
| During daily walk thru inspection it has been detected that 2 toilet drains are badly clogged with toilet paper rolls. | 2 toilet drains were unclogged | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza ES | Bldg 700 | Restroom | K | Plumbing | |||||
| 88 | 41984 | Closed Work Orders | Bldg. 700 - Room 1013 | |||||||||||
| During daily walk thru inspection 1 clogged sink has been detected. | the sink drain was unclogged | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza MS | Bldg 700 | Classroom | 1013 | Plumbing | |||||
| 89 | 41985 | Closed Work Orders | Bldg. 700 - MPR | |||||||||||
| During daily walk thru inspection it has been detected that a drinking fountain is not working properly. | the water pressure of the drinking fountain was adjusted | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza ES | Bldg 700 | Multi-purpose Room | Plumbing | ||||||
| 90 | 41986 | Closed Work Orders | Bldg. 700 - main office area | |||||||||||
| During daily walk thru inspection it has been detected that the heating system is not working properly | ACX was checked and reset | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza MS | Bldg 700 | Administration Area | main office | Heating/Ventilation /Air Conditioning | |||||
| 91 | 41987 | Closed Work Orders | Bldg. 700 - corridor Via Sicilia | |||||||||||
| During daily walk thru inspection it has been detected that some coat hooks are detaching from the wall. | the coat hooks along Via Sicilia were fixed to the wall | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza ES | Bldg 700 | Hallway/Corridor | Via Sicilia | General Maintenance | |||||
| 92 | 41988 | Closed Work Orders | Bldg. 309 - Gym | |||||||||||
| During daily walk thru inspection Maintenance Contractortechnicians were asked to tur on the heating in the gym, there is a scheduled event taking place in the gym. | heating system was turned on, technicians made sure that it was working properly | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza HS | 309 | Gym | Heating/Ventilation /Air Conditioning | ||||||
| 93 | 41989 | Closed Work Orders | Bldg. 700 - corridor Via Veneto | |||||||||||
| During daily walk thru inspection it has been detected that the fire door coordinator is not working properly. | the fire door coordinator was adjusted | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza ES | Bldg 700 | Hallway/Corridor | Via Sicilia | General Maintenance | |||||
| 94 | 41990 | Closed Work Orders | Bldg. 309 - Gym | |||||||||||
| During daily walk thru inspection 1 inoperative exit light has been detected. | the emergency exit light fixture was disassembled and inspected, there was a burnt neon tube, it was replaced | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza HS | 309 | Gym | Electrical | ||||||
| 95 | 41991 | Closed Work Orders | Bldg. 309 - room 59 | |||||||||||
| During daily walk thru inspection it has been detected that an electric box has detached from the wall. | the electric outlet box was secured to the wall | 12/16/17 | 12/15/17 | Technicians, SKE | Vicenza HS | 309 | room 59 | Electrical | ||||||
| 96 | 42052 | Closed Work Orders | Bldg. 201 - Bathroom T01 | |||||||||||
| During daily walk thru inspection it has been detected that the soap dispenser is detaching from the wall and the anti-panic door handle is not working properly. | the soap dispenser was fixed to the wall and the anti-panic door handle was disassembled, repaired and reinstalled | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Restroom | T01 | Miscellaneous | |||||
| 97 | 42053 | Closed Work Orders | Bldg. 201 - Bathroom T02 | |||||||||||
| During daily walk thru inspection a cracked toilet seat has been detected | the toilet seat was replaced with a new one | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Restroom | T02 | General Maintenance | |||||
| 98 | 42054 | Closed Work Orders | Bldg. 201 - Bathroom T02 | |||||||||||
| During daily walk thru inspection it has been detected that a portion of the baseboard came off and a toilet door latch won't close. | the baseboard was re-glued and the toilet latch was repaired | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Restroom | T02 | General Maintenance | |||||
| 99 | 42055 | Closed Work Orders | Bldg. 201 - Auditorium | |||||||||||
| During daily walk thru inspection it has been detected that the wall mounted clock topped working. | the wall mounted clock was reset and syncronized | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Auditorium | T02 | General Maintenance | |||||
| 100 | 42056 | Closed Work Orders | Bldg. 201 - room C10 | |||||||||||
| During daily walk thru inspection it has been detected that a roller shutter is stuck | the shutter box above the window was disassembled, the roller cord was repositioned inside the track, guide rails and other internal parts were lubricated, the roller shutter was reassembled and tested | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Classroom | C10 | General Maintenance | |||||
| 101 | 42057 | Closed Work Orders | Bldg. 201 - Computers' lab | |||||||||||
| During daily walk thru inspection 2 inoperative lights have been detected | light fixtures were disassembled, burnt lamps were replaced, light fixtures were reassembled and tested. | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Computers' Lab | Electrical | ||||||
| 102 | 42058 | Closed Work Orders | Office door sticks. |
| Identified during Facility survey by Alpha team | the door hinges were adjusted | 12/18/17 | 12/22/17 | Terry Hagen | Vicenza, Technician | Vicenza ES | Bldg 700 | Nurse's Office | Rm 257 | |
| 103 | 42059 | Closed Work Orders | Bldg. 201 - room C16 | |||||||
| During daily walk thru inspection 2 inoperative lights have been detected | light fixtures were disassembled, burnt lamps were replaced, light fixtures were reassembled and tested. | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Classroom | C16 | Electrical | |
| 104 | 42060 | Closed Work Orders | Blue composite sheet flooring is bubbling in spots. |
| Identified during facility survey by Alpha team | The floor has been inspected: there are no bubbles, you can see all the glue marks underneath the linoleum and there are some old stains that look like bubbles but it's just because the linoleum is stained and damaged by wear and tear | 12/18/17 | 12/20/17 | Terry Hagen | Vicenza, Technician | Vicenza ES | Bldg 700 | Classroom | Rm E84 | |
| 105 | 42061 | Closed Work Orders | Bldg. 201 - Supply room | |||||||
| During daily walk thru inspection 6 inoperative lights have been detected | light fixtures were disassembled, burnt lamps and starters were replaced, light fixtures were reassembled and tested. | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Supply | Electrical | ||
| 106 | 42062 | Closed Work Orders | Water stains on ceiling tile |
| Identified during facility survey by Alpha team | the ceiling panels were damaged due to a previous leak already fixed, all the damaged panels were replaced, material was on hand | 12/18/17 | 12/22/17 | Terry Hagen | Vicenza, Technician | Vicenza ES | Utility Room/Closet | Rm E84A | ||||||
| 107 | 42063 | Closed Work Orders | Light switch sizzles and two printers blew ( maybe power surge?) Time Available: 1400 | Maintenance Contractortechnicians found that the 220V printers had been connected to the 110V outlet, shorting the system and burning the switches - the damaged switches were replaced | 12/18/17 | 12/19/17 | Richard Kabonick | Vicenza, Technician | DSO South | Bldg 307 | 1st Floor | 108 | Electrical | |
| 108 | 42064 | Closed Work Orders | Bldg. 201 - FDKG external area | |||||||||||
| During daily walk thru inspection 1 inoperative perimeter light has been detected | burnt lamps were replaced | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | FDKG external area | Electrical | ||||||
| 109 | 42065 | Closed Work Orders | Bldg. 201 - room C02 | |||||||||||
| During daily walk thru inspection 2 inoperative lights have been detected | light fixtures were disassembled, burnt lamps were replaced, light fixtures were reassembled and tested. | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Classroom | C02 | Electrical | |||||
| 110 | 42066 | Closed Work Orders | Bldg. 201 - room C11 | |||||||||||
| During daily walk thru inspection 1 inoperative light has been detected | light fixture was disassembled, burnt lamp and starter were replaced, light fixture was reassembled and tested. | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Classroom | C11 | Electrical | |||||
| 111 | 42067 | Closed Work Orders | Bldg. 201 - Cafeteria corridor | |||||||||||
| During daily walk thru inspection it has been detected that a coat hook is loose, it needs to be secured to the wall | the coat hook was secured to the wall | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Hallway/Corridor | Cafeteria corridor | General Maintenance | |||||
| 112 | 42068 | Closed Work Orders | Bldg. 201 - room C08 bathroom | |||||||||||
| During daily walk thru inspection a clogged toilet has been detected. | the toilet was unclogged, it was severely clogged, tech. had to remove the toilet bowl | 12/18/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Restroom | C08 | General Maintenance | |||||
| 113 | 42069 | Closed Work Orders | During the facility Survey by Alpha Solutions, they identified safety cover plates are missing inside Electrical panel LP1. | safety cover plates were installed | 12/18/17 | 12/22/17 | Terry Hagen | Vicenza, Technician | Vicenza HS | 309 | Hallway/Corridor | |||
| 114 | 42070 | Closed Work Orders | It seems some Emergency exit lights are not working or have the proper emblems. Check all for proper operation and emblems with correct egress directions | Light fixtures were disassembled, burnt lamps were replaced, light fixtures were reassembled and tested. | 12/18/17 | 12/28/17 | Terry Hagen | Vicenza, Technician | DSO South | Bldg 307 | Various | |||
| 115 | 42072 | Closed Work Orders | wall shelf is detached from the wall. | the wall shelf was disassembled, repaired, reassembled and secured to the wall | 12/19/17 | 12/21/17 | David Andler | Aviano, Technician | Aviano ES | 151 | Administration Area | main office | General Maintenance | |
| 116 | 42073 | Closed Work Orders | Bldg. 201 - Gym | |||||||||||
| During daily walk thru inspection it has been detected that a wall mounted electric box is damaged, it needs to be repaired. | the damaged electric box was repaired/secured | 12/19/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Gym | Electrical | ||||||
| 117 | 42074 | Closed Work Orders | Bldg. 201 - Gym | |||||||||||
| During daily walk thru inspection it has been detected that there is a hole on the wall that needs to be plastered. | the hole on the gym wall was plastered | 12/19/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Gym | General Maintenance | ||||||
| 118 | 42075 | Closed Work Orders | Bldg. 201 - Bathroom T02 | |||||||||||
| During daily walk thru inspection it has been detected that the cover of the floor drainage well is broken, it needs to be replaced | the drain grid cover was replaced | 12/19/17 | 12/18/17 | Technicians, SKE | Livorno EHS | Bldg 201 (ES) | Restroom | T02 | General Maintenance | |||||
| 119 | 42076 | Closed Work Orders | Bldg. 151 - HS main entry | |||||||||||
| During daily walk thru inspection 1 inoperative light has been detected. | the light fixture was disassembled, 1 inoperative lamp and 1 damaged starter were replaced, light fixture was reassembled and tested | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Hallway/Corridor | HS main entry | Electrical | |||||
| 120 | 42077 | Closed Work Orders | Bldg. 151 - corridor in front of room S60 | |||||||||||
| During daily walk thru inspection 1 inoperative light has been detected. | the light fixture was disassembled, 1 inoperative lamp and 1 damaged starter were replaced, light fixture was reassembled and tested | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Hallway/Corridor | in front of room S60 | Electrical | |||||
| 121 | 42078 | Closed Work Orders | Bldg. 151 - corridor in front of room S15 | |||||||||||
| During daily walk thru inspection 2 inoperative lights been detected. | Light fixtures were disassembled, burnt lamps were replaced, light fixtures were reassembled and tested. | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Hallway/Corridor | in front of room S215 | Electrical | |||||
| 122 | 42079 | Closed Work Orders | Bldg. 151 - room S61 girls' bathroom | |||||||||||
| During daily walk thru inspection a clogged toilet has been detected. | the toilet was unclogged | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Restroom (Girls) | S61 | Plumbing | |||||
| 123 | 42080 | Closed Work Orders | Bldg. 151 - room S220 boys' bathroom | |||||||||||
| During daily walk thru inspection it has been detected that some ceiling tiles are detached from the false ceiling support frame, they need to be repositioned. | the ceiling tiles were repositioned/fixed | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Restroom (Boys) | S220 | General Maintenance | |||||
| 124 | 42081 | Closed Work Orders | Bldg. 151 - room S21 girls' bathroom | |||||||||||
| During daily walk thru inspection it has been detected that some ceiling tiles are detached from the false ceiling support frame, they need to be repositioned. | the ceiling tiles were repositioned/fixed | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Restroom (Girls) | S21 | General Maintenance | |||||
| 125 | 42082 | Closed Work Orders | Bldg. 151 - HS main entry | |||||||||||
| During daily walk thru inspection it has been detected that the main entry door is hard to open, it needs to be inspected and repaired. | the main entry door was repaired, additional screws were added, door hinges were adjusted | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Hallway/Corridor | HS main entry | General Maintenance | |||||
| 126 | 42083 | Closed Work Orders | Bldg. 151 - room S20 boys' bathroom | |||||||||||
| During daily walk thru inspection it has been detected that some ceiling tiles are broken, they need to be replaced. | the broken ceiling tiles were replaced and cut to insert the vents on the false ceiling | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Restroom (Boys) | S20 | General Maintenance | |||||
| 127 | 42084 | Closed Work Orders | Bldg. 151 - corridor in front of HS gym | |||||||||||
| During daily walk thru inspection it has been detected that some display case sliding doors are off the tracks | the doors of the display cases were put back in place | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Hallway/Corridor | in front of HS gym | General Maintenance | |||||
| 128 | 42085 | Closed Work Orders | b.220 - Admin entrance - As reported by MHS Assistant Principal the simons voss cylinder remain engaged and doesn't lock also after the master key lock input. the problem seems to be related to a programming problem (software managed by school personnel) so it has been requested only to dismount the cylinder from the door to leave it secured for this night and to reinstall it back tomorrow morning. thank you | 28-12-2017 - problem was related to software set up problem (solved by QAE when came back) so it was necessary to dismount the cylinder every night before to leave and reinstall it next early morning to guarantee door proper functioning to the admin area | 12/19/17 | 12/28/17 | Presti, Giusy | Sigonella MHS | Bldg 220 | Administration Area | Doors and Hardware | |||
| 129 | 42086 | Closed Work Orders | Bldg. 151 - room S61 girls' bathroom | |||||||||||
| During daily walk thru inspection it has been detected that a toilet flusher is constantly running. | toilet flusher tank was disassembled, parts were cleaned from calcium deposits, bottom seal was replaced, parts were reassembled | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Restroom (Girls) | S61 | Plumbing | |||||
| 130 | 42087 | Closed Work Orders | b.211 - hallway l.100 - as per DWT inspection, it has been found a damaged spring bar in the corridor door that have to be repaired | 19-12-2017 - the damaged spring bar has been reassembled and reinstalled. now the door mechanism is working properly | 12/19/17 | 12/19/17 | Presti, Giusy | Sigonella ES | Bldg 211 | Hallway/Corridor | Doors and Hardware | |||
| 131 | 42089 | Closed Work Orders | Bldg. 151 - room S86 boys' bathroom | |||||||||||
| During daily walk thru inspection it has been detected that 2 toilet flushers are constantly running. | toilet flusher tanks were disassembled, parts were cleaned from calcium deposits, bottom seals were replaced, water flow was adjusted and parts were reassembled | 12/19/17 | 12/18/17 | Technicians, SKE | Aviano MHS | HS 151 | Restroom (Boys) | S86 | Plumbing | |||||
| 132 | 42091 | Closed Work Orders | Bldg. 151 - corridor in front of room C02 | |||||||||||
| During daily walk thru inspection 2 inoperative lights have been detected. | the light fixtures were disassembled, inoperative lamps were replaced, light fixtures were reassembled and tested | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Hallway/Corridor | in front of room C02 | Electrical | |||||
| 133 | 42092 | Closed Work Orders | Bldg. 151 - corridor in front of room E40 | |||||||||||
| During daily walk thru inspection 1 inoperative light has been detected. | the light fixture was disassembled, 1 inoperative lamp and 1 starter were replaced, light fixture was reassembled and tested | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Hallway/Corridor | in front of room E40 | Electrical | |||||
| 134 | 42093 | Closed Work Orders | Bldg. 151 - corridor in front of room E25 | |||||||||||
| During daily walk thru inspection 2 inoperative lights have been detected. | the light fixtures were disassembled, 2 lamps, 2 lamp supports and 2 starters were replaced, light fixtures were reassembled and tested | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Hallway/Corridor | in front of room E25 | Electrical | |||||
| 135 | 42094 | Closed Work Orders | Bldg. 151 - corridor in front of room E95 | |||||||||||
| During daily walk thru inspection 2 inoperative lights have been detected. | the light fixtures were disassembled, 2 lamps were replaced, light fixtures were reassembled and tested | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Hallway/Corridor | in front of room E95 | Electrical | |||||
| 136 | 42095 | Closed Work Orders | Bldg. 151 - E121 girls' bathroom | |||||||||||
| During daily walk thru inspection 2 inoperative lights have been detected above the sinks | light fixtures were disassembled, burnt lamps were replaced, light fixtures were reassembled and tested | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Restroom (Girls) | E121 | Electrical | |||||
| 137 | 42096 | Closed Work Orders | Bldg. 151 - E121 girls' bathroom | |||||||||||
| During daily walk thru inspection 2 clogged sinks have been detected | sink drains were unclogged | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Restroom (Girls) | E121 | Plumbing | |||||
| 138 | 42097 | Closed Work Orders | Bldg. 151 - E161 girls' bathroom | |||||||||||
| During daily walk thru inspection 1 clogged sink has been detected | sink drain was unclogged | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Restroom (Girls) | E161 | Plumbing | |||||
| 139 | 42098 | Closed Work Orders | Bldg. 151 - E120 boys' bathroom | |||||||||||
| During daily walk thru inspection 1 clogged sink has been detected | sink drain was unclogged | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Restroom (Boys) | E120 | Plumbing | |||||
| 140 | 42099 | Closed Work Orders | Bldg. 151 - E220 boys' bathroom | |||||||||||
| During daily walk thru inspection 2 clogged sinks have been detected | sink drains were unclogged | 12/19/17 | 12/19/17 | Technicians, SKE | Aviano ES | 151 | Restroom (Boys) | E220 | Plumbing | |||||
| 141 | 42100 | Closed Work Orders | Bldg. 151 - E74 boys' bathroom |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .