A.07.23.02_Attch_2_Resume.docx

DOCX document 13 KB Posted

Attached to
Design/Build Secondary School Renovations in Svrljig, Serbia
Solicitation number
W912GB18R0032
Issued by

About this file

Solicitation Attachment 2 - Resume Form

View the file

Other files

Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

RESUME FORM

Solicitation W912GB18R0032 (Attach additional pages as necessary)

PRIME CONTRACTOR SPECIFICALLY IDENTIFIED KEY PERSONNEL: Check applicable box

[ ] Project Manager (PM)[ ] Construction Site Superintendent (SS)
[ ] Contractor Quality Control Manage (CQCM)[ ] Site Health and Safety Officer (SSHO)
[ ] Quality Control (QC) Civil Engineer[ ] QC Mechanical Engineer
[ ] QC Mechanical Technician[ ] QC Electrical Engineer

[ ] QC Concrete, Pavement and Soils (Material Technician)

Name of Individual: _________________________________________________________

Employed by: ________________________________________________________________

Number of years with firm: _________________________________________________

Number of years as practicing professional in your current field: ___________

Clearance Level (e.g. Secret, Top Secret, etc): ________________________________________

Education: (degree(s)/year/specialization): _____________________________________________________________________________

Registration/Number/State/Year: _____________________________________________________________________________

Experience: (most recent to earliest) (attach additional pages as required)

Project: __________________________Company: __________________________________ Dates: From _______________ to ___________________ Type of Construction or Design: _____________________________________________________________________________ Duties & Responsibilities:

Project: __________________________Company: __________________________________ Dates: From _______________ to ___________________ Type of Construction or Design: _____________________________________________________________________________ Duties & Responsibilities:

Project: __________________________Company __________________________________ Dates: From _______________ to ___________________ Type of Construction or Design: _____________________________________________________________________________ Duties & Responsibilities:

Project: __________________________Company __________________________________

Type of Construction or Design: _____________________________________________________________________________ Duties & Responsibilities:

Experience with other Key Personnel identified for this project:

Period of time as an employee of the US Prime Contractor or US Joint Venture Partner:

File details come from the government source that posted it.