CLIN 0001 List of jobs and parts.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- CAT bulldozer Model D8 Rebuild
- Solicitation number
- W912ES25QA060
About this file
The file is a detailed Excel spreadsheet (CLIN 0001 List of jobs and parts) describing a comprehensive Caterpillar D8T dozer rebuild process for the U.S. Army Corps of Engineers. The rebuild involves extensive reconditioning and replacement of critical components, including the engine, transmission, hydraulic systems, electrical systems, and structural elements. Specific tasks include removing and reinstalling/reconditioning major assemblies such as the track assembly, steering motor, brake assemblies, cab, and fuel tank, with all parts to be new and genuine Caterpillar OEM parts.
Key additional requirements include replacing the entire wiring harness, converting lighting to LED, installing an appropriately sized winch, performing all OEM preventive maintenance, painting to OEM specifications, and installing factory engine and operating system software. The rebuild comes with a warranty covering a minimum of three years or 5,000 hours. The specific dozer is a 2011 model with approximately 10,760 hours at the time of service, and all work will be performed at a Caterpillar OEM Certified Repair Facility by certified technicians. The total price for the comprehensive rebuild is listed as $0.00, though this may be a placeholder or placeholder value.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025-06-17 CAT D8T Rebuild.docx | DOCX document | |
| Solicitation - W912ES25QA060.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Job/Part | Price |
| The dozer will be cleaned prior to disassembly, all data plate information will be noted. If data plates are in good condition and legible they can be reused. | |
| Remove, install, recondition the belly pans, or bottom guards. | |
| Remove, install, recondition the radiator guard. | |
| Remove, install, recondition the radiator. | |
| Remove, install, recondition the engine and all engine components. This includes items such as water pumps, alternators, belts, tensioners, etc. | |
| Remove existing, install a new muffler. | |
| Remove, install, recondition the air conditioning system. This includes all lines, filters, and needed gaskets. | |
| Remove, install, recondition the heating system. This includes all lines, filters, and needed gaskets. | |
| Remove, install, recondition the torque converter and related parts. | |
| Remove, install, recondition the transmission system. This includes bearings, seals, fluids, filters, etc. | |
| Remove, install, recondition the transmission oil pump. | |
| Remove, install, recondition the track assembly. | |
| Remove, install, recondition the equalizer bar. | |
| Remove, install, recondition the steering motor. | |
| Remove, install, recondition the final drives, and the brakes assemblies. | |
| Remove, install, recondition the differential steering. | |
| Remove, install, recondition the piston pump. | |
| Remove, install, recondition the service brake controls. | |
| Remove, install, recondition the lift/hoist cylinders. | |
| Remove, install, recondition the tilt cylinders. | |
| Remove, install, replace all transmission oil lines. | |
| Remove, install, replace all hydraulic lines. | |
| Remove, install, replace all hydraulic pilot lines. | |
| Remove, install, recondition the hydraulic control valves. | |
| Remove, install, recondition the hydraulic tank. | |
| Remove, install, recondition the decelerator/ accelerator. | |
| Remove, install, recondition the cab. | |
| Remove, install, recondition the fuel tank. | |
| Replace the entire wiring harness. This includes all components, for the chassis, engine, and HVAC system. | |
| Perform all OEM preventive maintenance to the rebuilt unit. | |
| Paint the dozer to match OEM specifications. | |
| Install all factory engine and operating system software. | |
| Provide factory warranty that covers at a minimum three years, or 5,000 hours. | |
| All lighting needs to be converted to LED, from conventional lamps. | |
| Appropriate sized winch matched to machine installed. |
Total Price $0.00
File details come from the government source that posted it. Updated .