This document is an Amendment (No. 0002) to a federal solicitation for a mini-split HVAC unit installation on the M/V Warioto, a U.S. Army Corps of Engineers vessel. The amendment modifies key contract details, including extending the delivery date from May 19, 2025 to May 27, 2025 and changing the response date/time from May 8, 2025 at 11:00 AM to May 12, 2025 at 11:00 AM. The contract requires installing a new 4.0-ton outdoor heat pump condensing unit and indoor air handler at the Fountain City Service Base in Wisconsin, with compatibility for R-32 or R410A refrigerant and compliance with 2025 EPA regulations.

The scope of work involves complete replacement of the existing HVAC system, including procurement, installation, testing, commissioning, and disposal of the old unit. The contractor must provide operational manuals, perform all installation at 431 North Shore Drive in Fountain City, WI by the specified date, and be prepared to conduct future warranty work anywhere the vessel operates between St. Paul, MN and St. Louis, MO. The government will provide crane support for equipment movement if prior notice is given, and the installation must accommodate specific dimensional constraints with a heat pump capable of functioning at 0 degrees Fahrenheit or lower.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6751087775

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0002 is to change the type of refrigerants accepted to include R410A and extend the completion date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-May-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES25Q0046

X 9B. DATED (SEE ITEM 11)

29-Apr-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-May-2025

CODE

CONTRACTING DIVISION

USACE, ST PAUL

332 MINNESOTA STREET

SUITE E1500

ST PAUL MN 55101-1323

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES25Q0046

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 08-May-2025 11:00 AM to 12-May-2025 11:00 AM.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

19-MAY-2025 1 FOUNTAIN CITY SERVICE BASE

ADAM LOVEN

431 NORTH SHORE DRIVE

FOUNTAIN CITY WI 54629-0397

651-290-5141

FOB: Destination

965605

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

27-MAY-2025 1 FOUNTAIN CITY SERVICE BASE

ADAM LOVEN

431 NORTH SHORE DRIVE

FOUNTAIN CITY WI 54629-0397

651-290-5141

FOB: Destination

965605

The following have been modified:

STATEMENT OF WORK

1. SUMMARY

The contractor shall be responsible for installing, testing, and commissioning of the new HVAC unit with heat pump on the Warioto to include all labor and materials associated with the replacement of the HVAC system. All installation and testing shall take place at our service base, located at 431 North Shore Drive, Fountain City, WI 54629 by May 19, 2025. If installation takes longer, it may be completed at a remote site (TBD) while the vessel is underway in Pool 4 (between Lock & Dam 3 and Lock & Dam 4) before May 30, 2025. If the weather does not permit system testing and commissioning at the time of completion the contractor shall schedule a system test and commissioning on the next business day of permittable weather.

2. OPERATIONAL BACKGROUND

The Warioto is a towing vessel that pushes the Dredge Goetz fleet up and down the Mississippi

River System. The U.S. Army Corps of Engineers, Saint Paul District, operates the Warioto in the northern sections of the Mississippi River and parts of the Illinois River. It is typically operating from May thru November. For this reason, the work needs to be completed before

May 19, 2025, at the Fountain City Service Base (FCSB) in Fountain City, WI. Further, for this reason, any warranty work that is deemed necessary in the future shall be performed on location of the Warioto which could be located between St. Paul, MN and St. Louis, MO on the

Mississippi River.

3. SCOPE OF WORK

The contractor shall assume complete responsibility for procuring a new HVAC Unit and the disposal of the old unit following all local, state, and federal regulations. Should the condensing unit need to be relocated the contractor shall notify the Physical Support Branch Representative.

The contractor shall provide operational and/or instructional manuals for the operation of the units to include but not limited to; normal controlling of thermostats and settings, routine maintenance and cleaning, common troubleshooting procedures, SDS for any chemicals, etc.

The Contractor shall be responsible for installing the new condenser, new air handler, applicable control systems, applicable ductwork, applicable drains and new 3/8 x 5/8 line-sets, programming, commissioning, and testing of the HVAC Units on the Warioto, including all labor and materials associated with installation. All installation and testing shall take place at our service base, located at : 431 North Shore Drive, Fountain City, WI. 54629 by May 19, 2025.

All warranty work that is deemed necessary going forth shall be performed at any location where the MV Warioto is located at the time needed which could be from St. Paul, MN to St. Louis, MO along the Mississippi river.

The Government will supply crane support to move equipment on and off the vessel, if given prior notice this is required.

4. STANDARD PARTS & MATERIALS

All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the HVAC Units shall be of the highest grade, free from defects and imperfections, unused and, be the standard product of reputable manufacturers, to the maximum extent practicable. Any material not specified shall be the best of their kind for the purpose intended.

Materials specified herein to meet the requirements of standard specifications published by national authorities shall conform to the respective editions, including amendments, specified.

No salvage materials shall be used in the work.

Outdoor Heat Pump Condensing Unit 4.0 ton, 230VAC, single phase, 60 Hz to meet or exceed federal guidelines for energy star certification, compatible with 2025 EPA compliant regulations using R-32 Refrigerant or R410A Refrigerant and have Max Dimensions W 37”

X H 56” X D 30” to fit in the installation space

Indoor Air handler 230VAC, single phase, 60Hz to meet or exceed federal guidelines for energy star certification, that is compatible with 2025 EPA compliant regulations using R-

32 Refrigerant or R410A Refrigerant, Max Dimensions W 33.5” if including plumbing X

H57” or H 59.5” with allowable modification to existing inlet ductwork X D 25.25” including plumbing) to fit in the installation space. Cooling Btu/h between 45,000 and

50,000. Heating Btu/h between 50,000 and 55,000. The heat function shall be able to function to 0 degrees F or lower. The airflow shall have a minimum of 1250 CFM.

Line sets 3/8”x 5/8” that are compatible with 2025 EPA compliant regulations using R-32

Refrigerant or R410A Refrigerant (as applicable)

Applicable controls ie: thermostats, shut off switch, etc

Applicable ductwork transitions

Applicable drains

Notable Constraints:

The work shall be completed in Fountain City, WI. Contractor shall work with the point of contacts on the start and completion date.

As noted in the Scope of Work (SOW), the installation space is limited. The contractor shall measure and consider this constraint to stay within the project timeline.

Delivery and Installation Location Information:

United States Army Corps of Engineers

Attn: Dredge Goetz

431 North Shore Drive

Fountain City, WI 54629

Hours of Operation:

0700 – 1530: Monday – Friday

Closed: Weekends & Holidays

On-site Supervisor’s and Technical Point of Contact’s:

Adam Loven

Plant and Facilities Engineer

431 North Shore Drive

Fountain City, WI 54629

Cell #: 651-290-5141

E-mail: Adam.F.Loven@usace,.army.mil

(End of Summary of Changes)

File details come from the government source that posted it. Updated .