W912ES24B0005_PLANS.pdf

PDF 44 MB Posted

Attached to
Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5
Solicitation number
W912ES24B0005
Issued by

About this file

This document appears to be a solicitation package (W912ES24B0005) for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5. The project consists of constructing an approximately 1.8-mile-long earth dam embankment with soil-cement mixture and a gravel road, as well as replacing existing culverts at Wolverton Creek and the Hwy 75 intersection. The solicitation is a Firm, Fixed-Price contract with an estimated value between $5,000,000 and $10,000,000. The NAICS code is 237990 (Other Heavy and Civil Engineering Construction) with a size standard of $45.0 million. This is a Total Small Business Set-Aside and an Invitation for Bid (IFB). Offerors must be registered in the System for Award Management (SAM) and have an active account with the representations and certifications sections completed prior to award.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

IC

H L

A N

D C

O

45'

46°40'

T

N

T

N

To St. Benedict

To Hickson

RUSTAD

EST. POP. 50

BAKER

EST. POP. 100

DOWNER

COMSTOCK

P

IP

E

LIN

E

C O

C O

M P

A N

Y

C O

M P

A N

Y

A M E R

IC

A N

O

IL

C O

C O

R a ilw a y

V a lley

S to n y

Creek

H ay

H ay

B u ffa lo

Whisky

River

W olverton

C re e k

.2

Cr

EST. POP. 100

W I L K I N

N O

R T

H

D

A K

O T

A

1-

1-

B N

S F

POP. 93

WOLVERTON

.5

W o lv e rto n

C re e k

W o lv e rto n

Creek

S o u th

B ra n c h

.5

C A

SS

C O

To Christine

T

N

46°35'

96°45'

C L A Y C

R

B N

S F

R a ilw a y

POP. 142

58 58

A R N E S VB

O L Y

R O S S

H

C

L L IA N C EA

W O L V E R T O N

D E E R H O R N A T H

R O B E R T S

A N

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

S

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:5

:3

P

M

/2

/2

F M

M S

E

G

-0

.d g n

R M

C G

A R

V E

Y

D B

E N

C H

M A

R K

C O

N T

R O

L P

O

IN

T S

L O

C A

T

IO

N A

N D

V

IC

IN

IT

Y M

A P

G-002

J M

O S

E R

R M

C G

A R

V

F M

M S

E

G

-0

.d g n

J M

O S

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

PROJECT LOCATION SE-5

8408 F

JAGUARS

1406 S RESET

CROSS

STATE BOUNDARY

RED RIVER OF THE NORTH

CITY OF FARGO

17 MILES FROM

PROJECT LOCATION

180TH AVE S

TOWNSHIP 1

120TH ST

130TH ST

T O

W N

S H

IP

T O

W N

S H

IP

T

H S

T R

E E

T S

C O R

D

T O

W N

S H

IP

170TH AVE S

T

H S

T R

E E

T S

160TH AVE S

R

D S

T R

E E

T S

SEPARATE CONTRACT

TO BE COMPLETED UNDER

SE-4 PROJECT LIMITS

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

A1

SCALE: 1" = 5000'

LOCATION MAP

CLAY AND WILKIN COUNTIES, MINNESOTA 0 5000' 10000'

G14

ST PAUL DISTRICT

SCALE: NTS

VICINITY MAP

N

VERTICAL AND HORIZONTAL CONTROL POINTS

NAME

CROSS

1406 S RESET

JAGUARS

8408 F

NORTHING EASTING ELEVATION DESCRIPTION

948389.25

943345.65

937759.30

930015.55

1997681.49

1989662.90

1997299.30

1995664.82

919.49

920.48

923.23

923.26

25' ALUMINUM ROD

25' ALUMINUM ROD

25' ALUMINUM ROD

PRECAST CONCRETE POST WITH SURVEY DISK

D14

CONTROL TABLE

N

W

IL

K

IN

C O

C

L A

Y C

O

LEGEND

RIVERS & LAKES

LOCK AND DAM

NATIONAL BOUNDARIES

DISTRICT BOUNDARIES

STATE BOUNDARIES

IOWA

SOUTH DAKOTA

NORTH DAKOTA

MINNESOTA

WISCONSIN

MINOT

S

O S

RU

I

R

FORKS

GRAND

CITY

VALLEY

R

D E

R I V E R

F O

T H E

N O

T R

H

BRAINERD

BEMIDJI

MINNEAPOLIS

M I N

NES

O

TA

R

MANKATO

ST. PAUL

EAU CLAIRE

ROCHESTER

MADISON

PORTAGE

WIS

SIN

R

CON

C

HI

P P E

W A

R S T

CROIX

R

I S

SPPI

R

M I S S

I

DULUTH

GRAND RAPIDS

MICHIGAN

LAKE

DEVIL'S

CLOUD

ST.

C A N A D A

LOCATION

PROJECT

S

HEYENNE R

FARGO

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:5

:4

P

M

/2

/2

F M

M S

E

G

-0

.d g n

R M

C G

A R

V

IN

E X

G-003

J M

O S

E R

R M

C G

A R

V

M S

E

G

-0

.d

M

O S

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

DESCRIPTION

CONSTRUCTION DRAWING INDEX

PRODUCT I.D.

DRAWING NO.

AS-BUILT

REF.

SHEET

CS207

CS206

CS205

CS204

CS203

CS202

CS201

CS200

CS106

CS105

CS104

CS103

CS102

CS101

CS100

CP103

CP102

CP101

CP100

CD104

CD103

CD102

CD101

CD100

B-303

B-302

B-301

B-300

B-101

B-100

G-602

G-601

G-107

G-106

G-105

G-104

G-103

G-102

G-101

G-100

G-004

G-003

G-002

G-001

PROFILES - DITCH SOUTH SIDE STA SDC 0+00 TO 11+50

PROFILES - DITCH SOUTH SIDE STA SDB 22+00 TO 33+00

PROFILES - DITCH SOUTH SIDE STA SDB 0+00 TO 22+00

PROFILES - DITCH SOUTH SIDE STA SDA 0+00 TO 13+50

PROFILES - DITCH NORTH SIDE STA NDC 0+00 TO 11+50

PROFILES - DITCH NORTH SIDE STA NDB 22+00 TO 33+00

PROFILES - DITCH NORTH SIDE STA NDB 0+00 TO 22+00

PROFILES - DITCH NORTH SIDE STA NDA 0+00 TO 14+00

EMBANKMENT PLAN AND PROFILE STA 95+50 TO 107+50

EMBANKMENT PLAN AND PROFILE STA 83+50 TO 95+50

EMBANKMENT PLAN AND PROFILE STA 71+50 TO 83+50

EMBANKMENT PLAN AND PROFILE STA 59+50 TO 71+50

EMBANKMENT PLAN AND PROFILE STA 47+50 TO 59+50

EMBANKMENT PLAN AND PROFILE STA 11+50 TO 23+50

EMBANKMENT PLAN AND PROFILE STA 0+00 TO 11+50

PLAN - HIGHWAY 75 - FINAL STRIPING PLAN

PLAN - DETOUR - HIGHWAY 75 CLOSURE

PLAN - DETOURS SIGNS - 180TH AVE. CLOSURE

PLAN - ADVANCED SIGNING

DEMOLITION PLAN STA 95+50 TO 107+50

DEMOLITION PLAN STA 71+50 TO 95+50

DEMOLITION PLAN STA 47+50 TO 71+50

DEMOLITION PLAN STA 23+50 TO 47+50

DEMOLITION PLAN STA 0+00 TO 23+50

CIVIL

BORING LOGS (SHEET 4 OF 4)

BORING LOGS (SHEET 3 OF 4)

BORING LOGS (SHEET 2 OF 4)

BORING LOGS (SHEET 1 OF 4)

PLAN - BORING LOCATIONS MAP - HIGHWAY 75 INTERSECTION

PLAN - BORING LOCATIONS SITE

GEOTECHNICAL

HORIZONTAL CONTROL POINT TABLES - WORK LIMITS & HWY 75 PAVING

HORIZONTAL CONTROL POINT TABLES - CENTERLINE ALIGNMENTS

PLAN - HORIZONTAL DITCH ALIGNMENTS 2 OF 2

PLAN - HORIZONTAL DITCH ALIGNMENTS 1 OF 2

PLAN - HORIZONTAL ROAD ALIGNMENTS

PLAN - CULVERT STAGING AREA FOR BRRWD

PLAN - SE-5 BORROW SITE

PLAN - I-29 DISPOSAL SITE

PLAN - LOCATION MAP - BORROW AND DISPOSAL SITES

PLAN - OVERALL SITE & SHEET REFERENCE

GENERAL NOTES, ABBREVIATIONS AND LEGEND

INDEX

LOCATION AND VICINITY MAP AND BENCHMARK CONTROL POINTS

COVER SHEET

GENERAL

TO SCALE.

FORMAT OF THIS PLAN SET AND ARE NOT

REDUCED OR ENLARGED TO FIT THE SIZE

NOTE: DRAWINGS WITH AN "*" ARE

FMMSE5_CS207.dgn

FMMSE5_CS206.dgn

FMMSE5_CS205.dgn

FMMSE5_CS204.dgn

FMMSE5_CS203.dgn

FMMSE5_CS202.dgn

FMMSE5_CS201.dgn

FMMSE5_CS200.dgn

FMMSE5_CS106.dgn

FMMSE5_CS105.dgn

FMMSE5_CS104.dgn

FMMSE5_CS103.dgn

FMMSE5_CS102.dgn

FMMSE5_CS101.dgn

FMMSE5_CS100.dgn

FMMSE5_CP103.dgn

FMMSE5_CP102.dgn

FMMSE5_CP101.dgn

FMMSE5_CP100.dgn

FMMSE5_CD104.dgn

FMMSE5_CD103.dgn

FMMSE5_CD102.dgn

FMMSE5_CD101.dgn

FMMSE5_CD100.dgn

FMMSE5_B-303.dgn

FMMSE5_B-302.dgn

FMMSE5_B-301.dgn

FMMSE5_B-300.dgn

FMMSE5_B-101.dgn

FMMSE5_B-100.dgn

FMMSE5_G-602.dgn

FMMSE5_G-601.dgn

FMMSE5_G-107.dgn

FMMSE5_G-106.dgn

FMMSE5_G-105.dgn

FMMSE5_G-104.dgn

FMMSE5_G-103.dgn

FMMSE5_G-102.dgn

FMMSE5_G-101.dgn

FMMSE5_G-100.dgn

FMMSE5_G-004.dgn

FMMSE5_G-003.dgn

FMMSE5_G-002.dgn

FMMSE5_G-001.dgn

DESCRIPTION PRODUCT I.D.

DRAWING NO.

AS-BUILT

REF.

SHEET

CG306

CG305

CG304

CG303

CG302

CG301

CG300

CS508

CS507

CS506

CS505

CS504

CS503

CS502

CS501

CS500

CS418

CS417

CS416

CS415

CS414

CS413

CS412

CS411

CS410

CS409

CS408

CS407

CS406

CS405

CS404

CS403

CS402

CS401

CS400

CS314

CS313

CS312

CS311

CS310

CS309

CS308

CS307

CS306

CS305

CS304

CS303

CS302

CS301

CS300

CROSS SECTIONS EMBANKMENT 7 OF 46

CROSS SECTIONS EMBANKMENT 6 OF 46

CROSS SECTIONS EMBANKMENT 5 OF 46

CROSS SECTIONS EMBANKMENT 4 OF 46

CROSS SECTIONS EMBANKMENT 3 OF 46

CROSS SECTIONS EMBANKMENT 2 OF 46

CROSS SECTIONS EMBANKMENT 1 OF 46

CIVIL DETAILS - ROAD SECTIONS - HIGHWAY 76 - EXISTING

CIVIL DETAILS - ROAD SECTIONS - HIGHWAY 75 - PROPOSED

CIVIL DETAILS - ROAD SECTIONS - 180TH AVE S - 2 OF 3

CIVIL DETAILS - ROAD SECTIONS - 180TH AVE S - 2 OF 3

CIVIL DETAILS - ROAD SECTIONS - 180TH AVE S - 1 OF 3

CIVIL DETAILS - GRANULAR FILTER SECTIONS

CIVIL DETAILS - GRANULAR FILTER PLAN AND ELEVATION

CIVIL DETAILS - SOIL CEMENT & DAM TIE IN

CIVIL DETAILS - DITCH RIPRAP, CULVERT TRENCH

PROFILES - HIGHWAY 75 & 180TH AVE. INTERSECTION CONTROL LINES

PLAN - HIGHWAY 75 & 180TH AVE. INTERSECTION CONTROL LINES

PLAN & PROFILE - 180TH AVE S - EMBANKMENT & INSPECTION TRENCH

PLAN & PROFILE - HIGHWAY 75

PLAN & PROFILE - EAST CULVERT EXCAVATION

PLAN & PROFILE - WEST CULVERT EXCAVATION

PLAN & PROFILE - TOWNSHIP ROAD 172 ACCESS

PLAN & PROFILE - STA. 99+15 NORTH ACCESS

PLAN & PROFILE - STA. 90+35 NORTH ACCESS

PLAN & PROFILE - STA. 88+30 SOUTH ACCESS

PLAN & PROFILE - STA. 88+30 NORTH ACCESS

PLAN & PROFILE - STA. 86+30 SOUTH ACCESS

PLAN & PROFILE - STA. 83+90 SOUTH DRIVEWAY

PLAN & PROFILE - STA. 83+80 NORTH DRIVEWAY

PLAN & PROFILE - STA. 81+35 ACCESS

PLAN & PROFILE - STA. 72+45 SOUTH ACCESS

PLAN & PROFILE - STA. 55+60 NORTH ACCESS

PLAN - NORTH WOLVERTON CREEK RIPRAP

PLAN - SOUTH WOLVERTON CREEK RIPRAP

TYPICAL SECTION - DISPOSAL SITE - 50 SCALE

TYPICAL SECTIONS - HIGHWAY 75 THRU LANES AND TURN LANES 2 OF 2

TYPICAL SECTIONS - HIGHWAY 75 THRU LANES AND TURN LANES 1 OF 2

TYPICAL SECTIONS - 180TH AVE INTERSECTION WITH HIGHWAY 75

TYPICAL SECTIONS - DRIVEWAYS AND FIELD ACCESSES

TYPICAL SECTIONS - EMBANKMENT 10 OF 10

TYPICAL SECTIONS - EMBANKMENT 9 OF 10

TYPICAL SECTIONS - EMBANKMENT 8 OF 10

TYPICAL SECTIONS - EMBANKMENT 7 OF 10

TYPICAL SECTIONS - EMBANKMENT 6 OF 10

TYPICAL SECTIONS - EMBANKMENT 5 OF 10

TYPICAL SECTIONS - EMBANKMENT 4 OF 10

TYPICAL SECTIONS - EMBANKMENT 3 OF 10

TYPICAL SECTIONS - EMBANKMENT 2 OF 10

TYPICAL SECTIONS - EMBANKMENT 1 OF 10

CIVIL (CONTINUED)

FMMSE5_CG306.dgn

FMMSE5_CG305.dgn

FMMSE5_CG304.dgn

FMMSE5_CG303.dgn

FMMSE5_CG302.dgn

FMMSE5_CG301.dgn

FMMSE5_CG300.dgn

FMMSE5_CS508.dgn

FMMSE5_CS507.dgn

FMMSE5_CS506.dgn

FMMSE5_CS505.dgn

FMMSE5_CS504.dgn

FMMSE5_CS503.dgn

FMMSE5_CS502.dgn

FMMSE5_CS501.dgn

FMMSE5_CS500.dgn

FMMSE5_CS418.dgn

FMMSE5_CS417.dgn

FMMSE5_CS416.dgn

FMMSE5_CS415.dgn

FMMSE5_CS414.dgn

FMMSE5_CS413.dgn

FMMSE5_CS412.dgn

FMMSE5_CS411.dgn

FMMSE5_CS410.dgn

FMMSE5_CS409.dgn

FMMSE5_CS408.dgn

FMMSE5_CS407.dgn

FMMSE5_CS406.dgn

FMMSE5_CS405.dgn

FMMSE5_CS404.dgn

FMMSE5_CS403.dgn

FMMSE5_CS402.dgn

FMMSE5_CS401.dgn

FMMSE5_CS400.dgn

FMMSE5_CS314.dgn

FMMSE5_CS313.dgn

FMMSE5_CS312.dgn

FMMSE5_CS311.dgn

FMMSE5_CS310.dgn

FMMSE5_CS309.dgn

FMMSE5_CS308.dgn

FMMSE5_CS307.dgn

FMMSE5_CS306.dgn

FMMSE5_CS305.dgn

FMMSE5_CS304.dgn

FMMSE5_CS303.dgn

FMMSE5_CS302.dgn

FMMSE5_CS301.dgn

FMMSE5_CS300.dgn

PRODUCT I.D.

REFERENCE DRAWING INDEX

DESCRIPTION

SECTION 60 PAGE 1 FROM WP 47E UTILITY RELOCATION PLANS FOR SE-5 EAST OF HWY 75

REF.

SHEET

DRAWING NO.

AS-BUILT

DESCRIPTION PRODUCT I.D.

DRAWING NO.

AS-BUILT

REF.

SHEET

SR502

SR501

SR101

S-501

S-302

S-301

S-201

S-101

S-001

L-105

L-104

L-103

L-102

L-101

CG345

CG344

CG343

CG342

CG341

CG340

CG339

CG338

CG337

CG336

CG335

CG334

CG333

CG332

CG331

CG330

CG329

CG328

CG327

CG326

CG325

CG324

CG323

CG322

CG321

CG320

CG319

CG318

CG317

CG316

CG315

CG314

CG313

CG312

CG311

CG310

CG309

CG308

CG307

STRUCTRUAL REINFORCEMENT SHEET 2 OF 2

STRUCTRUAL REINFORCEMENT SHEET 1 OF 2

STRUCTURAL REINFORCEMENT PLAN

STRUCTURAL DETAILS

SECTIONS SHEET 2 OF 2

SECTIONS SHEET 1 OF 2

ELEVATIONS

GENERAL PLAN

STRUCTURAL NOTES

STRUCTURAL

PLAN - SEEDING 95+50 TO 107+00

PLAN - SEEDING 71+50 TO 95+50

PLAN - SEEDING 47+50 TO 71+50

PLAN - SEEDING 23+50 TO 47+50

PLAN - SEEDING 0+00 TO 23+50

CROSS SECTIONS EMBANKMENT 46 OF 46

CROSS SECTIONS EMBANKMENT 45 OF 46

CROSS SECTIONS EMBANKMENT 44 OF 46

CROSS SECTIONS EMBANKMENT 43 OF 46

CROSS SECTIONS EMBANKMENT 42 OF 46

CROSS SECTIONS EMBANKMENT 41 OF 46

CROSS SECTIONS EMBANKMENT 40 OF 46

CROSS SECTIONS EMBANKMENT 39 OF 46

CROSS SECTIONS EMBANKMENT 38 OF 46

CROSS SECTIONS EMBANKMENT 37 OF 46

CROSS SECTIONS EMBANKMENT 36 OF 46

CROSS SECTIONS EMBANKMENT 35 OF 46

CROSS SECTIONS EMBANKMENT 34 OF 46

CROSS SECTIONS EMBANKMENT 33 OF 46

CROSS SECTIONS EMBANKMENT 32 OF 46

CROSS SECTIONS EMBANKMENT 31 OF 46

CROSS SECTIONS EMBANKMENT 30 OF 46

CROSS SECTIONS EMBANKMENT 29 OF 46

CROSS SECTIONS EMBANKMENT 28 OF 46

CROSS SECTIONS EMBANKMENT 27 OF 46

CROSS SECTIONS EMBANKMENT 26 OF 46

CROSS SECTIONS EMBANKMENT 25 OF 46

CROSS SECTIONS EMBANKMENT 24 OF 46

CROSS SECTIONS EMBANKMENT 23 OF 46

CROSS SECTIONS EMBANKMENT 22 OF 46

CROSS SECTIONS EMBANKMENT 21 OF 46

CROSS SECTIONS EMBANKMENT 20 OF 46

CROSS SECTIONS EMBANKMENT 19 OF 46

CROSS SECTIONS EMBANKMENT 18 OF 46

CROSS SECTIONS EMBANKMENT 17 OF 46

CROSS SECTIONS EMBANKMENT 16 OF 46

CROSS SECTIONS EMBANKMENT 15 OF 46

CROSS SECTIONS EMBANKMENT 14 OF 46

CROSS SECTIONS EMBANKMENT 13 OF 46

CROSS SECTIONS EMBANKMENT 12 OF 46

CROSS SECTIONS EMBANKMENT 11 OF 46

CROSS SECTIONS EMBANKMENT 10 OF 46

CROSS SECTIONS EMBANKMENT 9 OF 46

CROSS SECTIONS EMBANKMENT 8 OF 46

CIVIL (CONTINUED)

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_STRUCT_RVT_2021.RVT

FMMSE5_L-105.dgn

FMMSE5_L-104.dgn

FMMSE5_L-103.dgn

FMMSE5_L-102.dgn

FMMSE5_L-101.dgn

FMMSE5_CG345.dgn

FMMSE5_CG344.dgn

FMMSE5_CG343.dgn

FMMSE5_CG342.dgn

FMMSE5_CG341.dgn

FMMSE5_CG340.dgn

FMMSE5_CG339.dgn

FMMSE5_CG338.dgn

FMMSE5_CG337.dgn

FMMSE5_CG336.dgn

FMMSE5_CG335.dgn

FMMSE5_CG334.dgn

FMMSE5_CG333.dgn

FMMSE5_CG332.dgn

FMMSE5_CG331.dgn

FMMSE5_CG330.dgn

FMMSE5_CG329.dgn

FMMSE5_CG328.dgn

FMMSE5_CG327.dgn

FMMSE5_CG326.dgn

FMMSE5_CG325.dgn

FMMSE5_CG324.dgn

FMMSE5_CG323.dgn

FMMSE5_CG322.dgn

FMMSE5_CG321.dgn

FMMSE5_CG320.dgn

FMMSE5_CG319.dgn

FMMSE5_CG318.dgn

FMMSE5_CG317.dgn

FMMSE5_CG316.dgn

FMMSE5_CG315.dgn

FMMSE5_CG314.dgn

FMMSE5_CG313.dgn

FMMSE5_CG312.dgn

FMMSE5_CG311.dgn

FMMSE5_CG310.dgn

FMMSE5_CG309.dgn

FMMSE5_CG308.dgn

FMMSE5_CG307.dgn

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

D S

P

D

:5

:4

P

M

/2

/2

F M

M S

E

G

-0

.d g n

R M

C G

A R

V

G

N E

R A

L N

O T

E S

A

B B

R E

V

IA

T

IO

N S

A N

D L

E G

E N

D

G-004

J M

O S

E R

R M

C G

A R

V

M S

E

G

-0

.d

M

O S

V D

8 1

B

N A

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

.9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

EACH VIEW)

(CENTERED UNDER

VIEW SUBTITLE

GENERAL VIEW SYMBOLS

D1

SCALE: NTS

DETAIL/SECTION

SUPPLEMENTAL INFORMATION

D1

SCALE: 1" = XXX'

DETAIL/SECTION

SUPPLEMENTAL INFORMATION

TITLE

SECTION/DETAIL

N

0 1' 2'

FRONT SIDE

SECTION

ELEVATION

TOP

D1

C-999 D1

SAME DRAWING

VIEW SHOWN ON

DETAIL SYMBOL W/

D1

SAME DRAWING

VIEW SHOWN ON

SECTION CUT W/

ANOTHER DRAWING

VIEW SHOWN ON

DETAIL SYMBOL W/

ANOTHER DRAWING

VIEW SHOWN ON

SECTION CUT W/D5

C-999

GENERAL PROJECT NOTES

CLINS.

PAID FOR UNDER THE EXCAVATION (OTHER) AND IMPERVIOUS FILL (OTHER)

OF IMPERVIOUS FILL OUTSIDE OF STATION RANGE 54+44.46 TO 100+47.85 IS

IMPERVIOUS FILL (WOLVERTON CREEK) CLINS. EXCAVATION AND PLACEMENT

100+47.85 IS PAID FOR UNDER THE EXCAVATION (WOLVERTON CREEK) AND

EXCAVATION AND PLACEMENT OF IMPERVIOUS FILL BETWEEN 54+44.46 AND 18.

LAYERS. SEE SPECIFICATIONS FOR REQUIREMENTS.

BEDDING MORTAR TO BE USED AS NECESSARY BETWEEN SOIL CEMENT 17.

CONSTRUCTION TRAFFIC.

ELEVATIONS AND TO TOP-DRESS AGGREGATE DETERIORATED BY

SHALL BE ADDED AS NEEDED TO RETURN THE ROAD TO PRE-CONSTRUCTION

BE RESHAPED TO PROVIDE ADEQUATE SURFACE DRAINAGE. AGGREGATE

CAUSED BY HAULING AND CONSTRUCTION OPERATIONS. THE ROAD SHALL

SHALL BE GRADED TO REMOVE RUTS, POTHOLES, OR OTHER DAMAGE

LIMITS, INCLUDING THE SECTION WEST OF HIGHWAY 75. THE ROADWAY

CONTRACTOR SHALL REGRADE AND RESHAPE 180TH AVE WITHIN THE WORK 16.

CULVERT INLETS.

POSITIVE DRAINAGE ALONG EMBANKMENT SLOPES, DITCH BOTTOMS AND TO

THE CONTRACTOR IS RESPONSIBLE FOR FINAL GRADING WHICH RESULTS IN 15.

REQUIREMENTS.

ELIMINATION SYSTEM AND STORMWATER POLLUTION PREVENTION PLAN

REFER TO THE SPECIFICATIONS FOR NATIONAL POLLUTANT DISCHARGE 14.

VERTICAL. (4:1 IS 4 HORIZONTAL PER 1 VERTICAL)

CONSTRUCTION SLOPES ARE LABELED AS RATIOS FOR HORIZONTAL TO 13.

THE WORK LIMITS

ZONE 1 - SHALL APPLY TO ALL OTHER GRADED OR DISTURBED AREAS WITHIN

ZONE 2 - SHALL APPLY TO RIPARIAN AREAS SHOWN WITHIN THESE PLANS

FIELDS

OUTSIDE THE FEE TITLE LINE, THAT ARE WITHIN EXISTING AGRICULTURAL

ZONE X - SHALL APPLY TO ALL DISTURBED AREAS WITHIN THE WORK LIMITS,

PLANS:

OR DECOMPACTED AS FOLLOWS, EXCEPT WHERE SHOWN WITHIN THESE

GRADED OR DISTURBED AREAS WITHIN THE WORK LIMITS SHALL BE SEEDED

TURF ESTABLISHMENT SHALL BE ACCORDING TO THE SPECIFICATIONS. ALL 12.

CONTRACTING OFFICER SHALL BE NOTIFIED IMMEDIATELY.

WITHIN THE EXCAVATION LIMITS. IF DRAIN TILE IS ENCOUNTERED, THE

DRAIN TILE EXISTS WITHIN THE WORK LIMITS BUT IS NOT ANTICIPATED 11.

ON PROFILES FOR CLARITY.

SURFACING DEPTH. THE BOTTOM OF AGGREGATE SURFACE IS NOT SHOWN

BITUMINOUS OR AGGREGATE SURFACING. SEE TYPICAL SECTIONS FOR

TOP OF EMBANKMENT PROFILE DEFINES CENTERLINE ELEVATION OF THE 10.

MATERIAL SHALL BE TAKEN FROM THEM TO USE AS FILL.

TYPICAL SECTIONS, CROSS SECTIONS AND PROFILES. NO ADDITIONAL

EXCAVATION FOR DITCHES SHALL BE LIMITED TO ELEVATIONS SHOWN IN THE 9.

OF TOPSOIL WILL BE PAID FOR AS EXCAVATION.

THE PLANS. ANY MATERIAL REMOVED BENEATH THESE STRIPPED 6 INCHES

STRIP 6 INCHES OF TOPSOIL WITHIN THE STRIPPING LIMITS INDICATED ON 8.

AND PROFILES.

OCCUR TO ELEVATION INDICATED IN TYPICAL SECTIONS, CROSS SECTIONS

CROSS SECTIONS. GRAVEL AND ROAD EMBANKMENT REMOVALS SHALL

LIMITS OF IMPERVIOUS FILL ARE SHOWN IN THE TYPICAL SECTIONS AND 7.

UTILITIES.

LOCATION OF UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE TO THESE

IS RESPONSIBLE FOR MAKING THE DETERMINATION AS TO THE TYPE AND

OF UTILITIES MAY NOT BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR

THE INFORMATION ON THESE DRAWINGS CONCERNING TYPE AND LOCATION 6.

TO OBTAIN GROUND COORDINATES.

PROPER LAYOUT OF THE PROJECT. DIVIDE GRID COORDINATES BY THE CF

COORDINATES SHOWN IN THE PLANS TO GROUND COORDINATES FOR

THE COMBINED FACTOR (CF) SHALL BE USED TO CONVERT THE GRID 5.

LIDAR INFORMATION.

PERFORMED OCTOBER 2022 BY HOUSTON MOORE GROUP AND OVERLAID ON

ORIGINAL DATA FROM 2017 AND 2020 LIDAR. ADDITIONAL SURVEY WAS 4.

ELEVATIONS REFER TO NAVD 88, GEOID 12B.3.

ON MINNESOTA STATE PLANE GRID SYSTEM, CENTRAL ZONE.

ORIGINAL DATA COMPILED NAD 83 US SURVEY FEET. COORDINATES BASED 2.

CONTRACT AWARD.

POINTS ARE AVAILABLE BY REQUEST TO THE CONTRACTING OFFICER UPON

TIE DIAGRAMS AND DESCRIPTIONS OF HORIZONTAL AND VERTICAL CONTROL 1.

LIMITS OF WORK

FILL

CUT

97-41MP.I. POINT

MANHOLE

CATCHBASINCB

WATER VALVE

FIRE HYDRANT

SANITARY SEWER

EXISTING

SEWER CULVERT

EXISTING STORM

LEVEE

AND NUMBER

DWG OUTLINE

OVERHEAD P0WER

EXISTING

GROUND DUCT

EXISTING UNDER-

EXISTING GAS

SHEETPILE

SHEET ID X-000

BUILDINGS

REMOVED

DITCH BOTTOM

NEW

SEWER CULVERT

NEW STORM

GENERAL LEGEND

AND NUMBER

LOCATION

BORING

3 DIMENSIONAL

POINT

CONTROL

2 DIMENSIONAL

POINT

CONTROL

1 DIMENSIONAL

POINT

CONTROL##

GROUND COMMUNICATION

EXISTING UNDER-

EXIST

MAX

MIN

SST

TYP

EXISTING

FAR FACE

GALVANIZED

INSIDE FACE

MAXIMUM

MINIMUM

MISCELLANEOUS

NEAR FACE

OUTSIDE FACE

ON CENTER

STAINLESS STEEL

TOP AND BOTTOM

TYPICAL

UNDERGROUND

APPROXIMATE

ALTERNATE WITH

ALUMINUM

BITUMINOUS

BOTTOM

CURB & GUTTER

CONSTRUCTION JOINT

CONCRETE

DIAMETER

EACH FACE

BOT

� C.L.C/L

C&G

CMP CORRUGATED METAL PIPE

EXPANSION JOINT

ELEVATION

EACH WAY

DRAWINGDWG

NUMBER

SAN SANITARY

SPECIFICATIONS

MIRR MIRRORED

* UNLESS OTHERWISE NOTED ON EACH SHEET

APPROX

ALT W/

ALUM

BITUM

CENTER LINE

CLR CLEAR

CJ

CONC

DIA

EF

EJ

EL ELEV

EW

FF

GALV

IF

MISC

OF

NO

OC

SPEC

T&B

UNO

UGNDFES FLARED END SECTION

WIDTH

WATER MAINWM

W

RIVERWARDR/W

LONG

LANDWARDL/W

LG

HT HEIGHT

NTS NOT TO SCALE

NF

GENERAL ABBREVIATIONS

OTHERWISE

UNLESS NOTED

C.O. CONTRACTING OFFICER

AGGREGATEAGG

GENERAL PATTERN LEGEND

SOIL CEMENT

ASPHALT PAVEMENT

CONCRETE

REINFORCED

TOPSOIL

AGGREGATE SURFACING

IMPERVIOUS FILL

PRIMARY FILTER

R20 RIPRAP

B1 BEDDING

SECONDARY FILTER

SHOULDERSHLD

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B U

IL

T

N O

F

IL

E N

A M

E

D S

P

D

:0

:1

A

M

/2

/2

F M

M S

E

B

-1

.d g n

R M

C G

A R

V E

Y

O V

E R

A L

L S

IT

E

B O

R

IN

G L

O C

A T

IO

N

S M

A P

P L

A N

B-100

J M

O S

E R

R M

C G

A R

V

M S

E B

-1 .d

M

O S

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

2006755.56932249.4919-129M

2005216.54932289.5419-128M

2003645.36932341.3919-127M

2003421.49932335.1419-123M

2003238.49932352.7319-122M

2002886.52932347.6219-121M

2000111.90932445.6119-120M

1997125.50932513.6419-119M

1995800.14932560.5219-118M

1994940.16932579.4219-117M

(X)

EASTING

(Y)

NORTHING

NAME

BORING LOCATIONS

19-117M 19-118M 19-119M

19-120M

19-121M 19-127M 19-128M

19-129M

19-122M

19-123M

24-140M

24-138M

24-137M

24-139M

24-144M

24-146M

24-141M

24-145M

24-143M 24-142M

24-147M

19-117M

TOWNSHIP ROAD 1

H

IG

H W

A Y

T O

W N

S H

IP

R

O A

D

T O

W N

S H

IP

R

O A

D

T O

W N

S H

IP

R

O A

D

T

H S

T S

W O

L V

E R

T O

N C

R E

E K

T

H S

T S

180TH AVE S

B N

S F R

A

IL

R O

A D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

A1

PLAN - BORING LOCATIONS - OVERALL SITE

SCALE: 1" = 600' 0 600' 1200'

N

THE EMBANKMENT PLAN AND PROFILES. SEE SECTION CS OF THESE PLANS.

BORING HORIZONTAL LOCATIONS AND LOGS ARE ADDITIONALLY DISPLAYED IN 1.

GENERAL SHEET NOTES

BORING LOCATION TABLE

F17

B-101

A1

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B U

IL

T

N O

F

IL

E N

A M

E

D S

P

D

:1

:3

A

M

/2

/2

F M

M S

E

B

-1

.d g n

R M

C G

A R

V E

Y

H

IG

H W

A Y

I

N T

E R

S E

C T

IO

N

B O

R

IN

G L

O C

A T

IO

N

S M

A P

P L

A N

B-101

J M

O S

E R

R M

C G

A R

V

M S

E B

-1 .d

M

O S

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

24-140M

24-138M

24-137M

24-139M

24-144M

24-146M

24-141M

24-145M

24-143M 24-142M

24-147M

19-117M

685+

686+

0 3

.7

S

P O

T

WORK LIMITS

HIGHWAY 75�

180TH AVE S�

H

IG

H W

A Y

180TH AVE. S

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G

E O

ID

N

0 10' 20'SCALE: 1" = 10'

PLAN - BORING LOCATIONS - HIGHWAY 75

A1

TABLE - BORING LOCATION POINTS

F16

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B U

IL

T

N O

F

IL

E N

A M

E

D S

P

D

:0

:3

A

M

/2

/2

F M

M S

E

B

-3

.d g n

R M

C G

A R

V

E E

T

O F

B O

R

IN

G L

O G

S

B-300

J M

O S

E R

M D

A V

IS

M S

E B

-3 .d

D

A

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

WATER SURFACE ELEVATION ON DAY OF BORING

GROUND SURFACE ELEVATION AT BORING

CLAYEY GRAVELS, GRAVEL - SAND - CLAY MIXTURES

WELL GRADED GRAVELS, GRAVEL - SAND MIXTURE, LITTLE OR NO FINES

SILTY GRAVELS, GRAVEL - SAND - SILT MIXTURES

POORLY GRADED GRAVELS, LITTLE OR NO FINES

WELL GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES

POORLY GRADED SANDS, GRAVELLY SANDS, LITTLE OR NO FINES

SILTY SANDS, SAND - SILT MIXTURES

CLAYEY SANDS, SAND - CLAY MIXTURES

INORGANIC SILTS, LIQUID LIMIT LESS THAN 50

INORGANIC SILTS, LIQUID LIMIT GREATER THAN 50

INORGANIC CLAYS, LOW TO MEDIUM PLASTICITY, LIQUID LIMIT LESS THAN 50

INORGANIC CLAYS, HIGH PLASTICITY, LIQUID LIMIT GREATER THAN 50

ORGANIC SILTS OR CLAYS, LOW PLASTICITY, LIQUID LIMIT LESS THAN 50

BORDERLINE MATERIAL

STRATIFIED MATERIAL

LOCATION AND SAMPLE NUMBER FOR UNDISTURBED SAMPLE

NO RECOVERY

WATER LEVEL ON DATE OF BORING

ELEVATION AT BOTTOM OF BORING

ELEVATION IN METERS

DATE OF BORING

( EG: M=MACHINE, A=AUGER, TP=TEST PIT, P=PIEZOMETER ).

YEAR OF BORING-BORING NUMBER, BORING TYPE

GW

SM

SP

SW

GC

GM

GP

ML

MH

CL

CH

OL

OH

PT

SP-

SM

SP&

SM

SC

W.S. 1026.7

G.S. 1020.2

W.L. 726.7

700.1

(238.56)

1 MAY 1984

84-1M

GENERAL BORING LEGEND:

THESE LOGS ARE AVAILABLE FOR INSPECTION BY REQUEST TO THE CONTRACTING OFFICER.

THE BORINGS SHOW SUMMARIES OF INFORMATION RECORDED ON THE ORIGINAL FIELD LOGS. 8.

SPECIFIED OTHERWISE, ALL CORE IS 4-INCH DIAMETER.

PERCENT RECOVERY IS LENGTH OF CORE RECOVERED/LENGTH OF CORE CUT X 100. UNLESS

% RECOVERY: PERCENT CORE RECOVERY IS SHOWN TO THE LEFT OF THE BORING STAFF.7.

4-INCHES.

COLUMN. RQD IS THE PERCENT RECOVERY CONSISTING OF UNBROKEN PIECES LONGER THAN

RQD: ROCK QUALITY DESIGNATION (RQD) IS SHOWN TO THE LEFT OF THE PERCENT RECOVERY 6.

THE LEFT OF THE BORING STAFF.

SIZE: THE GRAIN SIZE IN MILLIMETERS OF WHICH 10% OF THE SAMPLE IS FINER IS SHOWN TO

D5.

BORING STAFF.

ATTERBERG LIMITS: LIQUID LIMIT (LL) AND PLASTIC LIMIT (PL) ARE SHOWN TO THE RIGHT OF THE 4.

COUNTS SAMPLER SIZE, HAMMER WEIGHT, AND HEIGHT OF DROP ARE AS SHOWN.

A 1-3/8 X 2-INCH SAMPLER, 140 LB. HAMMER, AND A 30-INCH DROP. FOR NON-STANDARD BLOW

OF 12-INCHES. STANDARD BLOW COUNTS ARE FOR A STANDARD PENETRATION TEST (SPT) USING

AS NOTED, ARE THE NUMBER OF BLOWS NECESSARY TO DRIVE THE SAMPLER USED A DISTANCE

BLOW COUNT (SPT): BLOW COUNTS ARE SHOWN TO THE LEFT OF THE BORING STAFF AND, EXCEPT3.

IS SHOWN TO THE LEFT OF THE BORING STAFF.

MOISTURE CONTENT: THE NATURAL MOISTURE CONTENT IS IN PERCENT OF DRY WEIGHT (MC)2.

SPECIFIC BORING ARE SHOWN BELOW THE BORING STAFF.

INFORMATION IS ADDED TO THE RIGHT OF THE BORING STAFF. NOTES PERTAINING TO A

LEGEND REPRESENTS ONLY THE BASIC SOILS. TO COMPLETE THE CLASSIFICATION, PERTINENT

GENERAL: THE UNIFIED SOIL CLASSIFICATION SYSTEM IS USED TO IDENTIFY BASIC SOIL TYPE. THE 1.

PEAT

ORGANIC SILTS OR CLAYS, MEDIUM TO HIGH PLASTICITY, LIQUID LIMIT GREATER THAN 50

GENERAL BORING NOTES:

NOTES:

CL

CH

CH

CH

CH

SPT

W. L. 916.5

854.7

G.S. 924.7

19-117M

D MC LL PL10

TOP OF SHERACK FORMATION

TOP OF BRENNA FORMATION

920.8

895.0

TOP OF ARGUSVILLE FORMATION879.0

TOP OF UNIT "A" TILL863.4

CL

CL

18-19 JUL 2019

3. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

CH

CL

(TILL)F.-M., SAND F., V. HARD, MOIST, GRAY.

(CL) SANDY GRAVELLY CLAY, GRAVEL 61.3' TO 70'

(GLACIO-LACUSTRINE)GRAY.

LAMINATED, SOME SILT NODULES, GRITTY TEXTURE,

(CH) SILTY CLAY, M. STIFF TO SOFT, WET, 45.7' TO 61.3'

(FILL)STIFF, MOIST, BROWN TO BLACK.

TOPSOIL AND ORGANICS, GRAVEL F.-M., M.

(CL) SANDY GRAVELLY CLAY W/0' TO 3.9'

DRILLED WITH MUD BELOW EL. 909.7

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 909.7

(GLACIO-LACUSTRINE)

WEATHERED, GRAY W/YELLOWISH TINGE.

(CL) SILTY CLAY, M. STIFF, MOIST, 3.9' TO 10'

(GLACIO-LACUSTRINE)SL. SPONGY, YELLOW-GRAY.

W/MULTIPLE CALC. FILLED FRACTURES FROM 15.0' TO 16.4',

LAMINATED, FE STAINING, OCC. CALC DEPOSIT, ZONE

(CH) SILTY CLAY, M. STIFF, MOIST, POORLY 10' TO 18.6'

(GLACIO-LACUSTRINE)WET, LAMINATED, YELLOW-GRAY.

(CH) SILTY CLAY, M. STIFF TO SOFT, MOIST TO 18.6' TO 29.7'

(GLACIO-LACUSTRINE)

IN ZONES, GRAY TO GREEN-GRAY.

INDISTINCT SLICKENSIDES W/SHEARED IN ZONES, LAM.

(CH) FAT CLAY W/SILT, SOFT, WET, FORMS 29.7' TO 36.9'

(GLACIO-LACUSTRINE)RARE GRAVEL FRAG., GRAY.

FORMS INDISTINCT SLICKENSIDES IN ZONES W/SHEARED,

(CH) FAT CLAY W/SILT, M.STIFF, WET, 36.9' TO 45.7'

BOTTOM OF HOLE EL. 911.0

1. WATER LEVEL DETERMINED AFTER 25 HOURS IN OFFSET OPEN HOLE

NOTES:

CL

CL

CH

CH

CH

CH

SC

CL

SPT

855.5

G.S. 925.0

19-118M

D MC LL PL10

TOP OF SHERACK FORMATION

(GLACIO-LACUSTRINE)YELLOW-GRAY.

(CL) SILTY CLAY, M. STIFF, MOIST, WEATHERED, 2' TO 7.1'

TOP OF BRENNA FORMATION

TOP OF UNIT "A" TILL

(TILL)SAND F.- M., DENSE, WET, GRAY.

(SC) CLAYEY SAND W/GRAVEL, GRAVEL F., 62.4' TO 66.2'

878.0

862.6

923.0

893.1

CH

19-20 JUL 2019

70/0.8

W.L. 916.4

(FILL)ROOTS, AND ORGANICS, GRAY TO BLACK.

SHERACK AND TOPSOIL, M. STIFF, MOIST, OCC.

(CL) SILTY CLAY MIXED W/WEATHERED 0' TO 2'

(GLACIO-LACUSTRINE)

STICKY, YELLOW-BROWN MOTTLED W/GRAY.

(CH) FAT CLAY W/SILT, SOFT, LAMINATED, SL. 20' TO 25.6'

(GLACIO-LACUSTRINE)TO GRAY.

DEFINED LAMINATIONS, FE STAINING, YELLOW-BROWN

(CH) SILTY CLAY, M. STIFF, WET, WELL 25.6' TO 31.9'

(TILL)F.-M., SAND M., V. HARD, MOIST, GRAY.

(CL) GRAVELLY SANDY CLAY, GRAVEL 66.2' TO 69.5'

3. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

APPROXIMATE TOP OF ARGUSVILLE FORMATION

DRILLED WITH MUD BELOW EL. 911.0

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 911.0

(GLACIO-LACUSTRINE)GRAY.

SHEARED, SL. GRITTY TEXTURE, OCC. F. GRAVEL,

INCLUSIONS, FORMS INDISTINCT SLICKENSIDES WHEN

WET, STICKY, LAMINATED IN ZONES, OCC. TILL

(CH) FAT CLAY W/SILT, SOFT TO M. STIFF, 47' TO 62.4'

BOTTOM OF HOLE EL. 906.7

1. WATER LEVEL DETERMINED AFTER 23 HOURS IN OFFSET OPEN HOLE

(GLACIO-LACUSTRINE)BELOW 40.0', GRAY.

TEXTURE IN ZONES BELOW 40.0', TILL INCLUSIONS

SLICKENSIDES WHEN SHEARED, SL. GRITTY

STICKY, LAMINATED IN ZONES, FORMS INDISTINCT

(CH) FAT CLAY W/SILT, SOFT, WET, 31.9' TO 47'

(GLACIO-LACUSTRINE)

FILLED FRACTURES FROM 15.4' TO 17.0', YELLOW-BROWN.

FE STAINING IN ZONES, ZONE OF PRE-EXISTING CALC.

OCC. GYPSUM NODULES, POORLY DEFINED LAMINATIONS.

(CH) SILTY CLAY, M. STIFF TO SOFT, MOIST, 7.1' TO 20'

NOTES:

CL

CH

CH

CH

CH

GC

SC

CL

SPT

W. L. 920.3

858.4

G.S. 928.4

19-119M

D MC LL PL10

DRILLED WITH MUD BELOW EL. 908.4

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 908.4

TOP OF SHERACK FORMATION922.3

TOP OF BRENNA FORMATION

(TILL)SAND M.-C., LOOSE, WET, GRAY.

(GC) CLAYEY SANDY GRAVEL, GRAVEL F., 58.7' TO 60'

(TILL)M., SAND F.-M., HARD, MOIST, GRAY.

(CL) GRAVELLY SANDY CLAY, GRAVEL F.-65.5' TO 70'

869.7

906.7

890.4

TOP OF UNIT "A" TILL

22-23 JUL 2019

CL

(GLACIO-LACUSTRINE)YELLOW-BROWN.

WEATHERED ZONE FROM 6.1' TO 9.1', BROWN TO

(CL) LEAN CLAY W/SILT, STIFF, MOIST, 6.1' TO 10'

(OXIDIZED BRENNA FM.) (GLACIO-LACUSTRINE)

LAMINATIONS IN ZONES, YELLOW-BROWN TO GRAY.

TO WET, STICKY IN ZONES, POORLY DEFINED

(CH) FAT CLAY W/SILT, M. STIFF, MOIST 21.7' TO 31.4'

(GLACIO-LACUSTRINE)LAMINATED, GRAY.

(CH) FAT CLAY W/SILT, SOFT, WET, 31.4' TO 38'

(GLACIO-LACUSTRINE)

WHEN SHEARED, GRITTY TEXTURE, GRAY.

STICKY, LAMINATED, OCC. DROPSTONES, TEARS

(CH) FAT CLAY W/SILT, SOFT, WET, 38' TO 58.7'

(TILL)SATURATED, GRAY.

F.-M., SAND F.-M., M. DENSE TO DENSE, WET TO

(SC) GRAVELLY CLAYEY SAND, GRAVEL 60' TO 65.5'

3. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

APPROXIMATE TOP OF ARGUSVILLE FORMATION

(GLACIO-LACUSTRINE)18.7', YELLOW-BROWN.

DEPOSITS IN MULTIPLE FRACTURES FROM 17.2' TO

OCC. GYPSUM CRYSTALS, FE STAINING, CALC.

(CH) FAT CLAY W/SILT, M. STIFF, MOIST, 10' TO 21.7'

BOTTOM OF HOLE EL. 917.2

1. WATER LEVEL DETERMINED AFTER 27 HOURS IN OPEN OFFSET HOLE

(ROADFILL)ORGANICS, BROWN TO BLACK.

WEATHERED SHERACK), M. STIFF, MOIST, OCC.

(CL) SILTY CLAY (TOPSOIL MIXED W/ 0' TO 6.1'

NOTES:

CL

CL

CH

CH

CH

CH

CH

SPT

W. L. 909.4

858.6

G.S. 926.6

19-120M

D MC LL PL10

TOP OF BRENNA FORMATION

(GLACIO-LACUSTRINE)

SHEARED IN ZONES, OXIDIZED IN ZONES, GRAY.

STICKY, FORMS INDISTINCT SLICKENSIDES WHEN

(CH) FAT CLAY W/SILT, M. STIFF, WET, 23.8' TO 30'

TOP OF UNIT "A" TILL864.7

885.1

902.8

924.1

885.1

APPROXIMATE TOP OF SHERACK FORMATION

(GLACIO-LACUSTRINE)

LAMINATED, TR. C. SAND, YELLOW-BROWN.

(CH) FAT CLAY W/SILT, SOFT, MOIST, 6.9' TO 10'

(GLACIO-LACUSTRINE)GRAY.

TOPSOIL SEAM FROM 3.9' TO 4.0', WEATHERED, GREEN-

(CL) LEAN CLAY W/SILT, M. STIFF, SL. MOIST, 2.5' TO 6.9'

DRILLED WITH MUD BELOW EL. 906.6

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 906.6

3. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

(GLACIO-LACUSTRINE)TEXTURE, GRAY.

SLICKENSIDES WHEN SHEARED IN ZONES, SL. GRITTY

LAMINATED, OCC. DROPSTONES, FORMS INDISTINCT

(CH) FAT CLAY W/SILT, SOFT, WET, STICKY, 30' TO 41.5'

APPROXIMATE TOP OF ARGUSVILLE FORMATION

CL & SC

24-25 JUL 2019

858.6

(TILL)M. BEDDED, GRAY.

SAND F.-M., V. HARD TO V. DENSE, MOIST, THINLY TO

INTERBEDDED W/CLAYEY SAND (40%), GRAVEL F.-M.,

(CL & SC) SANDY GRAVELLY CLAY (60%) 61.9' TO 68'

(GLACIO-LACUSTRINE)

YELLOW-BROWN MOTTLED W/GRAY.

CALC. FILLED FRACTURES FROM 16.0' TO 17.1',

LAMINATED, STICKY IN ZONES, FE STAINING, ZONE OF

(CH) FAT CLAY W/SILT, M. STIFF, WET, 10' TO 23.8'

(FILL W/TOPSOIL)

STIFF, SL. MOIST, TR. SAND, OCC. ROOTS, BLACK.

(CL) GRAVELLY LEAN CLAY, GRAVEL F.-M., M. 0' TO 2.5'

BORHOLE OPEN TO EL. 907.8

1. WATER LEVEL DETERMINED AFTER 23 HOURS IN OPEN OFFSET HOLE

GRADATIONAL CONTACT

(GLACIO-LACUSTRINE)TO 54.0', GRAY.

TEXTURE, TEARS WHEN SHEARED, CL SEAM FROM 53.0'

STICKY, LAMINATED, OCC. DROPSTONES, GRITTY

(CH) FAT CLAY W/SILT, SOFT, WET, 41.5' TO 61.9'

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

ID

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B U

IL

T

N O

F

IL

E N

A M

E

D S

P

D

:0

:0

A

M

/2

/2

F M

M S

E

B

-3

.d g n

R M

C G

A R

V

E E

T

O F

B O

R

IN

G L

O G

S

B-301

J M

O S

E R

M D

A

M S

E B

-3 .d

D

A

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

NOTES:

CL

CL

CH

CH

CH

CH

SPT

854.8

G.S. 924.8

19-121M

D MC LL PL10

(GLACIO-LACUSTRINE)WEATHERED, GRAY-BROWN.

(CL) LEAN CLAY W/SILT, M. STIFF, MOIST, 0.6' TO 5.4'

TOP OF SHERACK FORMATION

(GLACIO-LACUSTRINE)LAMINATED, YELLOW-BROWN.

(CH) FAT CLAY W/SILT, M. STIFF, MOIST, 5.4' TO 10'

TOP OF BRENNA FORMATION

TOP OF ARGUSVILLE FORMATION

CL

CL

TOP OF UNIT "A" TILL865.0

884.8

892.2

924.2

DRILLED WITH MUD BELOW EL. 904.8

2. STABILIZED HOLE WITH HOLLOW STEM AUGER TO EL. 904.8

3. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

31 JUL 2019 - 01 AUG 2019

(GLACIO-LACUSTRINE)DROPSTONE, GRAY.

WET, STICKY, LAMINATED, SL. GRITTY TEXTURE, OCC.

(CH) FAT CLAY W/SILT, M. STIFF TO SOFT, 32.6' TO 40'

(TILL)63.3' TO 63.6', DARK GRAY.

SAND F.-M., HARD TO V. HARD, MOIST, SC SEAM FROM

(CL) GRAVELLY SANDY CLAY, GRAVEL F.-M., 59.8' TO 70'

(FILL)BROWN.

(CL) LEAN CLAY W/SILT, M. STIFF, DRY, 0' TO 0.6'

(GLACIO-LACUSTRINE)53.0' TO 54.0', GRAY.

SLICKENSIDES WHEN SHEARED IN ZONES, CL SEAM FROM

LAMINATED, SL. GRITTY TEXTURE, FORMS INDISTINCT

(CH) FAT CLAY W/SILT, SOFT, WET, STICKY, 40' TO 59.8'

(GLACIO-LACUSTRINE)YELLOW-BROWN W/GRAY MOTTLE.

GYPSUM CRYSTALS AND CALC. DEPOSITS, FE STAINING,

MOIST TO WET, STICKY IN ZONES, LAMINATED, OCC.

(CH) FAT CLAY W/SILT, M. STIFF TO SOFT, 10' TO 32.6'APPROX. WL 905.6

1. APPROX. WATER LEVEL DETERMINED AFTER 15 HRS.

NOTES:

CL

OL

CH

CH

CH

CH

CH

CL

SP-SC

SPT

859.7

G.S. 924.2

D MC LL PL10

19-122M/MU

(TOPSOIL)MOIST, BLACK.

(OL) ORGANIC RICH CLAY W/SILT, M. STIFF, 6.3' TO 11.3'

TOP OF SHERACK FORMATION912.9

(GLACIO-LACUSTRINE)WEATHERED, GREEN-GRAY.

(CH) FAT CLAY W/SILT, STIFF, MOIST, 11.3' TO 15.4'

TOP OF BRENNA FORMATION895.0

884.2

TOP OF UNIT "A" TILL865.1

TOP OF ARGUSVILLE FORMATION

02 - 03 AUG 2019

DRILLED WITH MUD BELOW EL. 914.2

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 914.2

4. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

(GLACIO-LACUSTRINE)

STICKY IN ZONES, YELLOW-BROWN.

LAMINATED, OCC. GYPSUM CRYSTALS, FE STAINING,

(CH) FAT CLAY W/SILT, M. STIFF, WET, 15.4' TO 29.2'

(TILL)F.-M., SAND F.- M., V. STIFF, MOIST, GRAY.

(CL) GRAVELLY SANDY CLAY, GRAVEL 59.1' TO 62'

W.L. 917.4

(FILL)GRAVEL, SOFT, SL. MOIST, BLACK.

(CL) ORGANIC RICH CLAY W/SILT AND 0' TO 6.3'

(GLACIO-LACUSTRINE)

INDISTINCT SLICKENSIDES WHEN SHEARED, GRAY.

STICKY, LAMINATED, OCC. DROPSTONES, FORMS

(CH) FAT CLAY W/SILT, SOFT, WET, 31.3' TO 40'

(GLACIO-LACUSTRINE)

FORMS INDISTINCT SLICKENSIDES IN ZONES, GRAY.

LAMINATED, OCC. DROPSTONES, SL. GRITTY TEXTURE,

(CH) FAT CLAY W/SILT, SOFT, WET, STICKY, 40' TO 59.1'

(TILL)F.-M., SAND F.- M., V. DENSE, WET, GRAY.

(SP-SC) GRAVELLY SAND W/CLAY, GRAVEL 62' TO 64.5'

OFFSET BOREHOLE OPEN TO EL. 905.6

1. WATER LEVEL DETERMINED AFTER 23 HOURS IN OFFSET HOLE

3. 5-INCH UNDISTURBED SAMPLES TAKEN IN OFFSET HOLE

(GLACIO-LACUSTRINE)

STICKY, OXIDIZED, YELLOW BROWN.

(CH) FAT CLAY W/SILT, SOFT, WET, 29.2' TO 31.3'

NOTES:

CL

CL

CH

CH

SPT

855.4

G.S. 925.4

D MC LL PL10

916.8

TOP OF SHERACK FORMATION

(GLACIO-LACUSTRINE)WEATHERED, YELLOW-GREEN.

(CL) LEAN CLAY W/SILT, M. STIFF, MOIST, 8.6' TO 10.2'

CH

TOP OF BRENNA FORMATION891.8

882.4

866.6 TOP OF UNIT "A" TILL

CL

CL

19-123M/MU

03 - 05 AUG 2019

W.L. 915.8

APPROXIMATE TOP OF ARGUSVILLE FORMATION

(GLACIO-LACUSTRINE)TEXTURE, GRAY.

WET, STICKY IN ZONES, LAMINATED, SL. GRITTY

(CH) FAT CLAY W/SILT, M. STIFF TO SOFT, 33.6' TO 43'

(GLACIO-LACUSTRINE)TEXTURE, GRAY.

IN ZONES, LAMINATED, OCC. DROPSTONES, GRITTY

(CH) FAT CLAY W/SILT, SOFT, WET, STICKY 43' TO 58.8'

DRILLED WITH MUD BELOW EL. 910.4

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 910.4

4. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

(GLACIO-LACUSTRINE)

YELLOW-BROWN W/ GRAY MOTTLE BELOW 20.0'.

OCC. GYPSUM CRYSTALS, FE STAINING,

MOIST TO WET, LAMINATED, OCC. CALC. DEPOSITS,

(CH) FAT CLAY W/SILT, M. STIFF TO SOFT, 10.2' TO 33.6'

(TILL)SAND F.-M., STIFF TO V. HARD, MOIST, GRAY,

(CL) GRAVELLY SANDY CLAY, GRAVEL F.-M., 58.8' TO 70'

OFFSET BOREHOLE OPEN TO EL. 914.4

1. WATER LEVEL DETERMINED AFTER 30 HOURS IN OFFSET HOLE

3. 5-INCH UNDISTURBED SAMPLES TAKEN IN OFFSET HOLE

(ROAD FILL/TOPSOIL)

M. STIFF, MOIST, OCC. ROOTS, BLACK.

(CL) ORGANIC RICH CLAY W/GRAVEL, GRAVEL F.-M., 0' TO 8.6'

NOTES:

CL

CH

CH

CH

CH

CH

CL&SC

ML

SPT

855.9

G.S. 925.9

19-127M

D MC LL PL10

CL

CL

TOP OF SHERACK FORMATION

900.9

923.9

TOP OF UNIT "A" TILL

875.9

868.2

(TILL)SAND M., HARD, MOIST, GRAY.

(CL) SANDY GRAVELLY CLAY, GRAVEL F.- M., 60' TO 69.1'

15 - 21 AUG 2019

APPROXIMATE TOP OF BRENNA FORMATION

APPROXIMATE TOP OF ARGUSVILLE FORMATION

(GLACIO-LACUSTRINE)

FE STAINING, WEATHERED, OLIVE BROWN.

LAMINATIONS, BLACK TO DARK BROWN LAMINATIONS,

(CH) FAT CLAY W/SILT, M. STIFF, MOIST, CALC. 2' TO 7.2'

(GLACIO-LACUSTRINE)

DROPSTONES BELOW 40.0', GRAY.

WHEN SHEARED, SL. GRITTY TEXTURE, OCC.

WET, LAMINATED, FORMS INDISTINCT SLICKENSIDES

(CH) FAT CLAY W/SILT, M. STIFF TO SOFT, 30.3' TO 50'

(GLACIO-LACUSTRINE)

LAMINATED, GRITTY TEXTURE IN ZONES, GRAY.

(CH) FAT CLAY W/SILT, SOFT, WET, 50' TO 57.7'

(TILL)LAMINATED, TR. F. SAND, GRAY.

(ML) CLAYEY SILT, V. HARD, MOIST, 69.1' TO 70'

3. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

DRILLED WITH MUD BELOW EL. 900.9

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 900.9

(ROAD FILL)GRAY.

GRAVEL, M. STIFF, MOIST, BROWN TO BLACK TO DARK

(CL) LEAN CLAY W/SILT, ORGANICS, AND 0.0' TO 2'

(GLACIO-LACUSTRINE)

OLIVE BROWN AND YELLOW GRAY.

CALCAREOUS FILLED FRACTURES FROM 15.0' TO 16.8',

POCKETS, SCAT. GYPSUM CRYSTALS, VERTICAL

WET, LAMINATED, FE STAINING AND VEINS, CALC.

(CH) FAT CLAY W/SILT, M. STIFF, MOIST TO 7.2' TO 25'

(GLACIO-LACUSTRINE)

OXIDIZED, YELLOW-BROWN W/GRAY.

WELL DEVELOPED LAMINATIONS, FE STAINING,

(CH) FAT CLAY W/SILT, M. STIFF, MOIST, 25' TO 30.3'

(TILL)GRAY.

SAND M., V. STIFF TO M. DENSE, WET, M. BEDDED,

INTERBEDDED W/CLAYEY SAND (30%), GRAVEL F.- M.,

(CL & SC) GRAVELLY SANDY CLAY (70%) 57.7' TO 60'

OFFSET BOREHOLE OPEN TO ELEVATION 916.3

1. WATER LEVEL NOT DETERMINED; OFFSET BOREHOLE DRY AFTER 6 DAYS

NOTES:

FARGO-MOORHEAD METRO FEASIBILITY STUDY & PED

CL

CH

CH

CH

CH

CH

CL

SC

CL

SPT

847.0

G.S. 927.0

19-128M

D MC LL PL10

TOP OF SHERACK FORMATION

TOP OF BRENNA FORMATION

TOP OF ARGUSVILLE FORMATION

TOP OF UNIT "A" TILL

(TILL)GRAY.

F.-M., SAND F.-M., M. DENSE, WET TO SATURATED,

(SC) GRAVELLY CLAYEY SAND, GRAVEL 70.3' TO 76.5'

897.0

887.0

857.2

921.8

DRILLED WITH MUD BELOW EL. 917.0

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 917.0

3. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

(GLACIO-LACUSTRINE)

WEATHERED FROM 5.2' TO 7.3', GRAY-BROWN.

(CH) FAT CLAY W/SILT, M. STIFF, MOIST, 5.2' TO 10'

(GLACIO-LACUSTRINE)

CRYSTALS, FE STAINING, YELLOW-BROWN.

LAMINATED, OCC. CALC. DEPOSITS AND GYPSUM

(CH) FAT CLAY W/SILT, M. STIFF, MOIST, 10' TO 20'

22 AUG 2019

(GLACIO-LACUSTRINE)

LAMINATED, GRITTY TEXTURE, GRAY.

(CH) FAT CLAY W/SILT, SOFT, WET, 40' TO 50'

(TILL)F.-M., SAND F.-M., M.STIFF TO STIFF, WET, GRAY.

(CL) GRAVELLY SANDY CLAY, GRAVEL 69.8' TO 70.3'

(TILL)SAND F.-M., V. STIFF, MOIST, GRAY.

(CL) GRAVELLY CLAY W/SAND, GRAVEL F.-M., 76.5' TO 80'

(GLACIO-LACUSTRINE)

SLICKENSIDES IN ZONES, GRAY.

GRITTY TO GRITTY TEXTURE, FORMS INDISTINCT

WET, STICKY, LAMINATED, OCC. DROPSTONES, SL.

(CH) FAT CLAY W/SILT, SOFT TO M. STIFF, 50' TO 69.8'

CH

CH

(GLACIO-LACUSTRINE)MOTTLED W/GRAY.

21.3' TO 22.7' AND FROM 26.2' TO 27.2', YELLOW-BROWN

IN ZONES, ZONE OF CALC. FILLED FRACTURES FROM

LAMINATED, OCC. CALC. DEPOSITS, FE STAINING, STICKY

(CH) FAT CLAY W/SILT, M. STIFF TO SOFT, WET, 20' TO 30'

(ROAD FILL FROM TOPSOIL)SAND, BLACK.

(CL) CLAY W/ORGANICS, M. STIFF, MOIST, TR. 0' TO 5.2'

(GLACIO-LACUSTRINE)

YELLOW-BROWN MOTTLED W/GRAY.

DEFINED LAMINATIONS, FE STAINING, OXIDIZED,

(CH) SILTY CLAY, M. STIFF, WET, WELL 30' TO 37.3'

(GLACIO-LACUSTRINE)LAMINATED, FE STAINING, GRAY.

(CH) FAT CLAY W/SILT, M. STIFF, WET, 37.3' TO 40'

W.L 908.3

APPROX.

1. APPROX. WATER LEVEL DETERMINED AFTER 6 HRS. IN OFFSET HOLE

NOTES:

CH

CH

CH

CH

CH

CH

CL

SPT

859.2

G.S. 928.7

19-129M

D MC LL PL10

TOP OF SHERACK FORMATION

CH

866.7

888.7

902.7

922.6

APPROXIMATE TOP OF BRENNA FORMATION

24-26 AUG 2019

(GLACIO-LACUSTRINE)

6.1' TO 8.2', YELLOW-BROWN TO GRAY-BROWN.

LAMINATED, OCC. CALC. DEPOSITS, WEATHERED FROM

(CH) FAT CLAY W/SILT, STIFF, SL. MOIST, 6' TO 10'

(GLACIO-LACUSTRINE)

STAINING, STICKY IN ZONES, YELLOW-BROWN.

MOIST TO WET, LAMINATED, OCC. CALC. DEPOSITS, FE

(CH) FAT CLAY W/SILT, M. STIFF TO STIFF, 10' TO 21'

APPROXIMATE TOP OF ARGUSVILLE FORMATION

(GLACIO-LACUSTRINE)BROWN MOTTLED W/GRAY.

WELL DEVELOPED SILTY LAMINATIONS, YELLOW-

(CH) SILTY CLAY, M. STIFF, WET, FE STAINING, 21' TO 26'

(GLACIO-LACUSTRINE)SHEARED, GRAY.

LAMINATED, FORMS DULL SLICKENSIDES WHEN

(CH) FAT CLAY W/SILT, SOFT, WET, STICKY, 31.6' TO 40'

APPROXIMATE TOP OF UNIT "A" TILL

(GLACIO-LACUSTRINE)

LAMINATED, OCC. DROPSTONES, GRITTY TEXTURE, GRAY.

(CH) FAT CLAY W/SILT, SOFT, WET, STICKY, 40' TO 62'

DRILLED WITH MUD BELOW EL. 903.7

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 903.7

3. BACKFILLED BORING WITH TREMIED CEMENT-BENTONITE GROUT

W.L. 914.7

ROAD FILL FROM TOPSOIL)(

MOIST, OCC. ORGANICS, BLACK.

(CH) ORGANIC RICH CLAY W/SILT, STIFF, SL. 0' TO 6'

(GLACIO-LACUSTRINE)

LAMINATED, FE STAINING, OXIDIZED, YELLOW-BROWN.

(CH) FAT CLAY W/SILT, SOFT, WET, 26' TO 31.6'

(TILL)SAND F.-M., HARD TO V. HARD, MOIST, GRAY.

(CL) SANDY GRAVELLY CLAY, GRAVEL F.-M., 62' TO 69.5'

OFFSET BORHOLE OPEN TO EL. 910.7

1. WATER LEVEL DETERMINED AFTER 48 HOURS IN OFFSET HOLE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B U

IL

T

N O

F

IL

E N

A M

E

D S

P

D

:2

:4

A

M

/2

/2

F M

M S

E

B

-3

.d

E E

T

O F

B O

R

IN

G L

O G

S

B-302

D F

O R

D

T M

E Y

E

M S

E B

-3 .d

W O

O

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 920

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

(ROAD FILL)TO BLACK.

GRAVEL, ASPHALT AND CLAY, FROZEN, GRAY 0' TO 2.7'

WEATHERED ASPHALT, SLIGHTLY MOIST.2.7' TO 3.8'

918.0

~G.S. 925.0

24-137M

24 JAN 2024

CH

10D MC LL PL

921.2

TOP OF SHERACK FORMATION

(GLACIO-LACUSTRINE)GRAY.

(CH) SILTY CLAY, M. STIFF, MOIST, WEATHERED, 3.8' TO 7'

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 920.5

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

ASPHALT0' TO 0.8'

(ROAD BASE)

SAND F. TO M., DENSE, DRY, PARTLY FROZEN, BROWN.

(SM) SILTY SAND W/GRAVEL, GRAVEL F., 0.8' TO 5.4'

(GLACIO-LACUSTRINE)GRAY.

(CH) SILTY CLAY, M. STIFF, MOIST, LAMINATED, 5.4' TO 8'

917.5

~G.S. 925.5

24-138M

24 JAN 2024

SM

CH

10D MC LL PL

920.1

TOP OF SHERACK FORMATION

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 920.5

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

ASPHALT0' TO 0'

(ROAD BASE)BROWN.

M., SAND F. TO M., DENSE, SL. MOIST TO DRY, FROZEN,

(SM) SILTY SAND W/GRAVEL,GRAVEL F. TO 0.8' TO 3.9'

MOIST, FROZEN, JUMBLED, GRAY TO BLACK.

(CL) SHERACK FM. MIXED W/TOPSOIL, STIFF, 3.9' TO 5.5'

(GLACIO-LACUSTRINE)LAMINATED, GRAY.

(CH) SILTY CLAY, M. STIFF, MOIST, 5.5' TO 7.0'

918.5

~G.S. 925.5

24-139M

24 JAN 2024

SM

CL

CH

10D MC LL PL

TOP OF SHERACK FORMATION

921.6

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 921.8

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

GRAVEL & ASPHALT MIXED W/CLAY0' TO 0.8'

MOIST, FROZEN, GRAY TO BLACK.

SILTY CLAY, SHERACK MIXED W/TOPSOIL, STIFF, 0.8' TO 5'919.8

~G.S. 924.8

24-140M

24 JAN 2024

10D MC LL PL

CL

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 918

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

(ROAD BASE)

(GP) GRAVEL MIXED W/ASPHALT AND CLAY, 0.8' TO 1.4'

FROZEN, JUMBLED, BLACK.

W/SHERACK FM.,M. STIFF, MOIST, TR. F. GRAVEL,

(CH) SILTY CLAY, TOPSOIL MIXED 1.4' TO 7.2'

(GLACIO-LACUSTRINE)WEATHERED, GRAY.

(CH) SILTY CLAY, M. STIFF, MOIST, 7.2' TO 9'

ASPHALT0' TO 0.8'

916.0

~G.S. 925.0

24-141M

24 JAN 2024

GP

CH

CH

10D MC LL PL

917.8

TOP OF SHERACK FORMATION

923.6 23 66 20

24 66 19

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 921

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

ASPHALT0' TO 0.8'

(ROAD BASE)

SAND F. TO M., V. DENSE, SL. MOIST, FROZEN, BROWN.

(SM) SILTY SAND W/GRAVEL, GRAVEL F., 0.8' TO 2.8'

(BURIED TOPSOIL)LIMESTONE CLAST, BLACK.

(CH) SILTY CLAY, M. STIFF, MOIST, OCC. 2.8' TO 6'

(GLACIO-LACUSTRINE)

(CH) SILTY CLAY, M. STIFF, MOIST, GRAY. 6' TO 8'

917.0

~G.S. 925.0

24-142M

24 JAN 2024

SM

CH

CH

10D MC LL PL

919.0

TOP OF SHERACK FORMATION

922.2

28 58 22

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B U

IL

T

N O

F

IL

E N

A M

E

D S

P

D

:3

:2

A

M

/2

/2

F M

M S

E

B

-3

.d

E E

T

O F

B O

R

IN

G L

O G

S

B-303

D F

O R

D

T M

E Y

E

M S

E B

-3 .d

W O

O

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 918.5

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

ASPHALT0' TO 0.8'

(ROAD BASE)BROWN.

SAND F. TO M., V. DENSE, SLIGHTLY MOIST, FROZEN,

(SM) SILTY SAND W/GRAVEL, GRAVEL F., 0.8' TO 3.7'

(BURIED TOPSOIL)

(CH) SILTY CLAY, STIFF, MOIST, BLACK. 3.7' TO 5.8'

(GLACIO-LACUSTRINE)GRAY.

(CH) SILTY CLAY, M. STIFF, MOIST, LAMINATED, 5.8' TO 9'

916.5

~G.S. 925.5

24-143M

24 JAN 2024

SM

CH

CH

10D MC LL PL

919.7

TOP OF SHERACK FORMATION

921.8

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 921.

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

ASPHALT0' TO 0.8'

(ROAD BASE)

M., SAND F. TO M., DENSE, SL. MOIST, FROZEN, BROWN.

(SM) SILTY SAND W/GRAVEL, GRAVEL F. TO 0.8' TO 4.4'

GRAY.

W/TOPSOIL, DENSE, MOIST, JUMBLED, FROZEN, BLACK TO

(CH) SILTY CLAY, SHERACK FM. MIXED 4.4' TO 6.3'

(GLACIO-LACUSTRINE)WEATHERED, GRAY.

(CH) SILTY CLAY, M. STIFF, MOIST, LAMINATED, 6.3' TO 8'

918.0

~G.S. 926.0

24-144M

24 JAN 2024

SM

CH

CH

10D MC LL PL

919.7

TOP OF SHERACK FORMATION

921.6

24 65 19

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 921

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

ASPHALT0' TO 0.8'

(GP) CRUSHED ASPHALT AND GRAVEL. 0.8' TO 1'

TO GRAY.

FM., V. STIFF, SL.MOIST, TR. GRAVEL, FROZEN, BLACK

(CH) SILTY CLAY, TOPSOIL MIXED W/SHERACK 1' TO 6.1'

(GLACIO-LACUSTRINE)LAMINATED, SL. WEATH, GRAY.

(CH) SILTY CLAY, M.STIFF, SL. MOIST, 6.1' TO 8'

~G.S. 926.2

918.2

24-145M

25 JAN 2024

GP

CH

CH

10D MC LL PL

920.1

TOP OF SHERACK FORMATION

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 921.2

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

ASPHALT0' TO 0.8'

BLACK TO GRAY.

W/TOPSOIL, STIFF, SL. MOIST, TR. GRAVEL, FROZEN,

(CL) SILTY CLAY, SHERACK MIXED 0.8' TO 6'

(GLACIO-LACUSTRINE)LAMINATED, GRAY.

(CH) SILTY CLAY, M. STIFF, SL. MOIST, 6' TO 8'

918.2

~G.S. 926.2

24-146M

25 JAN 2024

CH

CH

10D MC LL PL

920.2 TOP OF SHERACK FORMATION

24 65 19

NOTES:

1. GROUNDWATER NOT ENCOUNTERED

2. HOLE STABILIZED WITH HOLLOW STEM AUGER TO EL. 919.8

3. BACKFILLED WITH SOILS AND TOPPED WITH ASPHALT PATCH

4. EL. ESTIMATED FROM COE PROJECT LIDAR

SPT

ASPHALT0' TO 0.8'

(GP) CLAYEY GRAVEL.0.8' TO 1'

BLACK TO GRAY.

STIFF, SL. MOIST, TR. GRAVEL, JUMBLED, FROZEN,

(CH) SILTY CLAY, SHERACK MIXED W/TOPSOIL,1' TO 5.4'

(GLACIO-LACUSTRINE)MOTTLED W/YELLOW.

(CH) SILTY CLAY, M. STIFF, SL. MOIST, GRAY 5.4' TO 8'

~G.S. 924.8

916.8

24-147M

25 JAN 2024

GP

CH

CH

10D MC LL PL

919.4

TOP OF SHERACK FORMATION

24 61 18

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E L

E V

A T

IO

N

D A

T U

M

V E

R T

IC

A

L C

O N

T R

O L

C

O O

R D

IN

A

T E

S Y

S T

E M

H

O R

IZ

O

N T

A L

C O

N T

R O

L

C O

M B

IN

E

D F

A C

T O

R

C F

G E

O

P

D

:0

:2

P

M

/2

/2

F M

M S

E C

D .d

D

M N

S P

C S

C

E N

T R

A L

Z O

N E

-U .S

S

U R

V E

Y F

T

N A

V D

.9

B

R M

C G

A R

V

A

T

O

D E

M O

L

IT

IO

N

P L

A N

CD100

J M

O S

E R

R M

C G

A R

V

M S

E C

D .d

M

O S

S I

D

A D

V E

R T

IS

E

M E

N T

M O

O R

H E

A D

M

N

F A

R G

O -M

O O

R H

E A

D F

L O

O D

R

IS

K M

A N

A G

E M

E N

T

R E

D R

IV

E

R O

F T

H E

N O

R T

H R

IV

E

R B

A S

IN

F M

M S

O U

T H

E R

N E

M B

A N

K M

E N

T R

E A

C H

S E

-5

W

E S

B

P

A U

L M

IN

N

E S

O T

A

S T

P

A U

L D

IS

T

R

-B

U

IL

T N

O

F

IL

E N

A M

E

TOP OF EMBANKMENT

180TH AVE S�

WORK LIMITS

180TH AVE S

EXISTING GRAVEL EDGE (TYP.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

O C

T

TOP OF EMBANKMENT

180TH AVE S�

H

IG

H W

A Y

180TH AVE S

WORK LIMITS

EDGE

ASPHALT

EXISTING

EDGE

ASPHALT

EXISTING

6 EXISTING DRAINTILE

REMOVE BITUMINOUS & CONCRETE PAVEMENT

TOPSOIL STRIPPING

REMOVE ROAD EMBANKMENT

REMOVE UNDERGROUND CULVERT OR UTILITY

CLEAR AND GRUB TREE / AREA

SHEET KEYNOTES

1. REMOVE ROAD EMBANKMENT

2. REMOVE BITUMINOUS AND CONCRETE PAVEMENT

3. FULL DEPTH PAVEMENT SAWCUT

4. SALVAGE SIGN / MARKER / POST

5. PROTECT SIGN / MARKER / POST

6. PROTECT IN-PLACE PRIVATE UTILITY

7. PROTECT CULVERT

8. REMOVE CULVERT

9. CLEAR AND GRUB TREE / AREA

10. REMOVE SIGN / MARKER / POST

11. SALVAGE MAILBOX

12. REMOVE UNDERGROUND COMMUNICATION LINE

13. TOPSOIL STRIPPING

14. SALVAGE REINFORCED CONCRETE CULVERTS

15. PROTECT TREES

16. REMOVE UNDERGROUND COMMUNICATION LINE

(BY OTHERS)

1. ALL REMOVED MATERIALS SHALL BECOME PROPERTY OF

THE CONTRACTOR UNLESS OTHERWISE SPECIFIED.

2. NO MATERIAL STOCKPILING SHALL OCCUR OUTSIDE OF

WORK LIMITS. STOCKPILES SHALL MEET THE

REQUIREMENTS OF THE MINNESOTA POLLUTION

CONTROL AGENCY CONSTRUCTION STORMWATER

GENERAL PERMIT.

3. EXCAVATION DEPTHS ARE DEFINED BY THE TYPICAL

SECTIONS, PROPOSED PROFILES AND CROSS SECTIONS.

4. REMOVED AGGREGATE SURFACING AND TOPSOIL MAY BE

REUSED IF STOCKPILED MATERIAL MEETS ALL TESTING

AND MATERIAL REQUIREMENTS IN SPECIFICATIONS.

5. STRIP 6 INCHES OF TOPSOIL WITHIN THE STRIPPING

LIMITS INDICATED ON THE PLANS. ANY MATERIAL

REMOVED BENEATH THESE STRIPPED 6 INCHES OF

TOPSOIL WILL BE PAID FOR AS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .