FMMSE5_CD104_AMEND 0006.pdf

PDF 765 KB Posted

Attached to
Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-5
Solicitation number
W912ES24B0005
Issued by

About this file

This is a technical demolition plan drawing (sheet CD104) from the Army Corps of Engineers showing the demolition area between stations 95+50 to 107+50. The drawing includes a plan view of the demolition zone along E 180th Ave S, with work limits and existing right of way clearly marked. A detailed table of existing culvert information is provided, listing multiple culvert locations with their sizes and invert elevations for both upstream and downstream sections.

The sheet contains standard general notes, sheet keynotes, and a legend indicating different demolition elements including removal of bituminous & concrete pavement, topsoil stripping, road embankment removal, and underground conduit/utility removal. The drawing appears to be part of the broader Fargo Moorhead Metropolitan Area Flood Risk Management Project, specifically relating to demolition work required for the Southern Embankment Reach SE-5 construction.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .