W912ES23B0015 FMMSE4__PLANSET_REF.pdf

PDF 2 MB Posted

Attached to
Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-4
Solicitation number
W912ES23B0015
Issued by

About this file

This document appears to be a set of hydrological information and elevation duration curves related to the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-4. The information includes daily elevation hydrographs and monthly elevation duration curves for the Red River of the North in the project area, based on 49 years of historical data.

The associated federal contract opportunity is a solicitation (Solicitation Number W912ES23B0015) for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-4 in Clay County, Minnesota. The project consists of 5.8 miles of dam embankment, associated ditches, four road crossings, two drop structures, and a field access road. The anticipated contract value is between $25,000,000 and $100,000,000. The solicitation is an Invitation for Bid (IFB) that is unrestricted. The resulting contract will be a firm, fixed-price contract. The North American Industry Classification System (NAICS) code is 237990 - Other Heavy and Civil Engineering Construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2017 2018 2019 2020 2021 2022

1,000

1,500

2,000

2,500

3,000

3,500

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

F

LO

W I

N

C F

S

2012 2013 2014 2015 2016 2017

1,000

1,500

2,000

2,500

3,000

3,500

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

F

LO

W I

N C

F S

FMM SE-4

RED RIVER OF THE NORTH

DAILY ELEVATION HYDROGRAPHS

JANUARY 01 - DECEMBER 31

2014 - 2023

SHEET NUMBER: 1 of 3

RED RIVER STRUCTURE

HYDROLOGIC INFORMATION

Notes:

1. These daily elevation hydrographs are based on discharge data collected at the Red River of the North at Hickson, ND USGS gage (05051522). There are 49 years of record (1975-2023). A stage-discharge rating curve at the Red River Structure extracted from the FMM HEC-RAS model was used to estimate stage at the Red River Structure, which is near the FMM SE-4 project site. The highest peak elevation occurred on March 26, 2009 (914.24 ft NAVD 88).

2. These daily elevation hydrographs are based on the best information available. These daily elevation hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.

2019 2020 2021 2022 2023 2024

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

S T

A G

E I

N F

E E

T

N A

V D

8)

2014 2015 2016 2017 2018 2019

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J

S T

A G

E I

N F

E E

T

N A

V D

8)

FMM SE-4

RED RIVER OF THE NORTH

ELEVATION DURATION CURVES

JANUARY - JUNE

1975 - 2023

SHEET NUMBER: 2 of 3

RED RIVER STRUCTURE

HYDROLOGIC INFORMATION

Notes:

1. These monthly duration curves were derived using data collected at the Red River of the North at Hickson, ND USGS gage (05051522). There are 49 years of record (1975-2023). A stage-discharge rating curve at the Red River Structure extracted from the FMM HEC-RAS model was used to estimate stage at the Red River Structure, which is near the FMM SE-4 project site. The 2009 event is the flood of record (914.24 ft NAVD 88).

2. These elevation duration curves are based on the best information available. These elevation duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

MARCH

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

JUNE

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

JANUARY

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

8)

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

APRIL

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

8)

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

FEBRUARY

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

8)

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

MAY

FMM SE-4

RED RIVER OF THE NORTH

ELEVATION DURATION CURVES

JULY - DECEMBER

1975 - 2023

SHEET NUMBER: 3 of 3

RED RIVER STRUCTURE

HYDROLOGIC INFORMATION

Notes:

1. These monthly duration curves were derived using data collected at the Red River of the North at Hickson, ND USGS gage (05051522). There are 49 years of record (1975-2023). A stage-discharge rating curve at the Red River Structure extracted from the FMM HEC-RAS model was used to estimate stage at the Red River Structure, which is near the FMM SE-4 project site. The 2009 event is the flood of record (914.24 ft NAVD 88).

2. These elevation duration curves are based on the best information available. These elevation duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

SEPTEMBER

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

DECEMBER

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

JULY

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

8)

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

OCTOBER

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

8)

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

AUGUST

0 10 20 30 40 50 60 70 80 90 100

E

LE

V A

T

IO

N I

N F

E E

T

N A

V D

8)

PERCENTAGE OF TIME EQUALLED OR EXCEEDED

NOVEMBER

File details come from the government source that posted it. Updated .