This document contains an amendment to a federal solicitation and details of a related federal contract opportunity. The solicitation amendment removes a draft watermark from an attached form and memorializes a site visit conducted on May 10, 2023, where representatives from various construction firms asked clarifying questions about project requirements such as the size and duration of the needed helper boat.
The federal contract opportunity is to construct a 33-foot diameter sheet pile cell adjacent to the downstream end of the lower guide wall at Lock and Dam No. 4 in Alma, Wisconsin. Scope of work includes demolishing existing structures, concrete and underwater apron repair, and installing a pile-founded tremie-filled concrete end cell with a precast structural wall panel transition. A thermal analysis approval is required prior to concrete placement. If working during navigation season, a helper boat is also needed. The opportunity is a total small business set-aside with an anticipated value between $5-10 million. The solicitation is an invitation for bid administered by the US Army Corps of Engineers St. Paul District.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this solicitation amendment is to remove f ile W912ES22B0010_Specs.pdf and replace it w ith f ile W912ES22B0010_Specs_r.1.pdf. This removes the w atermark "DRAFT" from the Standard Form 1442.
This amendment also memorializes the site visit conducted on May 10, 2023.
All other solicitation terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES22B0010
X 9B. DATED (SEE ITEM 11)
11-Apr-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-May-2023
CODE
CONTRACTING DIVISION
USACE, ST PAUL
332 MINNESOTA STREET
SUITE E1500
ST PAUL MN 55101-1323
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES22B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SITE VISIT
A site visit at Lock and Dam 4 was conducted on May 10, 2023. The following firms were represented:
Michels Construction, Inc.
Lunda Construction Company American Mine Services, LLC Drax, Inc.
Kraemer North America Engineering & Construction Innovations, Inc.
J.F. Brennan Company, Inc.
MDM Construction Supply, LLC Larson Construction Company, Inc.
Panacea Construction Group, LLC KW Specialty Services, LLC Togiak Management Services
The following questions were asked and answered during the site visit:
Q – What is the size of the helper boat and the duration of time it will be needed for?
A – The description of the helper boat should be in the specs and is required only during Navigation season.
Navigation season closes down approximately December through March.
Q – The hours of the day in which the helper boat is available?
A – The tugs run 24/7 Q - Will the tug/boat be shoreward between the work area and the barges being pushed into the lock A – Yes
Q – Will we permit work during the non-navigation season / winter months?
A – The contractor can perform the work any time after the notice to proceed.
(End of Summary of Changes)