W912ES22B0004-0001 Amendment 0001.pdf

PDF 580 KB Posted

Attached to
Fabrication of New Miter Gates for LD 6, 7 & 9
Solicitation number
W912ES22B0004
Issued by

About this file

This document contains an amendment to a solicitation and related federal contract opportunity. The amendment adds a summary of changes and revised plan sheets to the solicitation. Key details include:

  • The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to fabricate and deliver replacement miter gates, ancillary equipment, and dispose of existing miter gates for three locks and dams on the Upper Mississippi River. Work includes fabricating, testing, painting, prestressing, and delivering new lock chamber miter gate assemblies and appurtenant parts.

  • The solicitation is an Invitation for Bid that will result in a firm-fixed price contract for fabrication, delivery, and barge demurrage of replacement miter gates for Lock & Dam 6, as well as disposal of the existing miter gates. Fabrication, delivery, barge demurrage, long term storage, and ancillary equipment for Lock & Dam 7 and Lock & Dam 9, as well as disposal of those gates, will be option items exercisable within one year of award.

  • The solicitation is 100% set aside for small businesses in NAICS code 332312, Fabricated Structural Metal Manufacturing, with a size standard of 500 employees. Offerors must be registered in SAM and include FAR and DFARS Reps and Certs sections. A bid guarantee is required.

View the file

Other files

File Type Posted
BID ABSTRACT W912ES22B0004 SIGNED.pdf PDF
BID ABSTRACT W912ES22B0004.pdf PDF
COVID-19 bid submission.docx DOCX document
W912ES22B0004-0002 Amendment 0002.pdf PDF
LD679MG_HI_S-105xxx.pdf PDF
LD679MG_HI_S-146xxx.pdf PDF
LD679MG_HI_S-204xxx.pdf PDF
LD679MG_HI_S-202xxx.pdf PDF
LD679MG_HI_S-201xxx.pdf PDF
LD679MG_HI_S-107xxx.pdf PDF
LD679MG_HI_S-145xxx.pdf PDF
W912ES22B0004_LD679MG_SPECS.pdf PDF
W912ES22B0004_LD679MG_PLANS.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6712589326

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to add the Summary of Changes and revised plan sheets.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES22B0004

X 9B. DATED (SEE ITEM 11)

15-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jan-2022

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES22B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

SUMMARY OF CHANGES

AMENDMENT NO. 1

Summary of Changes:

1. Specification Section 05 22 00 METAL RAILINGS, Paragraph 2.2.1 Aluminum Railings And Handrails is changed:

FROM:

Provide railings and handrails consisting of 2.5 inch nominal schedule 40 pipe ASTM B429/B429M. Handrail tubes shall be constructed from 6063-T6 alloy aluminum material. Provide mill finish railings. Ensure that all fasteners are Series 300 stainless steel.

TO:

Provide railings and handrails consisting of 2 inch nominal schedule 80 pipe ASTM B429/B429M. Handrail tubes shall be constructed from 6063-T6 alloy aluminum material. Provide mill finish railings. Ensure that all fasteners are Series 300 stainless steel.

2. Plan set is changed:

a. S-105 on detail C3: Transverse stiffener was removed.

b. S-107 on detail D1: Transverse stiffener was removed.

c. S-145 on details A1, D1, and C5: Bolt hole center from edge dimension changed from 1-1/2” to

2”.

d. S-146: Scale of details were updated from 1”=1’ to 1-1/2”=1’

e. S-201, S-202, S-203, S-204, and S-209: Railings and handrails changed from 2.5” nominal schedule

40 pipe to 2” nominal schedule 80 pipe.

(End of Summary of Changes)