This document summarizes a bid abstract and federal contract opportunity for the fabrication of new miter gates at three locks on the Upper Mississippi River. The U.S. Army Corps of Engineers - St. Paul District seeks a contractor to fabricate, test, paint, prestress, deliver, and dispose of existing miter gates at Locks 6, 7 and 9. The contractor must provide new lock chamber miter gate assemblies, each consisting of two miter gate leafs, and appurtenant parts to the Mississippi River Maintenance Facility in Pleasant Valley, Iowa. The solicitation is an Invitation for Bid resulting in a firm-fixed price contract for work at Lock 6, with Locks 7 and 9 constituting option items exercisable within one year of award. The small business set-aside is for the NAICS code 332312, Fabricated Structural Metal Manufacturing, with a size standard of 500 employees. Bids are due by June 30, 2022.

View the file

Other files

File Type Posted
BID ABSTRACT W912ES22B0004 SIGNED.pdf PDF
COVID-19 bid submission.docx DOCX document
W912ES22B0004-0002 Amendment 0002.pdf PDF
LD679MG_HI_S-105xxx.pdf PDF
LD679MG_HI_S-146xxx.pdf PDF
W912ES22B0004-0001 Amendment 0001.pdf PDF
LD679MG_HI_S-204xxx.pdf PDF
LD679MG_HI_S-202xxx.pdf PDF
LD679MG_HI_S-201xxx.pdf PDF
LD679MG_HI_S-107xxx.pdf PDF
LD679MG_HI_S-145xxx.pdf PDF
W912ES22B0004_LD679MG_SPECS.pdf PDF
W912ES22B0004_LD679MG_PLANS.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G&G Steel, Inc.

Item Description Quantity Unit of

Measure Unit Price Amount Unit Price Amount Unit Price Amount

0001 Bonds (Performance & Payment) 1 JOB 101,575.00$ 101,575.00$ 80,000.00$ 80,000.00$ 176,919.05$ 176,919.05$ 0002 Lock 6 Upstream Miter Gate Assembly (23' High) 1 JOB 2,595,830.00$ 2,595,830.00$ 2,820,000.00$ 2,820,000.00$ 5,113,220.00$ 5,113,220.00$ 0003 Lock 6 Downstream Miter Gate Assembly (25' High) 1 JOB 2,722,554.00$ 2,722,554.00$ 2,885,000.00$ 2,885,000.00$ 5,328,420.00$ 5,328,420.00$ 0004 Delivery of Lock 6 Miter Gate Assemblies 1 JOB 122,747.00$ 122,747.00$ 36,000.00$ 36,000.00$ 99,307.33$ 99,307.33$ 0005 Barge Demurrage for Lock 6 Miter Gate Assemblies

0005AA First 30 Days 30 DAY 350.00$ 10,500.00$ 420.00$ 12,600.00$ 435.60$ 13,068.00$ 0005AB Each Additional Day 120 DAY 350.00$ 42,000.00$ 240.00$ 28,800.00$ 492.47$ 59,096.40$

0006 Lock 6 Disposal of Existing Upstream Miter Gate 1 JOB 66,505.00$ 66,505.00$ 12,000.00$ 12,000.00$ 32,670.00$ 32,670.00$

Lock 6 Disposal of Existing Downstream Miter Gate Assemblies (25' High) 1 JOB 66,505.00$ 66,505.00$ 12,000.00$ 12,000.00$ 32,670.00$ 32,670.00$

0008 Lock 6 Anchorage Assembly 8 EACH 77,026.00$ 616,208.00$ 155,750.00$ 1,246,000.00$ 139,519.05$ 1,116,152.40$

TOTAL BASE BID ITEMS 6,344,424.00$ 7,132,400.00$ 11,971,523.18$

Option 1 Bid Items 1001 Lock 9 Upstream Miter Gate Assembly (27' High) 1 JOB 2,807,860.00$ 2,807,860.00$ 2,915,000.00$ 2,915,000.00$ 5,543,620.00$ 5,543,620.00$ 1002 Lock 9 Downstream Miter Gate Assembly (33' High) 1 JOB 3,091,377.00$ 3,091,377.00$ 3,125,000.00$ 3,125,000.00$ 6,060,100.00$ 6,060,100.00$ 1003 Delivery of Lock 9 Miter Gate Assemblies 1 JOB 122,747.00$ 122,747.00$ 36,000.00$ 36,000.00$ 105,304.93$ 105,304.93$ 1004 Barge Demurrage for Lock 9 Miter Gate Assemblies

1004AA First 30 Days 30 DAY 350.00$ 10,500.00$ 420.00$ 12,600.00$ 435.60$ 13,068.00$ 1004AB Each Additional Day 120 DAY 350.00$ 42,000.00$ 240.00$ 28,800.00$ 492.47$ 59,096.40$

1005 Lock 9 Disposal of Existing Upstream Miter Gate 1 JOB 66,505.00$ 66,505.00$ 12,000.00$ 12,000.00$ 32,670.00$ 32,670.00$

Lock 9 Disposal of Existing Downstream Miter Gate Assemblies (33' High) 1 JOB 66,505.00$ 66,505.00$ 12,000.00$ 12,000.00$ 32,670.00$ 32,670.00$

1007 Lock 9 Anchorage Assembly 8 EACH 75,303.00$ 602,424.00$ 155,750.00$ 1,246,000.00$ 139,519.05$ 1,116,152.40$

TOTAL OPTION 1 BID ITEMS 6,809,918.00$ 7,387,400.00$ 12,962,681.73$

Option 2 Bid Items 2001 Lock 7 Upstream Miter Gate Assembly (23' High) 1 JOB 2,506,530.00$ 2,506,530.00$ 2,820,000.00$ 2,820,000.00$ 5,113,220.00$ 5,113,220.00$ 2002 Lock 7 Downstream Miter Gate Assembly (25' High) 1 JOB 2,685,400.00$ 2,685,400.00$ 2,885,000.00$ 2,885,000.00$ 5,328,420.00$ 5,328,420.00$ 2003 Delivery of Lock 7 Miter Gate Assemblies 1 JOB 122,747.00$ 122,747.00$ 36,000.00$ 36,000.00$ 99,307.33$ 99,307.33$ 2004 Barge Demurrage for Lock 7 Miter Gate Assemblies

2004AA First 30 Days 30 DAY 350.00$ 10,500.00$ 420.00$ 12,600.00$ 435.60$ 13,068.00$ 2004AB Each Additional Day 120 DAY 350.00$ 42,000.00$ 240.00$ 28,800.00$ 492.47$ 59,096.40$

2005 Lock 7 Disposal of Existing Upstream Miter Gate 1 JOB 66,505.00$ 66,505.00$ 12,000.00$ 12,000.00$ 32,670.00$ 32,670.00$

Johnson Machine Works Independent Government Estimate

Base Bid Items

Optional Bid Items

Locks 6, 7, and 9 Miter Gate Supply Contract

Lock 7 Disposal of Existing Downstream Miter Gate Assemblies (25' High) 1 JOB 66,505.00$ 66,505.00$ 12,000.00$ 12,000.00$ 32,670.00$ 32,670.00$

2007 Lock 7 Anchorage Assembly 8 EACH 74,547.00$ 596,376.00$ 155,750.00$ 1,246,000.00$ 139,519.05$ 1,116,152.40$

TOTAL OPTION 2 BID ITEMS 6,096,563.00$ 7,052,400.00$ 11,794,604.13$

Option 3 3001 Greased Pintle Bearing Assemblies 12 SET 27,700.00$ 332,400.00$ 30,000.00$ 360,000.00$ 27,231.45$ 326,777.40$

Option 4 4001 Long Term Storage for Lock 6 Miter Gates 180 DAY 140.00$ 25,200.00$ 60.00$ 10,800.00$ 145.00$ 26,100.00$

Option 5 5001 Long Term Storage for Lock 7 Miter Gates 180 DAY 140.00$ 25,200.00$ 60.00$ 10,800.00$ 145.00$ 26,100.00$

Option 6 6001 Long Term Storage for Lock 9 Miter Gates 180 DAY 140.00$ 25,200.00$ 60.00$ 10,800.00$ 145.00$ 26,100.00$

TOTAL OPTIONAL BID ITEMS $13,314,481.00 14,832,200.00$ 25,162,363.26$

TOTAL BASE PLUS OPTIONAL BID ITEMS 19,658,905.00$ 21,964,600.00$ 37,133,886.44$