Amendment 0002.pdf

PDF 362 KB Posted

Attached to
Drayton Dam Fish Passage Mitigation Project at Drayton, ND Federal contract opportunity
Solicitation number
W912ES22B0002
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

This amendment modifies solicitation W912ES22B0002 for the Drayton Dam Fish Passage Mitigation Project at Drayton, ND. The project scope involves replacing an existing dam with a new structure that includes a rock fish passageway to improve connectivity as mitigation for another flood management project. The amendment increases the estimated value of the contract to between $10 million and $25 million. The work is a 100% small business set-aside and will result in a firm fixed-price contract awarded by the US Army Corps of Engineers, St. Paul District. The North American Industry Classification System code is 237990 for heavy and civil engineering construction.

View the file

Other files for this federal contract opportunity

Other files attached to Drayton Dam Fish Passage Mitigation Project at Drayton, ND, newest first.
File Type Posted
Bid Abstract W912ES22B0002 Drayton Dam Fish .pdf PDF
Amendment 0001 FMMDDM_S-102XXX.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 permit 1973_20220405134239.pdf PDF
SPECS Drayton Dam .pdf PDF
PLANS Drayton Dam .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6720606742

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update the estimated magnitude of this project.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES22B0002

X 9B. DATED (SEE ITEM 11)

09-Mar-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Apr-2022

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES22B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required performance has changed from Drayton Dam FIsh Passage Mitigation Project at Drayton, NDThis work involves replacement of an existing dam with one that includes a rock fish passageway to improve biotic connectivity as a mitigation measure for the Fargo-Moorhead Metropolitan Area Flood Risk Management Project. Construction will occur largely in-channel. The fish passage structure will be constructed upstream of the existing dam, with the downstream extent of a set of boulder weirs terminating at the location of the existing dam.

This new fish passage structure would function to maintain upstream water elevations and subsequently the existing Drayton Dam would be removed.This procurement is set-aside 100% for small business and will result in a firm fixed-price contract. The magnitude of this requirement is between $5 million and $10 million. The North American Industry Classification System (NAICS) code is 237990 with a small business size standard of $39.5 million. to Drayton Dam Fish Passage Mitigation Project at Drayton, NDThis work involves replacement of an existing dam with one that includes a rock fish passageway to improve biotic connectivity as a mitigation measure for the Fargo-Moorhead Metropolitan Area Flood Risk Management Project. Construction will occur largely in-channel. The fish passage structure will be constructed upstream of the existing dam, with the downstream extent of a set of boulder weirs terminating at the location of the existing dam. This new fish passage structure would function to maintain upstream water elevations and subsequently the existing Drayton Dam would be removed.This procurement is set-aside 100% for small business and will result in a firm fixed-price contract. The magnitude of this requirement is between $10 million and $25 million. The North American Industry Classification System (NAICS) code is 237990 with a small business size standard of $39.5 million..

(End of Summary of Changes)

File details come from the government source that posted it. Updated .