A22 21Q0013 Amendment 1.pdf

PDF 643 KB Posted

Attached to
LD4 Concrete Supply & Pumping Federal contract opportunity
Solicitation number
W912ES21Q0013
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

View the file

Other files for this federal contract opportunity

Other files attached to LD4 Concrete Supply & Pumping, newest first.
File Type Posted
W912ES21Q0004 LD4_Pump_Truck_Setup ATTACHMENT 1.pdf PDF
W912ES21Q0013 LD4 Concrete and Pumping.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6703176643

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment to the solicitation is to post answ ers to questions posed and attachment 1, and to extend the closing date and time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES21Q0013

X 9B. DATED (SEE ITEM 11)

20-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Dec-2020

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES21Q0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS & ANSWERS

Questions and Answers posed:

This solicitation initially asks for 56 CY’s of a 4500 PSI SCC mix. I assume this 56 CY’s is one placement?

o Yes, the 56 cy is for the downstream sill beam placement.

You then have additional options of 10 CY’s. Would these be the same day or alternate days?

o 10 CY as needed.

Pumping asks for a 200’ in minimum distance in length. I am assuming you are OK with Hose on the ground like we did the past for LD4 (JF Brennan as example) As the largest truck mounted pump by putzmeister for example has a horizontal reach of 190’7” ???

o USACE prefers a truck mounted pump with the longest boom horizontal reach. If a greater distance is needed extension hoses attached to the end of the boom would be acceptable. USACE will have a crane available to support the hose extensions.

o And As I am sure you are aware these are not common and would be traveling to get to LD4. Yes Would the USACE do the concrete construction end of the work (i.e. Placement) or is the supplier on the

Solicitation required, or would and should be partner up to complete this? ???

o USACE personal will be placing the concrete.

#1 – Concrete Mixture – 4500 PSI SCC – In the Cementitious Materials 2.f. – it says optional replacement of pozzolans is 25% Maximum, Silica Fume is 5% Maximum – I would be proposing a mixture that we have now used on LD 6,8, and 9. That has a high replacement of Slag @ a 1:1 Ratio with Cement. I am assuming that since this is not listed I am OK with this.

The specified concrete mixture is intended to create a hard, dense, abrasion resistant surface #2 – I am unaware of what the downstream bulkhead sill beam is exactly and where that is located.

Please see the attached PDF (Attachment 1) #3 – Reason I ask #2 – Is where would the pump need to be placed in the USACE’s “mind”?

Please see the attached PDF (Attachment 1)

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 09-Dec-2020 11:00 AM to 11-Dec-2020 10:00 AM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .