This solicitation amendment extends the response date for solicitation number W912ES21B0005 to March 3, 2021 at 2:00 PM. The solicitation is for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-1 located in Cass County, North Dakota. The project consists of constructing an earth dam embankment with gravel road, topsoiled and seeded slopes, ditches, and portions with turf reinforcement mat. The total length of the dam embankment is just over 2 miles. Embankment material will come from a government provided borrow site. The project also includes farm entrances, culverts, concrete headwalls with flap gates, and roadway gates. The anticipated value is between $1,000,000 and $5,000,000. The NAICS code is 237990. The solicitation is a total small business set-aside with a firm fixed price contract to be awarded.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6702031786

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to amend the specif ications and extend the date specif ied for receipt of bid.

All other solicitation terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES21B0005

X 9B. DATED (SEE ITEM 11)

15-Jan-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Feb-2021

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES21B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 17-Feb-2021 02:00 PM to 03-Mar-2021 02:00 PM.

The following have been added by full text:

AMENDMENT 0004

Section 01 57 20.00 13 paragraph 3.1 Permits which currently reads:

The Government has obtained the following permits related to this project.

1. STATE OF NORTH DAKOTA PERMIT TO CONSTRUCT OR MODIFY A DAM

The North Dakota State Water Commission has issued a permit to Construct or Modify a Dam, (Permit number 2489). The conditions that apply to or impact the Contractor are addressed elsewhere within the contract documents.

2. MNDNR DAM SAFETY & PUBLIC WATERS WORK PERMIT

The Minnesota Department of Natural Resources has issued a Dam Safety & Public Waters Work Permit, (Permit number 2018-0819). The conditions that apply to or impact the Contractor are addressed elsewhere within the contract documents.

3. 401 WATER QUALITY CERTIFICATION

A copy of this permit is attached at the end of this section.

The Contractor is responsible for obtaining all applicable permits or licenses, except those obtained by the Government. The Contractor shall be responsible for implementing the terms and requirements of the permits held by the Contractor or the Government.

Is hereby changed to read:

The Government has obtained the following permits related to this project.

1. STATE OF NORTH DAKOTA PERMIT TO CONSTRUCT OR MODIFY A DAM

The North Dakota State Water Commission has issued a permit to Construct or Modify a Dam. The conditions that apply to or impact the Contractor are addressed elsewhere within the contract documents.

2. MNDNR DAM SAFETY & PUBLIC WATERS WORK PERMIT

The Minnesota Department of Natural Resources has issued a Dam Safety & Public Waters Work Permit, (Permit number 2018-0819). The conditions that apply to or impact the Contractor are addressed elsewhere within the contract documents.

W912ES21B0005

3. 401 WATER QUALITY CERTIFICATION

A copy of this permit is attached at the end of this section.

The Contractor is responsible for obtaining all applicable permits or licenses, except those obtained by the Government. The Contractor shall be responsible for implementing the terms and requirements of the permits held by the Contractor or the Government.

(End of Summary of Changes)