This document contains an amendment to a solicitation for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-1. The amendment provides answers to vendor questions to clarify requirements. The project involves construction of an earth dam embankment with gravel road and turf reinforcement mat on slopes, as well as ditches, farm entrances, culverts, headwalls, and roadway gates along a 2 mile stretch. The majority of embankment material will come from a government borrow site. The solicitation is a small business set-aside between $1-5 million under NAICS 237990. The resulting contract will be firm fixed price awarded by the Army Corps of Engineers, St Paul District. Offerors must register in SAM and have representations and certifications completed prior to award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6702031786

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this solicitation amendment is to answ er vendor submitted questions.

All other solicitation terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES21B0005

X 9B. DATED (SEE ITEM 11)

15-Jan-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Feb-2021

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 FIFTH STREET EAST

SUITE 700

SAINT PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES21B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

AMENDMENT 0003

Vendor Questions and Answers:

Q - Clarification on number of times watering after seeding needs to be done.

A - There is no set number of times of watering. The contractor is required to water as needed to achieve the results indicated in the spec Section 32 92 19.01 13

Q - What should be done with any additional topsoil generated?

A - Excess topsoil shall be disposed of at the Disposal Site shown on Plan Sheet G-002. See Section 01 14 00.00 13 and Section 01 22 00.00 13.

Q - If subcontracted trucks/Side dumps are used, are the truck drivers subject to prevailing wage rates? The high wage rate for truck Drivers looks to indicate the wage is meant for off road trucks as it is higher than skilled operator positions.

A - Contractors are required to follow the rules and regulations of the Department of Labor regarding the applicability of Davis Bacon to truck drivers.

Q - Does the staging area have existing utility hook us for the government office trailer?

A - The staging area does not have existing utility hookups. See Section 01 50 02.00 13 para 1.3.

Q - Measurement and Payment spec section. Paragraph 9.5.1 Excavation and Paragraph 1.9.6 Borrow Excavation.

Which line item does the construction of the embankment fall under? How is the contractor compensated for use of suitable material excavated from the ditches and used as embankment material if the embankment construction is billed under borrow excavation?

A - If the embankment material is obtained from the ditches it is paid under the Excavation CLIN. If the embankment material is obtained from the borrow area, it is paid under the Borrow Excavation CLIN. See Section 01 22 00.00 13 para 1.9.5 and para 1.9.6.

Q - Can the Contractor Quality Control System Manager (CQC) and the Site Safety and Health Officer (SSHO) dual hat?

A – No. See Section 01 35 26 para 1.6.1.1.

Q - Can you please clarify if the Contractor Quality Control System Manager (CQC) and the Quality Control (QC) Manager are the same person?

W912ES21B0005

A - The CQC System Manager is the same as the Quality Control Manager is the same as CQC Manager is the same as the QC Manager.

Q - Is a NPDES (National Pollution Discharge Elimination System) permit required?

A – Yes. See Section 01 41 26.00 13

Q - Can debris from clearing be disposed of at the disposal site?

A – No. See Section 31 11 00 para 3.3.

Q - There does not appear to be any subgrade excavation (Clin 008) shown on the plans. Section 01 22 00 .00 13, Part 1.9.4, does not describe what the line item is for. Please describe the scope of work that is required for Clin 008 - Subgrade Excavation.

A - Subgrade Excavation is not shown on the plans because it is additional excavation required to remove questionable material based on field conditions. The following spec sections define and describe the scope of work for Subgrade Excavation: 31 00 00.00 13 para 2.1.13; 01 22 00.00 13 para 1.9.4.

Q - The water levels found in the soil boring logs along the alignment of the embankment vary. The bottom elevation of the borrow pit excavation is approximately 905.00. The soil borings for the borrow pit state that water level is not determined. Can you confirm that offerors should include dewatering in their price for CLIN 0010- Borrow Excavation?

A - It is the responsibility of the Contractor to manage groundwater and surface water. Therefore, it is the responsibility of the bidder to determine how to accommodate this. See 31 00 00.00 13 para 3.23.

Q - Does the Corp have any earthwork tables (cut/fill tables) for the project in order to hone in on where the dirt is actually moving onsite?

A – No, earthwork tables are not part of the plan set.

Q – There is not a line item for Mobilization. Will you be adding this bid item?

A – No, a line item for Mobilization will not be added.

(End of Summary of Changes)