AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to allow posting of the full request for quotes to FBO (the last 33 pages w ere missing from the original posting), add clause 52.232-5, remove the inapplicable w eather days clause, update w age determinations MN77and WI11, and extend the closing date and time to August 2, 2016 at 10:00am.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 30

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-16-T-0080

X 9B. DATED (SEE ITEM 11)

13-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jul-2016

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 5TH STREET EAST

SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-16-T-0080

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 27-Jul-2016 10:00 AM to 02-Aug-2016 10:00 AM.

SECTION 00700 - CONTRACT CLAUSES

The following have been added by full text:

52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.

(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.

(1) The Contractor's request for progress payments shall include the following substantiation:

(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.

(ii) A listing of the amount included for work performed by each subcontractor under the contract.

(iii) A listing of the total amount of each subcontract under the contract.

(iv) A listing of the amounts previously paid to each such subcontractor under the contract.

(v) Additional supporting data in a form and detail required by the Contracting Officer.

(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if--

(i) Consideration is specifically authorized by this contract; and

(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.

(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)

I hereby certify, to the best of my knowledge and belief, that--

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor's performance.

(Name)

(Title)

(Date)

(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall--

(1) Notify the Contracting Officer of such performance deficiency; and

(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until--

(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or

(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.

(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.

(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as--

(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or

(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.

(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.

(h) Final payment. The Government shall pay the amount due the Contractor under this contract after--

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 6305).

(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR Subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.

(j) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1), the amount payable under subparagraph (d)(2) of this clause shall be--

(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and

(2) Deducted from the next available payment to the Contractor.

(End of clause)

The following have been modified:

52.212-4003 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (OCT 1989) ER 415-1-15

a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the CONTRACT CLAUSES: DEFAULT (FIXED-PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the contractor.

b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The weather station selected for this analysis was Trempealeau Dam 6, which has a period of record of 68 years (1936-2004). Data shown is for precipitation of 0.1 inch or more and maximum daily temperatures less than 32 degrees Fahrenheit. The actual numbers have been multiplied by 5/7 to account for the workweek.

The contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORKDAYS BASED ON (5) DAY WORKWEEK.

GEOGRAPHIC LOCATION -- Trempealeau,WI: Lock and Dam 6 Month JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Days 16 11 6 5 5 5 4 5 5 3 5 12

c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled workday. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b, above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the CONTRACT CLAUSES: DEFAULT (FIXED-PRICE CONSTRUCTION).

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

MN WAGE DETERMINATION

General Decision Number: MN160077 07/22/2016 MN77

Superseded General Decision Number: MN20150077

State: Minnesota

Construction Type: Building

County: Winona County in Minnesota.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/22/2016 2 03/04/2016 3 06/17/2016 4 06/24/2016 5 07/01/2016 6 07/22/2016

ASBE0034-002 06/01/2016

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems).....$ 35.11 29.89

BOIL0647-001 01/01/2013

Rates Fringes

BOILERMAKER......................$ 32.40 25.37

BRMN0007-001 05/01/2016

Rates Fringes

BRICKLAYER.......................$ 36.02 18.40

CARP1382-006 06/01/2009

Rates Fringes

CARPENTER (Acoustical Installation and Drywall Hanging only)....................$ 25.70 15.21

ELEC0343-001 07/01/2015

Rates Fringes

ELECTRICIAN......................$ 34.61 17.44

ELEV0009-004 01/01/2016

Rates Fringes

ELEVATOR MECHANIC................$ 45.87 29.985

FOOTNOTE:

PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after

Thanksgiving, and Christmas Day.

ENGI0049-055 05/01/2016

Rates Fringes

OPERATOR: Power Equipment

GROUP 1.....................$ 39.14 18.40

GROUP 2.....................$ 38.80 18.40

GROUP 3.....................$ 37.39 18.40

GROUP 4.....................$ 37.05 18.40

GROUP 5.....................$ 36.13 18.40

GROUP 6.....................$ 34.62 18.40

GROUP 7.....................$ 33.50 18.40

GROUP 8.....................$ 31.49 18.40

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.

GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over.

GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane (Stationary) up to 200'; All-Terrain Vehicle Crane.

GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);

Overhead Crane (inside building perimeter).

GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor 450 CFM or over (2 or more machines); Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.

GROUP 6: Bobcat/Skid Loader, Loader up to 1 cu. yd., Tractor D2 or similar size.

GROUP 7: Crane Oiler.

GROUP 8: Oiler, Greaser (Tractor/Truck).

IRON0512-005 05/01/2015

Rates Fringes

IRONWORKER, ORNAMENTAL,

REINFORCING, AND STRUCTURAL......$ 35.50 23.45

LABO0405-004 01/01/2016

Rates Fringes

LABORER (ASBESTOS ABATEMENT)

Removal from Floors, Walls & Ceilings..................$ 30.08 16.19

LABO0405-005 05/01/2012

Rates Fringes

LABORER (LANDSCAPE)..............$ 17.49 12.10

LABO0405-013 05/01/2012

Rates Fringes

LABORER

(1) Form Work...............$ 20.30 14.48

(2) Bottom Person, Pipelayer...................$ 21.00 14.48

(3) Mason Tender (Brick, Cement/Concrete)............$ 21.55 14.48

PLUM0006-002 05/01/2015

Rates Fringes

PLUMBER..........................$ 38.11 17.48

* ROOF0096-002 06/01/2016

Rates Fringes

ROOFER...........................$ 22.92 10.50

SFMN0669-002 01/01/2016

Rates Fringes

SPRINKLER FITTER.................$ 33.83 17.77

SHEE0010-065 05/01/2009

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 26.15 13.03

SUMN2009-031 07/27/2009

Rates Fringes

CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 17.21 3.34

CEMENT MASON/CONCRETE FINISHER...$ 23.05 0.00

LABORER: Common or General......$ 15.92 3.30

LABORER: Roof Tearoff...........$ 10.42 2.08

OPERATOR: Excavator.............$ 17.64 2.97

OPERATOR: Mechanic..............$ 15.25 1.39

PAINTER: Spray..................$ 17.50 4.11

TRUCK DRIVER: Dump Truck........$ 13.92 1.08

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

WI WAGE DETERMINATION

General Decision Number: WI160011 07/22/2016 WI11

Superseded General Decision Number: WI20150011

State: Wisconsin

Construction Type: Building

Counties: Adams, Ashland, Barron, Bayfield, Buffalo, Burnett, Clark, Columbia, Crawford, Dodge, Door, Dunn, Florence, Fond Du Lac, Forest, Grant, Green, Green Lake, Iowa, Iron, Jackson, Jefferson, Juneau, Kewaunee, Lafayette, Langlade, Lincoln, Manitowoc, Marinette, Marquette, Menominee, Monroe, Oconto, Oneida, Pepin, Polk, Portage, Price, Richland, Rusk, Sauk, Sawyer, Shawano, Taylor, Trempealeau, Vernon, Vilas, Walworth, Washburn, Waupaca, Waushara and Wood Counties in Wisconsin.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 01/29/2016 2 03/04/2016 3 03/11/2016 4 04/01/2016 5 05/20/2016 6 06/17/2016 7 06/24/2016 8 07/01/2016 9 07/22/2016

ASBE0019-002 11/30/2015

COLUMBIA, CRAWFORD, DODGE, GRANT, GREEN, IOWA, JEFFERSON,

JUNEAU, LAFAYETTE, MARQUETTE, MONROE, RICHLAND, SAULK, VERNON,

AND WALWORTH COUNTIES

Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 33.83 28.25

ASBE0034-005 06/01/2016

BARRON, BUFFALO, DUNN, AND POLK COUNTIES

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials;

protective coatings, coverings, and finishes to all types of mechanical systems. Does not include asbestos removal)................$ 35.11 29.89

ASBE0049-003 06/01/2015

ASHLAND, BAYFIELD, BURNETT, IRON, PEPIN, SAWYER, AND WASHBURN

COUNTIES

Asbestos Workers/Insulator (Includes the application of all insulating materials;

protective coverings, coatings, and finishes to all types of mechanical systems).....$ 27.82 24.15

ASBE0127-002 05/29/2016

ADAMS, CLARK, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE,

JACKSON, KEWAUNEE, LINCOLN, MANITOWOC, MARINETTE, MENOMINEE,

OCONTO, ONEIDA, PORTAGE, PRICE, RUSK, SHAWANO, TAYLOR,

TREMMPEALEAU, VILAS, WAUPACA, WAUSHARA, AND WOOD COUNTIES

Heat and Frost Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems;

and the application of firestopping material in walls, floors, ceilings).........$ 30.79 21.43

ASBE0205-005 06/01/1998

ADAMS, CLARK, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE,

JACKSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARINETTE,

MENOMINEE, OCONTO, ONEIDA, PORTAGE, PRICE, RUSK, SHAWANO,

TAYLOR, TREMPEALEAU, VILAS, WAUPACA, WAUSHARA, AND WOOD COUNTIES

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not).................$ 16.56 3.10

ASBE0205-008 06/01/1999

COLUMBIA, CRAWFORD, DODGE, GRANT, GREEN, IOWA, JEFFERSON,

JUNEAU, LAFAYETTE, MARQUETTE, MONROE, RICHLAND, SAULK, VERNON,

AND WALWORTH COUNTIES

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)...$ 16.55 3.45

ASBE0205-012 05/01/1998

ASHLAND, BAYFIELD, BURNETT, IRON, PEPIN, SAWYER, AND WASHBURN

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)...$ 19.72 3.69

ASBE0205-013 05/01/1998

BARRON, BUFFALO, AND POLK COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)...$ 19.72 3.69

BOIL0107-001 01/01/2015

Rates Fringes

BOILERMAKER

Boilermaker.................$ 33.35 28.60 Small Boiler Repair (under 25,000 lbs/hr)..............$ 26.91 16.00

BRWI0001-003 06/01/2015

CRAWFORD,JUNEAU, MONROE,TREMPEALEAU, AND VERNON COUNTIES

Rates Fringes

Bricklayer & Tile Setter.........$ 31.22 16.69

BRWI0002-003 06/01/2015

ASHLAND, BURNETT, IRON, WASHBURN

Rates Fringes

BRICKLAYER

Bricklayer, Tile Setter.....$ 36.10 16.13 Cement Mason/Concrete Finisher....................$ 34.30 16.13

BRWI0002-004 06/01/2015

BAYFIELD COUNTY

BRICKLAYER

Bricklayer & Tile Setter....$ 36.10 16.13

BRWI0003-001 06/01/2015

DOOR, KEWAUNEE, FLORENCE, FOND DU LAC, GREEN LAKE, MANITOWOC,

MARINETTE, MARQUETTE, OCONTO, SHAWANO, WAUPACA, AND WAUSHARA

Bricklayer, Cement Mason, Tile Setter.................$ 31.59 16.39

BRWI0004-003 06/01/2013

WALWORTH COUNTY

Rates Fringes

BRICKLAYER.......................$ 35.11 18.58

CEMENT MASON/CONCRETE FINISHER...$ 32.36 18.58

TILE SETTER......................$ 28.21 18.58

BRWI0006-001 06/01/2013

ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MENOMINEE, ONEIDA,

PORTAGE, TAYLOR, VILAS AND WOOD COUNTIES

Bricklayer,Cement Mason,Tile Setter...........$ 32.14 16.56

BRWI0006-004 06/01/2013

PRICE COUNTY

Rates Fringes

Bricklayer & Tile Setter.........$ 32.14 16.56

BRWI0007-003 06/01/2015

GREEN AND LAFAYETTE COUNTIES

Rates Fringes

Bricklayer & Tile Setter.........$ 32.90 17.01

BRWI0013-003 06/01/2015

GRANT, IOWA, AND RICHLAND COUNTIES

Bricklayer......................$ 32.86 17.22

Tile Layer.......................$ 29.71 16.20

BRWI0019-004 06/01/2015

BARRON, BURNETT (Southern half), DUNN, PEPIN, POLK, RUSK, AND WASHBURN (Southern half) COUNTIES

Bricklayer, Cement Mason, Tile Layer..................$ 31.36 16.51

BRWI0019-005 06/01/2015

SAWYER COUNTY

Rates Fringes

Bricklayer & Tile Setter.........$ 31.36 16.51

BRWI0021-001 06/01/2015

DODGE AND JEFFERSON COUNTIES

Rates Fringes

BRICKLAYER

Bricklayer, Cement Mason, Tile Layer..................$ 33.58 16.65

BRWI0034-001 06/01/2015

COLUMBIA AND SAUK COUNTIES

Rates Fringes

BRICKLAYER

Bricklayer, Cement Mason, Tile Layer..................$ 32.86 17.22

CARP0087-003 05/01/2009

BURNETT (West of highway 48) AND POLK(West of Highways 35, 48 &

65) COUNTIES

CARPENTER (Including Drywall Hanging, Acoustical work)........$ 31.79 16.10

CARP0252-005 07/02/2012

ADAMS, BARRON, BAYFIELD (Eastern 2/3), BUFALO, BURNETT (East of Hwy 48), CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, FLORENCE (Except area bordering Michigan), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, KEWAUNEE, LAFAYETTE, MANITOWOC, MARINETTE (Except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, POLK (East of Hwy

35, 48, 65), PORTAGE, PRICE, RICHLAND, RUSK, SAUK, SAWYER,

SHAWANO, TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH,

WASHBURN, WAUPACA, WAUSHARA, AND WOOD COUNTIES

CARPENTER (Including Drywall Hanging, Acoustical work)........$ 30.48 15.80

MILLWRIGHT.......................$ 32.11 15.80

CARP0252-009 07/02/2012

ASHLAND COUNTY

Rates Fringes

CABINET INSTALLER (Including Drywall Hanging & Acoustical Work)............................$ 30.48 05.80

MILLWRIGHT.......................$ 32.11 15.80

CARP0361-006 07/11/2011

BAYFIELD COUNTY (West of Hwy 63)

Rates Fringes

Carpenters: (Including Drywall Hanging, Acoustical work)............................$ 27.20 14.75

CARP1348-006 05/03/2015

BAYFIELD COUNTY (Western 1/3)

Rates Fringes

MILLWRIGHT.......................$ 32.57 14.73

ELEC0014-001 06/01/2015

ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK

(Except Colby, Fremont, Lynn, Maryville, Sherman, Sherwood, Unity), CRAWFORD, DUNN, GRANT, IRON, JACKSON, MONROE, PEPIN, POLK, PRICE, RICHLAND, RUSK, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN COUNTIES

ELECTRICIAN......................$ 31.21 18.92

ELEC0014-005 06/01/2014

Rates Fringes

Teledata System Installer Installer/Technician........$ 22.50 12.72

Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).

ELEC0158-007 06/01/2015

DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES

Electricians:....................$ 29.84 29.50% + 9.37

ELEC0159-001 06/01/2015

COLUMBIA, DODGE (West of Hwy 26 except Chester and Emmet Twps), GREEN LAKE COUNTY (Except Townships of Berlin, Seneca & St.

Marie), IOWA, MARQUETTE COUNTY (Except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), AND SAUK COUNTIES

Electricians:....................$ 35.75 19.87

ELEC0219-006 06/01/2015

FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)

ELECTRICIAN

Electrical contracts over $180,000....................$ 31.16 18.34 Electrical contracts under $180,000....................$ 28.96 18.26

ELEC0388-004 06/01/2013

ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARINETTE (Beecher, Dunbar, Goodman & Pembine), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Aniwa and Hutchins), VILAS AND WOOD

ELECTRICIAN......................$ 28.96 24.85% + 9.70

ELEC0494-010 06/01/2015

DODGE COUNTY (Area East of Hwy 26 including all of Chester Township, but excluding Emmet Township), FOND DU LAC (except Waupun), AND MANITOWOC (Schleswig) COUNTIES

ELECTRICIAN......................$ 29.95 20.95

ELEC0494-014 06/01/2015

DODGE (Area East of Hwy 26 including Chester Twp but excluding Emmet Twp), FOND DU LAC (Except Waupun), AND MANITOWOC (Schleswig) COUNTIES

Sound & Communications Installer...................$ 16.47 14.84 Technician..................$ 26.00 17.70

Installation, testing, maintenance, operation and servicing of all sound, intercom, telephone interconnect, closed circuit TV systems, radio systems, background music systems, language laboratories, electronic carillion, antenna distribution systems, clock and program systems and low-voltage systems such as visual nurse call, audio/visual nurse call systems, doctors entrance register systems. Includes all wire and cable carrying audio, visual, data, light and radio frequency signals. Includes the installation of conduit, wiremold, or raceways in existing structures that have been occupied for six months or more where required for the protection of the wire or cable, but does not mean a complete conduit or raceway system.

work covered does not include the installation of conduit, wiremold or any raceways in any new construction, or the installation of power supply outlets by means of which external electric power is supplied to any of the foregoing equipment or products

ELEC0577-001 06/01/2015

GREEN LAKE (N. Part including Twps of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Twps of Crystal Lake, Neshkoro, Newton, and Springfield), WAUPACA, AND WAUSHARA

COUNTIES,

ELECTRICIAN......................$ 29.60 26.5%+9.15

ELEC0890-005 06/01/2015

DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, AND

WALWORTH COUNTIES

ELECTRICIAN......................$ 31.90 24.95% + $10.46

ENGI0139-004 06/01/2016

Rates Fringes

OPERATOR: Power Equipment

(1) Cranes, Tower Cranes with or w/o attachments over 100 tons; Cranes, tower Cranes with boom, leads and or jib length 176 ft or longer............$ 38.72 20.60

(2) Cranes, Tower Cranes with or w/o attachments 100 tons or less; Cranes, Tower Cranes with boom, leads, and or jib lengths 175 ft or less..............$ 37.47 20.60

(3) Travelling Crane (bridge type)...............$ 36.27 20.60

(4) Hydraulic Crane, 10 tons or less................$ 35.74 20.60

(6) Forklift...............$ 33.04 20.60

HAZARDOUS WASTE PREMIUMS:

EPA Level "A" Protection: $3.00 per hour EPA Level "B" Protection: $2.00 per hour EPA Level "C" Protection: $1.00 per hour

IRON0008-012 06/01/2014

CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC, MARINETTE,

OCONTO, OUTAGAMI, SHAWANO AND WALWORTH (Northeastern part)

IRONWORKER.......................$ 29.27 23.96

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

IRON0383-004 06/01/2015

ADAMS, COLUMBIA, CRAWFORD, DODGE, FLORENCE, FOREST, GRANT,

GREENE (Except S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD

IRONWORKER.......................$ 32.85 21.84

IRON0498-007 06/01/2008

GREEN (S.E. 1/3) AND WALWORTH (Except N.E. part) COUNTIES

IRONWORKER.......................$ 34.34 25.72

IRON0512-009 05/01/2015

BARRON, BUFFALO, CLARK, DUNN, JACKSON, PEPIN, POLK, RUSK,

TAYLOR AND TREMPEALEAU COUNTIES

IRONWORKER.......................$ 35.50 23.45

IRON0512-023 05/01/2015

ASHLAND, BAYFIELD, BURNETT, IRON, LINCOLN, ONEIDA, PRICE,

SAWYER, VILAS AND WASHBURN COUNTIES

IRONWORKER.......................$ 31.04 23.45

LABO0140-003 06/01/2016

BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND,

TREMPEALEAU (Southern part), AND VERNON COUNTIES

Laborer, General.................$ 26.06 16.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal and Encapsulation of Hazardous Materials from Non-Mechanical Systems).......................$ 25.02 16.55

NOTE: Mason Tender $.25 over general laborer scale; Pipelayer $1.00 over general laborer scale

LABO0268-001 06/01/2016

AREA 1: BARRON, CLARK (West 1/3), DUNN, PEPIN, POLK, RUSK TAYLOR (West 1/3)

AREA 2: CLARK (East 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (East 2/3), VILAS, WOOD

AREA 3: BURNETT, IRON, SAWYER, WASHBURN

Laborer, General Area 1......................$ 26.06 16.55 Area 2......................$ 25.31 16.55 Area 3......................$ 24.46 16.55

Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems) Area 1......................$ 25.12 16.55 Area 2......................$ 24.57 16.55 Area 3......................$ 25.77 16.55

NOTE: Mason Tender $.25 over general laborer. Burnett, Iron, Sawyer & Washburn $.70 over general laborer.

LABO0330-001 06/01/2016

DODGE, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE,

KEWAUNEE, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, OCONTO,

PORTAGE, SHAWANO, WAUPACA,WAUSHARA

Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems).........................$ 24.47 15.55 Laborers, General................$ 25.31 16.55

NOTE: Mason Tender $.25 over general laborer.

LABO0464-005 06/01/2016

ADAMS, COLUMBIA, GREEN, JEFFERSON, LAFAYETTE, SAUK, AND

WALWORTH COUNTIES

Laborer, General Adams County................$ 25.31 16.55 Remaining Area..............$ 26.06 16.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous Materials from Non-mechanical Systems) Adams County................$ 24.47 15.55 Remaining Area..............$ 24.47 15.55

LABO0464-008 06/01/2015

Rates Fringes

Landscape Laborer................$ 14.33 13.90

LABO1091-001 06/01/2016

BAYFIELD (West of County Trunk A including the Iron River

National Fish Hatchery and Great Lakes Transmission Co., Station 6) COUNTY

Laborer, General.................$ 23.16 16.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems).........................$ 22.91 15.55

LABO1091-002 06/01/2016

ASHLAND & BAYFIELD (East of County Trunk A exclusive of the Iron River National Fish Hatchery and Great Lakes Transmission Co., Station 6) COUNTIES

Laborer, General.................$ 21.71 16.55 Laborer: Asbestos/hazardous material remover (Preparation, Removal, Encapsulation of Hazardous materials from Non-mechanical Systems).........................$ 22.91 15.55

PLAS0599-003 07/01/2012

PEPIN COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 27.80 18.10

PLASTERER........................$ 31.56 18.18

PLAS0599-007 06/01/2013

BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND,

TREMPEALEAU, AND VERNON COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 25.85 18.10

PLASTERER........................$ 29.67 17.03

PLAS0599-011 06/01/2014

GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 33.15 16.78

PLASTERER........................$ 33.15 16.78

* PLAS0633-046 05/01/2016

BAYFIELD, PRICE, AND SAWYER COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 30.86 17.13

PLASTERER........................$ 31.49 17.88

PLUM0011-009 05/02/2016

ASHLAND BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER (Including HVAC work).......................$ 39.07 18.73

PLUM0075-006 06/01/2015

DODGE (Watertown), GREEN, JEFFERSON, AND LAFAYETTE COUNTIES

Rates Fringes

PLUMBER (Including HVAC work)....$ 39.87 20.12

PLUM0075-008 06/01/2015

COLUMBIA, IOWA, MARQUETTE, RICHLAND, AND SAUK COUNTIES

Rates Fringes

PLUMBER (Including HVAC work)....$ 38.82 20.12

PLUM0118-003 06/01/2016

WALWORTH COUNTY

Rates Fringes

PLUMBER/PIPEFITTER (Including HVAC work).......................$ 40.95 19.95

PLUM0400-002 05/30/2016

ADAMS, CALUMET, DODGE (Except Watertown), DOOR, FOND DU LAC, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE (Except Niagara), MENOMINEE, OCONTO, OUTAGAMIE, SHAWANO, WAUPACA, WAUSHARA, AND

WINNEBAGO COUNTIES

PLUMBER/PIPEFITTER (Including HVAC work)

(1) Small buildings (except industrial and power plants) where plumbing or heating is $50,000 or less.............$ 32.15 17.57

(2) All other work..........$ 34.39 17.65

PLUM0434-004 05/29/2016

BARRON, BUFFALO, CLARK, CRAWFORD, DUNN, FLORENCE, FOREST,

GRANT, JACKSON, JUNEAU, LANGLADE, LINCOLN, MONROE, ONEIDA,

PEPIN, PIERCE, POLK, PORTAGE, PRICE, RUSK, TAYLOR, TREMPEALEAU,

VERNON, VILAS, AND WOOD COUNTIES

PLUMBER/PIPEFITTER (Including HVAC work).......................$ 38.20 16.72

PLUM0601-006 06/01/2016

DODGE (Watertown), GREEN, JEFFERSON, AND LAFAYETTE COUNTIES

Rates Fringes

PIPEFITTER (Including HVAC work)............................$ 43.26 22.96

PLUM0601-008 06/01/2015

COLUMBIA, IOWA, MARQUETTE, RICHLAND, AND SAUK COUNTIES

Rates Fringes

PIPEFITTER (Including HVAC work)............................$ 45.55 18.44

SHEE0010-031 05/01/2008

ASHLAND, BAYFIELD AND IRON COUNTIES

Rates Fringes

SHEET METAL WORKER...............$ 27.53 14.61

SHEE0018-003 06/01/2011

FOND DU LAC AND MANITOWOC COUNTIES

Rates Fringes

Sheet Metal Worker (Including HVAC work).......................$ 31.88 17.40

SHEE0018-004 06/01/2015

ADAMS, DOOR, FLORENCE, FOREST, GREEN LAKE, KEWAUNEE, MARINETTE,

MARQUETTE, MENOMINEE, OCONTO, SHAWANO, WAUPACA, AND WAUSHARA

Sheet Metal Worker (Including HVAC work).......................$ 30.82 21.85

SHEE0018-014 06/01/2011

DODGE AND JEFFERSON COUNTIES

Sheet Metal Worker (Including HVAC work).......................$ 37.20 17.01

SHEE0018-015 09/01/2010

WALWORTH COUNTY

Rates Fringes

SHEET METAL WORKER (Including HVAC work).......................$ 31.85 22.50

SHEE0018-017 06/01/2011

GREEN COUNTY

Rates Fringes

Sheet Metal Worker (Including HVAC work).......................$ 32.75 20.36

SHEE0018-018 06/01/2015

LANGLADE, LINCOLN, ONEIDA, PORTAGE, AND WOOD COUNTIES

Rates Fringes

Sheet Metal Worker (Including HVAC work) Contracts $120,000 or less..$ 20.57 11.60 Contracts over $120,000.....$ 28.36 24.59

SHEE0018-022 06/01/2015

BARRON, BUFFALO, BURNETT, CLARK, DUNN, JACKSON, PEPIN, POLK,

PRICE, RUSK, SAWYER, TAYLOR, TREMPEALEAU, AND WASHBURN COUNTIES

Sheet Metal Worker (Including HVAC work).......................$ 28.63 23.79

SHEE0018-023 06/01/2015

COLUMBIA AND SAUK COUNTIES

Rates Fringes

Sheet Metal Worker (Including HVAC work).......................$ 35.55 24.61

SHEE0018-024 06/01/2015

CRAWFORD, GRANT, JUNEAU, MONROE, RICHLAND, AND VERNON COUNTIES

SHEET METAL WORKER (Including HVAC work).......................$ 28.75 21.62

TEAM0346-003 05/01/2013

ASHLAND, BAYFIELD, BURNETT, SAWYER & WASHINGTON COUNTIES

Rates Fringes

TRUCK DRIVER

2 Axle Trucks...............$ 27.42 14.986

TEAM0662-002 06/05/2016

ADAMS, BARRON, BUFFALO, CLARK , DOOR, DUNN, JACKSON, JUNEAU,

KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MENOMINEE, OCONTO,

ONEIDA, PEPIN, POLK, PORTAGE, PRICE, RUSK, SHAWANO, TAYLOR,

TEMPEALEAU, WAUPACA & WOOD COUNTIES

TRUCK DRIVER

2 Axle Trucks...............$ 28.26 16.77

SUWI2002-001 01/23/2002

Rates Fringes

Fence Installers.................$ 15.00 2.37

GLAZIER..........................$ 20.21 1.86

Painters:

Brush & Roller (Excluding Drywall Finishing).........$ 14.64 2.55 Spray.......................$ 13.72 2.25

Power Equipment Operator Backhoe.....................$ 17.454 7.61 Excavator...................$ 17.37 7.45 Front End Loader............$ 23.36 4.61

ROOFER...........................$ 15.52 3.21

TRUCK DRIVER (3-Axle)............$ 15.28 4.78

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .