W912ES-16-R-0002_PLANS_HALF_AMEND0005.pdf
PDF 4 MB Posted
- Attached to
- Fargo Diversion Inlet Structure
- Solicitation number
- W912ES-16-R-0002
About this file
W912ES-16-R-0002_PLANS_HALF_AMEND0005.pdf
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EST. TIP ELEVATION 836.00
77'-0"38'-0"
S
P S
O C
4'-0"
38'-0"
6'-0"
77'-0"
6'-0"
3 SPS @ 10'-0" OC = 30'-0" 4'-0"
10 SPS @ 6'-6" OC = 65'-0"
34'-6"42'-6"
LONG WITH 1'-0" EMBEDMENT
VERTICAL SHEET PILING 16'-0"
EMBEDMENT
16'-0" LONG WITH 1'-0"
VERTICAL SHEET PILING
EMBEDMENT
16'-0" LONG WITH 1'-0"
VERTICAL SHEET PILING
EL. 899.30
EL. 895.30
EL. 899.49
EL. 891.50
EL. 884.50
EL. 893.49
BATTERED PILING, TYP
3V:1H
OF SLAB
BOTTOM
CONTROL LINE "C"
S
P S
O C
LONG WITH 1'-0" EMBEDMENT
VERTICAL SHEET PILING 16'-0"
EL. 893.73
OF SLAB
BOTTOM
OF SLAB
BOTTOM
EL. 895.49
6'-0"
4 SPS @ 6'-6" OC = 31'-0"7 SPS @ 5'-0" OC = 35'-0"
5'-0"
2'-0"
34'-6"42'-6"
16'-1"
3'-0" 7
/0
/1
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F M
M D
IS
S -4
X X
X .d g n
A N
S I
D
S-403
F O
U N
D A
T
IO
N S
L A
B
P
IL
E L
A Y
O U
T
LEGEND:
T S
U L L
Y
N A
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
C
A
FLOW
W E
S -1
-R -0
D A
P
P R
F T
M G
D
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
O
ID
0.5% SLOPE
0 10' 20'
B
REQUIREMENTS.
SEE SPECIFICATION SECTION 31 41 16 FOR SHEET PILE SIZE
KEYNOTES:
GENERAL NOTES:
SCALE:
PLAN
PILE LAYOUT FOR FOUNDATION #1A & #2A
1" = 10'-0"
S-403
SCALE: N.T.S.
PILE EMBEDMENT DETAIL
B
C
D
ARROW INDICATES DIRECTION OF BATTER
BATTERED H-PILE ORIENTATION AS SHOWN ON DRAWING
VERTICAL H-PILE ORIENTATION AS SHOWN ON DRAWING
SCALE:
PILE FOUNDATION #1 & #2
SECTION
1" = 10'-0"
A
TESTING REQUIREMENTS.
12. SEE SPECIFICATION SECTION 31 62 14.01 12 FOR PILE DYNAMIC
DIMENSIONS.
11. SEE SHEET S-406 FOR STEPPED SPILLWAY ELEVATIONS AND
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
10. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
TO OBTAIN A MINIMUM ULTIMATE TENSION CAPACITY OF 276 KIPS.
A MINIMUM ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND
9. ALL PILES SHOWN ON THIS SHEET SHALL BE DRIVEN TO OBTAIN
HAVE TENSION CONNECTIONS PER SHEET S-407.
8. ALL H-PILES WITHIN THE CONTROL STRUCTURE SHALL
7. THE PILE LAYOUT IS MIRRORED ABOUT CONTROL LINE "C".
SLAB WHERE NEUTRAL AXIS OF PILE INTERSECTS GRID.
6. PILE LOCATIONS IN PLAN ARE AT BASE OF CONCRETE
STRUCTURE PILE LAYOUT ONLY.
5. PILE GRID SYSTEM SHOWN IS FOR CONTROL
IN THE TOP 1/3 OF THE PILE.
PILE SHALL BE PERMITTED AND THE SPLICE SHALL NOT BE
4. NO MORE THAN ONE SPLICE PER FULL LENGTH OF
FOUNDATION SLABS 1A, 1B, 2A AND 2B.
3. A TOTAL OF 400 HP 14x73 PILES ARE REQUIRED FOR
WILL BE ORIENTED AS SHOWN.
2. FLANGES OF ALL PILES SHOWN ON THIS DRAWING
GRADE 50 STEEL.
1. ALL H-PILES SHALL BE NEW HP 14x73, ASTM A572
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
ID
Sheet
4'-0" 4'-0"4'-0"4'-0"
4'-0"
OF SLAB
BOTTOM
74'-0"68'-0"
4'-0"
EL. 888.50
EL. 884.00
EL. 888.16
EL. 883.66
EL. 887.79
EL. 883.29
EL. 836.00
EST. TIP
4'-0"
8 SPS @ 7'-6" = 60'-0" 8 SPS @ 8'-3" = 66'-0"
6 SPS @ 11'-0" = 66'-0"6 SPS @ 10'-0" = 60'-0"
LONG WITH 1'-0" EMBEDMENT
VERTICAL SHEET PILING 16'-0"
CONTROL LINE "C"
LONG WITH 1'-0" EMBEDMENT
VERTICAL SHEET PILING 16'-0"
4'-0"
S
P S
S
P S
S
P S
VERTICAL PILE
2'-0"
/0
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F M
M D
IS
S -4
X X
X .d g n
A N
S I
D
S-405
F O
U N
D A
T
IO
N S
L A
B
P
IL
E L
A Y
O U
T
T S
U L L
Y
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
LEGEND:
BEMBEDMENT
PILE
A
FLOW
0.5% SLOPE0.5% SLOPE
W E
S -1
-R -0
D A
P
P R
F T
M G
2' 4'0 1'
0 10' 20'
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
O
ID
0 10' 20'
REQUIREMENTS.
SEE SPECIFICATION SECTION 31 41 16 FOR SHEET PILE SIZE
KEYNOTES:
GENERAL NOTES:
SCALE: 1/2" = 1'-0"
SCALE:
PLAN
PILE LAYOUT FOR FOUNDATION #3A & #4A
1" = 10'-0"
S-405
SCALE:
PILE FOUNDATION #3 & #4
SECTION
1" = 10'-0"
A
VERTICAL H-PILE ORIENTATION AS SHOWN ON DRAWING
TESTING REQUIREMENTS.
12. SEE SPECIFICATION SECTION 31 62 14.01 12 FOR PILE DYNAMIC
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
11. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
TO OBTAIN A MINIMUM ULTIMATE TENSION CAPACITY OF 257 KIPS.
A MINIMUM ULTIMATE COMPRESSION CAPACITY OF 460 KIPS AND
10. ALL PILES SHOWN ON THIS SHEET SHALL BE DRIVEN TO OBTAIN
9. THE PILE LAYOUT IS MIRRORED ABOUT CONTROL LINE "C".
FLOOR RAMP AND END SILL.
8. SEE SHEET S-406 FOR DETAILS ON THE BAFFLE BLOCKS,
SLAB WHERE NEUTRAL AXIS OF PILE INTERSECTS GRID.
7. PILE LOCATIONS IN PLAN ARE AT BASE OF CONCRETE
LAYOUT ONLY.
6. PILE GRID SYSTEM SHOWN IS FOR STILLING BASIN PILE
CONNECTIONS AS DETAILED ON SHEET S-407.
5. ALL H-PILES WITHIN STILLING BASIN HAVE TENSION
IN THE TOP 1/3 OF THE PILE.
SHALL BE PERMITTED AND THE SPLICE SHALL NOT BE
4. NO MORE THAN ONE SPLICE PER FULL LENGTH OF PILE
STILLING BASIN SLABS 3A, 3B, 4A AND 4B.
3. A TOTAL OF 352 HP 14x73 PILES ARE REQUIRED FOR
BE ORIENTED AS SHOWN.
2. FLANGES OF ALL PILES SHOWN ON THIS DRAWING WILL
50 STEEL.
1. ALL H-PILES SHALL BE NEW HP 14x73, ASTM A572 GRADE
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
MONOLITH
WALL
FOUNDATION
SLAB
REINFORCEMENT
CONTINUOUS
1" PREFORMED
1/4" AMPLITUDE
JOINT AT SLAB
CONSTRUCTION
D
MONOLITH
WALL
FOUNDATION
SLAB
1/4" TOOLED EDGES
JOINT SEALANT
D
BOND BREAKER
D
SLAB
STABILIZATION SHEET PILE
SLAB
STABILIZATION
SHALL PASS THROUGH THE JOINT
50 PERCENT OF REINFORCEMENT
DAM WALL
MIN. 12"
SLAB
JOINT THROUGH
CONTRACTION
JOINT
PARTIAL CONTRACTION
BOND BREAKER WITHIN
JOINT SEALANT AND
" AMPLITUDE)4
CONSTRUCTION JOINT
D
D/2D/2
3" MIN
MIN.
6" R12"
D/2
D
12"
6" MIN.
BASE OF DAM WALLS
START 1-1/2" CHAMFER AT
D
D /2
D /2
D /2
D /2
ON THE JOINT.
SOIL. THE GEOTEXTILE SHALL BE CENTERED
EXPANSION JOINT (EJ) PRIOR TO BACKFILLING WITH
PLACE 2'-0" WIDE STRIP OF GEOTEXTILE ACROSS
SHEET PILE
TOP OF
FOUNDATION SLAB
TOP OF DAM WALL
FOUNDATION SLAB
TOP OF DAM WALL
S I
/0
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
S-523
T S
U L L
Y
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
O
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
S-524
S-524
D
D/2D/2 EXPANSION JOINT
1'' PREFORMED
SECTION
S-524
(TYPICAL)
WATER STOP MATERIAL
WITH HYDROPHILIC
TO A MINIMUM DEPTH OF 3"
PACK HOLE IN WATERSTOP
SEALANT (TYP)
ELASTOMERIC JOINT
EXPANSION JOINT
S-524
J O
IN
T S
D A
M W
A L L
W E
S -1
-R -0
S-524
S-524
S-524
S-524
F M
M D
IS
S -5
X X
X .d g n
SCALE:NONE
DETAIL
OF FOUNDATION HEIGHT WITHIN DAM WALLS
TYPICAL EXPANSION JOINT AT CHANGE
SCALE:NONE
AT DAM WALL FOUNDATION SLAB
TYPICAL CONTRACTION JOINT (CTJ)
STABILIZATION SLAB STABILIZATION SLAB
P R
F
J L F
K D
H
UPSTREAM DOWNSTREAM
STABILIZATION SLAB
SCALE: NONE
DAM WALL EXPANSION JOINT
SCALE:NONE
CONNECTION DETAIL
TYPICAL EXPANSION JOINT AND SHEET PILE
SCALE:NONE
AT DAM WALLS
TYPICAL PARTIAL CONTRACTION JOINT (CTJ)
C/L SHEET PILE
5, 6
BARRIER AS SHOWN ON DETAIL 1, THIS SHEET.
THE WATER STOP MUST FORM A CONTINUOUS
NOTE:
BARRIER AS SHOWN ON DETAIL 1, THIS SHEET.
THE WATER STOP MUST FORM A CONTINUOUS
NOTE:11
SCALE:NONE
DETAIL - NOT USED
AT DAM WALL FOUNDATION SLAB
TYPICAL CONSTRUCTION JOINT (CJ)
D W
G R
E V
IS
E D W
IT
H A
M E
N D
M E
N T N
O
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
TYP.
H-PILE
14X73
57'-0"
17'-8"
15'-8"
2'-0" 2'-0"
3'-9"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"3'-9"
JOINT
CONTRACTION
JOINT
CONTRACTION
57'-0"
18'-0"
PILE
SHEET
VERTICAL
PILE
SHEET
VERTICAL
2'-6"
2'-6"
57'-0"
57'-0"
3"
8"
MONOLITH L1
MONOLITH L1MONOLITH L2
MONOLITH L2
SLAB
STABILIZATION
6"
15'-0"13'-6"16'-6"12'-0"
6" (TYP)
(T
Y P
(T
Y P
1'-0"
3'-1"
2'-9"
11'-0"
7'-10"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
/0
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
SB103
A
B
H-PILE
14X73
H-PILE
14X73
H-PILE
14X73
EL. 894.70
4 5
SCALE: 1''= 5'-0"
0 5'5' 2.5'
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
A N
S I
D
T S
U L L
Y
P R
F
D A
P
C R
W
C
W E
S -1
-R -0
R
LINE "O"
CONTROL
M O
N O
L
IT
H L
A
N D L
KEYNOTES:
SCALE:
1 LEFT DAM WALL
MONOLITH L1 AND L2
1" = 5'
SB101
MONOLITH L1 AND L2 - LEFT
DAM WALL FOUNDATION
1" = 5'
A
SCALE:
MONOLITH L1 AND L2
DAM WALL ELEVATION
1" = 5'
C
SCALE:
MONOLITH L1 AND L2
SECTION THROUGH DAM WALL
1" = 5'
B
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
ALIGNMENT CHANGE. SIMILAR AS SHOWN.
SEEPAGE BARRIER. CONTRACTOR TO ADJUST SHEET PILE AT
SHEET PILE BETWEEN MONOLITHS SHALL FORM A CONTINUOUS
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00.
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
L1 AND L2 WILL HAVE TENSION CONNECTORS.
FOR TENSION CONNECTOR DETAILS SEE SHEET S-407. ALL PILING FOR
SECTION 03 31 41 16 FOR SHEET PILE SIZE REQUIREMENTS.
THE FOUNDATIONAND A 1'-0" EMBEDMENT.) SEE SPECIFICATION
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF
GENERAL NOTES:
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
1. ALL PILES SHOWN ON THIS SHEET SHALL BE DRIVEN TO OBTAIN A MINIMUM
EST. TIP EL. 836.00
TYP.
H-PILE
14X73
2'-0" 2'-0"
60'-0"
60'-0"
8"
11'-0"
6"
JOINT
CONTRACTION
JOINT
CONTRACTION
15'-0"
3'-9"7'-6"7'-6"7'-6"7'-6"7'-6"7'-6"7'-6"3'-9"
PILE
SHEET
VERTICAL
2'-6"
SHEET PILE
VERTICAL
2'-6"
60'-0"
60'-0"
MONOLITH L3
MONOLITH L3MONOLITH L4
MONOLITH L4
2'-0"
2'-3"
PIER
STANDARD
FACE OF
SLAB
STABILIZATION
15'-0"15'-0"15'-0"15'-0"
6" (TYP)
(T
Y P
(T
Y P
15'-8"
17'-8"
7'-10"
1'-0"
3'-1"
3"
2'-0"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
/0
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
SB104
B
A
H-PILE
14X73
H-PILE
14X73
H-PILE
14X73
EL. 903.14
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
A N
S I
D
T S
U L L
Y
P R
F
C R
W
D A
P W
E
S -1
-R -0
R
LINE "O"
CONTROL
M O
N O
L
IT
H L
A
N D L
0 5' 10'
KEYNOTES:
SCALE:
MONOLITH L3 AND L4
DAM WALL FOUNDATION
1" = 5'
A
1 FOR LIGHT POLE
WALL EXTENSION
SCALE:
TYPICAL AT BRIDGE PIERS WITH LIGHT POLES
WALL EXTENSION FOR LIGHT POLE
N.T.S.
SCALE:
MONOLITH L3 AND L4
DAM WALL ELEVATION
1" = 5'
C
SCALE:
MONOLITH L3 AND L4
SECTION THROUGH DAM WALL
SCALE: 1" = 5'
1 LEFT DAM WALL
MONOLITH L3 AND L4
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
ADJUST SHEET PILE AT ALIGNMENT CHANGE.
CONTINUOUS SEEPAGE BARRIER. CONTRACTOR TO
SHEET PILE BETWEEN MONOLITHS SHALL FORM A
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00.
4 DIMENSION.
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE
AND BEARINGS.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH
ROADWAY AT DECK CENTERLINE SHALL BE EL. = 931.00.
PILING FOR L3 AND L4 WILL HAVE TENSION CONNECTORS.
FOR TENSION CONNECTOR DETAILS SEE SHEET S-407. ALL
OF THE FOUNDATIONAND A 1'-0" EMBEDMENT.) SEE SPECIFICATION
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM
GENERAL NOTES:
SEE SHEET S-520.
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY.
GROUND SYSTEM CONDUITS.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
JOINT
CONTRACTION
JOINT
CONTRACTION
TYP.
H-PILE
14X73
17'-8"
15'-8"
8"
5'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"5'-0"
6"
12'-0"
120'-0"
PILE
SHEET
VERTICAL
SHEET PILE
VERTICAL
2'-0"
2'-3"
PIER
STANDARD
FACE OF
SLAB
STABILIZATION
7'-10"
1'-0"
3"
3'-1"
2'-0"
11'-0"
JOINT
EXPANSION
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
/0
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
SB105
A
3 3
H-PILE
14X73
H-PILE
14X73
EL. 909.31
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
A N
S I
D
T S
U L L
Y
P R
F
C R
W
D A
P
W E
S -1
-R -0
R
LINE "O"
CONTROL
M O
N O
L
IT
H L
L L A
N D L
SCALE: 1''= 5'-0"
0 5'5' 2.5'
KEYNOTES:
SCALE:
MONOLITH L5, L6, L7 AND L8
DAM WALL FOUNDATION
1" = 5'
A
SCALE:
TYPICAL AT BRIDGE PIERS WITH LIGHT POLES
WALL EXTENSION FOR LIGHT POLE
N.T.S.
SCALE: 1"=5'
MONOLITH L5, L6 L7 AND L8
SB106
1 FOR LIGHT POLE
WALL EXTENSION
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00.
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
FOR L5, L6, L7, AND L8 WILL HAVE TENSION CONNECTORS.
FOR TENSION CONNECTOR DETAILS SEE SHEET S-407. ALL PILING
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF
GENERAL NOTES:
SEEPAGE BARRIER.
6. SHEET PILE BETWEEN MONOLITHS SHALL FORM A CONTINUOUS
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
1. ALL PILES SHOWN ON THIS SHEET SHALL BE DRIVEN TO OBTAIN A MINIMUM
14X73
17'-8"
15'-8"
30'-0"
8"
2'-0"
6"
5'-0"10'-0"10'-0"5'-0"
12'-0"
PILE
SHEET
VERTICAL
SHEET PILE
VERTICAL
30'-0"
15'-0"15'-0"
2'-0"
2'-3"
PIER
STANDARD
FACE OF
MONOLITH L9
SLAB
STABILIZATION
(T
Y P
(T
Y P
6" (TYP)
6" (TYP)
1'-0"
7'-10"
3"
3'-1"
2'-0"
11'-0"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
S
T S
U L L
Y
/0
P R
F
C R
W
D
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
SB107
B
A
SCALE: 1''= 5'-0"
0 5'5' 2.5'
H-PILE
14X73
H-PILE
14X73
EL. 915.47
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
W E
S -1
-R -0
LINE "O"
CONTROL
'-0
R
M O
N O
L
IT
H L
KEYNOTES:
SCALE:
MONOLITH L9
DAM WALL FOUNDATION
1" = 5'
A
SCALE:
MONOLITH L9
SECTION THROUGH DAM WALL
1" = 5'
B
SCALE:
TYPICAL AT BRIDGE PIERS WITH LIGHT POLES
WALL EXTENSION FOR LIGHT POLE
N.T.S.
SCALE: 1'-5"
MONOLITH L9
1 FOR LIGHT POLE
WALL EXTENSION
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00.
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
FOR L9 WILL HAVE TENTION CONNECTORS.
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF
GENERAL NOTES:
SEEPAGE BARRIER.
6. SHEET PILE BETWEEN MONOLITHS SHALL FORM A CONTINUOUS
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
14X73
17'-8"
3"
3'-4"
15'-8"
12'-0"
32'-0"
2'-6"5'-0"5'-0"6'-6"5'-0"5'-0"3'-0"
32'-0"
2'-0"
SHEET PILE
VERTICAL
PILE
SHEET
VERTICAL
MONOLITH L10
SLAB
STABILIZATION
15'-0"14'-0"3'-0"
2'-0"
(T
Y P
(T
Y P
6" (TYP)
6" (TYP)
7'-10"
1'-0"
2'-0" 6"
8"
11'-0"
15'-0"
2'-0"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
S
S
U L L
Y
/0
F
C R
W
D
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
B
A
H-PILE
14X73
EL. 915.47
H-PILE
14X73
SB108
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
W E
S -1
-R -0
R
LINE "O"
CONTROL
M O
N O
L
IT
H L
SCALE: 1''= 5'-0"
0 5'5' 2.5'
KEYNOTES:
SCALE:
MONOLITH L10
DAM WALL FOUNDATION
1" = 5'
A
SCALE:
MONOLITH L10
SECTION THROUGH DAM WALL
1" = 5'
B
SCALE: 1"=5'
MONOLITH L10
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
FOR L10 WILL HAVE TENSION CONNECTORS.
FOR TENSION CONNECTOR DETAILS SEE SHEET S-407. ALL PILING
SECTION 03 31 41 16 FOR SHEET PILE SIZE REQUIREMENTS.
THE FOUNDATIONAND A 1'-0" EMBEDMENT.) SEE SPECIFICATION
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF
GENERAL NOTES:
CONTINUOUS SEEPAGE BARRIER.
6. SHEET PILE BETWEEN AND AT THE END OF MONOLITHS SHALL FORM A
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
1. ALL PILES SHOWN ON THIS SHEET SHALL BE DRIVEN TO OBTAIN A MINIMUM
1 EST. TIP EL. 836.00
TYP.
H-PILE
14X73
57'-0"
57'-0"
3"
8"
6"
JOINT
CONTRACTION
3'-9"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"4'-6"3'-9"
2'-6"
SHEET PILE
VERTICAL
SHEET PILE
VERTICAL
57'-0"
2'-6"
2'-0"
57'-0"
MONOLITH R1
MONOLITH R1 MONOLITH R2
MONOLITH R2
SLAB
STABILIZATION
12'-0"16'-6"13'-6"15'-0"
2'-0"
(T
Y P
(T
Y P
6" (TYP)
6" (TYP)
1'-0" 15'-8"
7'-10"
2'-9"
18'-0"
11'-0"
3'-1"
17'-8"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
S
S
U L L
Y
/0
F
C R
W
D
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
SB109
B
A
H-PILE
14X73
H-PILE
14X73
H-PILE
14X73
EL. 894.70
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
W E
S -1
-R -0
'-0
R
LINE "O"
CONTROL
M O
N O
L
IT
H R
A
N D R
SCALE: 1''= 5'-0"
0 5'5' 2.5'
KEYNOTES:
SCALE:
MONOLITH R1 AND R2
SECTION THROUGH DAM WALL
MONOLITH R1 AND R2
DAM WALL ELEVATION
1" = 5'
C
SCALE:
MONOLITH R1 AND R2
DAM WALL FOUNDATION
1" = 5'
A
SCALE: 1"=5'
1 RIGHT DAM WALL
MONOLITH R1 AND R2
SB102
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
ALIGNMENT CHANGE. SIMILAR AS SHOWN.
SEEPAGE BARRIER. CONTRACTOR TO ADJUST SHEET PILE AT
SHEET PILE BETWEEN MONOLITHS SHALL FORM A CONTINUOUS
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00.
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
R1 AND R2 WILL HAVE TENSION CONNECTORS.
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF
GENERAL NOTES:
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
1EST. TIP EL. 836.00
3"
6"
15'-0"
JOINT
CONTRACTION
JOINT
CONTRACTION
8"
11'-0"
SHEET PILE
VERTICAL
2'-6"
60'-0"
3'-9"7'-6"7'-6"7'-6"7'-6"7'-6"7'-6"7'-6"3'-9"
H-PILE TYP.
14X73
SHEET PILE
VERTICAL
2'-0"
2'-3"
PIER
STANDARD
FACE OF
60'-0"
60'-0"
60'-0"
2'-0"
2'-6"
MONOLITH R3
MONOLITH R3 MONOLITH R4
MONOLITH R4
SLAB
STABILIZATION
15'-0"15'-0"15'-0"15'-0"
2'-0"
(T
Y P
6" (TYP)
3'-1"
17'-8"
7'-10"
15'-8"
1'-0"
2'-0"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
S
S
U L L
Y
/0
F
C R
W
D
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
SB110
B
A
H-PILE
14X73
H-PILE
14X73
H-PILE
14X73
EL. 894.70
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
SCALE:
MONOLITH R3 AND R4
SECTION THROUGH DAM WALL
1" = 5'
C
W E
S -1
-R -0
'-0
R
LINE "O"
CONTROL3
M O
N O
L
IT
H R
A
N D R
SCALE: 1''= 5'-0"
0 5'5' 2.5'
KEYNOTES:
SCALE:
MONOLITH R3 AND R4
DAM WALL FOUNDATION
1" = 5'
A
SCALE:
MONOLITH R3 AND R4
SECTION THROUGH DAM WALL
TYPICAL AT BRIDGE PIERS WITH LIGHT POLES
WALL EXTENSION FOR LIGHT POLE
N.T.S.
SCALE: 1"=5'
MONOLITH R3 AND R4
POLE
FOR LIGHT
EXTENSION
WALL
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
ALIGNMENT CHANGE.
SEEPAGE BARRIER. CONTRACTOR TO ADJUST SHEET PILE AT
SHEET PILE BETWEEN MONOLITHS SHALL FORM A CONTINUOUS
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00.
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
R3 AND R4 WILL HAVE TENSION CONNECTORS.
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF
GENERAL NOTES:
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
1. ALL PILES SHOWN ON THIS SHEET SHALL BE DRIVEN TO OBTAIN A MINIMUM
EL. 836.00
EST. TIP
SHEET PILE
VERTICAL
TYP.
H-PILE
14X73
JOINT
CONTRACTION
6"
2'-0"
2'-3"
PIER
STANDARD
FACE OF
120'-0"
5'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"10'-0"5'-0"
12'-0"
PILE
SHEET
VERTICAL
11'-0"
8"
SLAB
STABILIZATION
17'-8"
7'-10"
15'-8"
1'-0"
3"
3'-1"
2'-0"
JOINT
EXPANSION
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
S
S
U L L
Y
/0
F
C R
W
D
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
SB111
A
H-PILE
14X73
H-PILE
14X73
EL. 909.31
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
5'0 10'
W E
S -1
-R -0
LINE "O"
CONTROL3
R
M O
N O
L
IT
H R
R
R A
N D R
KEYNOTES:
SCALE:
TYPICAL AT BRIDGE PIERS WITH LIGHT POLES
WALL EXTENSION FOR LIGHT POLE
N.T.S.
SCALE: 1"=5'
MONLITH R5, R6, R7 AND R8
MONOLITH R5, R6, R7 AND R8
DAM WALL FOUNDATION
1" = 5'
A
SB112
1FOR LIGHT POLE
WALL EXTENSION
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
FOR R5, R6, R7, AND R8 WILL HAVE TENSION CONNECTORS.
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF
GENERAL NOTES:
SEEPAGE BARRIER.
6. SHEET PILE BETWEEN MONOLITHS SHALL FORM A CONTINUOUS
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
1. ALL PILES SHOWN ON THIS SHEET SHALL BE DRIVEN TO OBTAIN A MINIMUM
SHEET PILE
VERTICAL
30'-0"
15'-0" 15'-0"
17'-8"
15'-8"
8"
TYP.
H-PILE
14X73
2'-0"
6"
2'-0"
2'-3"
PIER
STANDARD
FACE OF
30'-0"
5'-0"10'-0"10'-0"5'-0"
PILE
SHEET
VERTICAL
MONOLITH R9
SLAB
STABILIZATION
(T
Y P
6" (TYP)
3"
3'-1"
11'-0"
12'-0"
2'-0"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
S
S
U L L
Y
/0
F
C R
W
D
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
SB113
B
A
H-PILE
14X73
H-PILE
14X73
EL. 915.47
5'0 10'
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
O
ID
W E
S -1
-R -0
R
LINE "O"
CONTROL3
M O
N O
L
IT
H R
KEYNOTES:
SCALE: 1" = 5'
MONOLITH R9
TYPICAL AT BRIDGE PIERS WITH LIGHT POLES
WALL EXTENSION FOR LIGHT POLE
N.T.S.
1FOR LIGHT POLE
WALL EXTENSION
SCALE:
MONOLITH R9
DAM WALL FOUNDATION
1" = 5'
A
SCALE:
MONOLITH R9
SECTION THROUGH DAM WALL
1" = 5'
B
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00.
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
FOR R9 WILL HAVE TENSION CONNECTORS.
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF 1
GENERAL NOTES:
SEEPAGE BARRIER.
6. SHEET PILE BETWEEN MONOLITHS SHALL FORM A CONTINUOUS
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED FROM THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED USING THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
14X73
17'-8"
15'-8"
32'-0"
3'-0"5'-0"5'-0"6'-6"5'-0"5'-0"2'-6"
32'-0"
2'-0"
PILE
SHEET
VERTICAL
SHEET PILE
VERTICAL
3'-0"14'-0"15'-0"
MONOLITH R10
SLAB
STABILIZATION
1'-0"
7'-10"
3"
3'-1"
6"
8"
11'-0"
2'-0"
12'-0"
15'-0"
2'-0"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
S
S
U L L
Y
/0
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
F M
M D
IS
S
B
X X
X .d g n
F O
U N
D A
T
IO
N P
L A
N A
N D W
A L L
D
IV
E R
S
IO
N I
N L E
T D
A M W
A L L
B
A
H-PILE
14X73
EL. 915.47
H-PILE
14X73
SB114
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
5'0 10'
C R
W
P R
F W
E
S -1
-R -0
'-0
R
LINE "O"
CONTROL3
M O
N O
L
IT
H R
KEYNOTES:
SCALE:
MONOLITH R10
DAM WALL FOUNDATION
1" = 5'
A
SCALE:
MONOLITH R10
SECTION THROUGH DAM WALL
1" = 5'
B
SCALE: 1" = 5'
MONOLITH R10
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
STABILIZATION SLAB, SEE SPECIFICATION 03 30 00.00
HEIGHT OF STEM SHALL BE 2" LESS THAN KEYNOTE 4 DIMENSION.
DIMENSION VARIES BASED ON PRECAST PLANK DEPTH AND BEARINGS.
ROADWAY AT DECK CENTERLINE SHALL BE ELEVATION = 931.00.
FOR R10 WILL HAVE TENSION CONNECTORS.
THE SHEET PILE SHALL BE 16'-0" LONG (15'-0" BELOW THE BOTTOM OF
GENERAL NOTES:
SEEPAGE BARRIER.
6. SHEET PILE BETWEEN MONOLITHS SHALL FORM A CONTINUOUS
5. AESTHETIC PATTERNING NOT SHOWN FOR CLARITY. SEE SHEET S-520.
4. SEE ELECTRICAL PLANS FOR INSTALLATION OF GROUND SYSTEM CONDUITS.
3. FOR BARRIER DETAILS SEE SHEET SB129.
TEST AND EVALUATION.
PENETRATION CRITERIA DEVELOPED USING THE PILE LOAD
2. FINAL TIP ELEVATIONS SHALL BE DETERMINED BY THE PILE
MINIMUM TENSION CAPACITY 276 KIPS.
ULTIMATE COMPRESSION CAPACITY OF 490 KIPS AND TO OBTAIN A
1. ALL PILES SHOWN ON THIS SHEET SHALL BE DRIVEN TO OBTAIN A MINIMUM
MIN. CLR TYP.
"2
CONCRETE GIRDER
(3) MIN. PVC CENTRALIZERS
TYP.
CABLE TIE
TYP. SEE NOTES
NUT & HARDENED WASHER
ANCHOR W/ HEAVY DUTY HEX
BASE PL
GIRDER
TRUNNION
TUBING TYP.
PLASTIC GROUT
AIR RELEASE
EQUAL
DUCT OR APPROVED
4" HDPE CORRUGATED
PRESTRESS BAR
" Ø EPOXY COATED4
5.5" PVC
3.5" HDPE
CEMENT GROUT
NON-METALLIC
NON-SHRINK
CEMENT GROUT
NON-SHRINK NON-METALLIC
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
W O
R L E
A N
S L
O U
IS
IA
N A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
S
W O
R L E
A N
S D
IS
T R
IC
S
U L L
Y
/0
/2
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
N A
D
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
N A
V D
.9
A
:1
A N
S I
D
C .J .W
ST401
F M
M D
IS
S
T
X X
X .d g n
D .J .S
I.
W .D
F A
R G
O
N D
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
W E
S -1
-R -0
T R
U N
N
IO
N G
IR
D E
R A
N D
D E
T A
IL
S
P
IE
R A
N C
H O
R A
G E
D W
G I S
S U
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps a u t o t im e
0 3" 6" 9" 12"
SCALE: 3"=1'
SCALE: 3" = 1'-0"
SG201
TRUNNION GIRDER ANCHORAGE
SCALE: 3" = 1'-0"SG201
2 PIER ANCHORAGE
GENERAL NOTES:
ACCORDING TO SPECIFICATION.
18. CONTRACTOR SHALL PROVIDE ANCHOR HEAD PROTECTION PACKED WITH GREASE/GEL
EPOXY PATCHING MATERIAL SHALL BE IN ACCORDANCE WITH ASTM 934 OR APPROVED EQUAL.
17. PRESTRESS EPOXY BARS SHALL BE COATED AND REPAIRED IN ACCORDANCE WITH ASTM 934.
TO CONTRACTING OFFICER (CO) FOR GOVERNMENT APPROVAL.
16. CENTRALIZER SPACING CALCULATIONS SHALL BE PROVIDED BY CONTRACTOR AND SUBMITTED
OR APPROVED EQUAL.
15. LONGITUDINAL ANCHOR BARS SHALL BE EPOXY COATED 150 KSI TYPE 2 ASTM 722
14. TRUNNION GIRDER ANCHOR BARS SHALL BE 150 KSI TYPE 2 ASTM 722.
BY MANUFACTURER.
13. GROUT TUBING, CORROSION INHIBITING COMPOUND, CENTRALIZERS, SHALL BE PROVIDED
12. ALL MATERIALS FOR POST TENSION ANCHORS SHALL CONFORM TO PTI DC35.1-14
REQUIREMENTS ESPECIALLY CHAPTER SA8.
11. TENSIONING OF ANCHORS SHALL STRICTLY ADHERE TO PTI DC35.1-14 SPECIFICATIONS AND
REQUIREMENTS AND SHALL HAVE A MINIMUM CLASS II CORROSION PROTECTION SYSTEM.
10. GROUTED ANCHOR SHALL STRICTLY ADHERE TO PTI DC35.1-14 SPECIFICATIONS AND
9. ALL ANCHORS SHALL BE ASTM A449 HOT DIPPED GALVANIZED.
M55 1-12 SPECIFICATIONS FOR GROUTING OF POST TENSIONED STRUCTURES.
TO THE MOST RECENT VERSION OF POST TENSIONING INSTITUTE (PTI)
8. GROUT FOR THE ANCHORS SHALL BE NON-SHRINK, NON-METALLIC, AND STRICTLY ADHERE
7. ALL PVC CENTRALIZERS SHALL BE SCHEDULE 40 PIPE ASTM D-1785 CLASS 200 PIPE - ASTM D-2241.
6. ALL CABLE TIES SHALL BE ELECTRICAL NYLON.
5. PLASTIC GROUT TUBING SHALL BE HIGH DENSITY POLYETHYLENE 0.06 WALL.
SPECIFICATION.
OF THE ANCHORS SHALL BE REPAIRED PER AN APPROVED PAINT REPAIR METHOD, SEE PAINT
SPECIFICATIONS. ANY DAMAGE TO THE COATING FOLLOWING INSTALLATION AND TENSIONING
4. KEY HOLE PL SHALL BE ASTM A588 GR. 50 AND SHALL BE PAINTED ACCORDING TO THE
3. HARDENED WASHER SHALL BE ASTM F-436 TYPE 1, AND BE HOT DIPPED GALVANIZED.
2. HEAVY DUTY HEX NUT SHALL BE ASTM A29 GRADE C-1045 AND BE HOT DIPPED GALVANIZED.
REVIEW AND APPROVAL WITH THE GROUTING PROCEDURE.
1. CONTRACTOR TO PROVIDE GROUTING ANCHORAGE DETAIL AND SUBMIT FOR GOVERNMENT
/0
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N K
D B
S
N .T .S
A N
S I
D
T S
U L L
Y
EP601
F M
M D
IS
E
P
X X
X .D
G
N D
U
IT
A
N D C
IR
C U
IT
S
C H
E D
U L E
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
D
N A
V D
.9
A
NOTE
D H
K
C O
N T
R O
L S
T R
U C
T U
R
EN
D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
FIBER OPTICFXX
CAMERACATXX
CONTROLCXX
LIGHTINGLXX
POWERSPXX
1. CIRCUIT TYPES:
W E
S -1
-R -0
D W
G R
E V
IS
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
JB6
JB6
JB6
JB7
JB7
JB5
CONTROL PANEL
JB4/ GATE 3
JB4
JB4
JB5
CONTROL PANEL
JB4/ GATE 3
JB7
LIGHT POLE P3
LIGHT POLE P2
LIGHT POLE P4
JB1
JB1
LIGHT POLE P1
UTILITY TRANSFORMER
UTILITY TRANSFORMER
HAND HOLE H.H. 1
JB1
JB1
JB2
JB2
JB2
JB1
JB1
JB1
JB1
JB1
JB2
JB3
JB3
JB3
CONTROL PANEL
JB4/ GATE 3
JB3
JB3
JB2
JB2
JB2
JB3
JB3
JB1
CONTROL PANEL
JB7/ GATE 2
JB6
JB7
CONTROL PANEL
JB8/ GATE 1
JB7
CONTROL PANEL
JB6/ GATE 2
JB5
JB4
JB5
CONTROL PANEL
JB6/ GATE 2
JB6
CONTROL PANEL
JB8/ GATE 1
P3
P2
P2
CONTROL PANEL
JB8/ GATE 1
JB9
JB9
JB2
JB2
JB2
JB2
JB2
JB2
JB1
JB1
JB1
JB1
JB1
JB2
CONTROL PANEL
JB4/ GATE 3
JB3
CONTROL PANEL
JB4/ GATE 3
JB4
CONTROL PANEL
JB4/ GATE 3
JB3
JB3
JB3
JB3
JB3
JB3
2 1/2" GRS
3/4" PGRS
R16
R6
R5
R7
R9
R8
2" GRS
2" GRS
2" GRS
2" GRS
R55
R54
R56
R58
R57
R53
R49
R48
R50
R52
R51
R59
R1
R2
R4
R3
R65
R61
R60
R62
R64
R63
2" GRS
CECC UTILITY POLE
CECC UTILITY POLE
UTILITY TRANSFORMER
GENERATOR RECEPTACLE
HADE HOLE H.H. 1
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
2" GRS
LTG POLE/FIXTURE LF5
LTG POLE/FIXTURE LF6
.LTG POLE FIXTURE LF7
FIBER OPTIC
CONDUIT RACK,
FIBER OPTIC
CONDUIT RACK,
RESOLVER/ENCODER
LTG POLE/FIXTURE LF6
LTG POLE/FIXTURE LF7
.POLE P11, LT AND RECPT
GATE 3 CONTROL PANEL LIGHTING CONDUIT.
GATE HTR LEFT SIDE
TBD CABLE
4-#12, 2-#12 GND
8-#12, 3-#12 GND
HOIST MOTOR
HOIST MOTOR/BRAKE
GAP IN SEQUENCE
GAP IN SEQUENCE
GAP IN SEQUENCE
GAP IN SEQUENCE
GAP IN SEQUENCE
GAP IN SEQUENCE
CONDUIT RACK SPARE
CONDUIT RACK SPARE
CONDUIT RACK SPARE
GAP IN SEQUENCE
QTY 2 CAT 6 OUTDR CBL
LIGHT POLE P5
LIGHTING CONDUIT
LIGHTING CONDUIT SPARE
POLE P6
POLE P7
4-#12, 2-#12 GND
JB10 JUNCTION BOX
JB10 JUNCTION BOX SPARE
P17, LF16
GATE PROX. LIMIT SW'S
CONDUIT RACK
TBD CABLE
TBD CABLE
HOIST MOTOR/BRAKE
POLE P16, LF15
HOIST MOTOR FEED
GATE PROX. LIMIT SW'S
2-#12, #12 GND
FIBER OPTIC
CONDUIT RACK,
2-#12, #12 GND
POLE P14, LF12, LF13
POLE P13, LF10, LF11
. 8-#12, 3-#12 GND
2-#12, #12 GNDPOLES P12/LF9
4-#12, 2-#12 GND.
POLE P17, LF16
GATE 1 CONTROL PANEL
GATE 1 CONTROL PANEL JB10 JUNCTION BOX
GATE HTR LEFT SIDE
POLE P18, LF17
POLE P18, LF17 POLE P19, LF18
HOIST MOTOR FEED
HOIST MOTOR/BRAKE HTR
CONDUIT RACK SPARE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
2-#12, #12 GND
2-#12, #12 GND
2-#12, #12 GND
2-#12, #12 GND
15kV CABLE
P12
4-4/0 THHN
4-3/0 THHN
4-4/0 THHN
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
P11
P12
P11
P13
LP4-L33
LP4-L31
LP4-L32
LP4-L30
P12
P11
P13
P12
P11
P13
P12
P11
P13
P12
P11
P13
3-4/0, #6 GND
CONDUIT RACK SPARE
CONDUIT RACK SPARE
CONDUIT RACK SPARE
CONDUIT RACK FEEDER 2
CONDUIT RACK FEEDER 1
CONDUIT RACK FEEDER 3
CONDUIT RACK SPARE
CONDUIT RACK FEEDER 3
CONDUIT RACK SPARE
CONDUIT RACK FEEDER 2
CONDUIT RACK FEEDER 1
CONDUIT RACK FEEDER 3
CONDUIT RACK FEEDER 1
CONDUIT RACK FEEDER 3
CONDUIT RACK FEEDER 2
CONDUIT RACK SPARE
CONDUIT RACK SPARE
CONDUIT RACK FEEDER 2
CONDUIT RACK SPARE
CONDUIT RACK SPARE
CONDUIT RACK FEEDER 1
CONDUIT RACK SPARE
LIGHT FIXTURE LF2
LIGHT FIXTURE LF1
LIGHT FIXTURE LF3
CAMERA CC2
LIGHT FIXTURE LF4
3-4/0, #6 GND
3-4/0, #6 GND
3-4/0, #6 GND
SPARE
3-4/0, #6 GND
CAMERA CC3
DUCTBANK SPARE
DUCTBANK SPARE
DUCTBANK SPARE
CONDUIT RACK FEEDER 2
CONDUIT RACK FEEDER 1
FIBER OPTIC CABLE
DUCTBANK FEEDER 1
CAMERA CC4
DUCTBANK FEEDER 2
DUCTBANK SPARE
DUCTBANK FEEDER 3
R47
GATE 2 CONTROL PANEL
R126
R127
R128
GATE 2 CONTROL PANEL
GATE 3 CONTROL PANEL
GATE 3 CONTROL PANEL
R123
R124
R125
GATE 3 CONTROL PANEL
GATE 2 CONTROL PANEL
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
GATE 1 CONTROL PANEL
GATE 2 CONTROL PANEL
R129
GATE 1 CONTROL PANEL
GATE 1 CONTROL PANEL
GATE 1 CONTROL PANEL
GATE 1 CONTROL PANEL
GATE 1 CONTROL PANEL
R112
R113
GATE 1 CONTROL PANEL
R110
3/4" PVC
GATE 1 CONTROL PANEL
R109 3/4" PVC
GATE 1 CONTROL PANEL
GATE 1 CONTROL PANEL
R120
R119
R121
GATE 3 CONTROL PANEL
R122
R118
R114
R115
GATE 1 CONTROL PANEL
R117
R116
1" PVC
2-#12, #12 GND
POLE P15, LF14, RCPT
2-#12, #12 GND
2-#12, #12 GND
2-#12, #12 GND
CAM LIMIT SWITCH BOX C6
GATE HTR, LEFT SIDE
3-#10, #12 GND
LIGHTING CONDUIT
C9CAM LIMIT SWITCH BOX
3-#10, #12 GND
CAT 6 OUTDOOR CABLE
RESOLVER/ENCODER
C8
GATE HTR RIGHT SIDE
4-#14, #14 GND
LIGHTING CONDUIT
CAM LIMIT SWITCH BOX
C7
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
1" PVC
4-#14, #14 GND
GATE HTR. RIGHT SIDE
LIGHTING CONDUIT
C4
RESOLVER/ENCODR
1" PVC
1" PVC
CAM LIMIT SWITCH BOX
3-#10, #12 GND
C3
R108
2-#12, #12 GND LIGHTING CONDUIT
GATE 3 CONTROL PANEL1" PVC
LIGHTING CONDUIT
2-#12, #12 GNDJB3 LIGHTING CONDUIT
2-#12, #12 GND
GATE HTR RIGHT SIDE
1" PVC
4-#14, #14 GND
R75
R78
R77
C1R73
2-#8, #8 GND
GATE 3 CONTROL PANEL GATE PROX. LIMIT SW'S3/4" PVC
CONDUIT AND CIRCUIT SCHEDULE (CONT'D)
NOTES
R66
R68
R67
TYPE
SIZE/ FROM
NO.
CONDUIT TO
NUMBER
CIRCUIT CONDUCTORS
JB5 LIGHTING CONDUIT
P14
R69
JB3
R70
R72
R71
3/4" PVC
R98
GATE 2 CONTROL PANEL
R99
R100
R97
3/4" PVC
GATE 2 CONTROL PANEL
R93
GATE 2 CONTROL PANEL
GATE 2 CONTROL PANEL
3/4" PVC
R105
R104
3/4" PVC
R107
R106
3/4" PVC
3/4" PVCR101
R102
R103
3/4" PVC
GATE 3 CONTROL PANEL
R81
R83
R84
GATE 3 CONTROL PANEL
GATE 3 CONTROL PANEL
GATE 3 CONTROL PANEL
R79
R82
R80
R85
R90
GATE 2 CONTROL PANEL
GATE 2 CONTROL PANEL
R92
GATE 2 CONTROL PANEL
3/4" PVC
R86
3/4" PVC
R88
R87
2-#12, #12 GNDGATE 2 CONTROL PANEL
HEATER
LEFT HOIST GEARBOX
LIGHT
PIER 2 PASSAGEWAY
TO HEATER
FLEX CONDUIT UP
TO HEATER
FLEX CONDUIT UP
GATE 2 CONTROL PANEL
GATE 2 CONTROL PANEL 2-#12, #12 GND
HEATER
RIGHT HOIST GEARBOX
2-#12, #12 GND
NO.
CONDUIT
TWO WAY LIGHT SWITCH
CONDUCTORS
TWO WAY LIGHT SWITCH
R95
R94
R96
HEATER
LEFT HOIST GEARBOX
2-#12, #12 GND
TO HEATER
FLEX CONDUIT UP
GATE 3 CONTROL PANEL
LIGHT
PIER 1 PASSAGEWAY
GATE 1 CONTROL PANEL
2-#12, #12 GND
2-#12, #12 GND
HEATER
RIGHT HOIST GEARBOX
R111
TO HEATER
FLEX CONDUIT UP
2-#12, #12 GND
GEARBOX HEATER
LEFT HOIST
TO HEATER
FLEX CONDUIT UP
UP TO HEATER
FLEX CONDUIT
2-#12, #12 GNDGATE 3 CONTROL PANEL
GEARBOX HEATER
RIGHT HOIST
NUMBER
CIRCUIT
R31
R30
R32
R34
R33
R29
R25
R24
R26
R28
R27
R35
R43
R42
R44
R46
R45
R41
R37
R36
R38
R40
R39
1" PGRS
3" PGRS
R10
3" PGRS
NOTES
TYPE
SIZE/
CONDUIT AND CIRCUIT SCHEDULE
4" PGRS
4" PGRS
R11
R20
R19
R21
R23
R22
R18
R13
R12
R14
R17
R15
GATE 1 CONTROL PANEL
P16
P18
P17
LIGHTING CONDUIT
LIGHTING CONDUIT
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
CAT 6 OUTDOOR CABLE
P19
CAM LIMIT SWITCH BOX1" PVC C5
AND HEATER
LIMIT SWITCHES
14-#14 (4 SP)
2-#12, #12 GND,
GATE 2 CONTROL PANEL
4-#12, #12 GNDGATE 3 CONTROL PANEL P15
R89
R91
14-#14 4 SP)
2-#12, #12 GND,
JB10
GATE 1 CONTROL PANEL,
AND HEATER
LIMIT SWITCHES
GATE 1 CONTROL PANEL
JB10
GATE 1 CONTROL PANEL,
GATE 2 CONTROL PANEL3/4" PVC 4-#12, #12 GNDP18
2-#8, #8 GND
2-#8, #8 GND
2-#8, #8 GND
MOTOR FEED
2-#8, #8 GND
2-#8, #8 GND
P21
P20
P22
P24
P23
MOTOR FEED
14-#14 (4 SP)
2-#12, #12 GND,
CAM LIMIT SWITCH BOX
AND HEATER
LIMIT SWITCH
3/4" PVCR76
1" PVC
MOTOR FEED
R74 GATE 3 CONTROL PANEL C2
CAT 437
CAT 441 & 4
CAT 444
FO94, FO95
FO94, FO95
FO94, FO95
GATE 3 PROX LIMIT SW
PIER 2 PASSAGE WAY LIGHT
GATE 3 PROX LIMIT SW
PIER 2 PASSAGEWAY SW 3-#12, #12 GND
2-#12, #12 GND BETWEEN LIMIT SWS'
GATE 2 PROX LIMIT SW
PIER 2 PASSAGE LIGHT
GATE 2 PROX LIMIT SW
PIER 2 PASSAGE SW 3-#12, #12 GND
2-#12, #12 GND
PASSAGE LIGHT
BETWEEN LIMIT SWS'
GATE 1 PROX LIMIT SW
PIER 1 PASSAGE LIGHT
GATE 1 PROX LIMIT SW
PIER 1 PASSAGE SW 3-#12, #12 GND
2-#12, #12 GND BETWEEN LIMIT SWS'
PASSAGE LIGHT
PIER 1 PASSAGE WAY LIGHT PIER 1 PASSAGE WAY SW 3-#12, #12 GND
CAT 334
CAT 337
CAT 341
CAT 344
CAT 234
CAT 237
CAT 241
CAT 244
CAT 134
CAT 137
CAT 141
CAT 144
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
POLE P6
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
MAIN CONTROL PANEL
FROM TO
2" GRS
3/4" PVC
JB5
UP OT LS JB
JB7
DOWN OT LS JB 2-#14, #14 GND
CONDUIT RACK SPARE
GATE 3
FO96, FO97
FO94, FO97
FO95, FO96
(UTILITY PROVIDED)
BRAKE HEATERS
BRAKE AND MOTOR AND
BRAKE HEATERS
BRAKE AND MOTOR AND
BRAKE HEATERS
BRAKE AND MOTOR AND
GATE 3
CONTROL PANEL
JB9/ GATE 1
CAMERA CC12
CAMERA CC11
CAMERA CC13
CAMERA CC15
CAMERA CC14
CAMERA CC10
CAMERA CC6
CAMERA CC5
CAMERA CC7
CAMERA CC9
CAMERA CC8
CAMERA CC16
PASSAGE LIGHT
1" PVC
1" PVC
1" PVC
STROBE AND HORN
LIGHTING CONDUIT,RECEPTACLE
10-#12, 3-#12 GND
STROBE AND HORN
LIGHTING CONDUIT, RECEPTACLE
STROBE AND HORN
LIGHTING CONDUIT, RECEPTACLE
FIBER OPTIC
CONDUIT RACK,
FIBER OPTIC
CONDUIT RACK,
.MAIN CONTROL PANEL BUILDING OUTSIDE FUTURE SCADA1-#14 PULL WIRE1" PGRS
3/4" PVC MAIN CONTROL PANEL HOLDING TANK FLOAT 3-#14 HOLDING TANK FLOAT
3/4" PGRS
3/4" PGRS
3/4" PGRS
1" PGRS
1" PGRS
2" PGRS
2" PGRS
2" PGRS
2" PGRS
2" PGRS
2" PGRS
2" PGRS
2" PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PGRS
3/4" PGRS
3/4" PGRS
3/4" PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
3/4" PVC/PGRS
5' PERSONNEL GATE
BUILDING
CONTROL
FENCE
LINE
SEWER
PAVEMENT
SIDEWALK
WATER LINE
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N K
D B
S
N .T .S
A N
S I
D
/0
/1
ES110
F M
M D
IS
E
S
X X
X .D
G
S
IT
E E
L E
C T
R
IC
A L U
T
IL
IT
IE
S
SHEET KEYNOTES
GENERAL NOTES
1 2
PRI
U.G.
S W
B
R1, R2
R3
R4
N. T. S.
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
S
U L L
Y
N A
D
N A
V D
.9
A
D H
K
C O
N T
R O
L B
U
IL
D
IN
G
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
TANK
U.G. HOLDING
W E
S -1
-R -0
N
SITE ELECTRICAL UTILITIES
2. COORDINATE FINAL UTILITIES LAYOUT WITH CCEC AND OTHER SITE WORK.
888-277-4424
PHONE: 701-356-4400
FARGO, ND 58104
4100 32ND AVE. S.
CASS COUNTY ELECTRIC COOP
1. ELECTRICAL SERVICE PROVIDED BY CCEC (CASS COUNTY ELECTRIC COOP).
9. SEE SHEET E-010 FOR CONTROL BUILDING POWER AND LIGHTING PLANS.
COORDINATED WITH OTHER BURIED ELECTRICAL CONDUITS.
8. HAND HOLE SHALL BE LOCATED TO EASE PULLING CONDUCTORS AND
7. SEE SHEET ES113 FOR CONTROL BUILDING DUCTS AND CONDUIT ENTRANCES.
6. SEE SHEET EP601 FOR CONDUIT RACEWAY SCHEDULE.
BUILDING, SEE SHEET ES113.
5. PROVIDE AND INSTALL GENERATOR RECEPTACLE MOUNTED ON OUTSIDE OF
SWEEP ELBOWS.
4. SECONDARY FEEDER CONDUIT TO BUILDING SHALL BE 3 INCH PGRS, WITH
AND ONE SPARE FROM UTILITY POLE TO TRANSFORMER.
3. CONTRACTOR SHALL PROVIDE AND INSTALL PRIMARY UNDERGROUND CONDUIT
2. CONTRACTOR SHALL PROVIDE AND INSTALL THE METERING ENCLOSURE.
METERING ENCLOSURE NEXT TO THE TRANSFORMER. TRANSFORMER BY CCEC.
1. TRANSFORMER PAD TO ACCOMMODATE BOTH THE UTILITY TRANSFORMER AND
D W
G R
E V
IS
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
H
H
SHEET ES111
CONTINUE ON
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
HOLDING TANK
WASTE WATER
SEWER LATERAL
4" DIA. PVC
BUILDING
CONTROL
T-WALL
(4 PLACES)
AND POLE
AREA LIGHT
(3 PLACES)
AND POLE
AREA CAMERA
SEE SHEET ES115
FOR CONTINUATION
GROUND SYSTEM
TO STRUCTURE
PAVEMENT
CONC.
CONDUCTOR
MAIN GROUND
GROUND RING
WATER LINE
OPENING GATE
GATE G-3 DOUBLE
OPENING GATE
GATE G-1 DOUBLE
SIDEWALK
CONC.
GATE
PERSONNEL
OPENING GATE
GATE G-2 DOUBLE
O. H. LINE
BY CCEC
FINAL POLE
SHEET ES110
CONTINUE FROM
/2
F A
R G
O
N D
F M
M D
IV
E R
S
IO
N I
N L E
T S
T R
U C
T U
R E
R E
D R
IV
E R O
F T
H E N
O R
T H R
IV
E R B
A S
IN
S T P
A U
L D
IS
T R
IC
T
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F A
R G
O -M
O O
R H
E A
D F
L O
O D R
IS
K M
A N
A G
E M
E N
T
N .T .S
A N
S I
D
/0
/1
N K
D B
S
ES111
F M
M D
IS
E
S
X X
X .D
G N
SHEET KEYNOTES
3 4
P1
P4
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
N. T. S.
S
U L L
Y
N A
D
N A
V D
.9
A
D H
K
N T
R O
L B
U
IL
D
IN
G A
N D V
IC
IN
IT
Y
N D S
P C
S S
O U
T H Z
O N
E -U .S S
U R
V E
Y F
T
G R
O U
N D
IN
G
3 4
P2
3 4
3 4
P3
P5
P6
P7
GENERAL NOTES
W E
S -1
-R -0
CONTROL BUILDING AND VICINITY GROUND SYSTEM
N
THIS APPLIES TO THE ENTIRE PROJECT.
CONDUITS. SEE SPECIFICATION SECTION 26 05 00.00 40 PARAGRAPH 2.1.1.1.
CONTRACTOR TO PROVIDE SUBMITTALS ON DETAILED DESIGN OF U.G. 7.
MILLIOHM ACCURACY.
6. GROUNDING SYSTEM CONTINUITY SHALL BE TESTED TO LESS THAN 0.5
FUSION WELDED TO MAIN GROUND RING CONDUCTORS.
WITH #2 AWG PIGTAIL CONDUCTORS. ALL BONDING CONDUCTORS SHALL BE
5. FENCE AND GATE BONDING JUMPERS MAY USE UL LISTED BONDING CLAMPS
4. FENCE SHALL BE BONDED TO GROUND SYSTEM, WITH #2 COPPER.
3. WARNING TAPE SHALL BE BURIED ONE FOOT ABOVE GROUND CONDUCTOR.
2. CONDUCTORS SHALL BE DIRECT BURIED 36 INCHES BELOW FINISHED GRADE.
1. GROUND RING CONDUCTOR SHALL BE BARE COPPER 4/0 SIZE.
D W
G R
E V
IS
E D W
IT
H A
M E
N D
M E
N T N
O
A U
G
O. H.
GUY WIRE
PRI
U.G.
8 1
POLE SHALL BE AT LEAST 30 FT. FROM FENCE.
8. COORDINATE ELECTRIC SERVICE WITH CCEC AND SITE CONSIDERATIONS.
LIGHTNING PROTECTION LOOP CONDUCTOR. SEE SHEET ES112.
7. THE GROUND RING CONDUCTOR SHALL BE CONNECTED TO THE
CLAMPS MAY BE USED.
6. BOND MOVABLE GATE TO FIXED GATE POSTS. UL LISTED BONDING
AND PARKING SURFACE
5. GROUND RING CONDUCTOR SHALL GENERALLY BE BETWEEN FENCE
4. SEE SHEET E-011 FOR PARKING AREA LIGHTING DETAILS.
3. LIGHT AND CAMERA POLES ARE ALUMINUM AND SHALL BE BONDED.
2. BOND OF PARKING AREA TO STRUCTURE GROUND SYSTEMS.
1. BOND OF LIGHTNING SYSTEM GROUND TO AREA GROUND.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
W
| FMMDIS_S403_405 |
| STRUCTURAL (S) |
| FMMDIS_S-403XXX |
| FMMDIS_S-405XXX |
| FMMDIS_SB |
| STRUCTURAL (SB) |
| FMMDIS_SB103XXX |
| FMMDIS_SB104XXX |
| FMMDIS_SB105XXX |
| FMMDIS_SB107XXX |
| FMMDIS_SB108XXX |
| FMMDIS_SB109XXX |
| FMMDIS_SB110XXX |
| FMMDIS_SB111XXX |
| FMMDIS_SB113XXX |
| FMMDIS_SB114XXX |
| FMMDIS_ELECTRICAL |
| ELECTRICAL |
| FMMDIS_EP601XXX |
| FMMDIS_ES110XXX |
| FMMDIS_ES111XXX |
File details come from the government source that posted it. Updated .