2401 W 66th Street Richfield, Minnesota 55423-2031
.002.005
Hydrometer Analysis
Fines
.2 .5
Sample
Type
.02 .05
Fine
5T
#20 #40
20 50
Other Tests
2.70
91.0
30.7
60.3
2.72
76.9
27.8
49.1
2.69
72.2
22.7
49.5 pH
Shrinkage Limit
Penetrometer
Qu (psf)
Dry Density (pcf)
Specific Gravity
Porosity
Organic Content
Liquid Limit
Plastic Limit
Plasticity Index
Water Content
Coarse Fine Coarse Medium
14-210mu
14-210mu
14-210mu
Sand
Gravel
Grain Size Distribution ASTM D422
12/24/14Report Date:
Test Date:
Reported To:
Project:
Job No. : 9660
12/10/14Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
USACE -Geotech. & Geology Section
5T
5T
Fat Clay (CH)
Fat Clay (CH)
Fat Clay (CH)
Sample No. Depth (ft)
20-22
30.5-32.5
45-47
3/8"
#4
Mass (g)
2"
1.5"
#200
77.4
#100 #200
#10
#20
#40
#100
1"
3/4"
99.8
99.8
Location / Boring No.
2 3/4 3/8 #4
72.3
#10
97.7
99.4
99.0
100.0
100.0
99.8
100.0
Percent Passing
57.9
99.5
99.5
100.0
99.8100.0
96.9
99.9
Remarks:
D60
D30
D10
CU
CC
Soil Classification
(* = assumed)
0.0010.010.1110100 Grain Size (mm)
P er ce n t P a ss in g
0.001 61.4
Hydrometer Data
0.001 56.3 0.001 56.2
0.005 87.6
0.003 76.7
0.005 84.2 0.005 87.5
71.4 0.002 73.7 0.002
0.007 89.8
0.009 95.7
0.007 91.0 0.006 94.0
0.009 96.9
0.026 94.3
0.017 93.2
0.010 91.7
0.015 98.0 0.015 98.2
0.024 99.1 0.024 99.2
Diameter % Passing Diameter % Passing
Remarks
Specimen 1 Specimen 2 Specimen 3
99.4
99.0
99.8
99.8
#20
#40
#100
#200#200
Specimen 1 Specimen 2 Specimen 3
96.999.5
Reported To: USACE -Geotech. & Geology Section
Diameter (mm) % Passing
#20
#40
#100
#200
100.0
Report Date: 12/24/14
Sample No. Depth (ft)
Sample
Type Soil Classification
Spec 1
#40
#100
99.8
99.5
#20
14-210mu 1 20-22
Spec 3
97.7
100.0
99.9
Grain Size Distribution ASTM D422 Job No. : 9660
Project: Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing Test Date: 12/10/14
5T Fat Clay (CH)
Location / Boring No.
Fat Clay (CH)
Fat Clay (CH)
Spec 2 14-210mu 30.5-32.5 5T
14-210mu 3 45-47 5T
Sieve Data
Specimen 1 Specimen 2 Specimen 3
Sieve % Passing
2"
#4
1.5"
1"
#10 100.0
Sieve % Passing
2"
1.5"
3/4"
1"
3/4"
#4
#10 100.0
Sieve % Passing
2"
1.5"
1"
3/4"
#4 100.0
2401 West 66th Street Richfield, MN 55423
#10 99.8
3/8" 3/8" 3/8"
2401 W 66th Street Richfield, Minnesota 55423-2031
.002.005
Hydrometer Analysis
Fines
.2 .5
Sample
Type
.02 .05
Fine
5T
#20 #40
20 50
Other Tests
2.70
69.3
25.8
43.5 pH
Shrinkage Limit
Penetrometer
Qu (psf)
Dry Density (pcf)
Specific Gravity
Porosity
Organic Content
Liquid Limit
Plastic Limit
Plasticity Index
Water Content
Coarse Fine Coarse Medium
14-210mu
Sand
Gravel
Grain Size Distribution ASTM D422
12/24/14Report Date:
Test Date:
Reported To:
Project:
Job No. : 9660
12/10/14Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
USACE -Geotech. & Geology Section
Fat Clay (CH)*
Sample No. Depth (ft)
60-62
3/8"
#4
Mass (g)
2"
1.5"
#200
86.7
#100 #200
#10
#20
#40
#100
1"
3/4"
Location / Boring No.
2 3/4 3/8 #4 #10
100.0
99.7
99.1
Percent Passing
97.6
96.6
Remarks:
D60
D30
D10
CU
CC
Soil Classification
(* = assumed)
0.0010.010.1110100 Grain Size (mm)
P er ce n t P a ss in g
Hydrometer Data
0.001 49.6
0.003
0.005 80.2
61.1
0.010 88.5
0.007 85.0
0.017 91.6
0.026 93.3
Diameter % Passing Diameter % Passing
Remarks
Specimen 1 Specimen 2 Specimen 3
#20
#40
#100
#200#200
Specimen 1 Specimen 2 Specimen 3
96.6
Reported To: USACE -Geotech. & Geology Section
Diameter (mm) % Passing
#20
#40
#100
#200
99.7
Report Date: 12/24/14
Sample No. Depth (ft)
Sample
Type Soil Classification
Spec 1
#40
#100
99.1
97.6
#20
14-210mu 4 60-62
Spec 3
Grain Size Distribution ASTM D422 Job No. : 9660
Project: Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing Test Date: 12/10/14
5T Fat Clay (CH)
Location / Boring No.
Spec 2
Sieve Data
Specimen 1 Specimen 2 Specimen 3
Sieve % Passing
2"
#4
1.5"
1"
#10 100.0
Sieve % Passing
2"
1.5"
3/4"
1"
3/4"
#4
#10
Sieve % Passing
2"
1.5"
1"
3/4"
#4
2401 West 66th Street Richfield, MN 55423
#10
3/8" 3/8" 3/8"
Type:
19.0 o
0.21
Before Consolidation A B C D E
1.43 1.43 1.44
2.88 2.87 2.87
41.9 43.2 43.0
79.6 78.3 78.3
1.11 1.14 1.14
1.43 1.43 1.41
2.88 2.85 2.81
41.3 41.0 38.7
79.5 79.9 82.3
1.11 1.10 1.04
6.9 9.1 8.0
0.50 1.00 2.00
0.84 1.27 1.63
0.82 0.99 1.08
0.78 1.23 1.63
0.24 0.44 0.89
0.95 0.95 0.95
3.1 3.9 7.8 o c'= 0.21 (tsf) α = 18.0 o a = 0.2 (tsf) o c= 0.23 (tsf)
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
22.7
72.2Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/11/14
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
49.5
2.69
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.006
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 12.4Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
14-210MU Sample #: 1 5T 20-22Depth (ft):
Failure Criterion: Max. Stress Ratio
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.00018
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
Rupture Envelope at Failure ------------ 19.0Effective φ':
12/30/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q ts f)
18.8 o
0.21
Before Consolidation A B C D E
1.43 1.43 1.44
2.88 2.87 2.87
41.9 43.2 43.0
79.6 78.3 78.3
1.11 1.14 1.14
1.43 1.43 1.41
2.88 2.85 2.81
41.3 41.0 38.7
79.5 79.9 82.3
1.11 1.10 1.04
6.9 9.1 8.0
0.50 1.00 2.00
0.84 1.27 1.63
0.82 0.99 1.08
0.84 1.27 1.63
0.24 0.44 0.89
0.95 0.95 0.95
4.9 4.9 7.8 o c'= 0.21 (tsf) α = 17.9 o a = 0.2 (tsf) o c= 0.26 (tsf)
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
22.7
72.2Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/11/14
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
49.5
2.69
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.006
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 11.8Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
14-210MU Sample #: 1 5T 20-22Depth (ft):
Failure Criterion: Max. Deviator Stress
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.00018
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
Rupture Envelope at Failure ------------ 18.8Effective φ':
12/30/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
14.3 o
0.20
Before Consolidation A B C D E
1.43 1.43 1.44
2.88 2.87 2.87
41.9 43.2 43.0
79.6 78.3 78.3
1.11 1.14 1.14
1.43 1.43 1.41
2.88 2.85 2.81
41.3 41.0 38.7
79.5 79.9 82.3
1.11 1.10 1.04
6.9 9.1 8.0
0.50 1.00 2.00
0.84 1.27 1.63
0.82 0.99 1.08
0.79 1.00 1.30
0.24 0.44 0.89
0.95 0.95 0.95
15.0 15.0 15.0 o c'= 0.20 (tsf) α = 13.9 o a = 0.2 (tsf) o c= 0.28 (tsf)
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
22.7
72.2Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/11/14
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
49.5
2.69
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.006
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 8.2Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
14-210MU Sample #: 1 5T 20-22Depth (ft):
Failure Criterion: Given Strain of: 15%
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.00018
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
Rupture Envelope at Failure ------------ 14.3Effective φ':
12/30/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
Date:
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.17 0.20 0.09 0.18 0.23 0.11 0.18 0.34 0.23
0.35 0.29 0.14 0.35 0.39 0.19 0.36 0.52 0.37
0.52 0.35 0.16 0.53 0.49 0.25 0.53 0.65 0.46
0.70 0.43 0.19 0.70 0.59 0.29 0.71 0.76 0.53
0.87 0.49 0.21 0.88 0.68 0.33 0.89 0.85 0.59
1.04 0.53 0.22 1.05 0.74 0.35 1.07 0.94 0.65
1.22 0.58 0.23 1.23 0.81 0.38 1.25 1.02 0.69
1.39 0.60 0.23 1.40 0.86 0.39 1.42 1.08 0.73
1.56 0.63 0.24 1.58 0.91 0.41 1.60 1.15 0.76
1.74 0.66 0.24 1.76 0.95 0.42 1.78 1.20 0.79
1.91 0.68 0.24 1.93 0.99 0.43 1.96 1.26 0.81
2.09 0.70 0.24 2.11 1.03 0.43 2.14 1.30 0.84
2.26 0.71 0.24 2.28 1.07 0.44 2.31 1.35 0.85
2.43 0.73 0.24 2.46 1.10 0.44 2.49 1.38 0.87
2.61 0.74 0.24 2.63 1.12 0.44 2.67 1.41 0.88
2.78 0.76 0.23 2.81 1.15 0.44 2.85 1.45 0.89
2.96 0.77 0.23 2.99 1.16 0.44 3.02 1.48 0.89
3.13 0.78 0.23 3.16 1.18 0.44 3.20 1.50 0.89
3.30 0.79 0.23 3.34 1.19 0.43 3.38 1.53 0.89
3.48 0.80 0.22 3.51 1.20 0.43 3.56 1.54 0.89
3.82 0.82 0.21 3.86 1.23 0.42 3.91 1.56 0.87
4.17 0.83 0.21 4.21 1.25 0.41 4.27 1.57 0.87
4.52 0.84 0.20 4.57 1.26 0.40 4.63 1.58 0.86
4.87 0.84 0.19 4.92 1.27 0.38 4.98 1.59 0.86
5.22 0.84 0.18 5.27 1.25 0.37 5.34 1.60 0.87
5.56 0.83 0.17 5.62 1.22 0.35 5.69 1.60 0.87
6.26 0.82 0.16 6.32 1.08 0.31 6.41 1.62 0.86
6.95 0.81 0.15 7.02 1.04 0.30 7.12 1.63 0.84
7.65 0.80 0.14 7.73 1.02 0.29 7.47 1.63 0.85
8.34 0.81 0.13 8.43 1.02 0.28 7.83 1.63 0.86
9.04 0.79 0.13 9.13 1.03 0.28 8.18 1.63 0.87
9.73 0.78 0.12 9.83 1.04 0.27 8.54 1.61 0.87
10.43 0.78 0.12 10.54 1.04 0.27 8.90 1.62 0.86
11.13 0.79 0.11 11.24 1.04 0.27 9.25 1.61 0.87
11.82 0.80 0.11 11.94 1.03 0.27 9.61 1.60 0.86
12.52 0.80 0.10 12.64 1.00 0.26 9.96 1.60 0.86
13.21 0.80 0.09 13.35 1.00 0.25 10.32 1.61 0.84
13.91 0.79 0.09 14.05 1.00 0.24 10.68 1.59 0.83
15.64 0.80 0.07 15.80 1.00 0.22 11.39 1.52 0.83
17.38 0.80 0.06 17.56 1.02 0.20 12.10 1.43 0.82
19.12 0.81 0.06 19.32 1.00 0.20 12.81 1.38 0.82
20.00 0.82 0.06 20.00 0.99 0.19 13.52 1.34 0.82
14.23 1.30 0.81
16.01 1.18 0.80
17.79 1.14 0.79
19.57 1.09 0.78
20.00 1.08 0.77
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s u re
(t s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
12/30/14
Sample 5Sample 1 Sample 2 Sample 3 Sample 4
Triaxial Data
Boring: 14-210MU Job:
Sample: 1 Depth: 20-22
19.4 o
0.32
Before Consolidation A B C D E
1.44 1.44 1.44
2.87 2.87 2.87
44.3 44.6 43.8
76.6 76.7 77.2
1.22 1.21 1.20
1.44 1.42 1.42
2.87 2.84 2.83
44.5 42.5 41.2
76.8 78.7 80.1
1.21 1.16 1.12
9.1 8.0 7.1
0.50 1.00 2.00
1.12 1.74 1.92
0.94 1.21 1.48
1.03 1.64 1.91
0.28 0.54 0.96
0.95 0.95 0.95
2.9 4.2 4.6 o c'= 0.32 (tsf) α = 18.4 o a = 0.3 (tsf) o c= 0.35 (tsf)
12/24/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 19.4Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
30.5-32.5Depth (ft):
Failure Criterion: Max. Stress Ratio
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.000287
14-210MU Sample #: 2 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 12.7Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
49.1
2.72
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.010
27.8
76.9Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/9/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
-0.2
0.2
0.4
0.6
0.8
1.2
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.5
1.5
2.5
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
19.2 o
0.33
Before Consolidation A B C D E
1.44 1.44 1.44
2.87 2.87 2.87
44.3 44.6 43.8
76.6 76.7 77.2
1.22 1.21 1.20
1.44 1.42 1.42
2.87 2.84 2.83
44.5 42.5 41.2
76.8 78.7 80.1
1.21 1.16 1.12
9.1 8.0 7.1
0.50 1.00 2.00
1.12 1.74 1.92
0.94 1.21 1.48
1.12 1.74 1.92
0.28 0.54 0.96
0.95 0.95 0.95
3.8 5.3 5.3 o c'= 0.33 (tsf) α = 18.2 o a = 0.3 (tsf) o c= 0.41 (tsf)
12/24/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 19.2Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
30.5-32.5Depth (ft):
Failure Criterion: Max. Deviator Stress
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.000287
14-210MU Sample #: 2 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 11.6Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
49.1
2.72
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.010
27.8
76.9Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/9/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
-0.2
0.2
0.4
0.6
0.8
1.2
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.5
1.5
2.5
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
23.1 o
0.09
Before Consolidation A B C D E
1.44 1.44 1.44
2.87 2.87 2.87
44.3 44.6 43.8
76.6 76.7 77.2
1.22 1.21 1.20
1.44 1.42 1.42
2.87 2.84 2.83
44.5 42.5 41.2
76.8 78.7 80.1
1.21 1.16 1.12
9.1 8.0 7.1
0.50 1.00 2.00
1.12 1.74 1.92
0.94 1.21 1.48
0.94 1.26 1.70
0.28 0.54 0.96
0.95 0.95 0.95
15.0 15.0 15.0 o c'= 0.09 (tsf) α = 21.5 o a = 0.1 (tsf) o c= 0.30 (tsf)
12/24/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 23.1Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
30.5-32.5Depth (ft):
Failure Criterion: Given Strain of: 15%
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.000287
14-210MU Sample #: 2 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 11.4Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
49.1
2.72
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.010
27.8
76.9Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/9/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
-0.2
0.2
0.4
0.6
0.8
1.2
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.5
1.5
2.5
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
0.17 0.21 0.10 0.18 0.30 0.15 0.18 0.47 0.27
0.35 0.32 0.15 0.36 0.45 0.24 0.35 0.67 0.40
0.52 0.41 0.19 0.53 0.57 0.30 0.53 0.84 0.51
0.70 0.49 0.22 0.71 0.68 0.36 0.71 0.97 0.58
0.87 0.55 0.24 0.88 0.77 0.40 0.89 1.10 0.65
1.05 0.61 0.26 1.06 0.86 0.43 1.07 1.21 0.71
1.22 0.65 0.27 1.24 0.93 0.46 1.24 1.30 0.75
1.40 0.70 0.28 1.41 0.99 0.48 1.42 1.38 0.78
1.67 0.76 0.25 1.59 1.06 0.50 1.59 1.46 0.82
1.85 0.82 0.27 1.77 1.12 0.51 1.77 1.53 0.84
2.03 0.85 0.28 1.94 1.17 0.53 1.95 1.59 0.87
2.20 0.90 0.28 2.12 1.21 0.53 2.13 1.64 0.88
2.38 0.93 0.27 2.29 1.25 0.54 2.30 1.69 0.90
2.55 0.97 0.27 2.47 1.30 0.54 2.48 1.72 0.91
2.72 1.00 0.26 2.65 1.32 0.54 2.65 1.75 0.91
2.90 1.03 0.26 2.82 1.37 0.54 2.83 1.79 0.92
3.07 1.07 0.25 3.00 1.40 0.54 3.01 1.81 0.92
3.25 1.09 0.24 3.17 1.45 0.53 3.19 1.83 0.91
3.42 1.11 0.23 3.35 1.48 0.52 3.37 1.84 0.92
3.60 1.12 0.21 3.52 1.52 0.51 3.54 1.86 0.92
3.77 1.12 0.20 3.88 1.58 0.50 3.89 1.89 0.91
3.94 1.11 0.18 4.23 1.64 0.48 4.25 1.90 0.90
4.12 1.09 0.15 4.58 1.68 0.45 4.60 1.91 0.90
4.29 1.08 0.14 4.93 1.71 0.43 4.96 1.91 0.89
4.47 1.06 0.13 5.29 1.74 0.41 5.31 1.92 0.89
4.64 1.05 0.11 5.64 1.73 0.39 5.66 1.91 0.88
4.81 1.04 0.11 6.34 1.63 0.34 6.37 1.90 0.87
4.99 1.03 0.10 7.05 1.44 0.30 7.08 1.88 0.86
5.34 1.03 0.10 7.75 1.36 0.29 7.43 1.88 0.86
5.69 1.03 0.09 8.46 1.31 0.29 7.79 1.87 0.86
6.04 1.02 0.09 9.16 1.29 0.28 8.14 1.86 0.85
6.39 0.99 0.08 9.87 1.28 0.28 8.49 1.85 0.86
6.74 0.98 0.08 10.57 1.29 0.27 8.85 1.84 0.86
7.08 0.96 0.07 11.28 1.29 0.26 9.20 1.84 0.86
7.78 0.96 0.06 11.98 1.30 0.26 9.56 1.83 0.86
8.48 0.97 0.05 12.68 1.31 0.25 9.91 1.83 0.86
9.18 0.98 0.04 13.39 1.30 0.24 10.26 1.82 0.87
9.88 0.99 0.03 14.09 1.26 0.23 10.62 1.82 0.87
10.57 1.01 0.02 15.86 1.20 0.21 11.33 1.80 0.88
11.27 1.03 0.01 17.62 1.24 0.20 12.03 1.77 0.88
11.97 1.03 0.00 19.38 1.23 0.20 12.74 1.75 0.89
12.67 1.03 0.00 20.00 1.21 0.20 13.45 1.72 0.90
13.36 0.99 -0.01 14.16 1.70 0.90
14.06 0.96 -0.01 15.93 1.64 0.93
14.76 0.94 -0.01 17.70 1.56 0.95
15.46 0.93 -0.02 19.46 1.50 0.96
17.20 0.94 -0.02 20.00 1.48 0.96
Job:
Sample: 2 Depth: 30.5-32.5
12/24/14
Sample 5Sample 1 Sample 2 Sample 3 Sample 4
Triaxial Data
Boring: 14-210MU
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s
14.2 o
0.26
Before Consolidation A B C D E
1.43 1.44 1.44
2.87 2.87 2.87
55.8 55.4 54.7
67.4 67.3 67.8
1.50 1.50 1.49
1.42 1.42 1.41
2.85 2.83 2.78
53.6 51.9 49.0
68.8 70.2 72.6
1.45 1.40 1.32
9.1 8.0 9.1
0.75 1.50 3.00
0.87 1.30 1.71
0.68 1.00 1.12
0.86 1.30 1.63
0.45 0.59 1.79
0.95 0.95 0.95
2.3 3.2 5.8 o c'= 0.26 (tsf) α = 13.8 o a = 0.3 (tsf) o c= 0.30 (tsf)
12/17/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 14.2Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
45-47Depth (ft):
Failure Criterion: Max. Stress Ratio
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.000285
14-210MU Sample #: 3 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 8.0Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
60.3
2.70
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.010
30.7
91.0Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/8/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
-0.2
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
13.5 o
0.27
Before Consolidation A B C D E
1.43 1.44 1.44
2.87 2.87 2.87
55.8 55.4 54.7
67.4 67.3 67.8
1.50 1.50 1.49
1.42 1.42 1.41
2.85 2.83 2.78
53.6 51.9 49.0
68.8 70.2 72.6
1.45 1.40 1.32
9.1 8.0 9.1
0.75 1.50 3.00
0.87 1.30 1.71
0.68 1.00 1.12
0.87 1.30 1.71
0.45 0.59 1.79
0.95 0.95 0.95
2.8 3.2 3.2 o c'= 0.27 (tsf) α = 13.2 o a = 0.3 (tsf) o c= 0.29 (tsf)
12/17/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 13.5Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
45-47Depth (ft):
Failure Criterion: Max. Deviator Stress
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.000285
14-210MU Sample #: 3 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 8.7Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
60.3
2.70
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.010
30.7
91.0Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/8/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
-0.2
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
13.5 o
0.18
Before Consolidation A B C D E
1.43 1.44 1.44
2.87 2.87 2.87
55.8 55.4 54.7
67.4 67.3 67.8
1.50 1.50 1.49
1.42 1.42 1.41
2.85 2.83 2.78
53.6 51.9 49.0
68.8 70.2 72.6
1.45 1.40 1.32
9.1 8.0 9.1
0.75 1.50 3.00
0.87 1.30 1.71
0.68 1.00 1.12
0.71 1.10 1.21
0.45 0.59 1.79
0.95 0.95 0.95
15.0 15.0 15.0 o c'= 0.18 (tsf) α = 13.1 o a = 0.2 (tsf) o c= 0.29 (tsf)
12/17/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 13.5Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
45-47Depth (ft):
Failure Criterion: Given Strain of: 15%
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.000285
14-210MU Sample #: 3 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 5.4Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
60.3
2.70
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.010
30.7
91.0Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/8/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
-0.2
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
0.18 0.23 0.14 0.01 0.00 0.00 0.18 0.44 0.28
0.35 0.34 0.21 0.01 0.01 0.00 0.36 0.71 0.47
0.53 0.43 0.26 0.19 0.32 0.15 0.54 0.86 0.58
0.70 0.52 0.31 0.36 0.48 0.23 0.72 1.04 0.70
0.88 0.58 0.34 0.54 0.60 0.28 0.90 1.15 0.78
1.05 0.64 0.37 0.72 0.69 0.32 1.08 1.25 0.86
1.23 0.68 0.39 0.90 0.78 0.36 1.26 1.34 0.92
1.41 0.72 0.40 1.07 0.85 0.39 1.44 1.41 0.98
1.58 0.76 0.42 1.25 0.91 0.42 1.62 1.49 1.04
1.76 0.79 0.43 1.42 0.97 0.44 1.80 1.54 1.09
1.93 0.81 0.44 1.60 1.03 0.46 1.98 1.58 1.13
2.11 0.84 0.45 1.78 1.07 0.48 2.16 1.61 1.16
2.28 0.86 0.45 1.95 1.11 0.50 2.34 1.64 1.20
2.46 0.87 0.45 2.13 1.14 0.51 2.52 1.67 1.23
2.64 0.87 0.44 2.31 1.18 0.52 2.70 1.69 1.26
2.81 0.87 0.44 2.48 1.21 0.53 2.88 1.70 1.28
2.99 0.85 0.43 2.66 1.24 0.53 3.06 1.70 1.30
3.16 0.82 0.42 2.84 1.28 0.54 3.24 1.71 1.33
3.34 0.79 0.41 3.01 1.29 0.54 3.42 1.70 1.35
3.51 0.76 0.40 3.19 1.30 0.53 3.60 1.70 1.37
3.87 0.73 0.38 3.37 1.30 0.53 3.95 1.69 1.40
4.22 0.71 0.37 3.55 1.30 0.52 4.31 1.69 1.43
4.57 0.71 0.36 3.90 1.28 0.51 4.67 1.68 1.46
4.92 0.70 0.35 4.25 1.27 0.50 5.03 1.67 1.49
5.27 0.70 0.34 4.61 1.27 0.49 5.39 1.65 1.51
5.62 0.70 0.34 4.96 1.25 0.49 5.75 1.63 1.53
6.33 0.72 0.33 5.31 1.26 0.48 6.47 1.58 1.56
7.03 0.73 0.32 5.67 1.26 0.48 7.19 1.54 1.59
7.73 0.73 0.30 6.38 1.26 0.48 7.55 1.51 1.60
8.44 0.72 0.29 7.08 1.23 0.48 7.91 1.48 1.61
9.14 0.72 0.29 7.79 1.22 0.49 8.27 1.49 1.63
9.84 0.72 0.28 8.50 1.22 0.49 8.63 1.47 1.64
10.54 0.72 0.28 9.21 1.20 0.49 8.99 1.43 1.64
11.25 0.72 0.28 9.91 1.20 0.49 9.35 1.38 1.63
13.36 0.72 0.29 10.62 1.20 0.50 9.71 1.31 1.63
14.06 0.71 0.29 11.33 1.21 0.50 10.07 1.26 1.62
15.82 0.70 0.28 12.04 1.20 0.50 10.43 1.21 1.61
17.57 0.69 0.27 12.74 1.18 0.51 10.79 1.18 1.61
19.33 0.68 0.26 13.45 1.15 0.53 11.50 1.17 1.62
20.00 0.68 0.25 14.16 1.10 0.54 12.22 1.18 1.64
15.93 1.05 0.57 12.94 1.19 1.65
17.70 1.03 0.59 13.66 1.20 1.67
19.47 1.02 0.59 14.38 1.21 1.69
20.01 1.00 0.59 16.18 1.20 1.74
17.98 1.10 1.76
19.77 1.13 1.79
20.00 1.12 1.79
Job:
Sample: 3 Depth: 45-47
12/17/14
Sample 5Sample 1 Sample 2 Sample 3 Sample 4
Triaxial Data
Boring: 14-210MU
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s
ASTM: D3080
Project/Client:
Boring #: Sample No. Depth:
Location: Sample Type:
Soil Type:
0.2 φ=φ=φ=φ= 15.5 deg. φ=φ=φ=φ= 16.5 deg.
Peak Conditions
Friction Angle: Friction Angle:
At Given Shear Disp. Of:
Apparent
Cohesion
0.125 TSF
Cohesion
TSF0.046
Apparent
X
0.97
2.50
"These tests are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design."
0.97Thickness (In.)
Water Content (%)
0.97
57.2
66.6 67.5
Initial
2.50 2.50Diameter (In.)
12/26/2014
Max Stress
Failure Criterion:
Fat Clay (CH)
5" TWT Date Reported:
Shear Rate
0.0003 (in/min)
91.0
60.3
2.70
30.7
Remarks: Specimens trimmed to given sizes; Inundated after applying normal load. Consolidated and sheared to given displacements at constant rate of 0.0003 inches/minute.
Plastic Limit:
Plasticity Index:
Specific Gravity:
Liquid Limit:
A B C D
65.6
56.2 55.2
52.8 51.7
0.96 0.94 0.91
55.5
Dry Density (pcf)
Before Shear
Thickness (In.)
Water Content (%)
Dry Density (pcf)
0.98
67.4 69.5 70.3
Normal Stress
Shear Stress 0.36 0.50
0.75 1.50 3.00
Direct Shear Test
Test Date:
Job No.:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing / USACE
14-210MU 3 45-47 12/4/2014
-0.06
-0.05
-0.04
-0.03
-0.02
-0.01
0 0.05 0.1 0.15 0.2 0.25
C h a n g e i n T h ic k n e s s in c h
0.2
0.4
0.6
0.8
1.2
0 0.05 0.1 0.15 0.2 0.25 Shear Displacement (inch)
S h e a r
S tr e s s
T S
F
0.5
1.5
2.5
0 0.5 1 1.5 2 2.5 3
Normal Stress (TSF)
S h e a r
S tr e s s
T S
F
21.5 o
0.27
Before Consolidation A B C D E
1.43 1.44 1.44
2.87 2.87 2.87
41.8 43.9 43.3
78.8 76.7 77.1
1.14 1.20 1.19
1.42 1.42 1.40
2.83 2.82 2.78
39.8 41.0 37.5
81.2 80.0 83.7
1.08 1.11 1.01
9.1 6.2 9.1
1.00 2.00 4.00
1.50 1.97 2.45
1.18 1.41 1.99
1.48 1.83 2.17
0.46 1.21 2.88
0.95 0.95 0.95
4.2 9.2 16.2 o c'= 0.27 (tsf) α = 20.2 o a = 0.3 (tsf) o c= 0.59 (tsf)
12/16/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 21.5Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
60-62Depth (ft):
Failure Criterion: Max. Stress Ratio
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.00071
14-210MU Sample #: 4 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 5.8Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
43.5
2.70
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.025
25.8
69.3Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/5/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
0.5
1.5
2.5
3.5
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.5
1.5
2.5
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
15.1 o
0.44
Before Consolidation A B C D E
1.43 1.44 1.44
2.87 2.87 2.87
41.8 43.9 43.3
78.8 76.7 77.1
1.14 1.20 1.19
1.42 1.42 1.40
2.83 2.82 2.78
39.8 41.0 37.5
81.2 80.0 83.7
1.08 1.11 1.01
9.1 6.2 9.1
1.00 2.00 4.00
1.50 1.97 2.45
1.18 1.41 1.99
1.50 1.97 2.45
0.46 1.21 2.88
0.95 0.95 0.95
5.3 4.6 3.2 o c'= 0.44 (tsf) α = 14.6 o a = 0.4 (tsf) o c= 0.55 (tsf)
12/16/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 15.1Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
60-62Depth (ft):
Failure Criterion: Max. Deviator Stress
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.00071
14-210MU Sample #: 4 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 7.6Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
43.5
2.70
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.025
25.8
69.3Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/5/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
0.5
1.5
2.5
3.5
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.5
1.5
2.5
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
26.9 o
0.06
Before Consolidation A B C D E
1.43 1.44 1.44
2.87 2.87 2.87
41.8 43.9 43.3
78.8 76.7 77.1
1.14 1.20 1.19
1.42 1.42 1.40
2.83 2.82 2.78
39.8 41.0 37.5
81.2 80.0 83.7
1.08 1.11 1.01
9.1 6.2 9.1
1.00 2.00 4.00
1.50 1.97 2.45
1.18 1.41 1.99
1.23 1.58 2.17
0.46 1.21 2.88
0.95 0.95 0.95
15.0 15.0 15.0 o c'= 0.06 (tsf) α = 24.3 o a = 0.1 (tsf) o c= 0.41 (tsf)
12/16/14
TRIAXIAL TEST ASTM: D 4767
Job No.
Date:
Rupture Envelope at Failure ------------ 26.9Effective φ':
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
60-62Depth (ft):
Failure Criterion: Given Strain of: 15%
(tsf)Apparent Cohesion, c' =
Strain Rate (%/min):
Strain Rate (in/min): 0.00071
14-210MU Sample #: 4 5T
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
_______ 7.7Total φ:
Angle of internal friction, φφφφ' =
CU w/pp
Soil Type: Fat Clay (CH)
Remarks: Radial drainage strips applied to trimmed specimen; Saturated, backpressured until "B" response was 0.95 to 1.00; Consolidated; All Drainage valves closed and immediately sheared.
X
43.5
2.70
Plasticity Index:
Height (in)
After Consolidation
Spec. Gravity :0.025
25.8
69.3Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/5/14
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Height (in)
Water Content (%)
Dry Density (pcf)
0.5
1.5
2.5
3.5
0.00 5.00 10.00 15.00 20.00
P o re P re s s u re ts f)
0.5
1.5
2.5
D e v ia to r
S tr e s s ts f)
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0 5 10 15 20 Axial Strain (%)
S tr e s s R a ti o
0 1 2 3 4 5 6 7 8 Normal Stress (tsf)
0 1 2 3 4 5
Normal Stress (p') (tsf)
S h e a r
S tr e s s q
0.18 0.35 0.17 0.18 0.52 0.26 0.18 0.78 0.39
0.35 0.48 0.25 0.35 0.76 0.41 0.36 1.11 0.63
0.53 0.58 0.30 0.53 0.91 0.51 0.54 1.37 0.85
0.71 0.67 0.34 0.71 1.06 0.59 0.72 1.59 1.05
0.88 0.73 0.37 0.89 1.16 0.65 0.90 1.76 1.20
1.06 0.80 0.39 1.07 1.26 0.70 1.08 1.88 1.32
1.23 0.85 0.41 1.24 1.34 0.74 1.26 2.00 1.44
1.41 0.90 0.42 1.42 1.42 0.77 1.44 2.09 1.53
1.59 0.96 0.43 1.60 1.51 0.80 1.62 2.18 1.62
1.76 1.02 0.44 1.77 1.58 0.83 1.80 2.24 1.70
1.94 1.06 0.45 1.96 1.64 0.85 1.98 2.29 1.76
2.12 1.10 0.46 2.13 1.70 0.87 2.16 2.34 1.82
2.29 1.15 0.46 2.31 1.74 0.89 2.33 2.37 1.87
2.47 1.19 0.46 2.48 1.78 0.90 2.51 2.40 1.92
2.65 1.23 0.46 2.66 1.82 0.91 2.69 2.43 1.97
2.82 1.27 0.46 2.84 1.85 0.92 2.87 2.44 2.01
3.00 1.31 0.46 3.02 1.88 0.93 3.05 2.45 2.05
3.17 1.33 0.46 3.20 1.90 0.94 3.23 2.45 2.08
3.35 1.37 0.45 3.37 1.92 0.95 3.41 2.45 2.11
3.53 1.40 0.45 3.55 1.93 0.95 3.59 2.44 2.14
3.88 1.44 0.43 3.90 1.96 0.97 3.95 2.43 2.19
4.23 1.48 0.42 4.26 1.96 0.97 4.31 2.43 2.24
4.59 1.49 0.41 4.61 1.97 0.98 4.67 2.42 2.29
4.94 1.50 0.40 4.97 1.97 0.99 5.03 2.41 2.32
5.29 1.50 0.38 5.32 1.97 1.00 5.39 2.40 2.36
5.64 1.48 0.37 5.68 1.95 1.01 5.75 2.40 2.40
6.35 1.46 0.35 6.39 1.93 1.03 6.47 2.38 2.46
7.05 1.43 0.34 7.10 1.90 1.04 7.18 2.38 2.51
7.76 1.40 0.34 7.45 1.88 1.05 7.90 2.38 2.56
8.47 1.36 0.33 7.81 1.87 1.06 8.62 2.38 2.60
9.17 1.33 0.33 8.16 1.86 1.07 9.34 2.38 2.64
9.88 1.30 0.33 8.52 1.85 1.07 10.06 2.36 2.66
10.58 1.29 0.34 8.87 1.83 1.08 10.78 2.31 2.69
11.29 1.26 0.34 9.23 1.83 1.09 11.50 2.26 2.72
11.99 1.25 0.35 9.58 1.81 1.09 12.21 2.22 2.74
12.70 1.24 0.35 9.94 1.80 1.10 12.93 2.19 2.76
13.40 1.23 0.36 10.29 1.78 1.11 13.65 2.18 2.77
14.11 1.23 0.36 10.65 1.77 1.12 14.37 2.17 2.79
15.87 1.21 0.37 11.36 1.73 1.13 16.16 2.17 2.82
17.64 1.20 0.38 12.07 1.69 1.13 17.96 2.09 2.85
19.40 1.19 0.39 12.78 1.64 1.14 19.76 2.00 2.87
20.00 1.18 0.39 13.49 1.61 1.15 20.00 1.99 2.88
14.20 1.58 1.16
15.97 1.51 1.18
17.74 1.47 1.19
19.52 1.43 1.21
20.00 1.41 1.21
Job:
Sample: 4 Depth: 60-62
12/16/14
Sample 5Sample 1 Sample 2 Sample 3 Sample 4
Triaxial Data
Boring: 14-210MU
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s f)
S tr a in
D e v ia to r
S tr e s s ts f)
P o re
P re s s
ASTM: D3080
Project/Client:
Boring #: Sample No. Depth:
Location: Sample Type:
Soil Type:
0.15 φ=φ=φ=φ= 21.7 deg. φ=φ=φ=φ= 19.5 deg.
Peak Conditions
Friction Angle: Friction Angle:
At Given Shear Disp. Of:
Apparent
Cohesion
0.017 TSF
Cohesion
TSF0.000
Apparent
X
0.97
2.50
"These tests are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design."
0.97Thickness (In.)
Water Content (%)
0.97
51.4
68.7 68.4
Initial
2.50 2.50Diameter (In.)
1/2/2014
Max Stress
Failure Criterion:
Fat Clay (CH)
5" TWT Date Reported:
Shear Rate
0.0003 (in/min)
69.3
43.5
2.70
25.8
Remarks: Specimens trimmed to given sizes; Inundated after applying normal load. Consolidated and sheared to given displacements at constant rate of 0.0003 inches/minute.
Plastic Limit:
Plasticity Index:
Specific Gravity:
Liquid Limit:
A B C D
69.5
53.0 53.8
50.6 46.9
0.95 0.93 0.91
51.8
Dry Density (pcf)
Before Shear
Thickness (In.)
Water Content (%)
Dry Density (pcf)
1.62
70.2 71.2 74.4
Normal Stress
Shear Stress 0.43 0.79
1.00 2.00 4.00
Direct Shear Test
Test Date:
Job No.:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing / USACE
14-210MU 60-62 12/18/2014
-0.07
-0.06
-0.05
-0.04
-0.03
-0.02
-0.01
0 0.05 0.1 0.15 0.2 0.25
C h a n g e i n T h ic k n e s s in c h
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
0 0.05 0.1 0.15 0.2 0.25 Shear Displacement (inch)
S h e a r
S tr e s s
T S
F
0.5
1.5
2.5
3.5
0 0.5 1 1.5 2 2.5 3 3.5 4
Normal Stress (TSF)
S h e a r
S tr e s s
T S
F
LL: PL: PI: Gs:
Organic Content (%): Initial Height (in.): Diameter (in.): eo=
Recompression Index (Cr):
2401 W 66th Street Richfield, Minnesota 55423-2031
Sample #: 1 Boring #: Job #: 9660
2.6949.5
1.107
22.7
Project: Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
14-210mu Depth ft: 20-22
0.09
Date: 12/17/14
Fat Clay (CH)
Initial W/C (%):
Soil Type:
Dry Density (pcf):41.4 79.7 72.2
0.746
Remarks: Testing performed in general accordance with ASTM:D2435
Preconsolidation Pressure (Pc): 3.5 tsf Compression Index (Cc): 0.48
2.506
Void Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of Pressure
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00
1.05
1.10
1.15
1.20
0.10 1.00 10.00 100.00
Pressure (tsf)
V o id R a ti o e
-4.4%
-2.4%
-0.4%
1.6%
3.6%
5.6%
7.6%
9.6%
11.6%
13.6%
15.6%
17.6%
19.6%
21.6%
23.6%
S e tt le m e n t
12/17/14
2401 W 66th Street Richfield, Minnesota 55423-2031
Project: Date:Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
Job #:Sample #: 20-221 Boring #: 14-210mu Depth ft:
Consolidation Log of Time CurvesConsolidation Log of Time CurvesConsolidation Log of Time CurvesConsolidation Log of Time Curves
0.1 1 10 100 1000 10000Time (min)
D e fo rm a ti o n
-4 i n
16 TSF: Cv =7.3 x 10 -5
(cm /sec)
8 TSF: Cv =1.7 x 10 -4
(cm /sec)
1 TSF: Cv =2.9 x 10 -4
(cm /sec)
2 TSF: Cv =2.2 x 10 -4
(cm /sec)
4 TSF: Cv =2.4 x 10 -4
(cm /sec)
Recompression Index (Cr):
2401 W 66th Street Richfield, Minnesota 55423-2031
Sample #: 2 Boring #: Job #: 9660
2.7249.1
1.265
27.8
Project: Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
14-210mu Depth ft: 30.5-32.5
0.10
Date: 12/17/14
Fat Clay (CH)
Initial W/C (%):
Soil Type:
Dry Density (pcf):46.7 75.0 76.9
0.747
Remarks: Testing performed in general accordance with ASTM:D2435
Preconsolidation Pressure (Pc): 3.4 tsf Compression Index (Cc): 0.60
2.506
Void Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of Pressure
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40
0.10 1.00 10.00 100.00
Pressure (tsf)
V o id R a ti o e
-6.0%
-4.0%
-2.0%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
14.0%
16.0%
18.0%
20.0%
22.0%
24.0%
26.0%
S e tt le m e
2401 W 66th Street Richfield, Minnesota 55423-2031
Project: Date:Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
Job #:Sample #: 30.5-32.52 Boring #: 14-210mu Depth ft:
Consolidation Log of Time CurvesConsolidation Log of Time CurvesConsolidation Log of Time CurvesConsolidation Log of Time Curves
0.1 1 10 100 1000 10000Time (min)
D e fo rm a ti o n
-4 i n
16 TSF: Cv =6.8 x 10 -5
(cm /sec)
8 TSF: Cv =1.5 x 10 -4
(cm /sec)
1 TSF: Cv =9.1 x 10 -4
(cm /sec)
2 TSF: Cv =4.4 x 10 -4
(cm /sec)
4 TSF: Cv =3.4 x 10 -4
(cm
Recompression Index (Cr):
2401 W 66th Street Richfield, Minnesota 55423-2031
Sample #: 3 Boring #: Job #: 9660
2.7060.3
1.512
30.7
Project: Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
14-210mu Depth ft: 45-47
0.15
Date: 12/17/14
Fat Clay (CH)
Initial W/C (%):
Soil Type:
Dry Density (pcf):55.6 67.1 91.0
0.748
Remarks: Testing performed in general accordance with ASTM:D2435
Preconsolidation Pressure (Pc): 2.9 tsf Compression Index (Cc): 0.73
2.503
Void Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of Pressure
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
0.10 1.00 10.00 100.00
Pressure (tsf)
V o id R a ti o e
-7.5%
-2.5%
2.5%
7.5%
12.5%
17.5%
22.5%
27.5%
S e tt le m e
2401 W 66th Street Richfield, Minnesota 55423-2031
Project: Date:Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
Job #:Sample #: 45-473 Boring #: 14-210mu Depth ft:
Consolidation Log of Time CurvesConsolidation Log of Time CurvesConsolidation Log of Time CurvesConsolidation Log of Time Curves
0.1 1 10 100 1000 10000Time (min)
D e fo rm a ti o n
-4 i n
16 TSF: Cv =6.1 x 10 -5
(cm /sec)
8 TSF: Cv =7.2 x 10 -5
(cm /sec)
1 TSF: Cv =5.9 x 10 -4
(cm /sec)
2 TSF: Cv =3.6 x 10 -4
(cm /sec)
4 TSF: Cv =2.6 x 10 -4
(cm
Recompression Index (Cr):
2401 W 66th Street Richfield, Minnesota 55423-2031
Sample #: 4 Boring #: Job #: 9660
2.7043.5
1.188
25.8
Project: Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
14-210mu Depth ft: 60-62
0.08
Date: 12/17/14
Fat Clay (CH)
Initial W/C (%):
Soil Type:
Dry Density (pcf):43.6 77.1 69.3
0.745
Remarks: Testing performed in general accordance with ASTM:D2435
Preconsolidation Pressure (Pc): 2.3 tsf Compression Index (Cc): 0.43
2.503
Void Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of PressureVoid Ratio and % Settlement vs. Log of Pressure
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00
1.05
1.10
1.15
1.20
1.25
1.30
0.10 1.00 10.00 100.00
Pressure (tsf)
V o id R a ti o e
-5.1%
-3.1%
-1.1%
0.9%
2.9%
4.9%
6.9%
8.9%
10.9%
12.9%
14.9%
16.9%
18.9%
20.9%
22.9%
S e tt le m e
2401 W 66th Street Richfield, Minnesota 55423-2031
Project: Date:Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
Job #:Sample #: 60-624 Boring #: 14-210mu Depth ft:
Consolidation Log of Time CurvesConsolidation Log of Time CurvesConsolidation Log of Time CurvesConsolidation Log of Time Curves
0.1 1 10 100 1000 10000Time (min)
D e fo rm a ti o n
-4 i n
16 TSF: Cv =1.6 x 10 -4
(cm /sec)
8 TSF: Cv =1.7 x 10 -4
(cm /sec)
1 TSF: Cv =7.1 x 10 -4
(cm /sec)
2 TSF: Cv =3.5 x 10 -4
(cm /sec)
4 TSF: Cv =3.0 x 10 -4
(cm
0.0 o
0.72
Before Consolidation A B C D E
1.44 1.43 1.44
2.86 2.87 2.87
41.7 42.4 41.3
79.4 78.7 79.8
1.12 1.13 1.11
0.50 1.00 2.00
1.45 1.15 1.73
1.06 0.77 0.91
1.45 1.15 1.73
4.2 4.2 5.6 o cu=
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Water Content (%)
Dry Density (pcf)
Height (in)
22.7
After Consolidation
Spec. Gravity :1.048Strain Rate (%/min):
Strain Rate (in/min): 0.03
Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/11/14
U-U
Fat Clay, gray (CH)
X
49.5
2.69
Plasticity Index:
Height (in)
72.2
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
Angle of internal friction, φφφφu =
14-210mu Sample #: 1 5T Depth (ft):
Soil Type:
Failure Criterion: Max. Deviator Stress
(tsf)Apparent Cohesion, cu =
Normal Stress (tsf)
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
12/23/14
TRIAXIAL TEST ASTM: D 2850
Job No.
Date:
Max. Pore Pressure Buildup (tsf)
Diameter (in)
0.0Total φu: 0.72 (tsf)
20-22
S h e a r S tr e s s ts f)
Deviator Stress (tsf)
Remarks: Specimens trimmed to given sizes; Allowed to adjust under applied confining pressures for about 10 minutes.
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
0 5 10 15 20
0.5
1.5
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 o
0.53
Before Consolidation A B C D E
1.44 1.43 1.44
2.86 2.87 2.87
41.7 42.4 41.3
79.4 78.7 79.8
1.12 1.13 1.11
0.50 1.00 2.00
1.45 1.15 1.73
1.06 0.77 0.91
1.21 0.89 1.10
15.0 15.0 15.0 o cu=
2401 W 66th Street Richfield, Minnesota 55423-2031
"These test results are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design"
Void Ratio
Pore Pressure Parameter "B"
Pct. Axial Strain at Failure
Diameter (in)
Water Content (%)
Dry Density (pcf)
Height (in)
22.7
After Consolidation
Spec. Gravity :1.048Strain Rate (%/min):
Strain Rate (in/min): 0.03
Test Date:
Test Type:
Liquid Limit:
Plastic Limit:
12/11/14
U-U
Fat Clay, gray (CH)
X
49.5
2.69
Plasticity Index:
Height (in)
72.2
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed Laboratory Soil Testing
Angle of internal friction, φφφφu =
14-210mu Sample #: 1 5T Depth (ft):
Soil Type:
Failure Criterion: Given Strain of: 15%
(tsf)Apparent Cohesion, cu =
Normal Stress (tsf)
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
12/23/14
TRIAXIAL TEST ASTM: D 2850
Job No.
Date:
Max. Pore Pressure Buildup (tsf)
Diameter (in)
0.0Total φu: 0.53 (tsf)
20-22
S h e a r S tr e s s ts f)
Deviator Stress (tsf)
Remarks: Specimens trimmed to given sizes; Allowed to adjust under applied confining pressures for about 10 minutes.
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
0 5 10 15 20
0.5
1.5 o
0.96
Before Consolidation A B C D E
1.43 1.44 1.44
2.87 2.87 2.87
44.1 44.4 43.8
77.2 76.5 77.1
1.20 1.22 1.20
0.50 1.00 2.00
2.00 1.88 1.90
0.85 0.96 0.95
2.00 1.88 1.90
4.9 4.9 4.2 o cu=
30.5-32.5
S h e a r S tr e s s ts f)
Deviator Stress (tsf)
Remarks: Specimens trimmed to given sizes; Allowed to adjust under applied confining pressures for about 10 minutes.
Water Content (%)
Dry Density (pcf)
Ultimate Deviator Stress (tsf)
Deviator Stress at Failure (tsf)
Void Ratio
Back Pressure (tsf)
0.0Total φu: 0.96 (tsf)
Normal Stress (tsf)
Max. Deviator Stress (tsf)
Minor Principal Stress (tsf)
12/23/14
TRIAXIAL TEST ASTM: D 2850
Job No.
Date:
Max. Pore Pressure Buildup (tsf)
Diameter (in)
Failure Criterion: Max. Deviator Stress
(tsf)Apparent Cohesion, cu =
Project:
Boring #:
Fargo-Moorhead Metro Flood Risk Management Project - Phase 2 Undisturbed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .