16-B-0001-0002.pdf
PDF 176 KB Posted
- Attached to
- Marsh Lake Ecosystem Restoration Phases 1 and 2 Federal contract opportunity
- Solicitation number
- W912ES-16-B-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_W912ES-16-B-0001.pdf | ||
| W912ES-16-B-0001_Amendment_0007.pdf | ||
| MLER_SJ101-P1_HALF.pdf | ||
| MLER_SJ101-P1_FULL.pdf | ||
| 16-B-0001-0006.pdf | ||
| CS205-A6.pdf | ||
| CS401-A6.pdf | ||
| 01_00_00.00_13_GENERAL_ATTACHMENTS_-_PERMITS.pdf | ||
| Plan_Sheet_CS401.pdf | ||
| 16-B-0001-0005.pdf | ||
| Plan_Sheet_CH101.pdf | ||
| 16-B-0001-0004.pdf | ||
| 16-B-0001-0003.pdf | ||
| 16-B-0001-0001.pdf | ||
| W912ES-16-B-0001_Specs.pdf | ||
| W912ES-16-B-0001_FullSize.pdf | ||
| W912ES-16-B-0001_HalfSize.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6761129348
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to update the w age rates and change the follow ing CLINs 0007, 0008, 0024, 0025, & 0041
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-16-B-0001
X 9B. DATED (SEE ITEM 11)
25-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Aug-2016
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 5TH STREET EAST
SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-16-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
MARSH LAKE ECOSYSTEM RESTORATION
MARSH LAKE, MINNESOTA
BIDDING SCHEDULE
ITEM ESTIMATED UNIT
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
BASE CONTRACT: PHASE 1
0001 Bonds (Performance and Payment) 1 Job
DRAWDOWN STRUCTURE
0002 Temporary Erosion Control Features 1 Job
0003 Drawdown Structure Upstream Cofferdam
0003AA First 17,400 CY 17,400 CY
0003AB Over 17,400 CY 5,800 CY
0004 Drawdown Structure Dewatering 1 Job
0005 Clearing and Grubbing 1 Job
0006 Stripping
0006AA First 800 CY 800 CY
0006AB Over 800 CY 300 CY
0007 Remove and Salvage Existing Riprap
0007AA First 400 CY 400 CY
0007AB Over 400 CY 150 CY
0008 Remove and Salvage Existing Gravel
0008AA First 150 CY 150 CY
0008AB Over 150 CY 70 CY
0009 Drawdown Structure 1 Job
0010 Drawdown Structure Sluice Gates 1 Job
0011 R20 Riprap 660 Ton
0012 B1 Bedding 210 Ton
0013 Aggregate Surface Course 75 CY
0014 Topsoil and Seeding 1 Job
OUTLET CHANNEL DOWNSTREAM OF
0015 Temporary Erosion Control Features 1 Job
0016 Clearing and Grubbing 1 Job
Inlet and Outlet Drawdown Structure Channel Excavation
0017AA First 20,000 CY 20,000 CY
0017AB Over 20,000 CY 3,000 CY
0018 R80 Riprap 1,520 Ton
0019 B2 Bedding 460 Ton
0020 Topsoil and Seeding 1 Job
ACCESS RAMP, ROAD, AND PARKING AREA WEST OF
0021 Temporary Erosion Control Features 1 Job
0022 Demolition of Fishery Control Structure 1 Job
0023 Stripping
0023AA First 400 CY 400 CY
0023AB Over 400 CY 150 CY
0024 Remove and Salvage Existing Riprap
0024AA First 400 CY 400 CY
0024AB Over 400 CY 150 CY
0025 Remove and Salvage Existing Gravel
0025AA First 150 CY 150 CY
0025AB Over 150 CY 70 CY
0026 Random Fill 7,550 CY
0027 R20 Riprap 1,000 Ton
0028 B1 Bedding 375 Ton
0029 Chinking Stone 25 Ton
0030 Aggregate Surface Course 320 CY
0031 Topsoil and Seeding 1 Job
0032 Bollards 1 Job
FISH PASSAGE AND FISH PASSAGE
EMBANKMENTS
0033 Temporary Erosion Control Features 1 Job
0034 Fish Passage Cofferdams 1 Job
0035 Fish Passage Dewatering 1 Job
0036 Demolition of Gauge Well 1 Job
0037 Demolition of Sluice Way Conduit 1 Job
0038 Concrete Notch Cutoff 1 Job
0039 Stripping
0039AA First 125 CY 125 CY
0039AB Over 125 CY 50 CY
Remove and Dispose of Existing Grouted Riprap
0040AA First 350 Tons 350 Ton
0040AB Over 350 Tons 100 Ton
0041 Remove and Salvage Existing Gravel
0041AA First 100 CY 100 CY
0041AB Over 100 CY 50 CY
0042 Fish Passage Excavation
0042AA First 1,200 CY 1,200 CY
0042AB Over 1,200 CY 400 CY
0043 Impervious Fill
0043AA First 6,000 CY 6,000 CY
0043AB Over 6,000 CY 1,000 CY
0044 Geotextile 6,220 SY
0045 Chinking Stone
0045AA First 900 Tons 900 Ton
0045AB Over 900 Tons 300 Ton
0046 R270 Riprap
0046AA First 7,500 Tons 7,500 Ton
0046AB Over 7,500 Tons 2,100 Ton
0047 B3 Bedding
0047AA First 2,500 Tons 2,500 Ton
0047AB Over 2,500 Tons 500 Ton
0048 Boulders
0048AA First 1,800 Tons 1,800 Ton
0048AB Over 1,800 Tons 500 Ton
0049 Aggregate Surface Course 25 CY
0050 Topsoil and Seeding 1 Job
0051 Pedestrian Bridge Abutments at Existing Dam 1 Job
0052 Fish Passage Tailwater Orifice Line 1 Job
EMERGENCY SPILLWAY
Remove and Dispose of Existing Grouted Riprap 10 Ton
0054 Remove and Salvage Existing Gravel 10 CY
0055 Pedestrian Bridge Abutments at Spillway 1 Job
TOTAL PRICE FOR BASE CONTRACT
(PHASE 1) BID ITEMS:
OPTION 1: PHASE 2
1001 Bonds (Performance and Payment) 1 Job
EMBANKMENT
1002 Temporary Erosion Control Features 1 Job
1003 Embankment Cofferdams 1 Job
1004 Embankment Dewatering 1 Job
1005 Stripping
1005AA First 9,000 CY 9,000 CY
1005AB Over 9,000 CY 11,500 CY
1006 Stripping Roadway Aggregate 950 CY
1007 Clearing and Grubbing 1 Job
Removal of Unsatisfactory Material for the Embankment Crossing at the Pomme de Terre Channel 1008AA First 10,000 CY 10,000 CY
1008AB Over 10,000 CY 5,500 CY
Removal of Unsatisfactory Material for the Embankment Crossing at
Marsh Lake 1009AA First 1,000 CY 1,000 CY
1009AB Over 1,000 CY 1,000 CY
1010 Inspection Trench 4,220 LF
1011 Impervious Fill
1011AA First 40,200 CY 40,200 CY
1011AB Over 40,200 CY 22,000 CY
1012 Random Fill
1012AA First 28,650 CY 28,650 CY
1012AB Over 28,650 CY 13,000 CY
1013 Aggregate Surface Course 4,450 CY
1014 R20 Riprap 1014AA First 4,000 Tons 4,000 Ton
1014AB Over 4,000 Tons 1,400 Ton
1015 B1 Bedding
1015AA First 2,000 Tons 2,000 Ton
1015AB Over 2,000 Tons 650 Ton
1016 Topsoil and Seeding 1 Job
1017 Remove Two 36" CMP Culverts 1 Job
1018 Signs 1 Job
EXISTING EMBANKMENT REMOVAL
1019 Temporary Erosion Control Features 1 Job
1020 Stripping
1020AA First 2,000 CY 2,000 CY
1020AB Over 2,000 CY 500 CY
1021 Stripping Roadway Aggregate 4,100 CY
1022 Clearing and Grubbing 1 Job
1023 Embankment Excavation 39,800 CY
1024 Topsoil and Seeding 1 Job
PARKING LOT ON WEST SIDE OF 240TH
AVE. SW
1025 Temporary Erosion Control Features 1 Job
1026 Stripping 1026AA First 300 CY 300 CY
1026AB Over 300 CY 150 CY
1027 Excavation of Parking Lot Swale 60 CY
1028 Random Fill 350 CY
1029 Aggregate Surface Course 180 CY
1030 Topsoil and Seeding 1 Job
1031 WMA Sign Board 1 Job
1032 Corner Posts 1 Job
RESTORATION OF POMME DE TERRE
RIVER ALIGNMENT
1033 Temporary Erosion Control Features 1 Job
1034 Excavation of Pomme de Terre Channel
1034AA First 18,375 CY 18,375 CY
1034AB Over 18,735 CY 11,025 CY
1035 R20 Riprap
1035AA First 2,940 tons 2,940 Ton
1035AB Over 2,940 Tons 315 Ton
1036 Channel Plugs 8 Each
1037 Toe Wood Structures 950 LF
255TH AVE SW RELOCATION
1038 Temporary Erosion Control Features 1 Job
1039 Stripping
1039AA First 1,200 CY 1,200 CY
1039AB Over 1,200 CY 500 CY
1040 Clearing and Grubbing 1 Job
1041 Random Fill 4,725 CY
1042 Aggregate Surface Course 325 CY
1043 Topsoil and Seeding 1 Job
1044 Signs 1 Job
TOTAL PRICE FOR OPTION 1 (PHASE 2)
BID ITEMS:
TOTAL PRICE FOR BASE (PHASE 1) AND OPTION 1
(PHASE 2) BID ITEMS:
The following have been modified:
WAGE RATES
General Decision Number: MN160118 07/29/2016 MN118
Superseded General Decision Number: MN20150118
State: Minnesota
Construction Type: Heavy Heavy including Water and Sewer Lines
Counties: Big Stone, Chippewa, Cottonwood, Grant, Jackson, Kittson, Lac Qui Parle, Lincoln, Lyon, Marshall, Murray, Nobles, Norman, Otter Tail, Pennington, Pipestone, Pope, Red Lake, Redwood, Rock, Roseau, Stevens, Swift, Traverse, Wilkin and Yellow Medicine Counties in Minnesota.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 06/17/2016 2 07/01/2016 3 07/29/2016
CARP0606-025 05/01/2015
BIG STONE, CHIPPEWA, COTTONWOOD, GRANT,JACKSON, LAC QUI PARLE,
LINCOLN, LYON, MURRAY, NOBLES, PIPESTONE, POPE, REDWOOD, ROCK,
STEVENS, SWIFT, TRAVERSE, YELLOW MEDICINE
Rates Fringes
CARPENTER (Form Work Only).......$ 26.62 15.68
CARP0606-026 05/01/2015
KITTSON, MARSHALL, NORMAN, OTTER TAIL, PENNINGTON, RED LAKE,
ROSEAU, WILKIN
CARPENTER (Form Work Only).......$ 26.15 16.15
ELEC0292-025 09/01/2008
BIG STONE, CHIPPEWA, LAC QUI PARLE, POPE, STEVENS, SWIFT
Rates Fringes
ELECTRICIAN
Electrical Contracts $300,000 and over...........$ 28.17 18.55 Electrical Contracts under
$300,000....................$ 27.04 18.27
* ELEC0343-023 07/01/2016
COTTONWOOD, JACKSON, LINCOLN, LYON, REDWOOD, YELLOW MEDICINE
Rates Fringes
ELECTRICIAN......................$ 32.70 14.92
ELEC0426-003 06/01/2016
MURRAY, NOBLES, PIPESTONE & ROCK COUNTIES
Rates Fringes
ELECTRICIAN
0 to 10 miles from Worthington, Minnesota, and 0 to 70 miles from Sioux Falls, South Daktoa...$ 22.19 10%+8.34 Remaining Area..............$ 27.31 1.5%+11.19
ELEC1426-005 06/01/2014
GRANT, KITTSON, MARSHALL, NORMAN, OTTER TAIL, PENNINGTON, RED
LAKE, ROSEAU, TRAVERSE & WILKIN COUNTIES
ELECTRICIAN......................$ 27.59 11.5%+8.20
ENGI0049-023 05/01/2016
Rates Fringes
OPERATOR: Power Equipment
GROUP 2.....................$ 26.35 18.90
GROUP 3.....................$ 25.42 18.90
GROUP 4.....................$ 25.11 18.90
GROUP 5.....................$ 23.40 18.90
GROUP 6.....................$ 22.80 18.90
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 2: Crane with over 135' Boom, excluding jib; Hydraulic Backhoe with shovel-type controls, 3 cubic yards and over;
Grader/Blade finishing earthwork and bituminous.
GROUP 3: Hydraulic Backhoe with shovel-type controls up to 3 cubic yards; Loader 5 cu yd and over (Excluding Sewer & Water lines); Mechanic; Tandem Scraper; Truck Crane;
Crawler Crane
GROUP 4: Bituminous Roller 8 tons & over; Elevating Grader;
Bobcat/Skid Steer Loader over 1 cu yd; Loader over 1 cu yd (Excluding Sewer & Water lines); Grader; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Loader over 1 cu yd (Excluding Sewer & Water lines); Tractor over 50 hp;
Bulldozer over 50 hp.
GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber Tire Roller; Bobcat/Skid Steer Loader up to 1 cu yd; Loader up to 1 cu yd (Excluding Sewer & Water lines); Tractor 50 hp or less; Bulldozer 50 hp or less.
GROUP 6: Oiler, Crane Oiler
CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;
CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM
UNDERGROUND WORK:
UNNELS, SHAFTS, ETC. - $ .25 PREMIUM
UNDER AIR PRESSURE - $ .50 PREMIUM
HAZARDOUS WASTE PROJECTS (PPE Required):
LEVEL A - $1.25 PREMIUM
LEVEL B - $ .90 PREMIUM
LEVEL C - $ .60 PREMIUM
IRON0512-012 05/01/2015
BIG STONE, CHIPPEWA, COTTONWOOD, GRANT, JACKSON, KITTSON, LAC
QUI PARLE, LINCOLN, LYON, MURRAY, NOBLES, OTTERTAIL,
PIPESTONE,POPE, REDWOOD, ROCK, STEVENS, SWIFT, TRAVERSE, YELLOW
MEDICINE
IRONWORKER, STRUCTURAL AND
REINFORCING......................$ 35.50 23.45
IRON0512-027 05/01/2015
MARSHALL, NORMAN, PENNINGTON, RED LAKE, ROSEAU, WILKIN
Rates Fringes
IRONWORKER, STRUCTURAL AND
REINFORCING......................$ 31.04 23.45
LABO0132-037 05/09/2016
Rates Fringes
LABORER (LANDSCAPE)..............$ 25.88 16.57
LABO0132-043 05/01/2012
COTTONWOOD, JACKSON, LAC QUI PARLE, LINCOLN, LYON, MURRAY,
NOBLES, PIPESTONE, REDWOOD, ROCK, AND YELLOW MEDICINE COUNTIES
LABORER (LANDSCAPE)..............$ 17.49 12.10
LABO0563-003 05/01/2014
BIG STONE, CHIPPEWA, GRANT, OTTER TAIL, POPE, STEVENS, SWIFT,
AND TRAVERSE COUNTIES
LABORERS
(2) Mason Tender - Cement/Concrete.............$ 20.20 13.88
(6) Pipelayer (Excluding Sewer & Water Lines)........$ 22.50 13.88
LABO0563-050 05/01/2016
BIG STONE, CHIPPEWA, GRANT, OTTER TAIL, POPE, STEVENS, SWIFT,
TRAVERSE, AND WILKIN COUNTIES
LABORER (LANDSCAPE)..............$ 21.39 14.80
LABO1097-003 05/01/2014
KITTSON, MARSHALL, NORMAN, PENNINGTON, RED LAKE, AND ROSEAU
COUNTIES
LABORERS
(2) Mason Tender - Cement/Concrete.............$ 20.20 13.88
(6) Pipelayer (Excluding Sewer & Water Lines)........$ 22.50 13.88
LABO1097-012 05/01/2014
KITTSON, MARSHALL, NORMAN, PENNINGTON, RED LAKE, AND ROSEAU
COUNTIES
LABORER (LANDSCAPE)..............$ 20.00 13.88
SUMN2009-090 09/28/2009
Rates Fringes
LABORER: Common or General (Excludes Water & Sewer Lines)...$ 15.58 5.67
TRUCK DRIVER: Straight Truck....$ 16.05 0.00
WATER & SEWER LINES:
Laborer, Common or General.......$ 13.66 5.92
WATER & SEWER LINES:
Laborer, Pipelayer...............$ 15.63 5.92
WATER & SEWER LINES:
Operator - Loader/Front End Loader...........................$ 17.56 7.55
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .