AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is to 1) update Specification Section language; 2) Issue Revised Draw ings; 3) Add an Option; and 4) Add an Interim Completion Date and change the final completion date. (See SF30 Continuation Page for details).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Nov-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-13-B-0008
X 9B. DATED (SEE ITEM 11)
04-Oct-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Nov-2013
CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-13-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
Revised Drawings:
C406 C503 (Attached)
Specification Changes:
Underlined text is added and strikethrough text is deleted.
1. Bid schedule has been revised as follows:
Add the following bid item:
1001 Optional Item ‐ Placement of
Acceptable Excavated Material at Alternate Site
14,300 CY
See attached revised bid schedule.
2. Section 01 00 00.00 13 – Paragraph 3.3 OTHER CONTRACTS
Add the following to the list of other contracts:
Construction Contract for Site Preparation and Grading at Alternate Placement Site.
3. Section 01 22 00.00 13 – Paragraph 1.7.2 Diversion Channel Excavation
Modify the Payment Paragraph (add last sentence) as follows:
Payment: Payment will be made for furnishing all materials, equipment and labor and performing all operations necessary for excavating the diversion channel as shown and specified. Items of work include, but are not limited to, diversion channel excavation, excavation for riprap, riprap bedding and geotextile as specified and as indicated on the drawings. Stockpiling of excavated materials for reuse and disposing of excess, unsuitable, and frozen excavated materials will be incidental to the price bid for excavation. Diversion channel excavation does not include excavation for off‐site borrow excavation and any other excavation which is included under another bid item.
The piezometers, dewatering trench (including the dewatering trench in the area identified for topsoil and seed near TH 11), and dewatering during excavation, stockpiling of excavated materials for reuse and disposing of excess, unsuitable, and frozen excavated materials will be incidental to the price bid for diversion channel excavation. Acceptable materials shall be incorporated in the work insofar as possible and excess material shall be transported to designated spoil piles within the work limits.
Additional costs associated with transportation of excavated material to the alternate placement site shall be included in the price for Optional Item – Placement of Acceptable Excavated Material at Alternate Site.
4. Section 01 22 00.00 13 – Add Paragraph 1.7.7 as follows:
1.7.7 Optional Item – Placement of Acceptable Excavated Material at Alternate Site Payment: Payment will be made for furnishing all materials, equipment and labor and performing all operations necessary for transporting and placing acceptable excavated material material at the alternate placement site indicated in the attachment to the specifications. Items of work include, but are not limited to, transportation to the alternate placement site and any other operations required to facilitate hauling the material to the alternate site and measuring the material to be hauled as specified.
Measurement: Hauling of material to the alternate site shall be measured for payment by the cubic yard in the original position within the channel reach to be excavated during these hauling operations. Quantity surveys shall be performed immediately prior to beginning the hauling operation and immediately following the completion of the hauling operation. The quantity to be paid will be determined by determining the volume between the DTM surfaces generated from these quantity surveys.
5. Section 31 00 00.00 13 – Add Paragraph 3.7.4 as follows:
3.7.4 Alternate Placement Site – Optional Item
If the option for the Alternate Placement Site is exercised, the Contractor shall transport the volume of acceptable excavated material listed in the bid schedule to the location shown on the map attached at the end of this section. Grading, placement in lifts and compaction of the material is not required. Clearing and grubbing of the alternate placement area prior to placement of material is not required. All site preparation and grading will be done by others. The Contractor shall notify the Contracting Officer a minimum of 7 calendar days in advance of beginning these hauling operations. The Contractor shall coordinate with other contractors preparing the alternate placement site to ensure that the material is placed in a location acceptable to the contractor preparing the alternate placement site and schedule the hauling operations to provide for a minimum of delays and interferences. Coordination shall be through the Contracting Officer.
3.7.4.1 Schedule and Operational Requirements
The Contractor will be notified whether the option will be exercised no later than April 30th, 2014. Once the Contractor’s hauling operations for the alternate placement site commence, they shall be performed continuously until completed, and shall be completed within 20 working days. If the option is exercised, the Contractor shall complete the hauling and dumping operations no later than July 31, 2014. Excavated material shall not be hauled to any other sites during the period that hauling to the alternate placement site is taking place, except that topsoil stripped ahead of the excavation may be hauled to other areas within the project limits. The Contractor shall be responsible for planning his operations in an efficient manner that results in the proper amount of material being hauled to the alternate placement site.
3.7.4.2 Acceptable Excavated Material
Acceptable excavated material to be hauled to the alternate placement site shall be classified as CL or CH under the Unified Classification System. The borings show areas of gravelly sand and silt above the channel bottom. Should the contractor run into pockets of material classified as coarse grained or silts under the Unified Classification System in the channel excavation during the period when hauling to the alternate placement site, the Contractor shall adjust the excavation depth or areas of excavation to avoid these materials.
3.7.4.3 Determination of Quantity Hauled
The quantity of material hauled to the alternate placement site shall be determined by surveying the channel reach to be excavated during these hauling operations prior to starting the hauling operation and after the topsoil has been stripped. A second survey shall take place following the completion of the hauling operation. Quantity surveys shall be performed in accordance with section 01 71 23.00 13 CONTRACTOR SURVEYS.
6. Section 32 92 19.00 13 – Edit Paragraph 3.1.2 as follows:
3.1.2 Seeding Time
Season of planting for each seed mixture shown shall be as specified in MNDOT 2575.
The season of planting for the Diversion Channel Bottom Wet Mix shall be April 15 – July 20 and September 20 – October 20. No finished construction area shall be left untopsoiled and unseeded during the winter months. When substantially complete areas are not seeded within the specified seeding times for fall planting, a temporary winter cover shall be placed.
7. Section 32 92 19.00 13 – Edit the table in Paragraph 2.2.2 as follows:
2.2.2 Permanent Seed Mixtures
Mixture: Diversion Channel Bottom Wet Mix
Common Name Rate (lb/ac) % of Mix (% by wt)
Northern Water Plantain
0.38 1.13
Ditch Stonecrop 0.06 0.18
Pinkweed 0.19 0.56
Great Bur Reed 1.75 5.20
American Sloughgrass 1.00 2.97
Fringed Brome 0.28 0.83
Blue Joint Grass 0.13 0.39
Bebb’s Sedge 0.06 0.18
Bottlebrush Sedge 0.13 0.39
Broom Sedge 0.06 0.18
Fox Sedge 0.31 0.92
Blunt Spikerush 0.13 0.39
Virginia Wild Rye 1.00 2.97
Switchgrass 0.03 0.09
Fowl Bluegrass 1.50 4.46
Green Bulrush 0.13 0.39
Prairie Cordgrass 1.50 4.46
Oats (cover crop)** 25.0 74.32
GRAND TOTAL 33.63 100.00
**For fall planting, substitute Winter Wheat for Oats
8. Section 32 92 19.00 13 – Edit Paragraph 3.6.2 as follows:
3.6.2 Mowing
Mowing of areas seeded with Mix 280 (modified) shall be done as needed to maintain lawn areas at a nominal height of 6 inches until final acceptance, except not more than 1/3 of the grass leaf shall be removed by the initial cutting. Clippings shall be removed when the amount of cut turf is heavy enough to damage the turfed areas. Areas seeded with Mix 280 (modified) shall be mowed immediately prior to final inspection. Areas seeded with mix 150 do not require mowing. Areas seeded with the Diversion Channel Bottom Wet Mix shall be mowed at a nominal height of 6 – 8 inches once per month in
May, June, July, August, and September, beginning no sooner than 30 days after planting.
9. Section 32 92 19.00 13 – Edit Paragraph 3.8 as follows:
3.8 ACCEPTANCE
Turf establishment after seeding shall extend for 12 months after completion of the seeding on the entire project, unless desired growth is established, and shortening the period of the Contractor's responsibility for acceptably established areas is authorized by the Contracting Officer. Grass plants shall be evaluated for species and health when the grass plants are a minimum 1 inch high.
An acceptable stand of turf for the seed mixtures specified for this project other than the Diversion Channel Bottom Wet Mix is defined as a minimum of 2 to 4 plants per square foot and where no gaps larger than 6‐inches in diameter occur anywhere in the turfed area a spacing of 1 – 6 inches between plants in each row and a maximum spacing of 8 inches between rows for areas that are planted using a seed drill. For areas planted by broadcast seeding, a stand of turf is considered acceptable when the area required to be seeded has produced the specified species over a minimum of 75 percent of the total area.
Seventy‐five percent coverage shall be confirmed by the use of a 1 meter square with 100 blocks of 100cm2 (10 cm grid). Measurements shall be made at random locations determined by the Government. If 25 blocks of the 1‐ meter square do not contain the specified plants, that section shall be deemed unacceptable. The plants shall be one or more of the species listed in the specified seed mixtures.
An acceptable stand of turf for the Diversion Channel Bottom Wet Mix is defined as emergent growth of native seedlings spaced 1 – 6 inches apart within each row, and a maximum spacing of 8 inches between rows for areas that are planted using a seed drill. For areas planted by broadcast seeding, a stand of turf is considered acceptable when the area required to be seeded has produced the specified species over a minimum of 75 percent of the total area.
Seventy‐five percent coverage shall be confirmed by the use of a 1 meter square with 100 blocks of 100cm2 (10 cm grid). Measurements shall be made at random locations determined by the Government. If 25 blocks of the 1‐ meter square do not contain the specified plants, that section shall be deemed unacceptable. In addition, for any seeding method, a minimum of 50% of the specified species planted shall be alive and present, and a minimum of 50% of the vegetation shall be the permanent species. The permanent species refers to the specified species other than oats or winter wheat.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required performance has changed from Roseau Flood Risk Management, Reach 1A, Roseau, Minnesota. The work includes but is not limited to construction services to complete approximately 1,200 feet of the Roseau diversion channel. The channel is approximately 17 feet deep in this reach. Work includes approximately 250,000 cubic yards of excavation. A permanent subterranean drainage system is required and the contractor will need to apply expertise in managing high ground water levels within the excavation area. The estimated price range for this acquisition is between $1,000,000 and $5,000,000. The North American Industry Classification System (NAICS) code is 237990 with a small business size standard of $33.5 million. This solicitation is being issued as an Invitation for Bids (IFB) and is 100% set aside for HUBZone small business concerns. to Roseau Flood Risk Management, Reach 1A, Roseau, Minnesota. The work includes but is not limited to construction services to complete approximately 1,200 feet of the Roseau diversion channel. The channel is approximately 17 feet deep in this reach. Work includes approximately 250,000 cubic yards of excavation. A permanent subterranean drainage system is required and the contractor will need to apply expertise in managing high ground water levels within the excavation area. There is one option to haul material to an alternate placement site. The estimated price range for this acquisition is between $1,000,000 and $5,000,000. The North American Industry Classification System (NAICS) code is 237990 with a small business size standard of $33.5 million. This solicitation is being issued as an Invitation for Bids (IFB) and is 100% set aside for HUBZone small business concerns..
CLIN 1001 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1001 14,300 Cubic
Yard
OPTION Option Item -Placement of Acceptable
FFP
Excavated Material at Alternate Site FOB: Destination
NET AMT
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
31-DEC-2016 1 N/A
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
20-SEP-2015 1 N/A
The following Delivery Schedule item for SUBCLIN 0002AA has been changed from:
31-DEC-2016 30,000 N/A
20-SEP-2015 30,000 N/A
The following Delivery Schedule item for SUBCLIN 0002AB has been changed from:
31-DEC-2016 9,000 N/A
20-SEP-2015 9,000 N/A
The following Delivery Schedule item for SUBCLIN 0003AA has been changed from:
31-DEC-2016 195,000 N/A
20-SEP-2015 195,000 N/A
The following Delivery Schedule item for SUBCLIN 0003AB has been changed from:
31-DEC-2016 59,500 N/A
20-SEP-2015 59,500 N/A
The following Delivery Schedule item for CLIN 0004 has been changed from:
The following Delivery Schedule item for SUBCLIN 0005AA has been changed from:
31-DEC-2016 200,000 N/A
20-SEP-2015 200,000 N/A
The following Delivery Schedule item for SUBCLIN 0005AB has been changed from:
31-DEC-2016 65,000 N/A
20-SEP-2015 65,000 N/A
The following Delivery Schedule item for CLIN 0006 has been changed from:
31-DEC-2016 2,140 N/A
20-SEP-2015 2,140 N/A
The following Delivery Schedule item for CLIN 0007 has been changed from:
31-DEC-2016 4,350 N/A
20-SEP-2015 4,350 N/A
The following Delivery Schedule item for SUBCLIN 0008AA has been changed from:
31-DEC-2016 450 N/A
20-SEP-2015 450 N/A
The following Delivery Schedule item for SUBCLIN 0008AB has been changed from:
31-DEC-2016 1,350 N/A
20-SEP-2015 1,350 N/A
The following Delivery Schedule item for CLIN 0009 has been changed from:
The following Delivery Schedule item for CLIN 0010 has been changed from:
The following Delivery Schedule item for CLIN 0011 has been changed from:
20-SEP-2016 1 N/A
The following Delivery Schedule item has been added to CLIN 1001:
31-JUL-2014 14,300 N/A
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 1001:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following have been modified:
BID SCHEDULE
Roseau Flood Risk Management Reach 1A Bid Schedule
ITEM DESCRIPTION QUANTI
TY
UNIT UNIT PRICE AMOUNT
0001 Clearing and Grubbing 1 LS ______.__ _______.__
0002AA
0002AB
Stripping Up to 30,000 Cubic Yards Over 30,000 Cubic Yards
30,000 9,000
CY
0003AA
0003AB
Diversion Channel Excavation Up to 195,000 Cubic Yards Over 195,000 Cubic Yards
195,000 59,500
0004 Topsoil 1 LS ______.__ _______.__
0005AA
0005AB
Spoil Pile Grading Up to 200,000 Cubic Yards Over 200,000 Cubic Yards
200,000 65,000
0006 Multi‐Use Trail 2,140 SY ______.__ _______.__
0007 Trench Drain 4,350 LF ______.__ _______.__
0008AA
0008AB
Channel Slope Toe Protection Up to 450 Lineal Feet Over 450 Lineal Feet
LF
LF
0009 Landscaping 1 LS ______.__ _______.__
0010 Site Furnishings 1 LS ______.__ _______.__
0011 Turf Establishment 1 LS ______.__ _______.__
Total Amount for Reach 1A Base (CLINS 0001‐0011) $_______._
Option Item – Placement of Acceptable Excavated Material at Alternate Site
14,300
Total Amount for Reach 1A Base and Option $_______._
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
SECTION 00700 - CONTRACT CLAUSES
52.211-13 TIME EXTENSIONS (SEP 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
(End of clause)
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and
(c)(1) complete all work, excluding turf establishment, ready for use no later than 20 September 2015, and
(c)(2) complete the turf establishment, ready for use not later than 20 September 2016.
The times stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 30 December 2013. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,935.62 for each calendar day of delay until the work is completed or accepted for the work to be completed by 20 September 2015 and $153.24 for each calendar day of delay until the work is completed or accepted for the work to be completed by 20 September 2016.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
52.217-4000 OPTION FOR ADDITIONAL WORK (Construction) (AUG 2000)
The Government may require the Contractor to perform the work identified as optional item(s) (CLIN(s) 1001) at the price stated in the Schedule. The Contracting Officer may exercise the option(s) by written notice to the Contractor at any time, including at time of award, but no later than 30 April 2014.
(End of Summary of Changes)