W81G6710104889
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to revise Specifications as described herein.
SEE SF30 BLOCK 14 CONTINUATION PAGE FOR DETAILS.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Apr-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-11-R-0001
X 9B. DATED (SEE ITEM 11)
12-Apr-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Apr-2011
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 5TH STREET EAST
SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-11-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SPECIFICATION CHANGES
Note: Additions are shown as underlined.
a. SECTION 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
Add Paragraph 3.1.4 ELECTRICAL CHARACTERISTICS as follows:
Contractor shall remove the existing electrical service to the three-pole, double-throw, non-fused switch in the existing laboratory building. The contractor shall leave in place the double throw, non-fused switch, the three-wire, three-pole weatherproof receptacle and the 240/120V, single phase distribution panel. The loads to be retained in the panel shall be coordinated with the Government. The contractor shall install a new three-phase, 480 Volt Alternating Current, 60 hertz electrical service sized as required for the new WWTP and any loads that remain on the existing 240/120 volt single-phase system. The contractor shall install a new three-phase, four-wire service entrance panelboard sized in accordance with this paragraph and in coordination with the power company. The contractor shall install a connection box with terminals to allow for connection of a three-phase generator with separate equipment ground bus. The connection box shall be sized for the service panelboard loads. The contractor shall install in the panelboard a Main Circuit Breaker and a Generator Circuit Breaker. The contractor shall provide a mechanical interlock between the Main Circuit Breaker and the Generator Circuit Breaker such that both circuit breakers cannot be energized at the same time. The contractor shall install a step down 480/240/120 Volt single-phase transformer sized for the existing 240/120 Volt single-phase loads and connect to the existing three-pole, double-throw, non-fused switch. The contractor shall ensure that electrical power is restored to all equipment disrupted or disturbed but not removed by this contract. All removed equipment shall become the property of the contractor.
b. SECTION 01 22 00.00 13 MEASUREMENT AND PAYMENT
Revise paragraph 1.3.1 REMOVAL OF EXISTING WWTP to read as follows:
Payment will be made on a lump sum basis for furnishing all materials, equipment, and labor and performing all operations necessary to remove and properly dispose of the existing WWTP, and appurtenances including concrete, piping, and conduit as described in these specifications and in accordance with all local, state, and federal regulations. The payment shall also include the complete disposal of the wastewater in the existing WWTP including cleaning of the WWTP in accordance with all local, state, and federal regulations.
(End of Summary of Changes)