UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: ANDSF O&M W912ER20R0011 Review: W912ER20R0011 (00001) (sorted by CommentID ) Displaying 152 inquiries.
Id Discipline Sheet Detail Spec
8589294 General 20 Proposal Due Date NA
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP page 20 shows the proposal due date as 06 July 2020, but the website indicates Jun 25. Please clarify.
On: May 20 2020.
Government Response. . An amendment will be forthcoming to address this discrepancy and clarify the proposal due date. On: May 20 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8592314 General NA NA NA Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation page 7 lists some countries including Afghanistan, that their citizens undergo additional levels of security screening and/or may be prohibited access to the project site. In regard to this specific requirement, is local Afghan firms eligible to submit a proposal as a prime offeror?
On: May 21 2020.
Government Response. . Yes, local Afghan firms are eligible to submit a proposal as a prime offeror. On: May 22 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8592434 Contracting 24 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation Page 24 states:
Each project submitted under Factor 1- Experience "must represent a minimum value of $5 million per year". Pleae clarify whether the required $5M magnitude is for each year of the contract or the total dollar amount of the project?
On: May 21 2020.
Government Response. . The Factor 1- Experience minimum value of $5 million per year means that a project submitted under experience must have the required $5M magnitude for each year of the contract. As an example, a contract for $10 million dollars for three years would not qualify. On: May 22 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8595410 Contracting Attachment G Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Attachment G - Responsibility Questionnaire, Page 3, Para D.1. States -
"Whether the Offeror currently, or previously on any of its currently administered contracts identified in paragraph "d", has any subcontractors or suppliers that have been unpaid for a duration longer than the time required by the contract for payment."
Paragraph "d" doesn't require any listing of suppliers or subcontractors. Please confirm it refers to listing asked under Paragraph "c".
On: May 22 2020.
Government Response. . Yes, Attachment G - Responsibility Questionnaire, Page 3, Para D.1. refers to the listing asked under Paragraph "c". On: May 22 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8597529 Contracting Attachment G - Responsibility Questionnaire
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 1 of 34ProjNet: Logged In User
6/24/2020https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...
Attachment G, page 2, para b.2 requires "Evidence of the Offeror's financial resources". Which of the following are acceptable:
balance sheet, statement of cash flow, income statement, and/or a bank statement? And, what is the minimum liquidity/amount that an offeror should have in their balance for a positive rating?
On: May 24 2020.
Government Response. . This will be corrected in a forthcoming amendment. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598583 General Attachment B Project Experience Information Sheet
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Attachment B requests details on the company's role and activities during "construction of the project" and specifically roles and responsibilities in the "design portion of the contract." Given that this solicitation is not for construction services, will the government change these instructions to allow offerors to focus on detailing their experience that is relevant to the types of O&M services described in the PWS?
On: May 26 2020.
Government Response. . This will be corrected in a forthcoming amendment.
The text will be changed to:
Provide details of your company's role and activities during the performance of Operations and Maintenance (O&M) services on the listed project: (Describe your role in this project. Include whether your firm participated as a prime or a subcontractor. SPECIFICALLY describe your roles and responsibilities in the O&M portion of the contract. Provide details for any past performance problems encountered and the corrective actions taken. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598587 General RFP page 25
Factor 2 – Phase-in and
Organization Plan Submission
Requirements, paragraph i
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Offerors are instructed to submit a phase-in plan in accordance with PWS "Section C-2.2.1, Phase-In Planning." However, PWS Section C-2.2.1 is titled "Notification." Please confirm the PWS section being referenced for the phase-in plan should be C-2.1.1.
On: May 26 2020.
Government Response. . Confirmed. This language will be revised in a forthcoming amendment. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598591 General RFP page 25
Factor 2 – Phase-in and
Organization Plan Evaluation
Requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP states that greater weight will be placed on a "proposal that demonstrates the Offeror's ability to provide full contract performance for the decisive site list following the phase-in period (on day 46)." All other references to the phase-in period specify 60 days. Please confirm if the government intentionally stated "day 46" in the evaluation description or if this should be day 61.
On: May 26 2020.
Government Response. . The solicitation requirement is for a contractor to provide full contract performance for the decisive site list following the phase-in period (on day 61). For proposal evaluation purposes greater weight will be placed on a "proposal that demonstrates the Offeror's ability to provide full contract performance for the decisive site list following the phase-in period (on day 46)." If a vendor can show that they can start full contract performance for the decisive site list following the phase-in period (on day 46) instead of the required 61 days; greater weight will be placed on a proposal evaluation. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598597 General RFP page 26 Factor 3 –
Management Approach
Submission
Page 2 of 34ProjNet: Logged In User
Requirements, paragraph i, Management
Approach Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP states: "Offeror shall provide a narrative to the PWS requirements that demonstrates an understanding of the methodology and scope of services outlined in the solicitation as part of Factor 2." Please confirm the reference to Factor 2 in this sentence should be Factor 3.
On: May 26 2020.
Government Response. . Confirmed. This language will be corrected in a forthcoming amendment. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598601 General RFP page 30
Past Performance Evaluation
Procedures, Adjectival Ratings and Descriptions
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In defining recency, paragraph a states: "...or (2) is currently under construction and is at least 80% complete." As this solicitation is for O&M services, will the government change "currently under construction" to "currently ongoing"?
On: May 26 2020.
Government Response. . Yes, language will be revised to read "Is currently performing O&M services that are at least 80% complete or on-going." On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598604 General RFP pages 21 and 32
Proposal Submission
Requirements, Volume 3 – Price, TAB 2; Factor 5 –
Price Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The instructions on page 21 require the submission of SF 33, Solicitation, Offer, and Award. The instructions on page 32 require the submission of Solicitation, Offer, and Award (SF 1449). Please confirm the references to SF 33 on page 21 should be SF 1449, which is what has been included with this solicitation.
On: May 26 2020.
Government Response. . The solicitation is on Standard Form (SF) 1449 and the solicitation amendments are on SF 30 and will be corrected in a forthcoming amendment. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598612 General RFP page 32 Factor 5 – Price Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP instructs offerors to complete blocks 14-20c on the SF 1449. Block 20c does not exist. Blocks 14-16 and 18 are not for offerors to fill in. Please clarify the blocks that must be completed by the offeror.
On: May 26 2020.
Government Response. . The correct boxes for offerors to fill in are boxes 30a, 30b, and 30c of the SF 1449 and blocks 15A, 15B and 15C of the solicitation amendment(s), SF 30. This language will be corrected in a forthcoming amendment. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598621 General RFP pages 21 and 32
Proposal Submission
Requirements, Volume 3 – Price, TAB 3; Factor 5 –
Price Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 3 of 34ProjNet: Logged In User
Instructions on page 21 require the completed Attachment E, Price List. Instructions on page 32 require the Price Breakdown Sheet (Attachment 1). Please clarify if offerors should submit the completed Attachment E, Attachment 1, or both.
On: May 26 2020.
Government Response. . Offerors shall submit Attachment E (O&M Pricing Schedule) with their proposals in Excel format. Attachment 1 (Task Order O&M Pricing Schedule (Post-Award)) will only be used after contract award for new task orders and change orders. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598624 General Attachment E and Attachment 1 Price List and
Price Breakdown Sheet
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The file named "ATT E O-M Pricing Sched W912ER20R0011" is titled Attachment 1 on line 1 of sheet 1. The file named "Att 1 - Task Order Pricing Schedule (Post-Award)" is titled Attachment E on line 1 of sheet 1. Please clarify which file is Attachment E and which is Attachment 1.
On: May 26 2020.
Government Response. . Offerors shall submit Attachment E (O&M Pricing Schedule) with their proposals in Excel format. Attachment 1 (Task Order O&M Pricing Schedule (Post-Award)) will only be used after contract award for new task orders and change orders. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598629 General RFP page 20 Format Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP requires proposals to be submitted as three separate files in PDF (or comparable) format. Please confirm that in addition to the three separate files in PDF format, offerors should submit Attachment E and/or Attachment 1 in Excel format.
On: May 26 2020.
Government Response. . Confirmed. Offerors shall submit Attachment E (O&M Pricing Schedule) with their proposals in Excel format. Attachment 1 (Task Order O&M Pricing Schedule (Post-Award)) will only be used after contract award for new task orders and change orders. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598631 General RFP page 23 Proposal
Submission Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the 4th bullet under the summary of formatting requirements, the RFP states "Pages larger than 8.5 x 11 shall count as two pages." In the paragraph right before Evaluation Factors, the RFP states: "11X17 folded pages are acceptable for tables/graphic representations and will not count towards page limitations." Please confirm that 11x17 foldout pages that contain tables or graphics will not count towards any page limitations.
On: May 26 2020.
Government Response. . Confirmed. 11x17 foldout pages that contain tables or graphics will not count towards any page limitations. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598634 General RFP pages 19 and 20
Location for Receipt of Proposals;
Format Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On page 19, the RFP instructs offerors to submit proposals directly to the Contracting Officer and Contract Specialist via email. On page 20, offerors are instructed to submit proposals through the DoD Secure Access File Exchange (SAFE) site. Please clarify if offerors should email proposals to the Contracting Officer and Contract Specialist in addition to submitting through the SAFE site.
On: May 26 2020.
Government Response. . Offerors are instructed to submit proposals through the DoD Secure Access File Exchange (SAFE) site. Please do not email proposals to the Contracting Officer and Contract Specialist. Submit proposals through the SAFE site. On: May 28 2020 Current Request Status: Request Closed
Page 4 of 34ProjNet: Logged In User
Information for this report is procurement sensitive.
8598636 General RFP page 23 Proposal
Submission Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What is the font requirement for figure/graphic captions and callout boxes?
On: May 26 2020.
Government Response. . Font size 10 for spredsheets, diagrams, tables. 11" x 17" may be used for charts, diagrams, spreadsheets and tables with a 10 point font minimum. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8598641 General RFP page 23 Proposal
Submission Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We respectfully request that document headers/footers be exempt from the 12 pt. font/text requirement.
On: May 26 2020.
Government Response. . Margins are 1" Top, Bottom, Right & Left, which should not affect the font size of the headers or footers. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600923 Contracting RFP Page 25
Factor 2 - Phase-in and
Organization Plan Evaluation
Requirements Comment Classification: UNCLASSIFIED (U)
The government's additional evaluation weight for those offerors with current or site access within the last 12 months appears to favor the incumbent and unfairly limits competition. Will the government remove this additional weighting factor to make it a level competition?
On: May 26 2020.
Government Response. . The Government does not favor any prospective offeror. Five total considerations are identified for which the Government will give greater weight, one of which deals with base access. The Government will not remove this greater weight consideration. Greater weight will be given to Offerors who can demonstrate current base access within the past year in Afghanistan. For Afghan bases and U.S. bases, both carry equally, greater weight. On:
Jun 24 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600925 Contracting RFP Page 8, Paragraph 9 Deployment Processing
Through CRC Comment Classification: UNCLASSIFIED (U)
Using the CRC link provided in this paragraph, would the government confirm that all the clothing and equipment listed under the KTR-CRC Contractor tab is government furnished?
On: May 26 2020.
Government Response. . Yes, as a non-CAAF contractor, the PPE in the KTR-CRC tab will be provided. The contractor will be responsible for signing for the PPE and is also responsible for returning all PPE issued upon redeployment. Contractors Authorized to Accompany Forces (CAAF) does not apply to this contract; therefore, military PPE will not be authorized (i.e , CBRN protective ensemble, body armor, ballistic helmet). If a contractor EXPAT has been previously issued PPE from a prior deployment, the contractor is required to bring it to CRC, regardless of which CRC it came from. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600929 Contracting RFP Page 18, Paragraph 4 CRC Processing and Departure
Points Comment Classification: UNCLASSIFIED (U)
Page 5 of 34ProjNet: Logged In User
Where is the DoD approved Non-CRC deployment center that is to be used for processing all OCN personnel?
On: May 26 2020.
Government Response. . This contract does not require OCNs to process through a deployment center. On: Jun 09 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600932 Contracting RFP Page 32 Factor 5 - Price Comment Classification: UNCLASSIFIED (U)
Usually either an SF1449 or an SF33 is required. In this case, the government provides and references SF 1449 on page 32, but states an acknowledged SF33 on page 21 as part of the requirements. Please confirm whether the SF1449 or the SF33 is required.
On: May 26 2020.
Government Response. . The solicitation is on a Standard Form (SF) 1449 and the solicitation amendment(s) are on a (SF) 30 and will be corrected in a forthcoming amendment. All forms will need to have signed acknowledgement upon proposal submission. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600934 General RFP Page 32 Factor 5 - Price Comment Classification: UNCLASSIFIED (U)
The Cover Page SF1449 states that offerors are to complete blocks 12, 17, 23, 24, AND 30. However, this section states to completed blocks 14-20c. Can the government define which blocks the offeror is required to complete?
On: May 26 2020.
Government Response. . The correct boxes for offerors to fill in are boxes 30a, 30b, and 30c of the SF 1449 and blocks 15A, 15B and 15C of the solicitation amendment, SF 30. This language will be corrected in a forthcoming amendment. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600937 General RFP Pages 105 and 106, Paragraph (2)(b)
252.237-7023, Continuation of
Essential Contractor
Services (OCT 2010)
Comment Classification: UNCLASSIFIED (U)
This paragraph states, "The Government has identified all or a portion of the contractor services performed under this contract as essential contractor services in support of mission-essential functions. These services are listed in the Performance Work Statement (PWS), Mission-Essential Contractor Services, dated the award date of the contract." There is no Mission-Essential Contractor Services section in the PWS. Please identify those contractor services deemed mission essential by the government.
On: May 26 2020.
Government Response. . This clause is not applicable and will be removed in a forthcoming amendment. On: Jun 09 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600938 General RFP Pages 115-179; Attachment 2, PWS
Performance Work Statement
Comment Classification: UNCLASSIFIED (U)
Two Performance Work Statements (PWS) have been provided in the RFP package – the version appearing on pages 115-179 of the solicitation document, and Attachment 2 of the solicitation. Which version of the PWS takes precedence in the event there are differences between the two versions?
On: May 26 2020.
Government Response. . Both documents should be identical, however, if there is a conflict between the two documents, then Attachment 2 PWS takes precedence. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600940 General RFP Page 124, Section C-3.5.3 Support to Other Contractors
Page 6 of 34ProjNet: Logged In User
Comment Classification: UNCLASSIFIED (U)
Will the government provide a few examples of the type of services, within the scope of the contract, that the contractor may have to provide to other government contractors and what is the approval process for service orders?
On: May 26 2020.
Government Response. . An example may be to provide subject matter expertise to review a recommended repair by another contractor and provide concurrence or alternate courses of action for repair work. Any such instances will be directed by the Contracting Officer and authorized to perform as a Service Order. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600941 General RFP Page 137 Fuel Test Kits Comment Classification: UNCLASSIFIED (U)
Is the Contractor or ANDSF responsible for providing fuel test kits? Under the "power plants with multiple fuel tanks" entry in the Fuel Storage Operations table on page 137, it states test kits will be provided by the Afghans. In the paragraph below the table it states, "The Contractor shall provide the test kits." Please clarify the source of the fuel test kits.
On: May 26 2020.
Government Response. . The Contractor shall provide the fuel test kits. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600943 General RFP Page 140, Paragraphs C-3.18.1 and C-3.18.2
Wastewater Services
Comment Classification: UNCLASSIFIED (U)
The referenced paragraphs seem to be in conflict. Paragraph C-3.18.1 states, "The Contractor shall collect and transport sewage and wastes...". Paragraph C-3.18.2 states, "The Contractor is not required to provide blackwater removal...". Please clarify whether C-3.18.1 or C-3.18.2 takes precedence and rephrase for consistent meaning. Is it correct to assume that C-3.18.1 takes precedence as a potential service order requirement?
On: May 26 2020.
Government Response. . The Contractor will not be required to price black water removal as part of routine O&M. In response to a life, health or safety concern, the Contracting Officer may authorize removal of black water as a Service Order. For clarification purposes, C-3.18.1 and C-3.18.2 will be revised in a forthcoming amendment. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600945 General Attachment G, Page 3 Responsibility Questionnaire
Comment Classification: UNCLASSIFIED (U)
Paragraph d)1 states "Whether the Offeror currently, or previously on any of its currently administered contracts identified in paragraph "d"". Does the Government mean paragraph C in this section?
On: May 26 2020.
Government Response. . Yes, the Government means paragraph C in this section . This will be corrected in a forthcoming amendment. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600946 General Attachment G, Page 3 Responsibility Questionnaire
Comment Classification: UNCLASSIFIED (U)
This section states to "Provide evidence consisting of a commitment or explicit arrangement, which will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the needed facilities, equipment, other resources, or personnel."
Since no subcontracts can be issued until the contract is awarded, the only evidence that could be provided in response to Section e would be Letters of Commitment from Key Personnel (none are required by the RFP), subcontractors, major subcontractors (additional weight already addressed in the evaluation criteria for signed teaming agreements), or Letters of Intent (nonbinding). Please confirm that these are acceptable evidence or eliminate this requirement as only the incumbent would have access to extent subcontracts under their prime contract.
Additionally, LOCs for... or personnel appears to unintentionally favor the incumbent. Please clarify that only personnel that must be in day to day contact with U.S. Government are required to provide LOCs. Rather than all proposed personnel which would require LOCs (if they are required, the five page limit for the response in this area needs to be extended or made unlimited).
On: May 26 2020.
Page 7 of 34ProjNet: Logged In User
Government Response. . Letters of Commitment from Key Personnel are not required by the RFP. Offerors must provide either Letters of Commitment, signed teaming agreements, or Letters of Intent from subcontractors and major subcontractors. On: Jun 24 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600947 General RFP Pages 21 and 32 Proposal
Submission Requirements
Comment Classification: UNCLASSIFIED (U)
Page 21 says the offeror must submit only Attachment E. Page 32 says the USG will evaluate only Attachment 1. Both are price schedule documents. Which should offerors submit, and which will be evaluated?
On: May 26 2020.
Government Response. . Attachment E, O&M Pricing Schedule will be evaluated and is to be submitted with your proposals. Attachment 1, Task Order O&M Pricing Schedule (Post-Award) will be evaluated at the task order level.
Offerors shall submit Attachment E (O&M Pricing Schedule) with their proposals in Excel format. Attachment 1 (Task Order O&M Pricing Schedule (Post-Award)) will only be used after contract award for new task orders and change orders. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600948 General Attachment E O-M Pricing Schedule
Comment Classification: UNCLASSIFIED (U)
In order for Attachment E and Attachment 1 to match, shouldn't Attachment E have the plug numbers that are already included in Attachment 1?
On: May 26 2020.
Government Response. . Yes, attachment E should have the "Plug" numbers for the unscheduled work, (service orders). Offeror's must submit Attachment E in response to this solicitation as part of Evaluation Factor 5. Attachment 1 will be used in the post award for new task orders or change orders. Amendment 0002 has clarified the use of Attachment E on beta.sam.gov. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600949 General RFP Page 21
Proposal Submission
Requirements, Volume 3 - Price
Comment Classification: UNCLASSIFIED (U)
This section states "The Offeror must complete the "Representations, Certifications, and Other Statements of Offerors" attached to this solicitation in Section K. If the Offeror has previously completed these forms electronically via the Online Representation and Certification Application (ORCA) website, please print and attach your completed ORCA forms."
For tab 4, offerors are to provide their Online Representations and Certification Application (ORCA) forms. However, ORCA has been supplanted by the System for Award Management (SAM). Please confirm that offerors are required to submit a copy of their SAM record to fulfill this requirement.
On: May 26 2020.
Government Response. . TAB 4 language will be revised in a forthcoming amendment. You are correct. ORCA is now SAM. Please refer to the clauses in the solicitation for the representations and certification/SAM requirements (2525.207- 7007 ALT A; 252.225-7993; 52.212-3; 52.204-8, etc.). Your company will have to have a valid SAM report with no exclusions in order to receive Government contracts. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600950 General RFP Page 25
Phase-In and Organizational
Plan Submission Requirements
Comment Classification: UNCLASSIFIED (U)
Instructions state, in part: The Organizational Chart shall list names of individuals, titles and shall identify staff that will interact with U.S. Government. Since this RFP does not require any Key Personnel, is this an artifact from the previous RFP?
On: May 26 2020.
Page 8 of 34ProjNet: Logged In User
Government Response. . The Offeror is to provide an Organizational Chart in accordance with the requirements for Factor 2. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600951 General RFP Page 79
52.245-2, Government
Property Installation Operation Services
Comment Classification: UNCLASSIFIED (U)
Section, in part, states: The awardee will be provided the property report which provides a detailed listing of excess GFP. Given the responsibility to track and administer the GFP, and the fact that the incumbent has prior knowledge of GFP currently available, can government provide the list of excess GFP to all bidders?
On: May 26 2020.
Government Response. . The list of known GFP is provided in Attachment 8, Government Furnished Property. On:
Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600952 General RFP Page 133, C-3.16.1 Generation
Overhaul Testing Requirements
Comment Classification: UNCLASSIFIED (U)
Section states, in part: The contractor shall submit a Gantt chart for each generator overhaul and upload it with vendor quotes, final detailed cost estimate, parts replacement list and other pertinent documentation supporting the overhaul for the USG to review for approve. Will the government confirm that these Gantt charts are due in response to a service order, not as a part of the proposal?
On: May 26 2020.
Government Response. . Confirm, that the Gantt charts referred to in the PWS are due in response to a service order, not as a part of the solicitation proposal. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600953 General Attachment 3 Site Density List Comment Classification: UNCLASSIFIED (U)
Facility maintenance is required for some sites; however, the government has not provided the square footage and details of the facilities that need to be maintained that would enable cost estimates to be generated and staffing labor categories to be appropriately estimated. Will the government please provide the square footage and description (office building or other construction type, i.e. masonry or frame, etc.)?
On: May 26 2020.
Government Response. . The Offeror shall propose based on the data provided in Attachment 3, Density List. On: Jun 22 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600954 General Attachment 3 Site Density List, Site List Tab
Comment Classification: UNCLASSIFIED (U)
Will the government please provide maps and locations of all the sites as it did in the 2018 RFP to enable maintenance team location and transportation planning?
On: May 26 2020.
Government Response. . A site map is being added as Attachment 12 and will be included in a forthcoming amendment. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8600955 General Attachment 10 Service Order 12- Month Workload
Data Comment Classification: UNCLASSIFIED (U)
Page 9 of 34ProjNet: Logged In User
Attachment 10 Service Order Work Load is provided but I do not see Work Load for SOO with detail. Since this is a FFP contract and in order to correctly price, will the government please provide detailed work load data history from current CMMS for the last year of SOOs by site?
On: May 26 2020.
Government Response. . The IDIQ CLINs for the unscheduled work, which cover the Service Orders, is already priced by the Government. Offerors do not propose pricing for the unscheduled work. When services are processed after award of an O&M task order, vendors are to provide the individual service order price. On: May 28 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8608375 General C-3.15.2 Maintenance Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Given the current operational environment and the extreme volatility in Afghanistan, with on-going lockdowns, acts of terror and other circumstances that can require longer timeframes than 15 days to procure parts and deliver to site. Upon site turnover the government requires a 30 day supply, in order to be compliant wouldn't offeror need a 30 day supply on hand at all times? Will the government consider requiring a 30 day supply of materials for mission continuity?
On: May 29 2020.
Government Response. . Offerors shall propose as requested in the PWS. Regarding the 30-day inventory to be left upon site transition, the intention of this requirement, as stated in C-2.2.2.3, is to leave a 30-day bench stock supply of PMI materials for the Government of the Islamic Republic of Afghanistan. These materials are not part of the 15–day stockage levels required in C-3.15.2. If required upon a site transition, the request for 30-day bench stock will be requested in writing by the Contracting Officer. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8608394 General p. 83 of RFP, Clauses included Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The RFP includes DFAR 252.225-7026 (Acquisition Restricted to Products or Services from Afghanistan). PWS requires we follow OEM specifications, those OEMS are not manufactured in Afghanistan, additionally given the high potential of counterfeit/used/ prohibited country materials for O&M in an operating environment such as Afghanistan, will the government allow sourcing of OEM materials from outside Afghanistan?
On: May 29 2020.
Government Response. . This clause was deleted in Amendment 0001. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8608407 General Evaluation Factors, Factor 1 – Experience Submission Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The requirement allowing for 6 years of experience and past performance does not appear to align with any of the previous RFPs for this work or the 5 year look back required for Attachment G which was provided with this RFP to ensure contractor responsibility. Q: For consistency, would the government please consider revising the Factor 1 Experience and Factor 4 Past Performance requirements to 5 years which more closely aligns to the previous RFP requirements as well as the Attachment G for this RFP?
On: May 29 2020.
Government Response. . Att G will be revised to reflect Factor 1, Experience, and Factor 4, Past Performance submission requirement of 6 years. On: Jun 22 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8608414 General Evaluation Factors, Factor 1 – Experience Submission Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The requirement allowing for 6 years of experience and past performance covers a period of significant changes in the Afghanistan operational environment. Since experience is more highly weighted if work is "similar to the types of services contemplated" and "that demonstrate appropriate type of experience," will the government give greater weight to experience in Afghanistan in the past 3 years as opposed to experience prior to these changes? Alternatively, should the past performance be shortened to only include experience from the past 3 years?
On: May 29 2020.
Government Response. . No, the requirement for 6 years for both Factor 1, Experience, and Factor 4, Past Performance, remains at 6 years. On: Jun 22 2020
Page 10 of 34ProjNet: Logged In User
Current Request Status: Request Closed
8609163 General RFP page 23 Proposal
Submission Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can offerors use 10 pt. font in the header and footer of each page for offeror identification, proposal identification, and disclosure restriction text?
On: May 29 2020.
Government Response. . Yes, 10 pt font will be acceptable in headers and footers of Offeror's proposal. On: Jun 09 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8611273 General Page 12 Past Performance (AMD 01 Page 12) Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
You wrote in page 12 of AMD 01 that the "Offerors shall not incorporate by reference into their proposals PPQ's previously submitted in response to other Solicitations".
Our referenced projects are USACE based projects. If we ask for PPQ, the COR will not reply as prompt as we need it for this solicitation. But we have previously issued PPQs. If we submit the previous PPQs, will we get lower scores?
On: Jun 01 2020.
Government Response. . See amendment 0002, Offerors must submit PPQs with their proposals. Just referencing PPQs does not meet the evaluation factor requirements. All PPQs will be evaluated in accordance with the solicitation criteria. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8612754 General Attachment E and Attachment 1 Price List and
Price Breakdown Sheet
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm if Attachment E, which offerors shall submit with their proposals, is actually the file named "Att 1 - Task Order Pricing Schedule (Post-Award)," which is titled "Attachment E - Section B, Pricing Schedule and Completed Price List" on line 1 of sheet 1 of the same file.
On: Jun 01 2020.
Government Response. . Yes, attachment E should have the "Plug" numbers for the unscheduled work, (service orders). Offeror's must submit Attachment E in response to this solicitation as part of Evaluation Factor 5. Attachment 1 will be used in the post award for new task orders or change orders. Amendment 0002 has clarified this issue. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614531 General RFP Page 28
Factor 4 - Past Performance
Proposal Submission
Requirements Comment Classification: UNCLASSIFIED (U)
As it stands, Past Performance and Experience appears to give the incumbent an advantage, as their incumbent contract and two bridge contracts constitute the minimum requirement for Past Performance and the Experience. Would the government consider broadening the experience section address other corporate contracts that meet the primary requirements of that section, not just those listed in the Past Performance?
On: Jun 02 2020.
Government Response. . The Government does not favor any prospective offeror. Experience: The Offeror shall demonstrate its capability that it has performed services in the Central Command (CENTCOM) AOR that were similar to the types of services contemplated by this solicitation as described in the PWS. Offerors shall submit a minimum of three
(3) projects. The contractor's experience should demonstrate performance, either as a prime or a subcontractor within the last six (6) years, from proposal submission. In addition, projects submitted must be at least 80% complete or on-going at the time of proposal submission and must represent a minimum value of $5 million per year.
Past Performance: The Offeror shall submit relevant past performance questionnaires (PPQ, Attachment C) on all projects submitted under Factor 1 – Experience. On: Jun 24 2020
Page 11 of 34ProjNet: Logged In User
8614546 General RFP Page 79
52.245-2, Government
Property Installation Operation Services
Comment Classification: UNCLASSIFIED (U)
Paragraph (e) of the referenced clause states that GFP will be turned over to the awardee during phase-in. For bidding purposes, will the government provide a listing, by location, of the government property managed by the current contractor? Knowing the general contents and quantities of repair parts, spares, and equipment items contained in the 53 containers identified in RFP Attachment 8 is needed for pricing and logistics planning.
On: Jun 02 2020.
Government Response. . The GFE is the 53 containers only; not the contents. The containers are either empty or are used for storage of contractor acquired parts and materials. On: Jun 22 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614552 General RFP Page 119 C-2.1.2.3, Phase- Out Plan
Comment Classification: UNCLASSIFIED (U)
Have the events to be included in the Phase-out Plan been omitted at the end of the last sentence of this section?
On: Jun 02 2020.
Government Response. . The events are referring to the activities listed in C-2.2, Transfer of Facilities. Attachment 2 will be revised to capture this in a forthcoming amendment. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614572 General RFP Page 131 Performance Measures Table
Comment Classification: UNCLASSIFIED (U)
In the 2nd bullet on page 131, there is a requirement for the contractor to provide an initial inventory list of parts, materials, and supplies 10 days after contract award. In the Performance Measures table below, the Initial Inventory is required 90 days after contract award. Please clarify this apparent conflict confirming that the initial inventory report is due 90 days after contract award.
On: Jun 02 2020.
Government Response. . The initial inventory is required 90 days after contract award. This will be corrected in a forthcoming amendment. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614583 General RFP Page 143 C-3.21.5 - Medical Facilities
Comment Classification: UNCLASSIFIED (U)
This paragraph identifies several systems resident in medical facilities. Please clarify that the contractor is responsible to repair or replace these systems, or otherwise maintain them through separate service orders since not all of the systems are addressed in the Site Density List.
On: Jun 02 2020.
Government Response. . For any medical facilities listed on Attachment E, Offerors shall provide monthly pricing for the assets reflected on Attachment 3, Density List. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614592 General RFP Page 153
C-4.13.3 - Preventive
Maintenance (PM) Schedule
Comment Classification: UNCLASSIFIED (U)
Submitting a PM schedule to the Contracting Officer within 10 calendar days following Contract Award does not seem realistic, since the Contractor will be in the throes of mobilization (e.g. CRC processing, interviewing personnel and staffing, establishing the PMO, etc.). Will the government consider changing this to 10 calendar days before Contract Start (Performance Start Date).
Page 12 of 34ProjNet: Logged In User
This will give the Contractor time to review the PM schedule of the current contract, make adjustments if necessary, and assess equipment condition?
On: Jun 02 2020.
Government Response. . The PM schedule will be due 60 days after contract award. Attachment 2 will be revised and reflected in a forthcoming amendment. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614604 General Page 23
Summary of Formatting
Requirements for All Volumes
Comment Classification: UNCLASSIFIED (U)
Will the Government confirm that screenshots/images are exempt from font requirements?
On: Jun 02 2020.
Government Response. . Yes, screenshots/images are exempt from font requirements. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614608 General RFP Page 32 Factor 5 - Price Comment Classification: UNCLASSIFIED (U)
Would the offerors be allowed to reformat Attachment 1 to ensure the text in each cell is visible and that it can be properly printed?
On: Jun 02 2020.
Government Response. . See revised Attachment E provided with Amendment 0002.
Additionally, Offerors shall submit Attachment E (O&M Pricing Schedule) with their proposals in Excel format. Attachment 1 (Task Order O&M Pricing Schedule (Post-Award)) will only be used after contract award for new task orders and change orders. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614631 General Amendment 1 Pg. 14
Evaluation Procedures, Adjectival Ratings and Descriptions
Comment Classification: UNCLASSIFIED (U)
Language in Amendment 1 states, in part: performing O&M services that are at least 80% complete or on-going. Would the government please confirm that "at least 80% complete or on-going" or have a minimum of two completed CPARS is the acceptable criteria for both Factor 1 and Factor 4 contract references?
On: Jun 02 2020.
Government Response. . There is no requirement for two completed CPARs.
Experience: The Offeror shall demonstrate its capability that it has performed services in the Central Command (CENTCOM) AOR that were similar to the types of services contemplated by this solicitation as described in the PWS.
Offerors shall submit a minimum of three (3) projects. The contractor's experience should demonstrate performance, either as a prime or a subcontractor within the last six (6) years, from proposal submission. In addition, projects submitted must be at least 80% complete or on-going at the time of proposal submission and must represent a minimum value of $5 million per year.
Past Performance: The Offeror shall submit relevant past performance questionnaires (PPQ, Attachment C) on all projects submitted under Factor 1 – Experience. On: Jun 24 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614671 General Amendment 1 Pg. 3 Basis of Award Comment Classification: UNCLASSIFIED (U)
This section states that to be determined responsive, a proposal must meet the requirements set forth in the solicitation (pg. 7) "Source Selection Procedures" at the paragraph titled "Proposal Files." The Source Selection Procedures begin at p. 2, but the section makes no mention of "Proposal Files" as referenced. Please clarify.
On: Jun 02 2020.
Government Response. . This was corrected in Amendment 0002. On: Jun 09 2020
Page 13 of 34ProjNet: Logged In User
8614786 General Amendment 1 Pg. 16 Factor 5 - Price Comment Classification: UNCLASSIFIED (U)
3. reads in part: Completed Proposal Schedule and Price Breakdown Sheet (Attachment 1) in an Excel format. Can the Government please confirm the referenced language should read "Completed Proposal Schedule and Price Breakdown (Attachment E) in an Excel Format" and that this language will be updated by amendment?
On: Jun 02 2020.
Government Response. . This was corrected in Amendment 0002. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614796 General RFP Page 19 Basis of Award Comment Classification: UNCLASSIFIED (U)
Paragraph states, in part, Please see the information in (pg.8) "Source Selection Procedures" of this solicitation under Tab 7 of the Price Proposal Submitted for information on Joint Contingency Contracting System (JCCS) registration. Can Government confirm the intended reference should be pg.18 and Tab 6 respectively?
On: Jun 02 2020.
Government Response. . This was corrected in Amendment 0002. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614809 General RFP Page 27
Factor 3 - Management
Approach Submission
Requirements, Management
Approach Comment Classification: UNCLASSIFIED (U)
In Factor 3 Management Approach Submission Requirement part f. there is a requirement for a Commissioning Plan to be submitted with the proposal.
There does not appear be any PWS reference to Commissioning Plan. This appears to be a legacy requirement without supporting PWS Detail. If this is a left over legacy requirement, will the government considering removing? If this is not, please provide PWS detail of what exactly is required and consider expanding page count to accommodate?
On: Jun 02 2020.
Government Response. . A Commissioning Plan is not a PWS requirement and will be removed from the Factor 3 submission requirement. On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8614843 General Attachment B Project Experience Information Sheet
Comment Classification: UNCLASSIFIED (U)
Attachment B states, in part: Details of your company's role and activities during construction of the project: (Describe your role in this project. Include whether your firm participated as a prime or a subcontractor. SPECIFICALLY describe your roles and responsibilities in the design portion of the contract. Provide details for any past performance problems encountered and the corrective actions taken.
Can the Government confirm that the language is to be removed from Attachment B and is to be replaced with "Details of the company's role and activities, as Prime Contractor, providing O&M services maintaining critical systems such as power generation, waste water systems, HVAC, HVAC&R, and water distribution system or similar" ?
On: Jun 02 2020.
Government Response. . Attachment B has been revised with Amendment 0001 to read "Provide details of your company's role and activities during the performance of Operations and Maintenance (O&M) services on the listed project: (Describe your role in this project. ) Include whether your firm participated as a prime or a subcontractor.
SPECIFICALLY describe your roles and responsibilities in the O&M portion of the contract. Provide details for any past performance problems encountered and the corrective actions taken." On: Jun 09 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
Page 14 of 34ProjNet: Logged In User
8616635 Facilities Maintenance
Att 2 - PWS provisions
Comment…