Performance Requirements Summary
Performance Element PWS Paragraph
Acceptable Quality Level
Surveillance Method
C-1 Description of Services Emergency Response Services C-1.3.2.2 100% Periodic/100% Inspection
C-2 Contractor Work Responsibility Phase-In of Requirements C-2.1.1.4 100% 100% Inspection
Phase-Out Requirements C-2.1.2.2 100% 100% Inspection Notification C-2.3.1 100% 100% Inspection Pre-Walk Through/Coordination Meeting C-2.3.2.1 100% 100% Inspection Initial Walk-Through C-2.3.2.2 100% 100% Inspection Bench Stock to be left at Site post-transition
C-2.3.2.3 100% 100% Inspection
Joint Inventory C-2.3.2.4.1 100% 100% Inspection Final Inspection/Walk-through C-2.3.2.5 100% 100% Inspection Clean-Up of Contractor Work Areas C-2.3.2.6 100% 100% Inspection
C-3 Contractor Management and Organizational Structure
Supervision of Work C-3.1.2 90% Periodic Inspection Training and Recruitment Plan C-3.4 90% Periodic Inspection Contractor Communication with Clients and Customers
C-3.5.5 95% Periodic Inspection
Employee Uniforms & Personal Protective Equipment (PPE)
C-3.8 80% Periodic Inspection
Display of ID Badge C-3.9.1 90% Periodic Inspection Returning ID Badges Contractor Accountability
C-3.9.2 100% Periodic Inspection
Libraries C-3.10.2 100% Periodic Inspection Commercial Publications C-3.10.2.2 85% Periodic Inspection Meetings, Conferences, and Briefings C-3.11 85% Periodic Inspection Meeting Minutes C-3.11.1 99% Periodic Inspection Quality Control Plan (QCP) C-3.12.1 100% Periodic Inspection Quality Control Files C-3.12.2 90% Periodic Inspection Quality Control Reports C-3.12.3 90% Periodic Inspection Partnering Meeting Minutes C-3.14.2 90% Periodic Inspection Maintenance C-3.15.2 90% Periodic Inspection Operate, Maintain, and Repair Electrical Power Generation and Distribution Infrastructure
C-3.16 99% Periodic Inspection
Top End Overhaul C-3.16.1.1 95% Periodic Inspection Major Overhaul C-3.16.1.2 95% Periodic Inspection Load Bank Testing for Top End Overhaul C.3.16.1.3.1 95% Periodic Inspection Load Bank Testing for Top End Load Bank Testing for Major Overhaul C-3.16.1.3.2 95% Periodic Inspection
Warranty Following Load Bank Testing C-3.16.1.4 95% Periodic Inspection Power Generation Fuel C-3.16.2 95% Periodic Inspection Drinking Water Services Operations C-3.17.1 90% Periodic Inspection Water Reports C-3.17.1.1 90% Periodic Inspection
W912ER20R0011 - Attachment 9
Testing Requirements: C-3.17.2 90% Periodic Inspection Testing Plan C-3.17.3 90% Periodic Inspection Collection and Transportation C-3.18.1 90% Periodic Inspection Catch Basins and Grills, Manholes, and Surrounding Area
C-3.18.4 90% Periodic Inspection
Water/Oil and Grease Separators C-3.18.5 90% Periodic Inspection Traps and Separators C-3.18.6 90% Periodic Inspection Settlement Tanks C-3.18.7 90% Periodic Inspection Waste-Water Treatment Plant Operation – Testing Wastewater Treatment Efficiency C-3.18.8 90% Periodic Inspection
HVAC&R General Acceptable Practices the Contractor Shall Comply
C-3.19.1 90% Periodic Inspection
Exterior Inspection C-3.21.1 75% Periodic Inspection Interior Inspection C-3.21.2 85% Period Inspection Site or facility additions C.3.21.3.1 90% Periodic Inspection
C-4 Work Classification and Management Control (WCMC)
Work Reception Operations C-4.1.1 90% Periodic Inspection Service Order (SO) Issuance C-4.1.2 90% 100% Inspection Customer Interface C-4.2.1 90% Periodic Inspection Work Status Inquiries C-4.2.2 90% Periodic Inspection
Notice of Service Disruption
C-4.2.3, C-4- 2.4, C-4.2.5, C- 4.2.6, C-4.2.7
90%
Periodic Inspection
Emergency Service Order Reporting C-4.4.1 90% 100% Inspection Work Standards C-4.5 90% Periodic Inspection Requests for Information (RFIs) C-4.7 90% 100% Inspection Data Criteria C-4.7.1 90% Periodic Inspection Ad Hoc Reporting C-4.7.2 90% 100% Inspection Support C-4.8.3 90% Periodic Inspection Access to Data and Information C-4.8.4 90% Periodic Inspection Reports – Management and Administration
C-4.11 80% Periodic Inspection
Property Report -- GFE Excess & Disposition of GFE until removed from Contractor Accountability
C-4.11.2 80% Periodic Inspection
Monthly Situation Report (SITREP) C-4.11.4 80% 100% Inspection Workload Data Report for Recurring Services
C-4.12.1 80% Periodic Inspection
Emergency Service Order Report C-4.12.3 80% 100% Inspection Generator Health Reports C-4.12.5.1 80% Periodic Inspection Incident Reporting C-4.12-8 90% Periodic Inspection Real Property Listing (RPL) C-4.14.2 80% 100% Inspection Preventative Maintenance (PM) Schedule C-4.14.3 80% Random Inspection
The following criteria shall be used to determine the contractor performance rating for each of the performance requirements:
Performance
Criteria
Outstanding
Performance meets all contractual requirements and exceeds most to the government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with almost no minor problems for which corrective actions were taken by the Contractor, and the corrective actions were highly effective.
Above Average
Performance meets all contractual requirements and exceeds some to the government’s benefit. The contractual performance element or sub-element being assessed was accomplished with very few minor problems for which corrective actions taken by the
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub- element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the Contractor’s corrective actions appear or were
Service Order Forms/Reports C-4.14.4 80% Periodic Inspection Fuel Level Report C-4.14.5 80% Periodic Inspection Equipment Maintenance Records C-4.14.6 80% Periodic Inspection Inventory Records of Supplies, Parts and Stock
C-4.14.7 80% Periodic Inspection
C-5 Special Requirements Safety C-5.1 100% Periodic Inspection Materials, Supplies and Spare Parts C-5.10 90% Periodic Inspection