LOAD BANK TEST REPORT
FACILITY___________________________________________
DATE____________
CMMS # ______________
NAMEPLATE DATA
KW__________________ KVA_______________ PF____________ GENERATOR # _________
HZ____________
VOLTS AMPSTIME &
Load %
A-B B-C C-A A B C
HZ HOURS OIL
PRESS
WATER
TEMP
KW
LOAD RATE 25%__________
LOAD RATE 50%__________
LOAD RATE 70% _________
LOAD RATE 80%__________
TESTED BY: ________________________
OBSERVED BY: _____________________
USACE LNQA: ______________________
Attachment 4 - Load Bank Test Data Form for Top End Overhaul
5 No-Load
5 No-Load
10 No-Load
10 @ 25%
10 @ 50%
10 @ 70%
20 @ 80%
5 No-Load
5 No-Load
10 @ 70%
20 @ 50%
20 @ 50%
10 No-Load
SERIAL # _____________________________ VOLTS __________ AMPS________