Sewage_Cost_Breakdown_Proposal_Schedule_-_8-5-2019.xls
XLS spreadsheet 41 KB Posted
- Solicitation number
- W912ER19R0029
About this file
This document contains a proposal schedule and cost breakdown for a federal solicitation to construct a sewage treatment system expansion at Ali Al Salem Air Base in Kuwait. The base bid requires mobilization, design, surveys, an effluent storage tank, sanitary sewer piping and accessories, manholes, a lift station, and electric service. There are four optional bid items that could be awarded for rehabilitating an existing lift station, removing and replacing a waste water unit, and providing two new waste water units. Bids are due by October 14, 2019. The estimated value is between $1-5 million and the period of performance is 420 calendar days from award. The Army Corps of Engineers is the contracting agency.
Cost Breakdown Worksheet (Excel) for W912ER19R0029
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Schedule
| PROPOSAL SCHEDULE | ||||||||
| RFP: | W912ER19R0029 | P2 | 460510 | |||||
| PROJECT: | Construct Sewage Treatment Extension - Ali Al Salem Air Base | |||||||
| LOCATION: | Kuwait | 12-Aug-08 | ||||||
| ITEM NO. | DESCRIPTION | QTY | UNIT | AMOUNT | TOTAL | TOTAL | ||
| Base Bid Items | ||||||||
| 0001 | Mobilization and Demobilization in accordance with the contract documents | JA | ||||||
| 0002 | Design, Topographic Survey and Site Surveys in accordance with the contract documents | JA | ||||||
| 0003 | Construct Sewage Treatment System in accordance with the contract documents | JA | $ | $ | $ | |||
| TOTAL BASE BID PRICE (ITEMS 0001-0003) | ||||||||
| Optional Bid Items | ||||||||
| 0004 | Option #1 Rehabilitate Brownstone Octagon Lift Station in accordance with the contract documents | JA | $ | $ | $ | |||
| 0005 | Option #2 Remove and replace existing offline packaged waste water unit in accordance with the contract documents | JA | $ | $ | $ | |||
| 0006 | Option #3 Provide and install one new packaged waste water unit in accordance with the contract documents | JA | $ | $ | $ | |||
| 0007 | Option #4 Provide and install one new packaged waste water unit in accordance with the contract documents | JA | $ | $ | $ | |||
| TOTAL OPTIONS PRICE (ITEMS 0004-0007) | ||||||||
| TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0007) | $805,900 | |||||||
| *OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS" | $805,900 | |||||||
| $8,611,972 | ||||||||
| $805,900 | ||||||||
| $805,900 | ||||||||
| $805,900 | ||||||||
| $8,611,972 | ||||||||
| $8,611,972 | ||||||||
| $8,611,972 |
&C&9&P of &N
Cost Breakdown Sheet
| COST BREAKDOWN | ||||||||||||||
| RFP: | W912ER19R0029 | 460510 | ||||||||||||
| PROJECT: | Construct Sewage Treatment Extension - Ali Al Salem Air Base | PROPOSER: | ||||||||||||
| LOCATION: | Kuwait | DATE: | ||||||||||||
| ITEM | DESCRIPTION | Unit of Measure (UOM) | Quantity | DIRECT LABOR COST | DIRECT EQUIPMENT COST | DIRECT MATERIALS COST | SUB CONTRACTOR COST | TOTAL DIRECT COST | INDIRECT COST HOOH (G&A) | INDIRECT COST JOOH (G&A) | BOND | Total OVERHEAD/ INDIRECT COST | PROFIT | TOTAL PROPOSED COST |
| 0001 | Mobilization and Demobilization in accordance with the contract documents | |||||||||||||
| 0001AA | Mobilization | Job | ||||||||||||
| 0001AB | Demobilization | Job | ||||||||||||
| Total Price (Items 0001AA-AB) | ||||||||||||||
| 0002 | Design, Topographic Survey and Site Surveys in accordance with the contract documents | |||||||||||||
| 0002AA | Design | Job | ||||||||||||
| 0002AB | Topographic Survey | Job | ||||||||||||
| 0002AC | Site Survey | Job | ||||||||||||
| Total Price (Items 0002AA-AC) | ||||||||||||||
| 0003 | Construct Sewage Treatment System in accordance with the contract documents | |||||||||||||
| 0003AA | Effluent Storage Tank | Job | ||||||||||||
| 0003AB | Sanitary Sewer Piping and accessories required for a complete and usable system | Job | ||||||||||||
| 0003AC | Sanitary Sewer Manholes | Each | ||||||||||||
| 0003AD | Sanitary Sewer Lift Station | Each | ||||||||||||
| 0003AE | Electric Service | Job | ||||||||||||
| Total Price (Items 0003AA-AE) | ||||||||||||||
| TOTAL BASE BID PRICE (ITEMS 0001-0003) | ||||||||||||||
| 0004 | Option #1 Rehabilitate Brownstone Octagon Lift Station in accordance with the contract documents | |||||||||||||
| 0004AA | Rehabilitate Brownstone Octagon Lift Station | Meters | ||||||||||||
| Total Option #1 Price (Item 0004AA) | ||||||||||||||
| 0005 | Option #2 Remove and replace existing offline packaged waste water unit in accordance with the contract documents | |||||||||||||
| 0005AA | Remove existing offline Packaged Waste Water Unit | Meters | ||||||||||||
| 0005AB | Install New Packaged Waste Water Unit | Meters | ||||||||||||
| Total Option #2 Price (Items 0005AA-AB) | ||||||||||||||
| 0006 | Option #3 Provide and install one new packaged waste water unit in accordance with the contract documents | |||||||||||||
| 0006AA | Provide and install one new packaged waste water unit | Meters | ||||||||||||
| Total Option #3 Price (Item 0006AA) | ||||||||||||||
| 0007 | Option #4 Provide and install one new packaged waste water unit in accordance with the contract documents | |||||||||||||
| 0007AA | Provide and install one new packaged waste water unit | Meters | ||||||||||||
| Total Option #4 Price (Item 0007AA) | ||||||||||||||
| TOTAL OPTIONS PRICE (ITEMS 0004-0007) | ||||||||||||||
| TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0007) |