This document contains a proposal schedule and cost breakdown for a federal solicitation to construct a sewage treatment system expansion at Ali Al Salem Air Base in Kuwait. The base bid requires mobilization, design, surveys, an effluent storage tank, sanitary sewer piping and accessories, manholes, a lift station, and electric service. There are four optional bid items that could be awarded for rehabilitating an existing lift station, removing and replacing a waste water unit, and providing two new waste water units. Bids are due by October 14, 2019. The estimated value is between $1-5 million and the period of performance is 420 calendar days from award. The Army Corps of Engineers is the contracting agency.

Cost Breakdown Worksheet (Excel) for W912ER19R0029

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposal Schedule

PROPOSAL SCHEDULE
RFP:W912ER19R0029P2460510
PROJECT:Construct Sewage Treatment Extension - Ali Al Salem Air Base
LOCATION:Kuwait12-Aug-08
ITEM NO.DESCRIPTIONQTYUNITAMOUNTTOTALTOTAL
Base Bid Items
0001Mobilization and Demobilization in accordance with the contract documentsJA
0002Design, Topographic Survey and Site Surveys in accordance with the contract documentsJA
0003Construct Sewage Treatment System in accordance with the contract documentsJA$$$
TOTAL BASE BID PRICE (ITEMS 0001-0003)
Optional Bid Items
0004Option #1 Rehabilitate Brownstone Octagon Lift Station in accordance with the contract documentsJA$$$
0005Option #2 Remove and replace existing offline packaged waste water unit in accordance with the contract documentsJA$$$
0006Option #3 Provide and install one new packaged waste water unit in accordance with the contract documentsJA$$$
0007Option #4 Provide and install one new packaged waste water unit in accordance with the contract documentsJA$$$
TOTAL OPTIONS PRICE (ITEMS 0004-0007)
TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0007)$805,900
*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS"$805,900
$8,611,972
$805,900
$805,900
$805,900
$8,611,972
$8,611,972
$8,611,972

&C&9&P of &N

Cost Breakdown Sheet

COST BREAKDOWN
RFP:W912ER19R0029460510
PROJECT:Construct Sewage Treatment Extension - Ali Al Salem Air BasePROPOSER:
LOCATION:KuwaitDATE:
ITEMDESCRIPTIONUnit of Measure (UOM)QuantityDIRECT LABOR COSTDIRECT EQUIPMENT COSTDIRECT MATERIALS COSTSUB CONTRACTOR COSTTOTAL DIRECT COSTINDIRECT COST HOOH (G&A)INDIRECT COST JOOH (G&A)BONDTotal OVERHEAD/ INDIRECT COSTPROFITTOTAL PROPOSED COST
0001Mobilization and Demobilization in accordance with the contract documents
0001AAMobilizationJob
0001ABDemobilizationJob
Total Price (Items 0001AA-AB)
0002Design, Topographic Survey and Site Surveys in accordance with the contract documents
0002AADesignJob
0002ABTopographic SurveyJob
0002ACSite SurveyJob
Total Price (Items 0002AA-AC)
0003Construct Sewage Treatment System in accordance with the contract documents
0003AAEffluent Storage TankJob
0003ABSanitary Sewer Piping and accessories required for a complete and usable systemJob
0003ACSanitary Sewer ManholesEach
0003ADSanitary Sewer Lift StationEach
0003AEElectric ServiceJob
Total Price (Items 0003AA-AE)
TOTAL BASE BID PRICE (ITEMS 0001-0003)
0004Option #1 Rehabilitate Brownstone Octagon Lift Station in accordance with the contract documents
0004AARehabilitate Brownstone Octagon Lift StationMeters
Total Option #1 Price (Item 0004AA)
0005Option #2 Remove and replace existing offline packaged waste water unit in accordance with the contract documents
0005AARemove existing offline Packaged Waste Water UnitMeters
0005ABInstall New Packaged Waste Water UnitMeters
Total Option #2 Price (Items 0005AA-AB)
0006Option #3 Provide and install one new packaged waste water unit in accordance with the contract documents
0006AAProvide and install one new packaged waste water unitMeters
Total Option #3 Price (Item 0006AA)
0007Option #4 Provide and install one new packaged waste water unit in accordance with the contract documents
0007AAProvide and install one new packaged waste water unitMeters
Total Option #4 Price (Item 0007AA)
TOTAL OPTIONS PRICE (ITEMS 0004-0007)
TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0007)

&C&"Arial,Bold"&12EXHIBIT 1&RPage &P of &N