This federal solicitation seeks proposals to construct a Sewage Treatment Plant Expansion project at Ali Al Salem Air Base in Kuwait. The requirement is to expand the existing sewage treatment system capacity from 313 cubic meters to 939 cubic meters per day by adding an effluent holding tank to prevent effluent water from entering an existing lagoon. The base bid includes a lift station, required piping, an effluent storage tank, and associated site utilities and improvements. There are also four optional bid items that may be awarded for rehabilitation of an existing lift station, replacement of an offline waste water unit, and installation of two new packaged waste water units, contingent on funding availability. Proposals are requested by 1600 hours on October 14, 2019 with an anticipated 420-day period of performance. The estimated project value ranges from $1-5 million. The solicitation was issued by the U.S. Army Corps of Engineers Middle East District.
CDC Drawings for W912ER19R0029 Part 2
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
ID
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S I
D
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
STRUCTURE DS1-104
OVERFLOW DIVERSION
BASIN
SEDIMENTATION
DS2
DIVERSION STRUCTURE
WWTP 1
PACKAGE
EXISTING
STATION
WATER LIFT
EFFLUENT EQUALIZATION
STORAGE
TANK
132.44
130.78
IE 131.38
IE 128.85
IE 128.78
MH2
IE 132.57
IE 132.42
IE 129.61 IE 129.82
GROUND
EXISTING
IE 130.38
IE 129.70
132.92
131.14
128.68
IE 128.91
MH1
IE 128.75
129.68
131.62
IE 128.62
IE 128.72
WWTP 2
PACKAGE
WWTP 3
PACKAGE
TRUCK FILL
PUMP
STRUCTURE DS2
FROM DIVERSION
G .L .H
K U -4
X M
P
N .d w g
A L I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-106
H Y
D R
A U
L
IC
P
R O
F
IL
E
IT
E D
E S
IG
N
C
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G
.H
P -4
1:1000
10 10 20 30 40 50 60 70 80 900
1:1000
10 10 20 30 40 50 60 70 80 90
SCALE: NTS
D-5
HYDRAULIC PROFILE
NOTES:
CONSTRUCTION.
ELEVATIONS AND INVERT ELEVATIONS PRIOR TO
SURVEY ELEVATIONS. CONTRACTOR TO VERIFY ALL
ORIGINAL HYDRAULIC PROFILE ADJUSTED TO NEW 1.
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
VALVE PIT
PUMP (TYP 2)
SEWAGE
ACCESS HATCH
C -7
X M -5
GATE VALVE
SWING CHECK VALVE
BYPASS CONNECTION
COVER & FRAME
ACCESS HATCH
FROM EXISTING SEWER LINE
150mm m m
150mm FORCE MAIN
BLIND FLANGE
CROSS WITH
ACCESS HATCH
600 X 600 FOR FLOAT
ACCESS HATCH
XE-506
DETAIL D-1 ON SHEET
AREA POLE LIGHT
GND
(1) #4mm
20mm-(2) #4mm
SUBSTATION TWO
GND TO
(1) 25mm
75mm-(4) 25mm
FLOAT CABLES
64mm CONDUIT FOR
FOR MOTOR CABLES
(3) 25mm CONDUITS
(TYP)
150mm
VALVE VAULT
HATCH
ACCESS
(TYP)
PUMP
SEWAGE
PAD
EQUIPMENT
WET WELL
LEVEL
WATER
HIGH
DEPTHS EXCEEDING 3600mm
REQUIRED FOR DISCHARGE
INTERMEDIATE BRACE
ALARM ON
HIGH LEVEL
ENTIRE WETWELL
HAZARDOUS AREA
CLASS 1 DIVISION 1
CONCRETE
PRECAST
LEAD PUMP ON
PUMPS OFF
OFF
EMERGENCY PUMP SHUT
LOW LEVEL ALARM AND
LINE
CONNECTION
BYPASS
HATCH
ACCESS
HOSE FITTING
QUICK CONNECT
PIPE IE 137.33
250mm INLET
FOR CLARITY
TURNED
GUIDE RAIL
FLOAT ACCESS HATCH
150mm
REQUIRED
SUPPORT AS
SHALL BE ALLOWED
& PUMPS. NO SPLICES
CABLES ON ALL FLOATS
TOC EL 140.50
TOC EL 134.28
150mm
LAG PUMP ON
HOLDING TANK.
LEADS TO THE
SEWER LINE THAT
THE EXISTING
CLEAN OUT. CAP
STATION INSTALL
CONNECT TO LIFT
EXISTING 250mm SS, INSTALL TEE ONTO
LIFT STATION,
BROWNSTONES
SEWER LINE TO
OF LIFT STATION AND
AFTER INSTALLATION
.H
K U -4
X M
D T .d
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-501
S O
U T
H Y
A R
D
R H -M
C T
H O
L D
IN
G T
A N
K A
N D L
IF
T S
T A
T
IO
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G .L
-4
LIFT STATION PLAN
SCALE: 1:40
C-3
C-7
XM-501
LIFT STATION SECTION
SCALE: 1:40
0 1 2 3 4
1:40
GENERAL NOTES:D-5
XE-505
NN
PER SECTION 33 01 30.83.
5. COAT INTERIOR OF LIFT STATION AND VALVE VAULT
TRIPLE LEAF ON ALL OTHERS.
1000mm, DOUBLE LEAF ON SPANS LESS THAT 2000mm, LIFTING HANDLE, SINGLE LEAF ON SPANS LESS THAN
OPEN ARM WITH RELEASE HANDLE, RECESSED
INCLUDING HINGES, AUTO LOCK T-316 SST HOLD
EXTRUDED ALUMINUM FRAME, T-316 SST HARDWARE
PER SQ METER WITH 7mm ALUMINUM DECK PLATE, ALL ACCESS HATCHES TO BE LOAD RATED @ 1464 KG 4.
FOR PERIODIC MAINTENANCE AND REMOVAL.
POSITION ACCESS HATCH ABOVE SUBMERSIBLE PUMP 3.
WITHOUT ENTERING THE WELL
TO GUIDE RAIL FOR REMOVAL FROM WETWELL
PUMPS WITH RETRIEVAL CHAIN SHALL BE ATTACHED
CABLES EVERY METER OPPOSITE THE GUARDRAIL.
INSTALL GUIDE RAIL AND ATTACH FLOAT SWITCH 2.
ALL FLOATS SHALL BE WIRED TO CONTROL PANEL1.
WETWELL
1800 DIA
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
1/4" X 1/4" SST SCREEN
100 VENT PIPE WITH
(IN FOREGROUND)
XP JUNCTION BOX,
TO PANEL
(TYP OF 2)
NON-CLOG PUMP
WELL WITH INTEGRAL BASE
PRECAST CONCRETE WET
VALVE (TYP)
FLAP - TYPE CHECK
ACCESS HATCH
DUPLEX ALUMINUM
PER MANUFACTURER
GUIDE RAIL SYSTEM
150 ISOLATION VALVE
PER MANUFACTURER
GUIDE RAIL SUPPORT
150 FM
BOT EL=127.06
SEAL CONDUIT
CLARITY) IE=128.78
WWTP (ROTATED FOR
200mm EFFLUENT FROM
CONDUIT EXITING WET WELL
SEAL-OFFS PRIOR TO
PROVIDE CONDUITS W/
PUMP 2 ON EL=128.48
PUMP 1 ON EL=128.28
PUMPS OFF EL=127.86
HIGH WATER LEVEL EL=128.68
F
M
IE=129.50
EL 130.50
ENTIRE WETWELL
HAZARDOUS LOCATION
UNCLASSIFIED
HIGH WATER LEVEL EL=129.26
PIPE SUPPORT (AS REQUIRED)
FROM WWTP
200 EFFLUENT WATER
HINGED SIDE
600 X 1000 OPENING
150 ISOLATION VALVE (TYP)
150 FM
150 FM
A-3
XM-5026
.H
K U -4
X M
D T .d
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-502
E F F
L U
E N
T W
A T
E R L
IF
T S
T A
T
IO
N D
E T
A
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G .L
-4
EFFLUENT WATER LIFT STATION SECTION
SCALE: 1:20
A-3
1 .50 0
1:20
11 .50 0
1:20
EFFLUENT WATER LIFT STATION PLAN
SCALE: 1:20
E-3
NN
200 200
200 200
200 200
195200 195 200
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
1400100 100
B-4
XM-503
B-2
XM-503
(TYP)
EACH WAY
D16@200
FOOTING
CONCRETE
REINFORCED
B-2
XM-503
B-4
XM-503
1000 SQUARE
1400 SQUARE100 100
1600 SQUARE
M
IN
GRAVEL
200 CRUSHED
SUBGRADE
COMPACTED
EMBEDDED IN CONCRETE
ON TOP AND FRAME
"SEWER" EMBOSSED
FRAME WITH WORD
MANHOLE COVER AND
FINISHED GRADE
VERTICAL BARS
DOWELS TO MATCH
FOOTING
CONCRETE
REINFORCED
EACH WAY
D16@200
WAY (TYP)
D16@200 EACH
1000 SQUARE
1400 SQUARE100 100
1600 SQUARE
M
IN
GRAVEL
200 CRUSHED
SUBGRADE
COMPACTED
EMBEDDED IN CONCRETE
ON TOP AND FRAME
"SEWER" EMBOSSED
FRAME WITH WORD
MANHOLE COVER AND
1400 SQUARE
FINISHED GRADE
BENCH FILL
CONCRETE
CONCRETE
TROWEL FINISHED
20 STEEL
BARS
MATCH VERTICAL
DOWELS TO
WAY (TYP)
D16@200 EACH
EACH WAY
D16@200
GENERAL NOTES:
TYPICAL MANHOLE PLAN (MH)
1:20SCALE:
1:20SCALE:
1 .50 0
1:20
.H
K U -4
X M
D T .d
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-503
S
IT
E U
T
IL
IT
Y D
E T
A
IL
S S
H E
E T
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G .L
-4
B-2
XM-503
SECTION
SCALE: 1:20
B-4
XM-503
SECTION
SCALE: 1:20
F-2 F-4
(MH) TOP VIEW
TYPICAL MANHOLE PLAN
30.83.
8. COAT INTERIOR OF MANHOLES PER SECTION 33 01
DETAILS ARE GIVEN IN DEDICATED DRAWINGS.
APPEARANCE OF PAVEMENTS ARE INDICATIVE. EXACT 7.
ARRANGEMENT.
SITE CONDITIONS DO NOT PERMIT A PERPENDICULAR
ALLOWABLE DEFLECTION ANGLE SHALL BE 45° IF THE
WALLS OF THE CATCH BASIN, THE MAXIMUM
THE CATCH BASINS ARE PERPENDICULAR TO THE
IN GENERAL, AXIS OF THE PIPES ENTERING OR LEAVING 6.
THE PIPES ENTERING OR LEAVING THE MANHOLE.
300 IS THE NOMINAL DIAMETER OF THE LARGEST OF 5.
MANHOLE COVER SHALL BE HEAVY DUTY TYPE. 4.
WITH THE FINISHED GRADE.
TOP OF MANHOLE AT PAVED AREAS SHALL BE FLUSH 3.
SEWERS.
SEWER, FOR EQUAL DIAMETER INLET AND OUTLET
30 LOWER THAN THE INVERT ELEVATION OF THE INLET
INVERT ELEVATION OF THE OUTLET SEWER SHALL BE 2.
SEWER SHALL BE SAME.
BRANCH OF THE INLET SEWER AND THE OUTLET
CROWN ELEVATIONS OF DIFFERENT DIAMETER DROP 1.
P
IP
E O
D
M
IN
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
F-4
XM-504
F-4
XM-504
MIN
MIN
A
A A A
B B
450 MIN
CL
(S Q
C
D S
Q
MIN
ELEVATION
BENDS PLAN &
ELEVATION
TEES PLAN &
BENDS & TEES
& ELEVATION
PLUGS PLAN
SCALE:
F-4
XM-5041:20
SECTION
SIZE
PIPE TEES PLUGS
A B A B A B A B C D
150 400 250 230 250 150 200 250 300 250 530
200 560 330 300 330 200 250 330 410 300 740
FOR BELL AND SPIGOT PIPE ONLYNOTE:
OD + 400
OD
(P A
V E
D A
R E
A S
M
IN
M
IN
WATER LINE
4-#12 CONT
POROUS FILL
28 MPA CONCRETE
SEWER LINE
#8@200
POROUS FILL
V A
R
IE
S
V A
R
IE
S
V A
R
IE
S
M
IN
) 1
M
IN
P
A V
E D A
R E
A S
M
IN
ORIGINAL CONDITION
REPAIR SURFACE TO
TO 95% DENSITY
BACKFILL COMPACTED
WARNING TAPE
100 WIDE MAGNETIC
BRICK 90X190X50
ELECTRIC CABLE
FINE SAND
WATER LINE
FINISHED GRADE
AWAY. AT LEAST ONE MARKER SHALL BE PLACED FOR EACH LINE.
DIRECTION AND AT EVERY 30 METERS (MAX) ON THE STRAIGHT
CONCRETE MARKERS SHALL BE PLACED AT EVERY CHANGE IN
NOTE:
M
IN
P
A V
E D A
R E
A S
M
IN
O D
200 200 200
PIPE OD + 400
TAPE
WARNING
100 WIDE
DENSITY
TO 95%
COMPACTED
BACKFILL
LINE
SEWER
ORIGINAL CONDITION
REPAIR SURFACE TO
OR SAND
AGGREGATE
CRUSHED
MIN
2000 ROADWAY
MIN
STEEL CARRIER PIPE WATER OR SEWER PIPE
CARRIER PIPE AT ANY LOCATION.
TOTALLY ON SKIDS AND PIPE BELL DOES NOT REST ON THE
CONTINUOUS SKIDS TO BE LARGE ENOUGH SO THAT PIPE RESTS
NOTE:
3000 3000
FINISHED GRADE
WATER LINE
CONDITION
TO ORIGINAL
SURFACE
REPAIR
ENCASEMENT
CONCRETE
REINFORCED
SEWER LINE
POROUS FILL
SEWER IN CONCRETE FOR A DISTANCE OF 3m ON EACH SIDE OF THE CROSSING.
WHERE SANITARY SEWER LINES PASS ABOVE OR BELOW WATER LINES, ENCASE
NOTE:
V A
R
IE
S
150 130
V A
R
IE
S
GRADE
FINISHED
CONCRETE
CHAMFERED EDGE
GRAVEL
300X300X300
LID
CAST IRON
10 THICK
VALVE STEM
TO FIT
VALVE BOX
TOP OF
WRENCH
GENERAL NOTES:
STRENGTH 0F 250 kg/cm2 WITH 20mm AGGREGATE SIZE.
THRUST BLOCKS SHALL HAVE A 28 DAY COMPRESSIVE 3.
CONCRETE THRUST BLOCKS.
ALL NEW PIPE TURNS AND TIE-IN PIPES SHALL RECEIVE 2.
GROUND.
ALL BEARING SURFACES TO BE UNDISTURBED 1.
1:10SCALE:
LINE INTERSECTION DETAIL
TYPICAL WATER-ELECTRIC
FOR SEWER LINE
TYPICAL TRENCH SECTION
1:100SCALE:
WATER OR SEWER LINES UNDER ROADS
LONGITUDINAL ENCASEMENT SECTION FOR
C-7
XM-504
1:50SCALE:
1:50SCALE:
1.00.500
1:10
1 .50 0
1:20
43211
1:50
1 0 1 2 3 4 5 6 7 8 9
1:100
NOTE:
ENCASED IN CONCRETE AS SHOWN IN SECTION B, THIS SHEET.
ROADWAYS, PIPE SHALL BE PLACED IN PIPE ENCASEMENT OR
IF GRAVITY SEWER CANNOT MAINTAIN 1000 COVER UNDER 1.
SPECIAL NOTE:
GENERAL REFERENCE.
IS APPLICABLE TO THE PROJECT, BUT IS INCLUDED FOR
NOT ALL OF THE INFORMATION DETAILED ON THIS DRAWING
SCALE: 1:10
SCALE: 1:20
.H
K U -4
X M
D T .d
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-504
S
IT
E U
T
IL
IT
Y D
E T
A
IL
S S
H E
E
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G .L
-4
WATERLINES/FORCE MAINS
STANDARD THRUST BLOCK DETAILS FOR
INTERSECTION DETAIL
TYPICAL WATER-SEWER PIPE
C-7
XM-504
SECTION
SCALE: 1:20
F-2
TYPICAL CI OR PVC VALVE BOX DETAIL
E-9
C-5
A-2
A-5
C-9
OF CONCRETE
FORM DAM
AS NECESSARY
CUT END OF TEE
RUN OF SEWER
SIZE SAME AS
BOTTOM
SHAPE MANHOLE
BASE
MANHOLE
EARTH
UNDISTURBED
(IF SPECIFIED)
CONNECTION (TYP)
WATERTIGHT
FLEXIBLE,
V A
R
IE
S m m
MANHOLE DROP CONNECTION
NOTES:
STANDARD TEE
MANHOLE WALL
90 ELBOW
SEE MANHOLE DETAIL.
FOR GENERAL DIMENSIONS OF MANHOLE 3.
MORE THAN 600mm ABOVE OUTLET PIPE.
MANHOLES SANITARY SEWERS ENTERING
DROP CONNECTION TO BE USED FOR ALL 2.
SIDE OF MANHOLE TO UNDISTURBED EARTH.
CONCRETE 100mm EACH SIDE AND FROM
ENCASE DROP PIPE WITH CLASS B 1.
C-2
(TYP)
(TYP)
G R
O U
T
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
150 PIPE
DWG
SEE DETAIL THIS
PIPE SUPPORT,
BOLLARD
WB-67) (NIC)
(ASSUMED
WATER TRUCK
150 PIPEEQUALIZATION
STORAGE
TANK
FOUNDATION
PUMP HOUSE
PREMANUFACTURED
ROUTING
XM-105 FOR
ONLY SEE SHEET
FOR INFORMATION
OVERFLOW SHOWN
INSECT SCREEN
300 STEEL VENT WITH
FULL
WHEN TANK IS
STATION PUMPS
EFFLUENT LIFT
TO DISENGAGE
FLOAT SWITCH
200mm TANK DRAIN AND
ON SHEET XE-504
SEE DETAIL D9
EQUALIZATION
STORAGE TANK
(M
IN
(M
IN
(TYP FOR 5)
GATE VALVE
(TYP FOR 2)
CHECK VALVE
BOLLARD
ROAD
EDGE OFTO CSS
SPACE
CLASSIFICATION ENTIRE
HAZARDOUS ELECTRICAL
UNCLASSIFIED
SHEET
DETAIL THIS
FOOTING, SEE
PIPE SUPPORT
NOTES:
1. SUPPORT ALL PIPES AS REQUIRED
2. PRE-MANUFACTURED PUMP HOUSE TO HAVE SIDE ACCESS AND
USE FILTERS ON ALL OPENINGS TO VENT HEAT FROM BUILDING.
3. PRE-MANUFACTURED PUMP HOUSE IS SHOWN FOR SHAPE.
ACTUAL SIZE WILL BE DETERMINED BY CONTRACTOR BASED ON
THE EXTERNAL DIMENSIONS OF THE PUMPS SELECTED.
4. CONTRACTOR TO PROVIDE CONCRETE PAD AS REQUIRED BY
MANUFACTURER.
5. OVERFLOW PIPE ROUTED AS SHOWN ON SHEET XM-105.
6. SUPPORT OVERFLOW AS REQUIRED.
7. PIPE AND VALVES TO BE RATED @ 1035kPA (150 LB CLASS).
8. FOR OVERFLOW INVERT EL, SEE SHEET XM-105.
.H
K U -4
X M
D T .d
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-505
T R
U C
K F
IL
L S
T A
T
IO
N D
E T
A
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G .L
-4
SCALE: NTS
PLAN
F-4
SCALE: NTS
SECTION
D-2
BASE PLATE
25 X 350 X 350
(TYP)
(TYP)
(T Y
P
(T Y
P
(T Y
P
BOLTS (TYP)
PLAN
SCALE: NTS
B-9
B-9
XM-506
C-2
XM-506
D-9
XM-506
SECTION
PIPE/SUPPORT
SCALE: NTS
D-9
U-BOLT
150 PIPE
C150
HSS150 X 150
150 1000 1000 350
EACH END)
SEAL WELDED (TYP
3 END PLATES,
TYP
150 PIPE
WP
WP
MAX SPACING (TYP)
C150 X 12.2 X 250 @ 1200
TYP
(TYP)
HSS150 X 150 X 6.3
AND 100 PROJECTION
WITH 300 EMBEDMENT
GRADE
D16@250 EW (TYP)
PIPE SUPPORT DETAIL
SCALE: NTS
B-7
150200
TYP
IN
m m
M
IN
m m
M
IN
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
PIPE
PRESSURE
SEE NOTE 1BACKFILL
REMAINING
BACKFILL
INITIAL
P
IP
E E
N V
E L
O P
E
PIPE BEDDING
BACKFILL PIPE TRENCH TO EXISTING SURFACE.3.
TRENCH BOTTOM ELEVATION.
EXCAVATE TO ROCK UNDERLAYMENT. BACKFILL TO CREATE UNIFORM 2.
MAXIMUM TRENCH WIDTH = PIPE OUTSIDE DIAMETER PLUS 600mm.1.
NOTES:
TO DS
CO
CO
LIFT STATION
FROM BROWNSTONES
TO CONSTRUCT
ANGLE BEND REQUIRED
CONTRACTOR TO VERIFY
CONVENIENCE,
CONNECT
GV & QUICK
F-9
XM-506
TO DS
FOR CLARITY
TURNED
V A R
IE
S
V A
R
IE
S
CL CLEANOUT
150/200 UPVC SEWER CONCRETE BLOCK MIN WIDTH OD + 300
VALVE BOX
FRP OR PVC
PREFABRICATED
100 PVC RISER
PAVED AREA
IS LOCATED IN
WHERE CLEANOUT
ENCASEMENT
CONCRETE
100 MIN OF
GRADE
FINISHED
CAP AND COLLAR
THREADED 100 PVC
CAP
THREADED
TYPICAL TRENCH CROSS-SECTION
SCALE: NONE
WASHOUT CONNECTION
NN
NN
NOTES:
1) ALL PIPE FITTINGS ARE SHOWN AS 125 CLASS FITTINGS.
2) ORIENTATION SHOWN FOR INFORMATION ONLY.
3) CONTRACTOR TO CONFIRM AND USE APPROPRIATE PIPE
FITTING TO MAINTAIN PIPE ALIGNMENT IN SEWER ROW.
PIPE TRANSITION
.H
K U -4
X M
D T .d
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-506
G E
N E
R A
L D
E T
A
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G .L
-4
F-9
XM-506
SECTION
SCALE: NONE
F-2 F-4
F-6
CL HATCH
CL MANHOLE
FINISH GRADE
NOTE 7
PROPOSED FORCE MAIN
CONCRETE BRICK
NOTE 3
NOTE 14
NOTE 6
NOTE 5
NOTE 9
NOTE 13
(SEE DETAILS)
SST BALL VALVE
NOTE 11
NOTE 8
NOTE 12
NOTE 4
STEPS
300mm)
=FORCE MAIN (
PROPOSED
EXISTING OR
SLEEVE
TEE OR TAPPING
RELEASE VALVE
50mm SST AIR
BALL VALVE
50mm SST
WITH 25mm TAP
100mm SST FLANGE
50mm SST COUPLING
NOTE 10
NOTE 1
NOTE 2
MINIMUM PIPE COVER UNLESS APPROVED BY COR.
CONTRACTOR TO EXCAVATE FULL DEPTH TO PROVIDE 15.
WALL.
STEEL STRAP W/STAINLESS STEEL ANCHORS SET IN EPOXY IN
STRAP AND ANCHORS: 3mm THICK X 38mm WIDE STAINLESS 14.
STAINLESS STEEL NIPPLE AND BALL VALVE.13.
COUPLING.
STAINLESS STEEL NIPPLE, ANGLE, BALL VALVE AND QUICK 12.
MODEL S-020 (50mm THREADED OR 100mm FLANGED).
CORROSION RESISTANT NYLON OR PLASTIC. A.R.I. USA, INC.
AND NUTS, WASHER, AND SPRING; ALL OTHER PARTS TO BE
BODY, POLY FLOAT, STAINLESS STEEL FLOAT STEM, BOLTS
50mm OR 100mm AUTOMATIC AIR RELEASE VALVE WITH NYLON 11.
RELEASE VENT".
WHITE BACKGROUND READING "SEWAGE FORCE MAIN AIR
175mm X 250mm ALUMINUM SIGN WITH 19mm HIGH LETTERS ON 10.
STAINLESS STEEL UNISTRUT, 75mm X 75mm MINIMUM.9.
TO 600mm ABOVE TOP AS SHOWN.
IMMEDIATELY BELOW PRECAST TOP AND EXTEND 50mm VENT
PLASTIC SCREEN. INCREASE FROM 25mm TO 50mm PIPE
6mm SQUARE MESH CORROSION RESISTANT NYLON OR
TUBING WITH TERMINAL RETURN BEND. COVER OPENING WITH
AND 50mm BLACK, PVC, CPVC, OR ABS, SCHEDULE 80 VENT
USE FLEXIBLE STYROFOAM AROUND MANHOLE SIDES.25mm 8.
MANHOLE TOP AND SIDES.
50mm STYROFOAM INSULATION SECURELY ATTACHED TO 7.
K-5, OR EQUAL.
1050mm SQUARE, ALUMINUM, HINGED ACCESS HATCH; BILCO 6.
WITH CAST-IN-PLACE HATCH.
1800mm DIAMETER (ID) PRECAST REINFORCED CONCRETE TOP 5.
EMBEDMENT AND PROJECTION, 250mm WIDTH.
POLYPROPYLENE ENCAPSULATED 12mm STEEL ROD; 125mm 4.
1800mm RCP; ASTM C76 CLASS II, WALL B, OR ASTM C478.3.
PROVIDE "KNOCKOUTS" IN MANHOLE WALLS FOR ALL PIPES.2.
EW.
RESTS IN AGGREGATE. REINFORCE SADDLES WITH D16@175
SADDLES AGAINST BOTH SIDES OF MANHOLE UNLESS PIPE
CONSTRUCT REINFORCED CONCRETE PIPE SUPPORT 1.
A-1
SCALE: NONE
AIR RELEASE VALVE AND STRUCTURE DETAILS
INSTALLATION CONDITIONS:
AIR RELEASE VALVE DETAIL
NOTES:
TYPICAL SECTION
SCALE: NONESCALE: NONE
150mm BRANCH).
BRANCH; LARGER THAN 300mm MAIN WITH
DI TEE (300mm OR SMALLER MAIN WITH 100mm
PUSH-ON OR MECHANICAL JOINT X FLANGED
NEW INSTALLATION:
100mm PIPE m m M
IN
m m C
L E
A N
C R
U S
H E
D L
IM
E S
T O
N E
BOTH SIDES
TYPICAL SEWER CLEANOUT (CO) DETAIL
SCALE: NONED-6
33 01 30.83.
COAT INTERIOR OF VAULT PER SPECIFICATION
ASSEMBLY.
ANCHORS FOR SUPPORTING VALVE
INSTALL STAINLESS STEEL STRAP AND WALL
MANHOLE.
CENTERLINE TO MAXIMIZE WORKING SPACE IN
AIR RELEASE VALVE MAY BE OFFSET FROM
FOR FITTINGS.
SEE ALTERNATIVE ISOLATING VALVE DETAILS
BASINS
SEDIMENTATION
STRUCTURE DS2
DIVERSION
WWTP 1
PACKAGE
EXISTING
MH 2
PUMPS
EFFLUENT
TANK
STORAGE
EQUALIZATION
OVERFLOW
PUMPS
WAS
W A
S
POND
EXISTING TREATMENT
OVERFLOW TO
SEDIMENTATION
PRIMARY
& DISINFECTION
SECONDARY TREATMENT
DS1-104
STRUCTURE
DIVERSION
OVERFLOW
WWTP 2
PACKAGE
WWTP 3
PACKAGE
MH 1
WAS
300 SS
PUMP
FILL
TRUCK
S
S
POND
TREATMENT
TO EXISTING
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
.H
K U -4
X M
D T .d
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-507
P R
O C
E S
S F
L O
W D
IA
G R
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G .L
-4
PROCESS FLOW DIAGRAM
B-5
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
ACCESS HATCH
SEWAGE PUMP (TYP)
WATER LEVEL
HAZARDOUS AREA
CLASS 1 DIVISION 1
PIPE IE = 136.70
NEW 400mm
HATCH
FLOAT ACCESS
.H
K U -4
X M
D T .d
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XM-508
B R
O W
N S
T O
N E
S L
IF
T S
T A
T
IO
N O
V E
R F
L
W
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
G .L
-4
GENERAL NOTES:
LIFT STATION SECTION
EXISTING BROWNSTONES
SCALE: NONE
C-4
OUT OF SERVICE.
PRIOR TO TAKING BROWNSTONES LIFT STATION
TO CONTRACTING OFFICERS' REPRESENTATIVE
OPERATIONS. CONTRACTOR SHALL PROVIDE PLAN
TRANSPORTED TO WWTP DURING REHABILITATION
MAKEPROVISIONS FOR WASTEWATER TO BE
RECOMMENDATIONS. CONTRACTOR SHALL
APPLY EPOXY COATING PER MANUFACTURERS
CONTRACTOR SHALL CLEAN STRUCTURE AND
PROTECTION. SEE SECTION 33 01 30.83.
APPLYING EPOXY COATING FOR CORROSION
EXISTING BROWNSTONES LIFT STATION BY
OPTION 1: CONTRACTOR TO REHABILITATE 2.
PIECES MINIMUM 500mm LONG.
PIPE CONNECTIONS TO STRUCTURES MADE WITH 2 1.
H
H
C H
H
CHH
CHH
C H
H
CHH
CHH
CPT-3
E744956.901
N3250836.628
130.01
FG FG FG
FGFG
FG FG
FGFG
FG
TMH
SBSB
SBSB
SBSB
SURVEY
LIMITS OF NEW
PLANT SYSTEM
PACKAGE WASTEWATER
TANK
EQUALIZATION STORAGE
EXISTING EARTHEN ACCESS DRIVE
EXISTING FORCEMAIN
HANDHOLE
EXISTING COMMUNICATIONS
FUTURE TELECOMMUNICATIONS
CELL 76mm FABRIC DUCT FOR
ONE OF THE CONDUITS HAVING 3
EXISTING 2-100mm CONDUIT WITH
11KV 3/C 35mm SWA CABLE
EXISTING DIRECT BURIED
G A
T C
H R
O A
D
CPT-3
E744956.901
N3250836.628
130.01
E
J
S
S
S
S
S
S
S
S
S
S
S
S
S
S
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
M A
T C
H L
IN
E F
O R C
O N
T
IN
U A
T
IO
N S
E E S
H E
E T X
E -1
NN
1:1000
10 10 20 30 40 50 60 70 80 90
MATCHLINE - FOR CONTINUATION SEE SHEET XE-102
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-101
E L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:1000
ELECTRICAL SITE PLAN - SHEET 1
B-5
SEE SHEET XE-109
FOR ENLARGED PLAN
EX SS
EX SS
EX SS
EX SS
EX SS
EX C
EX C
EX C
EX C
EX C
EX C
TELECOMMUNICATIONS
DUCT FOR FUTURE
HAVING 3 CELL 76mm FABRIC
WITH ONE OF THE CONDUITS
EXISTING 2-100mm CONDUIT
11KV 3/C 35mm SWA CABLE
EXISTING DIRECT BURIED
BELOW ROAD
CONCRETE ENCASEMENT
MAIN 11KV SUBSTATION
ALI AL SALEM
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
NN
1:1000
10 10 20 30 40 50 60 70 80 90
MATCHLINE - FOR CONTINUATION SEE SHEET XE-101
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-102
E L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:1000
ELECTRICAL SITE PLAN - SHEET 2
B-5
E X
FO
RCEM
AIN
CHH
CHH
CHH
CHH
CHH
WMH
TL=119.75
TMH
TL=119.58
TL=119.66
TL=120.16
MH
MH
MH
SBSB
SBSB
SBSB
SBSB
SBSB
C U
R B S
T O
N E
BUILDING HANDHOLE
EXISTING COMMUNICATIONS
FUTURE TELECOMMUNICATIONS
CELL 76mm FABRIC DUCT FOR
ONE OF THE CONDUITS HAVING 3
EXISTING 2-100mm CONDUIT WITH
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
MATCHLINE - FOR CONTINUATION SEE SHEET XE-104
1:1000
10 10 20 30 40 50 60 70 80 90
M A
T C
H L
IN
E F
O R C
O N
T
IN
U A
T
IO
N S
E E S
H E
E T X
E -1
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-103
E L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:1000
ELECTRICAL SITE PLAN - SHEET 3
B-5
EX C
EX C
EX C
F
R C
E M
A
IN
CHH
CHH
C H
H
C H
H
C H
H
TL=124.27
MH
CABLE
CABLE
HANDHOLE
EXISTING COMMUNICATIONS
FUTURE TELECOMMUNICATIONS
CELL 76mm FABRIC DUCT FOR
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
MATCHLINE - FOR CONTINUATION SEE SHEET XE-105
10 10 20 30 40 50 60 70 80 90
MATCHLINE - FOR CONTINUATION SEE SHEET XE-103
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-104
E L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
K C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:1000
ELECTRICAL SITE PLAN - SHEET 4
B-5
EX C
E X C
E X C
E X
CHH
CHH
CHH
TL
TL
SURVEY
LIMITS OF NEW
SEWER
300mm GRAVITY
MH B2
MH B3
MH B4
S S
S S
S S
SEWER
400mm GRAVITY
CO
CPT-2
E746411.344
N3249692.142
143.826
DD
D D
DD
E E
E
E
E
E
E
E
E
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
ST
DEPTH 0.90m
E P
T H .9 m
HANDHOLE
COMMUNICATIONS
MANHOLE
COMMUNICATION
EXISTING
CONDUCTOR
WITH 150mm EARTH
4/C 300mm SWA CABLE
DIRECT BURIED
FUTURE TELECOMMUNICATIONS
CELL 76mm FABRIC DUCT FOR
ONE OF THE CONDUITS HAVING 3
EXISTING 2-100mm CONDUIT WITH
MANHOLE
EXISTING COMMUNICATIONS
FUTURE TELECOMMUNICATIONS
CELL 76mm FABRIC DUCT FOR
ONE OF THE CONDUITS HAVING 3
EXISTING 2-100mm CONDUIT WITH
FM
EXISTING
S
S
S
S
ST
CL139.86
MH
CL140.31
MH
CL140.21
MH
CL140.21
MH
MH
CL140.19
MH
CL140.18
MH
CL139.91
MH
140.11
MH
CL140.13
MH
TANK
D E P T H .3 m
D E
P T
H .9 m
SEWAGE
DRY AREA
Brownstones Lift Station (LS2)
There are Two Pumps only
BOX
SWITCH
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
MATCHLINE - FOR CONTINUATION SEE SHEET XE-104
NN
1:1000
10 10 20 30 40 50 60 70 80 90
MATCHLINE - FOR CONTINUATION SEE SHEET XE-106
SITE ELECTRICAL NOTES:
1.
FOR THE DESIGN AND CONSTRUCTION OF THE SITE ELECTRICAL DISTRIBUTION SYSTEM.
EXISTING CONDITIONS. CONTRACTOR SHALL ALSO COORDINATE WITH OTHER UTILITIES AND TRADES
OF THE EXISTING SITE UTILITIES WITH THE LOCAL REPRESENTATIVE, SURVEY INFORMATION AND THE
CONTRACTOR SHALL DETERMINE, VERIFY, AND COORDINATE THE DEMOLITION AND/OR RELOCATION
SHOWN OR NOT SHOWN AT ALL BASED ON THE AVAILABLE INFORMATION AT THE TIME OF DESIGN. THE
THE EXISTING UNDERGROUND UTILITIES INFORMATION MAYBE INCOMPLETE AND ARE ONLY PARTIALLY
2.
UNDERGROUND UTILITIES.
OR OTHER ACCEPTABLE MEANS TO DETERMINE LOCATION AND ROUTING OF THE EXISTING
ENSURE SAFETY OF PERSONNEL. THE CONTRACTOR SHALL UTILIZE ELECTRICAL CIRCUIT TRACERS
LOCATION OF ALL EXISTING UTILITIES PRIOR TO STARTING ANY WORK AND TAKE MEASURES TO
CLEARLY DETERMINE THE EXISTING SITE CONDITIONS. CONTRACTOR SHALL DETERMINE THE ACTUAL
THE CONTRACTOR SHALL PERFORM SITE SURVEYS AND ALL OTHER INVESTIGATIONS NEEDED TO
3.
FINISH WORK LOCATION TO MATCH THE EXISTING.
IN CONFLICT WITH THE CONSTRUCTION OR OTHER UNDERGROUND UTILITIES. PATCH REPAIR AND
DUCT BANKS, MANHOLES AND HANDHOLES MAY BE ABANDONED IN PLACE IF THEIR LOCATIONS ARE NOT
ARE LOCATED IN THE AFFECTED FOOTPRINT OF THE CONSTRUCTION AREA. EXISTING UNDERGROUND
THE CONTRACTOR SHALL REMOVE ALL OF THE EXISTING ABANDONED RACEWAYS AND CABLES THAT
4.
OUTAGES, ALL NECESSARY DISCONNECTIONS, AND RECONNECTIONS.
INCLUDING MARKING OF EXISTING UNDERGROUND UTILITIES, DIGGING PERMITS, SCHEDULING OF
COORDINATION WITH THE BASE AGENCIES TO CLEARLY DETERMINE ALL WORK REQUIREMENTS
OF THE AFFECTED CONSTRUCTION AREA. CONTRACTOR SHALL MAKE ALL NEEDED CONTACTS AND
THE CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL UTILITIES THAT ARE IN OPERATION OUT
5.
SWITCHGEAR AND SECONDARY DISTRIBUTION FEEDER CIRCUITS TO THE SEWAGE TREATMENT EQUIPMENT.
MANHOLES, HAND HOLES, DIRECT BURIED CONDUITS, DIRECT BURIED CABLES, SECONDARY DISTRIBUTION
(RMUS), COMPACT SECONDARY SUBSTATIONS, DISTRIBUTION TRANSFORMERS, ELECTRICAL DUCT BANKS, DISTRIBUTION FEEDER CIRCUIT CABLES, PAD-MOUNTED DISTRIBUTION SWITCHES OR RING MAIN UNITS
COORDINATION OF THE SITE ELECTRICAL DISTRIBUTION SYSTEM MAY INCLUDING PRIMARY (11 KV)
REQUIREMENTS, AND OUTAGE REQUIREMENTS WITH BASE OPERATION REPRESENTATIVES. THE
COORDINATION OF THE SITE ELECTRICAL SERVICES, INTERCONNECTION REQUIREMENTS, PHASING
6.
THE NEW FACILITIES.
CONTRACTOR SHALL PROVIDE FINAL ELECTRICAL SERVICES CONNECTIONS, TERMINATIONS FOR
FORCEMAIN200
MANHOLE
EXISTING SEWAGE
TELECOMMUNICATIONS
DUCT FOR FUTURE
3 CELL 76mm FABRIC
THE CONDUITS HAVING
CONDUIT WITH ONE OF
EXISTING 2-100mm
CONTROL PANEL
BROWNSTONES LIFT STATION
EARTH CONDUCTOR
CABLE WITH 150mm
SWA
4/C 300mm
DIRECT BURIED
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-105
E L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SURVEY
LIMITS OF NEW
SCALE: 1:1000
ELECTRICAL SITE PLAN - SHEET 5
B-4
SCALE: 1:400
ENLARGED ELECTRICAL PLAN
E-8
B-2
XE-503
THIS SHEET
SEE ENLARGED PLAN
MH B1
MH B1
SS
SS
NEW SURVEY
LIMITS OF
FORCEMAIN
150mm
S S
S S
S S
S S
CO
CO
SHEET XM-506
CO - SEE D-6 ON
ONE-LINE DIAGRAM
SUBSTATION ELECTRICAL
EXISTING CV2
SEE SHEET XE-603 FOR
CV2 SUBSTATION
CONDUCTOR
EARTH
WITH 150mm
SWA CABLE
4/C 300mm
DIRECT BURIED
CPT-1
E746506.381
N3249449.888
147.917
X XX
X XX
E
E
C
C C
C
C
C
C
C
PORTA CABIN
CL140.58
MHT
CL142.35
MHT
D E P T H .8 m
DEP
TH 0
.50 m
DEPTH 0.6m
DEPTH 0.3m
DEP
TH
0.3 m
D E P
T H .5 m
D E
P T
H .2 m
D E P T
H .8 m
D E P T H .7 m
D E P T H .7 m
D E P T H .8 m
D E P T H 0.45m
D E P T H .5 m
SECURITY ARM
D E P
T H .8 m
D E P
T H .8 m
CL142.87
MH
ASP
HALT
ROAD
ASPHALT R
OAD
ASPHALT R
OAD
ASPHALT
ROAD
ASPHALT
ROAD
F E
N C
E
F E
N C
E
F E
N C
E
F E
N C
E
F E
N C
E
G A
T E
G A
T E
C H
A N
N E
L
C H
A N
N E
L
ASP
HALT
R O
AD
SECURITY ARM
SECURITY ARM
A S
P H
A L T R
O A
D
A S
P H
A L T R
O A
D
SECURITY ROOM
S E
C U
R
IT
Y B
A R
R
IE
R
CO
NCRETE
B
ASE
CONCRETE BASE
D E
P T
H .4 m
D E P T
H .6 m
G A
T E
TRAFFIC LIGHT
TRAFFIC LIGHT
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
MATCHLINE - FOR CONTINUATION SEE SHEET XE-105
10 10 20 30 40 50 60 70 80 90
SITE ELECTRICAL NOTES:
1.
ELECTRICAL DISTRIBUTION SYSTEM.
UTILITIES AND TRADES FOR THE DESIGN AND CONSTRUCTION OF THE SITE
EXISTING CONDITIONS. CONTRACTOR SHALL ALSO COORDINATE WITH OTHER
SITE UTILITIES WITH THE LOCAL REPRESENTATIVE, SURVEY INFORMATION AND THE
VERIFY, AND COORDINATE THE DEMOLITION AND/OR RELOCATION OF THE EXISTING
INFORMATION AT THE TIME OF DESIGN. THE CONTRACTOR SHALL DETERMINE,
ARE ONLY PARTIALLY SHOWN OR NOT SHOWN AT ALL BASED ON THE AVAILABLE
THE EXISTING UNDERGROUND UTILITIES INFORMATION MAYBE INCOMPLETE AND
2.
AND ROUTING OF THE EXISTING UNDERGROUND UTILITIES.
CIRCUIT TRACERS OR OTHER ACCEPTABLE MEANS TO DETERMINE LOCATION
ENSURE SAFETY OF PERSONNEL. THE CONTRACTOR SHALL UTILIZE ELECTRICAL
EXISTING UTILITIES PRIOR TO STARTING ANY WORK AND TAKE MEASURES TO
CONDITIONS. CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION OF ALL
INVESTIGATIONS NEEDED TO CLEARLY DETERMINE THE EXISTING SITE
THE CONTRACTOR SHALL PERFORM SITE SURVEYS AND ALL OTHER
3.
PATCH REPAIR AND FINISH WORK LOCATION TO MATCH THE EXISTING.
CONFLICT WITH THE CONSTRUCTION OR OTHER UNDERGROUND UTILITIES.
AND HANDHOLES MAY BE ABANDONED IN PLACE IF THEIR LOCATIONS ARE NOT IN
THE CONSTRUCTION AREA. EXISTING UNDERGROUND DUCT BANKS, MANHOLES
RACEWAYS AND CABLES THAT ARE LOCATED IN THE AFFECTED FOOTPRINT OF
THE CONTRACTOR SHALL REMOVE ALL OF THE EXISTING ABANDONED
4.
RECONNECTIONS.
SCHEDULING OF OUTAGES, ALL NECESSARY DISCONNECTIONS, AND
MARKING OF EXISTING UNDERGROUND UTILITIES, DIGGING PERMITS,
AGENCIES TO CLEARLY DETERMINE ALL WORK REQUIREMENTS INCLUDING
SHALL MAKE ALL NEEDED CONTACTS AND COORDINATION WITH THE BASE
IN OPERATION OUT OF THE AFFECTED CONSTRUCTION AREA. CONTRACTOR
THE CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL UTILITIES THAT ARE
5.
TO THE SEWAGE TREATMENT EQUIPMENT.
DISTRIBUTION SWITCHGEAR AND SECONDARY DISTRIBUTION FEEDER CIRCUITS
HOLES, DIRECT BURIED CONDUITS, DIRECT BURIED CABLES, SECONDARY
DISTRIBUTION TRANSFORMERS, ELECTRICAL DUCT BANKS, MANHOLES, HAND
SWITCHES OR RING MAIN UNITS (RMUS), COMPACT SECONDARY SUBSTATIONS,
DISTRIBUTION FEEDER CIRCUIT CABLES, PAD-MOUNTED DISTRIBUTION
ELECTRICAL DISTRIBUTION SYSTEM MAY INCLUDING PRIMARY (11 KV)
BASE OPERATION REPRESENTATIVES. THE COORDINATION OF THE SITE
REQUIREMENTS, PHASING REQUIREMENTS, AND OUTAGE REQUIREMENTS WITH
COORDINATION OF THE SITE ELECTRICAL SERVICES, INTERCONNECTION
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-106
E L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:1000
ELECTRICAL SITE PLAN - SHEET 6
B-5
MATCHLINE - FOR CONTINUATION SEE SHEET XE-107
TERMINATIONS FOR THE NEW FACILITIES.
CONTRACTOR SHALL PROVIDE FINAL ELECTRICAL SERVICES CONNECTIONS, 6.
SURVEY
LIMITS OF NEW
GENERATOR
DENMARK
OFFICE
DENMARK
OFFICE
FENCE
ASPHALT ROAD
ASPHALT ROAD
CABIN
PORTA
CABIN
PORTA
TENT
TRANSFORMER
A S P H
A
LT
R
O A D
A S P
H A
L T R
O A
D
SHED
CAR
AREA
FILLING
FUEL
D E P
T H .8 m
S S
SS
CO
SHEET XM-506
CO - SEE D-6 ON
TR
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
MATCHLINE - FOR CONTINUATION SEE SHEET XE-106
NN
1:1000
10 10 20 30 40 50 60 70 80 90
SITE ELECTRICAL NOTES:
1.
ELECTRICAL DISTRIBUTION SYSTEM.
UTILITIES AND TRADES FOR THE DESIGN AND CONSTRUCTION OF THE SITE
EXISTING CONDITIONS. CONTRACTOR SHALL ALSO COORDINATE WITH OTHER
SITE UTILITIES WITH THE LOCAL REPRESENTATIVE, SURVEY INFORMATION AND THE
VERIFY, AND COORDINATE THE DEMOLITION AND/OR RELOCATION OF THE EXISTING
INFORMATION AT THE TIME OF DESIGN. THE CONTRACTOR SHALL DETERMINE,
ARE ONLY PARTIALLY SHOWN OR NOT SHOWN AT ALL BASED ON THE AVAILABLE
THE EXISTING UNDERGROUND UTILITIES INFORMATION MAYBE INCOMPLETE AND
2.
AND ROUTING OF THE EXISTING UNDERGROUND UTILITIES.
CIRCUIT TRACERS OR OTHER ACCEPTABLE MEANS TO DETERMINE LOCATION
ENSURE SAFETY OF PERSONNEL. THE CONTRACTOR SHALL UTILIZE ELECTRICAL
EXISTING UTILITIES PRIOR TO STARTING ANY WORK AND TAKE MEASURES TO
CONDITIONS. CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION OF ALL
INVESTIGATIONS NEEDED TO CLEARLY DETERMINE THE EXISTING SITE
THE CONTRACTOR SHALL PERFORM SITE SURVEYS AND ALL OTHER
3.
PATCH REPAIR AND FINISH WORK LOCATION TO MATCH THE EXISTING.
IN CONFLICT WITH THE CONSTRUCTION OR OTHER UNDERGROUND UTILITIES.
AND HANDHOLES MAY BE ABANDONED IN PLACE IF THEIR LOCATIONS ARE NOT
THE CONSTRUCTION AREA. EXISTING UNDERGROUND DUCT BANKS, MANHOLES
RACEWAYS AND CABLES THAT ARE LOCATED IN THE AFFECTED FOOTPRINT OF
THE CONTRACTOR SHALL REMOVE ALL OF THE EXISTING ABANDONED
4.
RECONNECTIONS.
SCHEDULING OF OUTAGES, ALL NECESSARY DISCONNECTIONS, AND
MARKING OF EXISTING UNDERGROUND UTILITIES, DIGGING PERMITS,
AGENCIES TO CLEARLY DETERMINE ALL WORK REQUIREMENTS INCLUDING
SHALL MAKE ALL NEEDED CONTACTS AND COORDINATION WITH THE BASE
IN OPERATION OUT OF THE AFFECTED CONSTRUCTION AREA. CONTRACTOR
THE CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL UTILITIES THAT ARE
5.
TO THE SEWAGE TREATMENT EQUIPMENT.
DISTRIBUTION SWITCHGEAR AND SECONDARY DISTRIBUTION FEEDER CIRCUITS
HOLES, DIRECT BURIED CONDUITS, DIRECT BURIED CABLES, SECONDARY
DISTRIBUTION TRANSFORMERS, ELECTRICAL DUCT BANKS, MANHOLES, HAND
SWITCHES OR RING MAIN UNITS (RMUS), COMPACT SECONDARY SUBSTATIONS,
DISTRIBUTION FEEDER CIRCUIT CABLES, PAD-MOUNTED DISTRIBUTION
ELECTRICAL DISTRIBUTION SYSTEM MAY INCLUDING PRIMARY (11 KV)
BASE OPERATION REPRESENTATIVES. THE COORDINATION OF THE SITE
REQUIREMENTS, PHASING REQUIREMENTS, AND OUTAGE REQUIREMENTS WITH
COORDINATION OF THE SITE ELECTRICAL SERVICES, INTERCONNECTION
6.
TERMINATIONS FOR THE NEW FACILITIES.
CONTRACTOR SHALL PROVIDE FINAL ELECTRICAL SERVICES CONNECTIONS,
M A
T C
H L
IN
E F
O R C
O N
T
IN
U A
T
IO
N S
E E S
H E
E T X
E -1
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-107
E L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:1000
ELECTRICAL SITE PLAN - SHEET 7
E-5
MATCHLINE - FOR CONTINUATION SEE SHEET XE-108
NEW SURVEY
LIMITS OF
SUBSTATION 2
EXISTING COMPACT
GND
25mm
, (1)
75mm - (4) 25mm
NEW
SURVEY
LIMITS OF NEW
S S
SS CO
S S
S S
SS
SHEET XM-506
CO - SEE D-6 ON
S S
S
S
TR
E
E
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
NN
1:1000
10 10 20 30 40 50 60 70 80 90
SITE ELECTRICAL NOTES:
1.
ELECTRICAL DISTRIBUTION SYSTEM.
UTILITIES AND TRADES FOR THE DESIGN AND CONSTRUCTION OF THE SITE
EXISTING CONDITIONS. CONTRACTOR SHALL ALSO COORDINATE WITH OTHER
SITE UTILITIES WITH THE LOCAL REPRESENTATIVE, SURVEY INFORMATION AND THE
VERIFY, AND COORDINATE THE DEMOLITION AND/OR RELOCATION OF THE EXISTING
INFORMATION AT THE TIME OF DESIGN. THE CONTRACTOR SHALL DETERMINE,
ARE ONLY PARTIALLY SHOWN OR NOT SHOWN AT ALL BASED ON THE AVAILABLE
THE EXISTING UNDERGROUND UTILITIES INFORMATION MAYBE INCOMPLETE AND
2.
AND ROUTING OF THE EXISTING UNDERGROUND UTILITIES.
CIRCUIT TRACERS OR OTHER ACCEPTABLE MEANS TO DETERMINE LOCATION
ENSURE SAFETY OF PERSONNEL. THE CONTRACTOR SHALL UTILIZE ELECTRICAL
EXISTING UTILITIES PRIOR TO STARTING ANY WORK AND TAKE MEASURES TO
CONDITIONS. CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION OF ALL
INVESTIGATIONS NEEDED TO CLEARLY DETERMINE THE EXISTING SITE
THE CONTRACTOR SHALL PERFORM SITE SURVEYS AND ALL OTHER
3.
PATCH REPAIR AND FINISH WORK LOCATION TO MATCH THE EXISTING.
CONFLICT WITH THE CONSTRUCTION OR OTHER UNDERGROUND UTILITIES.
AND HANDHOLES MAY BE ABANDONED IN PLACE IF THEIR LOCATIONS ARE NOT IN
THE CONSTRUCTION AREA. EXISTING UNDERGROUND DUCT BANKS, MANHOLES
RACEWAYS AND CABLES THAT ARE LOCATED IN THE AFFECTED FOOTPRINT OF
THE CONTRACTOR SHALL REMOVE ALL OF THE EXISTING ABANDONED
4.
OUTAGES, ALL NECESSARY DISCONNECTIONS, AND RECONNECTIONS.
EXISTING UNDERGROUND UTILITIES, DIGGING PERMITS, SCHEDULING OF
CLEARLY DETERMINE ALL WORK REQUIREMENTS INCLUDING MARKING OF
MAKE ALL NEEDED CONTACTS AND COORDINATION WITH THE BASE AGENCIES TO
OPERATION OUT OF THE AFFECTED CONSTRUCTION AREA. CONTRACTOR SHALL
THE CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL UTILITIES THAT ARE IN
5.
TO THE SEWAGE TREATMENT EQUIPMENT.
DISTRIBUTION SWITCHGEAR AND SECONDARY DISTRIBUTION FEEDER CIRCUITS
HOLES, DIRECT BURIED CONDUITS, DIRECT BURIED CABLES, SECONDARY
DISTRIBUTION TRANSFORMERS, ELECTRICAL DUCT BANKS, MANHOLES, HAND
SWITCHES OR RING MAIN UNITS (RMUS), COMPACT SECONDARY SUBSTATIONS,
DISTRIBUTION FEEDER CIRCUIT CABLES, PAD-MOUNTED DISTRIBUTION
ELECTRICAL DISTRIBUTION SYSTEM MAY INCLUDING PRIMARY (11 KV)
BASE OPERATION REPRESENTATIVES. THE COORDINATION OF THE SITE
REQUIREMENTS, PHASING REQUIREMENTS, AND OUTAGE REQUIREMENTS WITH
COORDINATION OF THE SITE ELECTRICAL SERVICES, INTERCONNECTION
6.
TERMINATIONS FOR THE NEW FACILITIES.
CONTRACTOR SHALL PROVIDE FINAL ELECTRICAL SERVICES CONNECTIONS,
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-108
E L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:1000
ELECTRICAL SITE PLAN - SHEET 8
B-5
SEE SHEET XE-110
FOR ENLARGED PLAN
S H
E E
T X
E -1
C O
N T
IN
U A
T
IO
N S
T C
H L
IN
E F
SHEET XE-107
CONTINUATION SEE
MATCHLINE - FOR
KEYED NOTES:
STATION.
INTERRUPTING CAPACITY TO FEED THE SOUTH YARD LIFT
THERMAL MAGNETIC CIRCUIT BREAKER WITH 65KAIC
AND 433/250V SWITCH BOARD. PROVIDE NEW 60A/3P
EXISTING RING-MAIN-UNIT; 1250KVA, 433/250V TRANSFORMER;
SUBSTATION INCLUDES:
B-5
XE-503
RATHER THAN COMMUNICATION AS SHOWN ON DETAIL C-5.
ON SHEET XE-504. USE "ELECTRICAL" ENGRAVED INTO COVER
PROVIDE HANDHOLE PER DETAILS E1, C-1, G-5, E-5, C-5 AND A-1
CPT-3
E744956.901
N3250836.628
130.01
E
S
S
S
S
S
S
S
S
S
S
S
S
S
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
NN
1:400
10 20 30
PAD GFGI
GENERATOR
EXISTING
ONE-LINE DIAGRAM ON SHEET XE-601
SUBSTATION (CSS), 225KVA, 433/250V, SEE
EXISTING COMPACT SECONDARY
COORDINATION
SHEET XE-504 FOR
XM-505 AND DETAIL D-9 ON
CONTROL PANEL SEE SHEET
TRUCK FILL LIFT STATION
NEW
DETAIL D-1 ON SHEET XE-505
PUMP CONTROLLER, SEE
EFFLUENT LIFT STATION
NEW
CONTROLLER
LIFT STATION PUMP
EXISTING (WAS)
INTERLOCKED DISCONNECT
EXISTING 400A 4P, IP56
FOR CONTINUATION
SEE SHEET XE-101
T
T
T
T
C H
H
SITE ELECTRICAL NOTES:
1.
ELECTRICAL DISTRIBUTION SYSTEM.
UTILITIES AND TRADES FOR THE DESIGN AND CONSTRUCTION OF THE SITE
EXISTING CONDITIONS. CONTRACTOR SHALL ALSO COORDINATE WITH OTHER
SITE UTILITIES WITH THE LOCAL REPRESENTATIVE, SURVEY INFORMATION AND THE
VERIFY, AND COORDINATE THE DEMOLITION AND/OR RELOCATION OF THE EXISTING
INFORMATION AT THE TIME OF DESIGN. THE CONTRACTOR SHALL DETERMINE,
ARE ONLY PARTIALLY SHOWN OR NOT SHOWN AT ALL BASED ON THE AVAILABLE
THE EXISTING UNDERGROUND UTILITIES INFORMATION MAYBE INCOMPLETE AND
2.
AND ROUTING OF THE EXISTING UNDERGROUND UTILITIES.
CIRCUIT TRACERS OR OTHER ACCEPTABLE MEANS TO DETERMINE LOCATION
ENSURE SAFETY OF PERSONNEL. THE CONTRACTOR SHALL UTILIZE ELECTRICAL
EXISTING UTILITIES PRIOR TO STARTING ANY WORK AND TAKE MEASURES TO
CONDITIONS. CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION OF ALL
INVESTIGATIONS NEEDED TO CLEARLY DETERMINE THE EXISTING SITE
THE CONTRACTOR SHALL PERFORM SITE SURVEYS AND ALL OTHER
3.
REPAIR AND FINISH WORK LOCATION TO MATCH THE EXISTING.
CONFLICT WITH THE CONSTRUCTION OR OTHER UNDERGROUND UTILITIES. PATCH
HANDHOLES MAY BE ABANDONED IN PLACE IF THEIR LOCATIONS ARE NOT IN
CONSTRUCTION AREA. EXISTING UNDERGROUND DUCT BANKS, MANHOLES AND
AND CABLES THAT ARE LOCATED IN THE AFFECTED FOOTPRINT OF THE
THE CONTRACTOR SHALL REMOVE ALL OF THE EXISTING ABANDONED RACEWAYS
4.
OUTAGES, ALL NECESSARY DISCONNECTIONS, AND RECONNECTIONS.
EXISTING UNDERGROUND UTILITIES, DIGGING PERMITS, SCHEDULING OF
CLEARLY DETERMINE ALL WORK REQUIREMENTS INCLUDING MARKING OF
SHALL MAKE ALL NEEDED CONTACTS AND COORDINATION WITH THE COR TO
IN OPERATION OUT OF THE AFFECTED CONSTRUCTION AREA. CONTRACTOR
THE CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL UTILITIES THAT ARE
5.
TO THE SEWAGE TREATMENT EQUIPMENT.
DISTRIBUTION SWITCHGEAR AND SECONDARY DISTRIBUTION FEEDER CIRCUITS
HOLES, DIRECT BURIED CONDUITS, DIRECT BURIED CABLES, SECONDARY
DISTRIBUTION TRANSFORMERS, ELECTRICAL DUCT BANKS, MANHOLES, HAND
SWITCHES OR RING MAIN UNITS (RMUS), COMPACT SECONDARY SUBSTATIONS,
DISTRIBUTION FEEDER CIRCUIT CABLES, PAD-MOUNTED DISTRIBUTION
ELECTRICAL DISTRIBUTION SYSTEM MAY INCLUDING PRIMARY (11 KV)
BASE OPERATION REPRESENTATIVES. THE COORDINATION OF THE SITE
REQUIREMENTS, PHASING REQUIREMENTS, AND OUTAGE REQUIREMENTS WITH
COORDINATION OF THE SITE ELECTRICAL SERVICES, INTERCONNECTION
6.
TERMINATIONS FOR THE NEW FACILITIES.
CONTRACTOR SHALL PROVIDE FINAL ELECTRICAL SERVICES CONNECTIONS,
7.
8.
SEE SHEET XE-602 FOR LIGHT FIXTURE SCHEDULE.
CIRCUIT SCHEDULE
SEE SHEET XE-602 FOR
WWTP 1
PACKAGED
EXISTING
EXISTING GROUND TEST WELL
(TYP)
GROUND ROD
EXISTING
SWA CABLE
35mm
EXISTING 11KV 3/C
FUTURE TELECOMMUNICATIONS
CELL 76mm FABRIC DUCT FOR
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-109
E N
L A
R G
E D E
L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:400
ENLARGED ELECTRICAL SITE PLAN
C-5
WWTP 2
PACKAGED
PROPOSED
WWTP 3
PACKAGED
PROPOSED
TO CSS CKT 25, 27, 29
NEW
TO CSS CKT 7, 9, 11
NEW
TO CSS CKT 19, 21, 23
NEW
TO CSS CKT 2, 4, 6
NEW
T
9.
REQUIRED ELECTRICAL SHUTDOWN SHALL BE COORDINATED WITH THE COR.
THE EXISTING WWTP MUST REMAIN IN OPERATION DURING CONSTRUCTION. ANY
PROVIDE GROUNDING AT WWTP 2 AND WWTP 3 PER DETAIL B-6 ON SHEET XE-503.
S S
S
S
TR
E
SURVEY
LIMITS OF NEW
NEW SURVEY
LIMITS OF
ON SHEET XE-505
XM-501 AND DETAIL D-5
PANEL. SEE SHEET
STATION CONTROL
SOUTH YARD LIFT
NEW
GND
(1) 25mm
75mm - (4) 25mm
NEW
SS
T
FOR DETAILS
AND XE-602
SEE XE-506
AREA LIGHTS
NEW
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN METERS.
1:400
10 20 30
SITE ELECTRICAL NOTES:
1.
ELECTRICAL DISTRIBUTION SYSTEM.
UTILITIES AND TRADES FOR THE DESIGN AND CONSTRUCTION OF THE SITE
EXISTING CONDITIONS. CONTRACTOR SHALL ALSO COORDINATE WITH OTHER
SITE UTILITIES WITH THE LOCAL REPRESENTATIVE, SURVEY INFORMATION AND THE
VERIFY, AND COORDINATE THE DEMOLITION AND/OR RELOCATION OF THE EXISTING
INFORMATION AT THE TIME OF DESIGN. THE CONTRACTOR SHALL DETERMINE,
ARE ONLY PARTIALLY SHOWN OR NOT SHOWN AT ALL BASED ON THE AVAILABLE
THE EXISTING UNDERGROUND UTILITIES INFORMATION MAYBE INCOMPLETE AND
2.
AND ROUTING OF THE EXISTING UNDERGROUND UTILITIES.
CIRCUIT TRACERS OR OTHER ACCEPTABLE MEANS TO DETERMINE LOCATION
ENSURE SAFETY OF PERSONNEL. THE CONTRACTOR SHALL UTILIZE ELECTRICAL
EXISTING UTILITIES PRIOR TO STARTING ANY WORK AND TAKE MEASURES TO
CONDITIONS. CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION OF ALL
INVESTIGATIONS NEEDED TO CLEARLY DETERMINE THE EXISTING SITE
THE CONTRACTOR SHALL PERFORM SITE SURVEYS AND ALL OTHER
3.
PATCH REPAIR AND FINISH WORK LOCATION TO MATCH THE EXISTING.
CONFLICT WITH THE CONSTRUCTION OR OTHER UNDERGROUND UTILITIES.
AND HANDHOLES MAY BE ABANDONED IN PLACE IF THEIR LOCATIONS ARE NOT IN
THE CONSTRUCTION AREA. EXISTING UNDERGROUND DUCT BANKS, MANHOLES
RACEWAYS AND CABLES THAT ARE LOCATED IN THE AFFECTED FOOTPRINT OF
THE CONTRACTOR SHALL REMOVE ALL OF THE EXISTING ABANDONED
4.
RECONNECTIONS.
SCHEDULING OF OUTAGES, ALL NECESSARY DISCONNECTIONS, AND
MARKING OF EXISTING UNDERGROUND UTILITIES, DIGGING PERMITS,
AGENCIES TO CLEARLY DETERMINE ALL WORK REQUIREMENTS INCLUDING
SHALL MAKE ALL NEEDED CONTACTS AND COORDINATION WITH THE BASE
IN OPERATION OUT OF THE AFFECTED CONSTRUCTION AREA. CONTRACTOR
THE CONTRACTOR SHALL RELOCATE EXISTING ELECTRICAL UTILITIES THAT ARE
5.
TO THE SEWAGE TREATMENT EQUIPMENT.
DISTRIBUTION SWITCHGEAR AND SECONDARY DISTRIBUTION FEEDER CIRCUITS
HOLES, DIRECT BURIED CONDUITS, DIRECT BURIED CABLES, SECONDARY
DISTRIBUTION TRANSFORMERS, ELECTRICAL DUCT BANKS, MANHOLES, HAND
SWITCHES OR RING MAIN UNITS (RMUS), COMPACT SECONDARY SUBSTATIONS,
DISTRIBUTION FEEDER CIRCUIT CABLES, PAD-MOUNTED DISTRIBUTION
ELECTRICAL DISTRIBUTION SYSTEM MAY INCLUDING PRIMARY (11 KV)
BASE OPERATION REPRESENTATIVES. THE COORDINATION OF THE SITE
REQUIREMENTS, PHASING REQUIREMENTS, AND OUTAGE REQUIREMENTS WITH
COORDINATION OF THE SITE ELECTRICAL SERVICES, INTERCONNECTION
6.
TERMINATIONS FOR THE NEW FACILITIES.
CONTRACTOR SHALL PROVIDE FINAL ELECTRICAL SERVICES CONNECTIONS,
7.SEE SHEET XE-602 FOR LIGHT FIXTURE SCHEDULE.
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-110
E N
L A
R G
E D E
L E
C T
R
IC
A L S
IT
E P
L A
N S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: 1:400
ENLARGED ELECTRICAL SITE PLAN
C-5
SEE SHEET XE-108
FOR CONTINUATION
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
EQUIPMENT
GRADE
AS REQUIRED
GROUND CABLE
WELDED TERMINAL
EXOTHERMIC
CONNECTION
BRONZE BOLTED
WELDED TO EQUIP
GROUNDING LUG
910mm MINIMUM RADIUS
COUPLING
STEEL (RGS)
GALVANIZED
TO RIGID
PROVIDE PVC
100 MIN
M
IN
RGS NOTE 1PVC
(RGS) COUPLING
GALVANIZED STEEL
PROVIDE PVC TO RIGID
B E
L O
W F
L O
O R S
L A
B
OF WATERPROOF PIPE TAPE.
COATED WITH PVC OR BE WRAPPED WITH A MINIMUM OF TWO LAYERS
ONLY RGS SHALL PENETRATE CONCRETE SLAB. RGS MUST BE FACTORY
BARRIER (NOT SHOWN).
SEAL AROUND CONDUITS AT PENETRATION THROUGH VAPOR
NOTE 2
100mm - 150mm
FROM WALL
FOOTING
UNDER
300 MINIMUM
RADIUS
910mm MINIMUM
C O
N C S
L A
B m m A
F F
GROUND LEVEL
EXTERIOR WALL
BUILDING
DUCTS ENTERING
FOOTING
M
IN
IM
U M
U N
D E
R F
O O
T
IN
G
PVC
PVCRGS
NOTE 1
BUILDING
DUCTS ENTERING
EXTERIOR WALL
GROUND LEVEL
1.
2.
NOTES
C O
N C S
L A
B m m A
F F
100mm - 150mm
FROM WALL
NOTE 2
RGS
NOTE 1
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-501
E L E
C T
R
IC
A L D
E T
A
IL
S S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: NONE
CONDUIT ENTRY UNDER FOOTINGSE-5
XE-501 SCALE: NONE
CONDUIT ENTRY THRU SLABE-8
XE-501
SCALE: NONE
ARC FLASH WARNING LABELB-2
XE-501 SCALE: NONE
EQUIPMENT GROUNDING CONNECTIONB-5
XE-501
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
COLUMN FOOTING
COMPLETE WITH NUT & BOLT
COMPRESSION CONNECTOR
TO MAIN GROUND GRID
GROUNDING CONDUCTOR
BARE COPPER
95mm
CONNECTION
EXOTHERMIC
FLOOR SLAB
PLATE
COLUMN BASE
COLUMN
BUILDING STEEL
CONNECTION
EXOTHERMIC
ELEVEVATION
FINISHED GRADE
MAIN GROUND GRID 95mm
M
IN
(T Y
P
ELEVEVATION
FINISHED GRADE
REBAR
CONNECTION
EXOTHERMIC
GRID
COPPER TO GROUND
BARE
95mm
GRID 95mm
MAIN GROUND
THRU SLAB
25 PVC SLEEVE
COPPER CONDUCTOR
BARE SOFT DRAWN
95mm
LIGHTNING CONDUCTOR
CLASS I COPPER
EXOTHERMIC WELD
STEEL GROUND ROD
20mm X 3100mm COPPER CLAD
CONDUCTOR
DRAWN COPPER
BARE SOFT
95mm
EXOTHERMIC WELD
GROUND ROD
COPPER CLAD STEEL
20mm X 3100mm
M
IN
(T Y
P
M
IN
(T Y
P
CONNECTION
EXOTHERMIC
WIRE
100 X 100 JUNCTION BOX
WALL
CONDUIT
EXPOSED JUNCTION BOX
EXTENSION RING AS
COVER
GLAND
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-502
E L E
C T
R
IC
A L D
E T
A
IL
S S
H E
E
W S
T E
P H
E N
S O
N
S
IT
E D
E S
N S
T R
U C
T S
E W
A G
E T
R E
A T
M E
N T E
X T
E N
S
IO
N
J M
C
C h ie f, B
L D
G S y s te m s B ra n c h
P -4
SCALE: NONE
TEE CONNECTION
GROUND GRID
F-1
XE-502 SCALE: NONE
CROSS CONNECTION
GROUND GRID
F-3
XE-502 SCALE: NONE
GROUNDING CONNECTION
ALTERNATE BOLTED COLUMN
F-6
XE-502 SCALE: NONE
GROUND ROD WITH TAP DETAILF-9
XE-502SCALE: NONE
COLUMN GROUNDING F-7
XE-502
SCALE: NONE
REBAR GROUNDING D-1
XE-502 SCALE: NONE
EMBEDDED ROUTING IN WALL DETAIL
CONVERTING FROM EXPOSED TO
D-4
XE-502 SCALE: NONE
GROUND ROD DETAIL D-6
XE-502
100 100
M
IN
250 250 200
WARNING TAPE
100 WIDE
95% DENSITY
COMPACTED TO
BACKFILL
SAND LAYER
SEWER LINE
ORIGINAL CONDITION
REPAIR SURFACE TO
ENCASED IN CONCRETE UNDER ROADWAYS.
NOTE:
PVC CONDUIT
100mm COMMUNICATION
GRADE
95% DENSITY
COMPACTED TO
BACKFILL
SAND LAYER
ORIGINAL CONDITION
REPAIR SURFACE TO
ENCASED IN CONCRETE UNDER ROADWAYS.
NOTE:
200200
GRADE
BELOW
CAUTION - ELECTRICAL LINE
150mm WIDE WARNING TAPE
CONDUIT
ELECTRICAL
D L E E
A S
T D
IS
T R
IC
T
P .O
B O
X
W
IN
C H
E S
T E
R
V A
-1
P L
O T D
A T
E
F
IL
E N
A M
E
A N
S
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D
A T
E
T
IM
E
U
S E
R
F
IL
E
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
HLP
U L
50H2
BONDING LUG
BRONZE SECONDARY
FLAT METAL CLAMP
BRONZE CABLE TO
SPLICER
BRONZE PARALLEL
BONDING PLATE
TINNED BRONZE
PARALLEL CLAMP
BRONZE 1 BOLT
BONDING LUG
BRONZE HEAVY DUTY
m m
M
IN
2 4
GRADE
COPPER BURIED MINIMUM 450mm BELOW
GROUNDING CONDUCTOR 120mm
GROUND CLAMP
X 3100mm
COPPER CLAD GROUND ROD 20mm
SITE CLASS D (DESIGN CATEGORY D)
CONCRETE REINFORCED BOX RATED FOR SEISMIC
COVER FOR ABOVE BOX
GRAVEL OR CRUSHED STONE
(COVER REMOVED)
TOP VIEW
MATERIAL LIST
A
XE-503
SCALE:
A
XE-503NONE
SECTION
S E
K U -4
X E
I
A L S
A L E
M A
IR
B
A S
E
K U
W A
IT
XE-503
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .