This document contains a cost breakdown sheet and solicitation for runway repair work at Ali Al Salem Air Base in Kuwait. The cost breakdown sheet provides pricing for various repair items including full and partial slab replacement, spall repair, joint sealant replacement, and runway markings. The fixed price solicitation was issued by the U.S. Army Corps of Engineers Middle East District on behalf of the Department of the Army. Responses for the design-build contract are due by September 19, 2019. The solicitation seeks a prime contractor to conduct runway and taxiway repairs at the air base located in Kuwait.

Cost Breakdown Sheet for W912ER19R0027

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: W912ER19R0027 450800

PROJECT: REPAIR RUNWAYS PROPOSER:

LOCATION: Ali Al Salem Air Base, Kuwait DATE:

Mobilization and Demobilization in accordance with the contract documents

Repair South Runway 12R/30L in accordance with the contract documents

0002AA

Full Slab Replacement to Subgrade in accordance with the contract documents

0002AB

Partial Slab Repair to Subgrade in accordance with the contract documents

0002AC Spall Repair in accordance with the contract documents

0002AD

Remove and Replace Joint Sealant in accordance with the contract documents

0002AE

Remove Rubber from Remaining Pavement in accordance with the contract documents

0002AF Markings in accordance with the contract documents

Total Price (Items 0002AA - 0002AF)

Repair North and South Hammerhead Taxiways in accordance with the contract documents

0003AA

Partial Slab Repair to Subgrade in accordance with the contract documents

0003AB

Remove and Replace Joint Sealants in accordance with the contract documents

Total Price (Items 0003AA - 0003AB)

DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

TOTAL BASE BID PRICE (ITEMS 0001-0003)

Total OVERHEAD/

INDIRECT COST PROFIT TOTAL PROPOSED

COST

COST BREAKDOWN

ITEM DESCRIPTION

Cost Breakdown Sheet