Kuwait_Repair_Runway_Cost_Breakdown.pdf
PDF 80 KB Posted
- Attached to
- Runway Repairs at Ali Al Salem Air Base, Kuwait
- Solicitation number
- W912ER19R0027
About this file
This document contains a cost breakdown sheet and solicitation for runway repair work at Ali Al Salem Air Base in Kuwait. The cost breakdown sheet provides pricing for various repair items including full and partial slab replacement, spall repair, joint sealant replacement, and runway markings. The fixed price solicitation was issued by the U.S. Army Corps of Engineers Middle East District on behalf of the Department of the Army. Responses for the design-build contract are due by September 19, 2019. The solicitation seeks a prime contractor to conduct runway and taxiway repairs at the air base located in Kuwait.
Cost Breakdown Sheet for W912ER19R0027
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: W912ER19R0027 450800
PROJECT: REPAIR RUNWAYS PROPOSER:
LOCATION: Ali Al Salem Air Base, Kuwait DATE:
Mobilization and Demobilization in accordance with the contract documents
Repair South Runway 12R/30L in accordance with the contract documents
0002AA
Full Slab Replacement to Subgrade in accordance with the contract documents
0002AB
Partial Slab Repair to Subgrade in accordance with the contract documents
0002AC Spall Repair in accordance with the contract documents
0002AD
Remove and Replace Joint Sealant in accordance with the contract documents
0002AE
Remove Rubber from Remaining Pavement in accordance with the contract documents
0002AF Markings in accordance with the contract documents
Total Price (Items 0002AA - 0002AF)
Repair North and South Hammerhead Taxiways in accordance with the contract documents
0003AA
Partial Slab Repair to Subgrade in accordance with the contract documents
0003AB
Remove and Replace Joint Sealants in accordance with the contract documents
Total Price (Items 0003AA - 0003AB)
DIRECT
MATERIALS COST
SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
TOTAL BASE BID PRICE (ITEMS 0001-0003)
Total OVERHEAD/
INDIRECT COST PROFIT TOTAL PROPOSED
COST
COST BREAKDOWN
ITEM DESCRIPTION
Cost Breakdown Sheet
File details come from the government source that posted it. Updated .