W912ER-18-R-0031_Solicitation_IRAQ_PSC.pdf
PDF 2 MB Posted
- Attached to
- Iraq Personal Services
- Solicitation number
- W912ER-18-R-0031
About this file
W912ER-18-R-0031 Solicitation Iraq PSC
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912ER18R0031 12-Apr-2018
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
04:00 PM 11 May 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912ER9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS-CETAM-CT
MIDDLE EAST DISTRICT, CETAM-CT
PO BOX 2250
WINCHESTER VA 22604-1450
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$27,500,000
NAICS:
561320
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF246
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base Year Phase In and Support Services
FFP
Base Year Phase In and Support Services in accordance with Performance Work Statement, dated 29 September 2017. Period of Performance is 2 June 2018 - 1 June 2019. Total Capacity is $25 Million which may be used in its entirety during this period.
Estimated Ordering Period is 1 year, with the exact dates being provided upon contract award. Pricing is established on the Price Breakdown Worksheet. The Government may elect to order some or all of the services listed on the Price Breakdown worksheet during the ordering period. Offerors shall insert the total amount from the Price Breakdown Worksheet in the CLIN Amount here.
FOB: Destination
NET AMT
000101 Phase-In (2 month period)
FFP
Description of Duties in accordance with Section C – Performance Work Statement
5.1 Phase In.
000102 Admin & Scheduling Asst.(ASA) - Level II
FFP
Description of Duties in accordance with Section C – Performance Work Statement, Appendix A, Section 1.
000103 Admin & Scheduling Asst. (ASA) - Level I
FFP
Statement, Appendix A, Section 1.
000104 Lead Engineer Asst. (LEA) - Level II
FFP
Technical Position. Description of Duties in accordance with Section C – Performance Work Statement, Appendix A, Section 2.
000105 Lead Engineer Asst. (LEA) - Level I
FFP
Performance Work Statement, Appendix A, Section 2.
000106 Logistics/Supply Specialist - Level II
FFP
Statement, Appendix A, Section 3.
000107 Logistics/Supply Specialist - Level I
FFP
Statement, Appendix A, Section 3.
000108 Program Manager (PM) - Level II
FFP
Statement, Appendix A, Section 4.
000109 Program Manager (PM) - Level I
FFP
Statement, Appendix A, Section 4.
000110 Project Engineer Asst. (PEA) - Level II
FFP
Performance Work Statement, Appendix A, Section 5.
000111 Project Engineer Asst. (PEA) - Level I
FFP
Performance Work Statement, Appendix A, Section 5.
000112 Quality Assurance Rep (QAR) - Level II
FFP
Performance Work Statement, Appendix A, Section 6.
000113 Quality Assurance Rep (QAR) - Level I
FFP
Performance Work Statement, Appendix A, Section 6.
000114 Safety Officer (SO) - Level II
FFP
Statement, Appendix A, Section 7.
000115 Safety Officer (SO) - Level I
FFP
Statement, Appendix A, Section 7.
000116 Contractor Management Reporting (CMR)
FFP
Base Period CMR in accordance with Section C – Performance Work Statement, Section 13.4.
The contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.
000117 Daily Per Diem/Lodging
FFP
Base Period Daily Per Diem/Lodging in accordance with Section C – Performance Work Statement Section 10.0 Contractor Expenses.
000118 Mileage
FFP
Base Period Mileage in accordance with Section C – Performance Work Statement Section 10.0 Contractor Expenses.
1001 1 Job OPTION Option Year 1 - Support Services
FFP
Support services for the Period of Performance of 2 June 2019 through 1 June 2020. Total Capacity is $25 Million which may be used in its entirety during this period.
Estimated Ordering Period is 1 year, with the exact dates being provided upon contract award. Pricing is established on the Price Breakdown Worksheet. The Government may elect to order some or all of the services listed on the Price Breakdown worksheet during the ordering period. Offerors shall insert the total
100101 Admin & Scheduling Asst.(ASA) - Level Il
FFP
Option Year 1 Admin & Scheduling Asst (ASA) in accordance with Section C – Performance Work Statement Appendix A Section 1.
100102 Admin & Scheduling Asst. (ASA) - Level I
FFP
Option Year 1 Admin & Scheduling Asst (ASA) in accordance with Section C – Performance Work Statement Appendix A Section 1.
100103 Lead Engineer Asst (LEA) - Level II
FFP
Technical Position. Option Year 1 Lead Engineer Assistant in accordance with Section C – Performance Work Statement Appendix A Section 2.
100104 Lead Engineer Asst (LEA) - Level I
FFP
Technical Position. Option Year 1 Lead Engineer Assistant - Mid. in accordance with Section C – Performance Work Statement Appendix A Section 2
100105 Logistics/Supply Specialist (LSS) Lev-II
FFP
Option Year 1 Logistics and Supply Specialist in accordance with Section C – Performance Work Statement Appendix A Section 3.
100106 Logistics/Supply Specialist (LSS) Lev-l
FFP
Option Year 1 Logistics and Supply Specialist - Mid. in accordance with Section C
– Performance Work Statement Appendix A Section 3.
100107 Program Manager (PM) - Level II
FFP
Option Year 1 Program Manager (PM) - Sr. in accordance with Section C – Performance Work Statement Appendix A Section 4.
100108 Program Manager (PM) - Level I
FFP
Option Year 1 Program Manager (PM) - Mid. in accordance with Section C –
100109 Project Engr. (PEA) - Level II
FFP
Technical Position. Option Year 1 Project Engineer Assistant (PEA) - Sr. in accordance with Section C – Performance Work Statement Appendix A Section 5.
100110 Project Engr. (PEA) - Level I
FFP
Technical Position. Option Year 1 Project Engineer Assistant (PEA) - Mid. in
100111 Quality Assurance Rep (QAR) - Level II
FFP
Technical Position. Option Year 1 Quality Assurance Representative (QAR) - Sr.
in accordanc with Section C – Performance Work Statement Appendix A Section 6.
100112 Quality Assurance Rep (QAR) - Level I
FFP
Technical Position. Option Year 1 Quality Assurance Representative (QAR) - Mid. in accordance with Section C – Performance Work Statement Appendix A Section 6.
100113 Safety Officer (SO) - Level II
FFP
Option Year 1 Safety Officer (SA) - Sr. in accordance with Section C – Performance Work Statement Appendix A Section 7.
100114 Safety Officer (SO) - Level I
FFP
Option Year 1 Safety Officer (SA) - Mid. in accordance with Section C –
100115 Contractor Management Reporting
FFP
Option Year 1 Contractor Manpower Reporting in accordance with Section C – Performance Work Statement Section 13.3.
100116 Daily Per Diem/Lodging
FFP
Option Year 1 Daily Per Diem/Lodging in accordance with Section C – Performance Work Statement Section 10.0 Contractor Expenses.
100117 Mileage
FFP
Option Year 1 Mileage in accordance with Section C – Performance Work Statement Section 10.0 Contractor Expenses.
2001 1 Job OPTION Option Year 2 - Support Services
FFP
Support services for the Period of Performance of 2 June 2020 through 1 June 2021. Total Capacity is $25 Million which may be used in its entirety during this period.
Estimated Ordering Period is 1 year, with the exact dates being provided upon contract award. Pricing is established on the Price Breakdown Worksheet. The Government may elect to order some or all of the services listed on the Price Breakdown worksheet during the ordering period. Offerors shall insert the total
200101 Admin & Scheduling Asst.(ASA) - Level Il
FFP
Option Year 2 Admin & Scheduling Asst (ASA) - Sr. in accordance with Section C
– Performance Work Statement Appendix A Section 1.
200102 Admin & Scheduling Asst. (ASA) - Level I
FFP
Option Year 2 Admin & Scheduling Asst (ASA) - Mid. in accordance with Section C – Performance Work Statement Appendix A Section 1.
200103 Lead Eng Asst (LEA) - Level II
FFP
Technical Position. Option Year 2 Lead Engineer Assistant - Sr. in accordance with Section C – Performance Work Statement Appendix A Section 2.
200104 Lead Eng Asst (LEA) - Level I
FFP
Technical Position. Option Year 2 Lead Engineer Assistant - Mid. in accordance
200105 Logistics/Supply Specialist - Level-ll
FFP
Option Year 2 Logistics and Supply Specialist - Sr. in accordance with Section C –
200106 Logistics/Supply Specialist - Level l
FFP
Option Year 2 Logistics and Supply Specialist - Mid. in accordance with Section C
200107 Program Manager (PM) - Level II
FFP
Option Year 2 Program Manager (PM) - Sr. in accordance with Section C –
200108 Program Manager (PM) - Level I
FFP
Option Year 2 Program Manager (PM) - Mid. in accordance with Section C –
200109 Project Engr. (PEA) - Level II
FFP
Technical Position. Option Year 2 Project Engineer Assistant (PEA) - Sr. in
200110 Project Engr. (PEA) - Level I
FFP
Technical Position. Option Year 2 Project Engineer Assistant (PEA) - Mid. in
200111 Quality Assurance Rep (QAR) - Level II
FFP
Technical Position. Option Year 2 Quality Assurance Representative (QAR) - Sr.
in accordance with Section C – Performance Work Statement Appendix A Section
200112 Quality Assurance Rep (QAR) - Level I
FFP
Technical Position. Option Year 2 Quality Assurance Representative (QAR) -
200113 Safety Officer (SO) - Level II
FFP
Option Year 2 Safety Officer (SA) - Sr. in accordance with Section C –
200114 Safety Officer (SO) - Level I
FFP
Option Year 2 Safety Officer (SA) - Mid. in accordance with Section C –
200115 Contractor Management Reporting
FFP
Option Year 2 Contractor Manpower Reporting in accordance with Section C –
200116 Daily Per Diem/Lodging
FFP
Option Year 2 Daily Per Diem/Lodging in accordance with Section C –
200117 Mileage
FFP
Option Year 2 Mileage in accordance with Section C – Performance Work
3001 1 Job OPTION Option Year 3 - Support Services
FFP
Support services for the Period of Performance of 2 June 2021 through 1 June 2022. Total Capacity is $25 Million which may be used in its entirety during this period.
Estimated Ordering Period is 1 year, with the exact dates being provided upon contract award. Pricing is established on the Price Breakdown Worksheet. The Government may elect to order some or all of the services listed on the Price Breakdown worksheet during the ordering period. Offerors shall insert the total
300101 Admin & Scheduling Asst.(ASA) - Level Il
FFP
Option Year 3 Admin & Scheduling Asst (ASA) - Sr. in accordance with Section C
300102 Admin & Scheduling Asst. (ASA) - Level I
FFP
Option Year 3 Admin & Scheduling Asst (ASA) - Mid. in accordance with Section
300103 Lead Eng Asst (LEA) - Level II
FFP
Technical Position. Option Year 3 Lead Engineer Assistant - Sr. in accordance
300104 Lead Eng Asst (LEA) - Level I
FFP
Technical Position. Option Year 3 Lead Engineer Assistant - Mid. in accordance
300105 Logistics/Supply Specialist - Level Il
FFP
Option Year 3 Logistics and Supply Specialist - Sr. in accordance with Section C –
300106 Logistics/Supply Specialist - Level l
FFP
Option Year 3 Logistics and Supply Specialist - Mid. in accordance with Section C
300107 Program Manager (PM) - Level II
FFP
Option Year 3 Program Manager (PM) - Sr. in accordance with Section C –
300108 Program Manager (PM) - Level I
FFP
Option Year 3 Program Manager (PM) - Mid. in accordance with Section C –
300109 Project Engr. (PEA) - Level II
FFP
Technical Position. Option Year 3 Project Engineer Assistant (PEA) - Sr. in
300110 Project Engr. (PEA) - Level I
FFP
Technical Position. Option Year 3 Project Engineer Assistant (PEA) - Mid. in
300111 Quality Assurance Rep (QAR) - Level II
FFP
Technical Position. Option Year 3 Quality Assurance Representative (QAR) - Sr.
300112 Quality Assurance Rep (QAR) - Level I
FFP
Technical Position. Option Year 3 Quality Assurance Representative (QAR) -
300113 Safety Officer (SO) - Level II
FFP
Option Year 3 Safety Officer (SA) - Sr. in accordance with Section C –
300114 Safety Officer (SO) - Level I
FFP
Option Year 3 Safety Officer (SA) - Mid. in accordance with Section C –
300115 Contractor Management Reporting
FFP
Option Year 3 Contractor Manpower Reporting in accordance with Section C –
300116 Daily Per Diem/Lodging
FFP
Option Year 3 Daily Per Diem/Lodging in accordance with Section C –
300117 Mileage
FFP
Option Year 3 Mileage in accordance with Section C – Performance Work
4001 1 Job OPTION Option Year 4 - Support Services
FFP
Support services for the Period of Performance of 2 June 2022 through 1 June 2023. Total Capacity is $25 Million which may be used in its entirety during this period.
Estimated Ordering Period is 1 year, with the exact dates being provided upon contract award. Pricing is established on the Price Breakdown Worksheet. The Government may elect to order some or all of the services listed on the Price Breakdown worksheet during the ordering period. Offerors shall insert the total
400101 Admin & Scheduling Asst.(ASA) - Level Il
FFP
Option Year 4 Admin & Scheduling Asst (ASA) - Sr. in accordance with Section C
400102 Admin & Scheduling Asst. (ASA) - Level I
FFP
Option Year 4 Admin & Scheduling Asst (ASA) - Mid. in accordance with Section
400103 Lead Eng Asst (LEA) - Level II
FFP
Technical Position. Option Year 4 Lead Engineer Assistant - Sr. in accordance
400104 Lead Eng Asst (LEA) - Level I
FFP
Technical Position. Option Year 4 Lead Engineer Assistant - Mid. in accordance
400105 Logistics/Supply Specialist - Leve ll
FFP
Option Year 4 Logistics and Supply Specialist - Sr. in accordance with Section C –
400106 Logistics/Supply Specialist - Level l
FFP
Option Year 4 Logistics and Supply Specialist - Mid. in accordance with Section C
400107 Program Manager (PM) - Level II
FFP
Option Year 4 Program Manager (PM) - Sr. in accordance with Section C –
400108 Program Manager (PM) - Level I
FFP
Option Year 4 Program Manager (PM) - Mid. in accordance with Section C –
400109 Project Engr. (PEA) - Level II
FFP
Technical Position. Option Year 4 Project Engineer Assistant (PEA) - Sr. in
400110 Project Engr. (PEA) - Level I
FFP
Technical Position. Option Year 4 Project Engineer Assistant (PEA) - Mid. in
400111 Quality Assurance Rep (QAR) - Level II
FFP
Technical Position. Option Year 4 Quality Assurance Representative (QAR) - Sr.
400112 Quality Assurance Rep (QAR) - Level I
FFP
Technical Position. Option Year 4 Quality Assurance Representative (QAR) -
400113 Safety Officer (SO) - Level II
FFP
Option Year 4 Safety Officer (SA) - Sr. in accordance with Section C –
400114 Safety Officer (SO) - Level I
FFP
Option Year 4 Safety Officer (SA) - Mid. in accordance with Section C –
400115 Contractor Management Reporting
FFP
Option Year 4 Contractor Manpower Reporting in accordance with Section C –
400116 Daily Per Diem/Lodging
FFP
Option Year 4 Daily Per Diem/Lodging in accordance with Section C –
400117 Mileage
FFP
Option Year 4 Mileage in accordance with Section C – Performance Work
5001 6 Months Personal Services Extension
FFP
Reference FAR 52.217-8, Option to Extend Services, in Section I - Contract Clauses.
The Government may elect to order some or all of the services listed on the Price Breakdown worksheet during the ordering period. Offerors shall insert the total
6001 1 Job Phase-Out
FFP
In accordance with Description of Duties Section C – Performance Work Statement, Section 5.2, Phase Out.
INITIAL TASK ORDER
MINIMUM GUARANTEE
In accordance with Federal Acquisition Regulations (FAR) 52.216-19, the minimum order for this contract is $1,000.00 and the maximum order for a single item under this contract is $20,000,000.00.
The total minimum guarantee under this contract is $5000.00 for the base period and all option periods (if exercised by the Government) combined.
Subject to Availability of Funds: Funds are not presently available for this acquisition. The acquisition is subject to the availability of funds at the time of contract award. See Section I, Clause 52.232-18.
INITIAL TASK ORDERS
All pricing shall be submitted on the Price Breakdown Worksheet. The Price Breakdown Worksheet constitutes binding price through the potential life of the contract and will be incorporated into the contract award as a Unit Price Book for the successful Offeror. The prices for services ordered by task order through the entire term of the contract will be derived from the Unit Price Book.
The Government intends to award task orders on or about the contract award date for mobilization and phase-in, and for full performance of services within a short time afterwards. Offerors should reference the Task Order Performance Work Statement (PWS) for information purposes only in order to understand the Government’s current anticipated requirement, and to prepare for rapid mobilization shortly after contract award. Offerors shall NOT provide separate pricing for the Task Order PWSs with their price offer; all pricing shall be provided on the Price Breakdown Worksheet only. However, Offerors shall assume that the same level of services will be ordered throughout the life of the contract for price evaluation purposes, and shall therefore use the quantities of services listed in the Task Order PWSs to price their quantities on the Price Breakdown Worksheet. While the Government may order the services as listed in the Task Order PWSs during the base period of performance, no guarantee will be made on the level and type of services until task order issuance.
As part of price evaluation, the Government will evaluate its option to extend services (see FAR Clause 52.217-
8) by adding six (6) months of the Offeror's final option period price to the Offeror's total price. Offerors are required only to price the base and option periods. Offerors shall not submit a price for the potential six month extension of services period. The Government may choose to exercise the Extension of Services at the end of any performance period (base or option periods), utilizing the rates of that performance period.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS)
USACE
IRAQ PERSONAL SERVICES (IRQ PSC)
Re-compete
U.S. Army Corps of Engineers Middle East District
(MED)
29 SEPTEMBER 2017
USACE Personal Services – Iraq III
PERFORMANCE WORK STATEMENT
29 September 2017
1.0 DESCRIPTION OF SERVICES
The US Army Corps of Engineers (USACE) requires Iraqi National project and program management, contract administration, project engineering, quality assurance, real estate, and support staff through a firm fixed price, personal services contract for its continued operations in Iraq. These positions shall replicate typical foreign national service (FNS) employee positions obtained by U.S. Government Agencies to support overseas projects and locations. This contract is for Personal Services in exclusive support of USACE missions, to include Foreign Military Sales (FMS) throughout Iraq.
1.1 Contract Period of Performance (POP): This contract is for one (1) 1-year base period and four (4) one-year option periods.
2.0 DEFINITIONS OF WORDS AND TERMS
A word or term defined in this contract maintains the same definition found in Part 2 of the Federal Acquisition Regulations (FAR) unless specifically defined otherwise within this document.
3.0 CONCEPT OF OPERATION
This contract is performance-based; as such, successful performance of the contract is the complete staffing of USACE-required positions with qualified subject matter experts. The USACE concept of operations is for the Contractor to provide support personnel to fill positions throughout Iraq.
The Contractor shall furnish their own office site, labor, materials, equipment and transportation as necessary to accomplish the requirements stated in this contract. The Contractor shall establish a Contract Management Plan (CMP) that will lay out the requirements necessary to provide administrative and logistical support and oversight for all Contractor personnel and equipment. This plan shall be submitted to the Procuring Contract Officer (PCO) within ten (10) days of contract award.
3.1 Contractor’s Key Personnel:
The CMP will identify all key personnel. The CMP will contain an organizational chart that clarifies the structure, and it shall define the interface among the Contractor, the Contractor’s Key Personnel and Contracting Officer’s Representative(s) (CORs).
3.1.1 Criteria for Key Personnel:
In-country Program Manager:
The in-country Program Manager (PgM) shall be physically located in Iraq and shall be authorized to act on behalf of the Contractor for all matters relating to this contract. The PgM shall possess all necessary background checks and credentials for operating in theater, and provide at time of solicitation a certificate stating proficiency in written and spoken English at Level 1 as defined in paragraph 7.8.3. The PgM shall have a minimum of 2-year Associate college level degree, or equivalent. The PgM shall possess a minimum of ten (10) years of pertinent experience in the position to which they will be assigned. Professional certification in either project management or safety is preferred. The PgM must be available for contact during working hours or as required by the Contracting Officer.
3.2 Iraqi National Staff:
The Contractor shall ensure the readiness of Contractor Iraqi National staff and equipment to prevent gaps or denial of services at all times throughout the performance period of the contract. The Contractor shall ensure that the Contractor work force is properly recruited, trained, outfitted, fielded, and supplied to successfully perform duties in accordance with the provisions of this contract.
The Contractor shall maintain all necessary administrative files to include personnel records, invoices, investigation reports, licenses and other documentation supporting contract execution. The Contractor shall promptly conduct the necessary investigations into allegations of wrongdoing or poor performance by Contractor personnel and provide expeditious remedy of any deficiency in the quality of service provided.
The Contractor shall coordinate the provision of Contractor Iraqi National staff to meet the USACE requirements as detailed in the Position Descriptions in Appendix A of this PWS. Typical positions being sought to be filled are listed below. Positions will be filled as deemed necessary by the COR at the direction of the PCO. The approximate total number of projected positions country-wide are approximately 50. Positions are listed alphabetically:
▪ Administrative and Scheduling Assistant (ASA)
▪ Lead Engineer Assistant (LEA)*
▪ Logistics and Supply Specialist (LSS)
▪ Program Manager (PM)
▪ Project Engineer Assistant (PEA)*
▪ Quality Assurance Representative (QAR)*
▪ Safety Officer (SO)
Positions marked with an * are Technical Positions
3.3 Work Schedule:
In accordance with DFARS Clause 252.233-7001, Choice of Law (Overseas), work schedules, overtime pay and holidays may not conform to Iraqi Labor Laws.
Each required position is based on a Full-Time Equivalent (FTE) of 2,496 hours per year. The typical duty week shall be from Saturday through Thursday – 8 hours per day, 6 days per week, for 52 weeks; although, the United States Government (USG) supervisor and/or COR will adjust work day hours within each work week to accommodate project oversight requirements and workload. The work schedule is for the position and does not imply pay or reimbursement for time not worked by Contractor employees. i.e. Holiday/ Sick time / Personal time or vacation. For this contract, an FTE is defined as the number of total hours required to be worked in a work year.
For example, if the work year is defined as 2,496 hours, then one worker occupying a paid full time job all year would constitute one FTE.
The Contractor is responsible for ensuring that all positions are covered adequately. All positions theater-wide must be filled on a continual basis with no gaps in staffing, to include personnel availability during holidays and leave, as needed and directed by USACE. It is the responsibility of the Contractor to ensure for personnel on leave, that there are adequate backfill personnel available to ensure work coverage at all times, in coordination with the assigned USG Supervisor and/or COR.
3.4 Time Clarification:
3.4.1 Travel to and from work:
Ordinary home-to-work travel by Contractor employees – that is, travel involved in reporting to work at the start of the day and returning to home at day’s end – does not count as time worked. However, once the employee has reported to work for the day, time spent traveling from one project site to another as part of their duties, shall be reported as time worked.
3.4.2 Over-Time (OT) Hours:
All OT (hours worked beyond 60 hours per week) must be pre-approved in writing. The USACE supervisor and a USACE manager will be the approver and reviewer of OT requests. If a contract employee is required to work more than 48 hours in any calendar week, Saturday through Thursday, OT compensation shall be provided at a rate 1.25 normal rate. Working on Fridays or official Iraq Holidays does not automatically grant the employee hours at the OT rates.
3.4.3 OT hours shall be logged on the Contractor employee’s monthly timesheets and verified by the contractor, the USG and paid following approval by the PCO.
3.5 Holiday Leave:
3.5.1 It is the responsibility of the Contractor to ensure for personnel on leave there are adequate backfill positions supplied to ensure work coverage at all times, in coordination with the assigned supervisor and/or COR.
The Government does not pay for contractor employee Holiday Leave.
3.6 Personal Leave:
3.6.1 At no time is leave to impact the operations of the USACE office/project to which the Contractor personnel are assigned. It is the responsibility of the Contractor to ensure for personnel on leave there are adequate backfill positions supplied to ensure work coverage at all times, in coordination with the assigned supervisor and/or COR. The Government does not pay for contractor employee personal Leave.
4.0 WORK REQUIREMENT
4.1 The Contractor, as delineated by the contract PWS, shall provide qualified Iraqi project, administration, and technical support personnel to advise and consult with USACE personnel for the performance of quality assurance, warranty, material and equipment inspections and on-site monitoring of geographically disbursed construction sites both inside and outside the confines of government installations in the USACE Area of Operations. This is not a Professional Services contract, as such, neither the Contractor (firm) nor its employees are required to be certified, registered, or licensed to perform required duties as advisors providing services in support of USACE as described in Appendix A. Contractor personnel shall display their name and the name of the company while in the work area, wear and display a building pass at all times, include the company's name in his or her e-mail display, and identify themselves as contractors when attending meetings, answering Government telephones, or working in situations where their actions could be construed as official U.S. Government acts by U.S. Government personnel or third parties. Contractor personnel are precluded from performing inherently governmental functions as defined by FAR Subpart 7.5 – Inherently Governmental Functions.
4.2 The Contractor shall maintain the capability to increase and decrease manpower staffing to meet changes to the USACE project workload as directed by the Contracting Officer.
4.3 USACE has operating locations throughout Iraq that are subject to change. These operations require personal services.
4.4 Appendix A. (POSITION DUTY DESCRIPTIONS): Outlines the qualifications and primary responsibilities of personnel performing the contract services.
4.5 The Contractor’s personnel shall be responsible for ensuring that they have the means to travel on a day-to-day basis between the respective residence and the place of employment. Place of employment is defined as the Contractor’s in-country office, USACE, or project site to which the individual is required to report. USACE will not provide transportation for Contractor employees.
4.6 If the Contractor’s personnel are assigned to remote sites where daily back-and-forth travel is not feasible, the Contractor shall ensure that life support (billeting and meals) are provided for the employee(s) as established and addressed by the PWS.
4.7 The local commuting area includes one population center in which employees live and reasonably travel back and forth to work. For this contract the local commuting area is 75 km (47 miles) one-way from home of residence to work or 150 km (94 miles) round-trip (to and from work).
5.0 CONTRACTOR PHASE-IN/PHASE-OUT RESPONSIBILITIES:
Phase In shall include all activities and associated costs for transportation of Contractor's personnel, equipment, and operating supplies to Iraq; establishment of offices, buildings, and other necessary general facilities for the Contractor's operations. The Phase-In Plan will include any mobilization required and details how they will perform reception, staging, onward movement, and integration (RSOI) of deploying personnel, equipment, and material into Iraq. It will also include as well as recruit, hire, deploy and obtain all required certifications and clearances for personnel necessary to meet the requirements of this contract. Phase Out shall include all activities and costs for transportation of personnel, equipment, and supplies no longer required on the contract; including the disassembly, removal of offices, buildings and other facilities assembled in Iraq specifically for this contract.
5.1 Phase In
5.1.1 The Contractor shall provide a proposed Phase-In Plan to the Contracting Officer, as part of the
Contractor’s proposal submission, which clearly delineates how the Contractor plans to mobilize and deploy personnel, equipment, and material within Iraq or into ports of debarkation for Iraq.
5.1.2 The period between contract award and contract start will constitute the phase-in period.
During the phase-in period, the Contractor shall prepare to assume full responsibility for all areas of operation in accordance with the terms and conditions of this contract. The Contractor shall take all actions necessary for a smooth transition of the contracted operations.
5.1.3 As deliverable, the successful Contractor shall submit their final Phase-In Plan within ten (10) days after contract award, for approval and acceptance, to the Contracting Officer. At a minimum, the Phase-In Plan shall include the following items:
5.1.3.1 Phase-in milestone activity schedule,
5.1.3.2 Establish the appropriate management office and subordinate office workspace(s);
5.1.3.3 Process for ensuring appropriate Contractor-furnished equipment, materials and supplies are on-site at the end of the phase-in period.
5.1.3.4 Where applicable, the Contractor shall ensure that Contractor personnel have all required documentation (i.e., Passports, Visa, etc.), based on the category of employee, to work in Iraq.
5.2 Phase Out
5.2.1 Full phase out of Contractors, including sub-Contractor(s) at all tiers in Iraq is critical to responsible drawdown. The prime Contractor is required to submit a Phase Out Plan to the Contracting Officer, one hundred twenty (120) days prior to the end of contract performance period, or when requested by the Contracting Officer. The Phase Out plan shall address, as a minimum, the following:
5.2.1.1 Phase-Out milestone activity schedule
5.2.1.2 Comprehensive procedures for phasing out Contractor performance to the level prescribed and within the time allowed under the terms of this contract. The Contractor shall provide its procedures for the return of all badging and sanitizing or destruction of hard drives used in computers.
5.2.1.3 The Contractor shall describe in detail its plan to close-out Contractor’s personnel, including sub-Contractor(s) employees at all tiers, at the end of the contract performance period and release the personnel from the Synchronized Pre-deployment and Operational Tracker (SPOT) database.
5.2.1.4 The Contractor shall describe in detail its plan for the timely and responsible exit from
Iraq. The prime Contractor shall be responsible and accountable to ensure their sub-Contractor(s) at all tiers comply with its plan and procedures for departure from the country of Iraq at the end the contract performance period.
5.2.1.5 Contract Phase-Out shall be completed no later than sixty (60) days from the date of the successive contract award unless otherwise stated in the follow-on contract. Contract start is defined as the first date of full contract performance.
6.0 DELIVERY OF SERVICES
6.1 The Contractor shall provide all services to support all Task Orders within forty-five (45) days of award.
Any deviations from this schedule require approval by the Contracting Officer.
6.2 The Contractor shall execute staffing increases or decreases within fourteen (14) days of the Contracting Officer’s request.
7.0 RECRUITMENT, PROMOTION, AND RETENTION OF PERSONNEL
The Contractor shall provide a Recruitment, Promotion, and Retention plan that includes the following:
7.1 The Contractor is the source of personnel; as such, the Contractor shall include with the plan, the process detailing the recruiting, hiring, staffing, and backfill procedures. The Recruitment, Promotion, and Retention Plan shall be provided to the PCO, for review and acceptance, within fifteen (15) days of contract award. The Recruitment, Promotion, and Retention Plan shall, as a minimum, include:
7.1.1 Organization chart which clearly establishes lines of communication and authority (organization chart is a graphical picture of the organization and reporting relationships).
7.1.2 Staff Acquisition: The methodologies the Contractor shall use as their hiring process.
7.1.3 Staff Assignment: Staffing structure which clearly allocates manpower to appropriate project section
(a detailed breakdown of the actual staff to be assigned to the project role).
7.1.4 Staff Training: The Contractor’s detailed approach to maintain staff at the level of skill required for successful performance on this contract.
7.1.5 Staff Tracking: The Contractor shall describe their procedures used to manage staff on the contract.
The Contractor shall address tracking losses, gains and absences to preclude a gap in service or a denial of service caused by vacant positions.
7.1.6 Staff Transition: The Contractor shall detail their staff replacement process to prevent a gap in service or a denial of service.
7.1.7 Staff Promotion: The Contractor shall detail their staff promotion process and procedures to develop and promote employees who demonstrate potential for advancement and promotion as permitted by vacancies within the staffing requirements. The Contractor shall submit all promotable employees’ requests to the COR for review before promotion is granted to the employee. USACE reserves the right to approve proposed promotions as well as make recommendations for promotion to a higher grade, provided there is a vacancy on the manning document.
7.2 The Contractor shall submit all potential employment candidate resumes through the CORs for USG review and acceptance before an offer of employment is extended to the candidate. Additionally, USACE personnel may be present and serve as a consultant to conduct face-to-face interviews with potential hires. The USG will only accept or reject a candidate based on the qualifications for the position or if the USG knows of adverse past performance. The USG review is not an approval to hire; it is a review to ensure the minimum qualifications for each position are met.
7.3 The Contractor shall make every effort to hire personnel within the local commuting area, within 75 km one-way, of each position advertised for employment. The Contractor should be aware that some sites are remotely located.
7.4 The Contractor is responsible for a plan to backfill Contractor personnel ensuring that there is no lapse in the services provided by required positions. The Contractor shall use this plan to ensure the specified number/type of personnel and equipment are available and ready to perform assigned work during the times specified in the base contract and subsequent Task Order’s. The backfill plan shall ensure scheduled absence replacements are managed with no decrement to performed services, and that unscheduled/unforeseen absences are handled promptly and efficiently to lessen any decrement to performed services
7.5 The Contractor shall offer current Iraqi incumbents the right of first refusal. Contractor shall provide notice of this right to the existing Iraqi workforce ten (10) days after receiving the list of current employees. The Contracting Officer shall furnish a listing of the existing Iraqi workforce at time of award. The Contractor should be aware that the current number of Iraqi nationals may increase or decrease, depending on USACE work requirements.
7.6 Work environmental and physical demands:
7.6.1 The characteristics described below are representative of those encountered while performing the essential functions of these positions. Conditions may vary at each project location, but the conditions listed below shall generally apply.
7.6.1.1 While performing assigned services, the Contractor’s employee shall frequently be required to stand, walk, sit, reach with hands and arms, climb or balance, stoop or kneel, talk and hear, and use fingers and hands to feel objects, tools or controls.
7.6.1.2 Must occasionally lift and/or move up to 25 pounds.
7.6.1.3 Specific vision abilities required include close vision, distance vision, depth perceptions, normal color vision, and the ability to adjust focus.
7.6.1.4 As work load dictates, the job may require working weekdays, weeknights, weekends and/or holidays.
7.6.1.5 The job shall generally be performed at a construction job site or field office.
7.7 Minimum Personnel Employment Prerequisites/Restrictions:
Each potential Contractor candidate shall meet the prerequisites/attributes listed below:
Prerequisite/ Attribute Minimum Standards Affiliations As a minimum, Contractor personnel shall not be affiliated with associations, elements, groups, organizations, and/or programs that seek to undermine the legitimacy and initiatives of the Government of Iraq or the U.S. Government.
Medical The Contractor shall apply and comply with contract requirements regarding medical fitness.
Addiction/Dependence Contractor personnel shall not be afflicted with habitual drunkenness or addicted and dependent on narcotics as evidenced by a recognized drug/alcohol testing procedure.
Convictions 1. Contractor personnel shall not have been convicted of any misdemeanor during the five (5) year period preceding the date of this contract that would negatively impact on the reputation or question the integrity of the contracted services unless approved in advance in writing by the PCO.
2. No individual convicted of a felony crime will be employed under this contract.
Note: These prerequisites apply to the prime Contractor and its Subcontractors at all tiers.
7.8 Contractor Personnel Language Proficiency Requirements. The Contractor shall employ only persons able to speak, read, write and understand English for those positions requiring them to interact with clients and other government personnel, and/or where English is used or essential to provide product, or record data, information, or service.
7.8.1 The TOEIC (Test of English for International Communication) proficiency scores are used to correlate the USACE Level to an accepted industry standard, and are used as guidelines only for assisting Contractors in staffing positions requiring the use of English. They should not be considered definitive.
7.8.2 Contractors are not required to use TOEIC; however an equivalent English proficiency testing program may be approved by the PCO to benchmark groups of individuals within the organization and ensure that contract requirements are satisfied.
7.8.3 Contractors shall provide written certification citing the level of proficiency for positions requiring use of the English language to the PCO and retain a copy of certification in each individual’s training record. The following table represents the levels of proficiency requirements:
TOEIC Level Description Level Designation 900-990
Managers who are able to represent the company unaccompanied and with final authority in negotiating agreements and contracts with native English-speaking partner organizations.
800-850 Managers who are able to represent the company unaccompanied with native English-speaking partner organizations.
700-750 Personnel must be able to speak and write the English/Host Nation language correctly and fluently. They must be able to communicate effectively and compose correspondence and other written communications about the work for which they are responsible. Typically, these individuals actively participate in meetings with partner organizations using English.
600-650 Personnel must speak and write the English/Host Nation language well enough to communicate on complex matters. Typically, these individuals may be called upon to give a short, prepared speech and/or to take the minutes of the meeting.
500-550 Personnel must speak and read English/Host Nation Language sufficiently to understand simple oral and written work assignments and to express themselves in matters pertaining to their work.
7.9 Termination of Personnel: Any violations of safety, security, theft, falsification of official reports/documents, and/or unexcused absences in excess of (1) day, and/or poor performance are all grounds for immediate termination. Before a Contractor employee is terminated, USACE will concur with the termination.
Additionally, USACE reserves the right to recommend a termination.
8.0 EMPLOYEE TRAINING
8.1 The Contractor will work with USACE employees to develop and provide additional training required to include safety, Quality Control, RMS, and business processes. Contractor personnel will be paid normal wages including travel and transportation expense while participating in the training.
8.2 The Contractor will determine training topics, duration, frequency, and develop a methodology for keeping records on what was conducted.
9.0 TRAVEL AND TRANSPORTATION
9.1 Contractor employees shall be responsible for providing their own means and mode of transportation to and from their residence to their place of employment. Travel to-and-from home to work is not part of the duty day and the cost will not be allowed or attributed to this contract.
9.2 Time spent traveling from one project site to another by the contract employee is part of the employee’s duty day and the cost may be paid under this contract. Payment will be provided for expenses as indicated in paragraph 10, below. It is estimated that all Quality Assurance and Safety personnel will travel annually 1,200 miles per employee between project sites.
9.3 As addressed in the Work Requirement paragraph, section 4.0, the Contractor shall establish a daily rate in their Basis of Estimate (BOE), which will include billeting, meals, travel and other life support needs. The daily rate shall not exceed the USG Joint Travel Regulations’ rates (JTR).
9.4 Contractor employees driving without proper insurance will be considered as self-insured and shall be responsible for all and any damages that may occur while in a travel status.
9.5 International Travel: In general, costs associated with international travel are not supported by this contract and therefore will not be paid by the Government. There are a few instances where, given proximity to other nation borders and the route available to reach a site, international travel is required. For Contractor personnel working in these areas, the Contractor is required to secure passports, visas, and other necessary supporting documents to allow exit from and return entry into Iraq. Prior coordination with the COR and approval from the PCO is required from before Contractor personnel may conduct travel that requires the crossing of international borders. The mileage payment referenced in paragraph 10.1 applies here.
10.0 CONTRACTOR EXPENSES
10.1 Expenses incurred by personnel provided under this contract are only paid after review by the COR and approval by the PCO as necessary to fulfill the duties of their position.
10.1.1 Lodging, Mileage and Incidental Expenses: these items will be paid on a flat-rate that shall be provided by the Contractor’s BOE. The rate shall not exceed the USG Joint Travel Regulations’ rates (JTR). No documentation of travel expenses is required. The flat-rate shall be established at time of award based on the Contractor’s accepted proposal. There will be no adjustments to the flat-rate during the term of this contract unless authorized in writing in advance by the PCO.
10.1.2 For intermittent trips, lodging and meals are authorized if an overnight trip is required. A flat rate to be proposed by the Contractor, to include lodging and meals, is authorized.
10.2 No other expenses reimbursable under this contract shall be incurred by the personnel supporting USACE unless reviewed in advance by the COR and approved in advance by the PCO.
11.0 SECURITY AND FACILITY ACCESS
11.1 The Contractor will be responsible for obtaining all permits, licenses, rights of entry and approvals, from all local Government authorities (Iraq and US) as necessary for the performance of this contract.
11.2 The Contractor shall be responsible for coordinating security vetting, including collecting the prospective employee’s biographical data on the appropriate USG or coalition force forms required by the entity which performs the security vetting function, and escorting the candidates to the vetting venue. The appropriate Government intelligence or other agency or its designee will be responsible for conducting the background investigation and screening to vet the employees.
11.3 The Contractor is responsible for costs associated in acquiring badges for their employees before they start work. The local USACE office will be responsible for providing sponsorship where needed for the badges, and may assist with coordination and support to acquire access badges at installations and forward operating bases only when required by the installation regulations.
11.4 As part of the coordination responsibilities, the Contractor shall also be responsible for tracking and transmitting final proof of vetting provided by the Government investigatory agency to the PCO for all new employees hired.
11.5 Security Notification: Should a Contractor employee be arrested for whatever reason or fail to pass any screening/vetting process, the Contractor shall immediately notify the COR and the PCO.
12.0 CONTRACTOR’S STANDARD OPERATING PROCEDURES (SOP) OR PLANS;
12.1 The Contractor shall address each of the following procedures individually and submit the procedures to the PCO within fifteen (15) calendar days after contract award for Government review and acceptance.
12.1.1 Security SOP which includes screening and vetting procedures.
12.1.2 Safety Plan in accordance with EM 385-1-1, “Safety and Health…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.