Pier Side Mini-Mart, NSA 2, Bahrain 405346

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 17.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 METRIC MEASUREMENTS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 22 00 ROOF AND DECK INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING

PROJECT TABLE OF CONTENTS Page 1 W912ER18R0015 Amendment 0002

07 55 00 PROTECTED MEMBRANE ROOFING (PMR)

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 14 00 WOOD DOORS

08 39 54 BLAST RESISTANT DOORS

08 56 53 BLAST RESISTANT TEMPERED GLASS WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 36 LATH

09 23 00 GYPSUM PLASTERING

09 24 23 STUCCO

09 30 13 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE Revised by Amendment 0002

10 14 01 EXTERIOR SIGNAGE

10 24 00 BUILDING SPECIALTIES

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 05 40 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT

11 41 11 REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT

DIVISION 12 - FURNISHINGS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

PROJECT TABLE OF CONTENTS Page 2

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 12 19.00 40 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS

26 13 00 SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED SWITCHGEAR

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 ELECTRICITY METERING

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH

AUXILIARIES

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM REVISED BY

AMENDMENT 0002

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 16 15 CONCRETE BLOCK PAVEMENTS

32 84 23 UNDERGROUND SPRINKLER SYSTEMS

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 61 PAGES

Pier Side Mini-Mart, NSA 2, Bahrain

09 30 13 Grout

SD-07 Certificates

2.1Tile

2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions

3.7Maintenance Instructions

09 51 00 SD-02 Shop Drawings

1.2 G MApproved Detail Drawings

SD-03 Product Data

Acoustical Ceiling Systems

1.4Certification

SD-04 Samples

2.1 G RAcoustical Units

2.1.1 G RAcoustic Ceiling Tiles

SD-06 Test Reports

G MFire Resistive Ceilings

G MCeiling Attenuation Class and

Test

SD-07 Certificates

2.1Acoustical Units

2.1.1Acoustic Ceiling Tiles

09 77 00 SD-02 Shop Drawings

2.1 G MPanels

SD-03 Product Data

2.1Panels

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W912ER18R0015 Amendment 0002 n0ectmcb Cross-Out

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 61 PAGES

Pier Side Mini-Mart, NSA 2, Bahrain

09 77 00 2.1 G RPanels

SD-06 Test Reports

2.1 G MPanels

SD-07 Certificates

Manufacturer's Certificate

1.5.1Installer Qualifications

SD-08 Manufacturer’s Instructions

Manufacturer's Instructions

09 90 00 SD-02 Shop Drawings

3.10 G MPiping identification

3.10 G Mstencil

SD-03 Product Data

Certification

1.9.2Environmental Data

2.1Materials

2.1Coating

2.1Manufacturer's Technical Data

Sheets

3.2.5Sealant

SD-04 Samples

1.11 G RColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2Qualification Testing

SD-08 Manufacturer’s Instructions

3.3.1Application instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W912ER18R0015 Amendment 0002 n0ectmcb Cross-Out

SECTION TABLE OF CONTENTS

DIVISION 10 - SPECIALTIES

SECTION 10 14 00.20

INTERIOR SIGNAGE Revised by Amendment 0002

PART 1 GENERAL

1.1 REFERENCES

1.2 SUSTAINABILITY REQUIREMENTS

1.2.1 EPA Comprehensive Procurement Guidelines

1.3 SUBMITTALS

1.4 EXTRA MATERIALS

1.5 QUALITY ASSURANCE

1.5.1 Samples

1.5.2 Detail Drawings

1.6 DELIVERY, STORAGE, AND HANDLING

1.7 WARRANTY

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

2.2 ROOM IDENTIFICATION/DIRECTIONAL SIGNAGE SYSTEM

2.2.1 Standard Room Signs

2.2.2 Changeable Message Strip Signs

2.2.3 Type of Mounting For Signs

2.2.4 Graphics

2.2.4.1 First Surface Copy Direct Print or Silkscreened

(Non-Tactile)

2.2.4.2 Surface Applied Photopolymer

2.2.4.3 Engraved Copy

2.2.4.4 Graphic Blast Raised Copy

2.2.4.5 Embossed

2.2.5 Character Proportions and Heights

2.2.6 Tactile Letters, Symbols and Braille

2.3 ALUMINUM ALLOY PRODUCTS

2.4 ANODIC COATING

2.5 FABRICATION AND MANUFACTURE

2.5.1 Factory Workmanship

2.5.2 Dissimilar Materials

2.6 COLOR, FINISH, AND CONTRAST

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Anchorage

3.1.2 Protection and Cleaning

-- End of Section Table of Contents --

SECTION 10 14 00.20 Page 1

SECTION 10 14 00.20

INTERIOR SIGNAGE

Revised by Amendment 0002

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ALUMINUM ASSOCIATION (AA)

AA DAF45 (2003; Reaffirmed 2009) Designation System for Aluminum Finishes

AA PK-1 (2009) Pink Sheets: Designations and Chemical Composition Limits for Aluminum Alloys in the Form of Castings & Ingot

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI Z97.1 (2009; Errata 2010) Safety Glazing Materials Used in Buildings - Safety Performance Specifications and Methods of Test

AMERICAN WELDING SOCIETY (AWS)

AWS D1.2/D1.2M (2008) Structural Welding Code - Aluminum

ASTM INTERNATIONAL (ASTM)

ASTM B209M (2010) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)

ASTM B221M (2013) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)

ASTM D635 (2010) Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Self-Supporting Plastics in a Horizontal Position

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

36 CFR 1191 Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines

SECTION 10 14 00.20 Page 2

1.2 SUSTAINABILITY REQUIREMENTS

Materials in this technical specification may contribute towards contract compliance with sustainability requirements.

1.2.1 EPA Comprehensive Procurement Guidelines

See Section 01 33 29 SUSTAINABILITY REPORTING for requirements associated with EPA designated products.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Detail Drawings; G M

SD-03 Product Data

Installation

SD-04 Samples

Interior Signage; G R Software; G R

SD-10 Operation and Maintenance Data

Approved Drawings and Manufacturer's Instructions Protection and Cleaning

1.4 EXTRA MATERIALS

Provide 5 percent extra frames and extra stock of the following: blank plates of each color and size for sign types, changeable message strips for sign types. Provide paper inserts and one copy of the software for user produced signs and inserts after project completion and equipment necessary for removal of signage parts and pieces.

1.5 QUALITY ASSURANCE

1.5.1 Samples

Submit interior signage samples of each of the following sign types showing typical quality, workmanship and color: Directional sign, Standard Room sign, Changeable message strip sign. The samples may be installed in the work, provided each sample is identified and location recorded.

1.5.2 Detail Drawings

Submit detail drawings showing elevations of each type of sign, dimensions, details and methods of mounting or anchoring, mounting height, shape and thickness of materials, and details of construction. Include a schedule showing the location, each sign type, and message.

SECTION 10 14 00.20 Page 3

1.6 DELIVERY, STORAGE, AND HANDLING

Materials shall be packaged to prevent damage and deterioration during shipment, handling, storage and installation. Product shall be delivered to the jobsite in manufacturer's original packaging and stored in a clean, dry area in accordance with manufacturer's instructions.

1.7 WARRANTY

Warrant the interior signage for a period of 2 years against defective workmanship and material. Warranties shall be signed by the authorized representative of the manufacturer. Submit warranty accompanied by the document authenticating the signer as an authorized representative of the guarantor. Guarantee that the signage products and the installation are free from any defects in material and workmanship from the date of delivery.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Signs, plaques, directories, and dimensional letters shall be the standard product of a manufacturer regularly engaged in the manufacture of such products that essentially duplicate signs that have been in satisfactory use at least 2 years prior to bid opening. Obtain signage from a single manufacturer with edges and corners of finished letterforms and graphics true and clean.

2.2 ROOM IDENTIFICATION/DIRECTIONAL SIGNAGE SYSTEM

2.2.1 Standard Room Signs

Signs shall consist of acrylic plastic 2 mm thickness minimum conforming to ANSI Z97.1 and shall conform to the following:

a. Frames shall be molded acrylic, 3 mm6 mm thick.

b. End caps shall be molded acrylicround style corners.

2.2.2 Changeable Message Strip Signs

Changeable message strip signs shall be of same construction as standard room signs to include a clear sleeve that will accept a paper or plastic insert identifying changeable text. The insert shall be prepared dry transfer letters applied to paper and coard stock. Sliding inserts or slide knobs that slide horizontally exposing different graphic information shall be provided as identified in the signage placement schedule and drawings

2.2.3 Type of Mounting For Signs

Provide extruded aluminum brackets for hanging, projecting, and double-sided signs. Mounting for framed, hanging, and projecting signs shall be by mechanical fasteners. Surface mounted signs shall be mounted with magnetic tape silicone adhesive fabricated from materials that are not corrosive to sign material and mounting surface.

SECTION 10 14 00.20 Page 4

2.2.4 Graphics

Signage graphics for modular signs shall conform to the following:

2.2.4.1 First Surface Copy Direct Print or Silkscreened (Non-Tactile)

Message may be applied to panel using the silkscreen process.

Silkscreened images shall be executed with photo screens prepared from original art. Handcut screens will not be accepted. Original art is defined as artwork that is a first generation reproduction of the specified art. Edges and corners shall be clean.

2.2.4.2 Surface Applied Photopolymer

Integral graphics and Braille achieved by photomechanical stratification processes. Photopolymer used for ADA compliant graphics shall be of the type that has a minimum durometer reading of 90. Tactile graphics shall be raised 0.8 mm from the first surface of plaque by photomechanical stratification process.

2.2.4.3 Engraved Copy

Machine engrave letters, numbers, symbols, and other graphics into panel sign on face to produce precisely formed copy and sharp images, incised to uniform depth. Melamine plastic engraving stock used for ADA compliant graphic shall be three-ply lamination contrasting color core meeting

ASTM D635.

2.2.4.4 Graphic Blast Raised Copy

Background is sandblasted to a uniform depth of 0.8 mm leaving raised text and Braille. Background shall be painted with polyurethane paint.

2.2.4.5 Embossed

Methods other than sandblasting such as vacuum formed to create ADA compliant projected graphics.

2.2.5 Character Proportions and Heights

Letters and numbers on signs conform to 36 CFR 1191 .

2.2.6 Tactile Letters, Symbols and Braille

Raised letters and numbers on signs shall conform to 36 CFR 1191 .

2.3 ALUMINUM ALLOY PRODUCTS

Aluminum extrusions shall be at least 3 mm thick, and aluminum plate or sheet shall be at least 1.3 mm thick. Extrusions shall conform to ASTM B221M; plate and sheet shall conform to ASTM B209M. Where anodic coatings are specified, alloy shall conform to AA PK-1 alloy designation

514.0. Exposed anodized aluminum finishes shall be as shown. Welding for aluminum products shall conform to AWS D1.2/D1.2M .

2.4 ANODIC COATING

Anodized finish shall conform to AA DAF45 as follows:

SECTION 10 14 00.20 Page 5

a. Integral color anodized designation AA-M10-C22-A32, Architectural Class

0.010 to 0.018 mm.

2.5 FABRICATION AND MANUFACTURE

2.5.1 Factory Workmanship

Holes for bolts and screws shall be drilled or punched. Drilling and punching shall produce clean, true lines and surfaces. Exposed surfaces of work shall have a smooth finish and exposed riveting shall be flush.

Fastenings shall be concealed where practicable.

2.5.2 Dissimilar Materials

Where dissimilar metals are in contact, the surfaces will be protected to prevent galvanic or corrosive action.

2.6 COLOR, FINISH, AND CONTRAST

Color shall be from a manufacturer's standard product line. Finish of all signs shall be eggshell, matte, or other non-glare finish as required in handicapped-accessible buildings.

PART 3 EXECUTION

3.1 INSTALLATION

Signs shall be installed plumb and true and in accordance with approved drawings and manufacturer's instructions at locations shown on the schedule below. Submit six copies of operating instructions outlining the step-by-step procedures required for system operation. The instructions shall include simplified diagrams for the system as installed, the manufacturer's name, model number, service manual, parts list, and brief description of all equipment and their basic operating features. Each set shall be permanently bound and shall have a hard cover. The following identification shall be inscribed on the covers: the words "OPERATING AND MAINTENANCE INSTRUCTIONS", name and location of the facility, name of the Contractor, and contract number.

Mounting height and mounting location shall conform to 36 CFR 1191 .

Required blocking shall be installed. Signs on doors or other surfaces shall not be installed until finishes on such surfaces have been installed. Signs installed on glass surfaces shall be installed with matching blank back-up plates in accordance with manufacturer's instructions.

SIGNAGE SCHEDULE

NOTE: Prior to fabrication, Contractor shall develop a Signage Schedule for all buildings using the example provided below, and shall meet with Contracting Officer to establish actual message content of all signage.

The entries under the "PLACEMENT" column signify - H- above header; J-adjacent to jamb; D- on door - as door location and function dictate.

Entries under "TYPE" column signify each type of sign to be provided as listed in the body of this specification section.

SIGN PLACEMENT SIZE(MM) MESSAGE

DOOR # TYPE W X H

SECTION 10 14 00.20 Page 6

SIGNAGE SCHEDULE

103B S3 J 230 X 180 CLOSET

104 S1 J 230 X 280 MALE

105 S3 J 230 X 180 JANITOR'S CLOSET

106 S3 J 230 X 180 LOUNGE ROOM

108 S3 J 230 X 180 WASH ROOM

109 S1 J 230 X 280 FEMALE

108 S3 J 230 X 180 WASH ROOM

110A S4 J 230 X 230 STOCK ROOM

110B S3 J 230 X 180 EMERGENCY EXIT ONLY -

ALARM WILL SOUND

111 S3 J 230 X 180 OFFICE

112 S3 J 230 X 180 COMMUNICATIONS ROOM

001 A H 250 X 300 SHIPS STORE

002 B J 250 X 250 PATIO DINING

003 B D 250 X 250 EMERGENCY EXIT ONLY -

ALARM WILL SOUND

004 B D 250 X 250 EMERGENCY EXIT ONLY -

ALARM WILL SOUND

005 A H 250 X 300 ITT & LEISURE TRAVEL

006 B D 250 X 250 OFFICE MANAGER

007 B D 250 X 250 GEAR STORAGE/ISSUE

3.1.1 Anchorage

Anchorage shall be in accordance with approved manufacturer's instructions. Anchorage not otherwise specified or shown shall include slotted inserts, expansion shields, and powder-driven fasteners when approved for concrete; toggle bolts and through bolts for masonry; machine carriage bolts for steel; lag bolts and screws for wood. Exposed anchor and fastener materials shall be compatible with metal to which applied and shall have matching color and finish.

a. Signs mounted to painted gypsum board surfaces shall be removable for painting maintenance.

b. Mount signs mounted to lay-in ceiling grids with clip connections to ceiling tees.

c. Install signs mounted on metal surfaces with magnetic tape.

d. Install signs mounted on fabric surfaces with hook and loop tape or pin mount.

3.1.2 Protection and Cleaning

Protect the work against damage during construction. Hardware and electrical equipment shall be adjusted for proper operation. Glass, frames, and other sign surfaces shall be cleaned at completion of sign installation in accordance with the manufacturer's approved instructions and the requirements of Section 01 78 00 CLOSEOUT SUBMITTALS. Submit copies of maintenance instructions listing routine procedures, repairs, and guides.

-- End of Section --

SECTION 10 14 00.20 Page 7

SECTION TABLE OF CONTENTS

DIVISION 27 - COMMUNICATIONS

SECTION 27 10 00

BUILDING TELECOMMUNICATIONS CABLING SYSTEM REVISED BY AMENDMENT 0002

PART 1 GENERAL

1.1 REFERENCES

1.2 RELATED REQUIREMENTS

1.3 DEFINITIONS

1.3.1 Campus Distributor (CD)

1.3.2 Building Distributor (BD)

1.3.3 Floor Distributor (FD)

1.3.4 Telecommunications Room (TR)

1.3.5 Entrance Facility (EF) (Telecommunications)

1.3.6 Entrance Room (ER) (Telecommunications)

1.3.7 Open Cable

1.3.8 Open Office

1.3.9 Pathway

1.4 SYSTEM DESCRIPTION

1.5 SUBMITTALS

1.6 QUALITY ASSURANCE

1.6.1 Shop Drawings

1.6.1.1 Telecommunications Drawings

1.6.1.2 Telecommunications Space Drawings

1.6.2 Telecommunications Qualifications

1.6.2.1 Telecommunications Contractor

1.6.2.2 Key Personnel

1.6.2.3 Minimum Manufacturer Qualifications

1.6.3 Test Plan

1.6.4 Regulatory Requirements

1.6.5 Standard Products

1.6.5.1 Alternative Qualifications

1.6.5.2 Material and Equipment Manufacturing Date

1.7 DELIVERY AND STORAGE

1.8 ENVIRONMENTAL REQUIREMENTS

1.9 WARRANTY

1.10 MAINTENANCE

1.10.1 Operation and Maintenance Manuals

1.10.2 Record Documentation

1.10.3 Spare Parts

PART 2 PRODUCTS

2.1 COMPONENTS

2.2 TELECOMMUNICATIONS PATHWAY

2.3 TELECOMMUNICATIONS CABLING

2.3.1 Backbone Cabling

2.3.1.1 Backbone Copper

2.3.1.2 Backbone Optical Fiber

2.3.2 Horizontal Cabling

2.3.2.1 Horizontal Copper

2.3.2.2 Horizontal Optical Fiber

SECTION 27 10 00 Page 1

2.4 TELECOMMUNICATIONS SPACES

2.4.1 Backboards

2.4.2 Equipment Support Frame

2.4.3 Connector Blocks

2.4.4 Cable Guides

2.4.5 Patch Panels

2.4.5.1 Modular to 110 Block Patch Panel

2.4.5.2 Fiber Optic Patch Panel

2.5 TELECOMMUNICATIONS OUTLET/CONNECTOR ASSEMBLIES

2.5.1 Outlet/Connector Copper

2.5.2 Optical Fiber Adapters

2.5.3 Optical Fiber Connectors

2.5.4 Cover Plates

2.6 MULTI-USER TELECOMMUNICATIONS OUTLET ASSEMBLY (MUTOA)

2.7 TERMINAL CABINETS

2.8 GROUNDING AND BONDING PRODUCTS

2.9 FIRESTOPPING MATERIAL

2.10 MANUFACTURER'S NAMEPLATE

2.11 FIELD FABRICATED NAMEPLATES

2.12 TESTS, INSPECTIONS, AND VERIFICATIONS

2.12.1 Factory Reel Tests

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Cabling

3.1.1.1 Backbone Cable

3.1.1.2 Horizontal Cabling

3.1.2 Pathway Installations

3.1.3 Service Entrance Conduit, Underground

3.1.4 Cable Tray Installation

3.1.5 Work Area Outlets

3.1.5.1 Terminations

3.1.5.2 Cover Plates

3.1.5.3 Cables

3.1.5.4 Pull Cords

3.1.6 Telecommunications Space Termination

3.1.6.1 Connector Strips

3.1.6.2 Patch Panels

3.1.6.3 Equipment Support Frames

3.1.7 Electrical Penetrations

3.1.8 Grounding and Bonding

3.2 LABELING

3.2.1 Labels

3.2.2 Cable

3.2.3 Termination Hardware

3.3 FIELD APPLIED PAINTING

3.4 FIELD FABRICATED NAMEPLATE MOUNTING

3.5 TESTING

3.5.1 Telecommunications Cabling Testing

3.5.1.1 Inspection

3.5.1.2 Verification Tests

3.5.1.3 Performance Tests

3.5.1.4 Final Verification Tests

-- End of Section Table of Contents --

SECTION 27 10 00 Page 2

SECTION 27 10 00

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

REVISED BY AMENDMENT 0002

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 709 (2001; R 2007) Laminated Thermosetting Materials

CONSUMER ELECTRONICS ASSOCIATION (CEA)

CEA-310-E (2005) Racks, Panels, and Associated Equipment

INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)

IEC 60793-2-50 Type B1.3 (2008) Optical fibres - Part 2-50: Product specifications - Sectional specification for class B single-mode fibres

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

ICEA S-83-596 (2001) Optical Fiber Premises Distribution Cable

ICEA S-90-661 (2006) Category 3, 5, & 5e Individually Unshielded Twisted Pair Indoor Cables for Use in General Purpose and LAN Communications Wiring Systems Technical Requirements

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA WC 66 (2001; Errata 2003) Performance Standard for Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pairs

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2008; AMD 1 2008) National Electrical Code

SECTION 27 10 00 Page 3

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

ANSI/TIA-607-B (2011) Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications

TIA-455-21-A (1988) FOTP-21 - Mating Durability of Fiber Optic Interconnecting Devices

TIA-492CAAA (1998; R 2002) Class IVA Dispersion-Unshifted Single-Mode Optical Fibers

TIA/EIA 492-CAAB (2012) Detail Specification for Class IVa Dispersion-Unshifted Single-Mode Optical Fibers with Low Water Peak

TIA-526-14-A (1998) OFSTP-14A Optical Power Loss Measurements of Installed Multimode Fiber Cable Plant

TIA-526-7 (2002; R 2008) Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant OFSTP-7

TIA-568-C.1 (2009) Commercial Building Telecommunications Cabling Standard

TIA-568-C.3 (2008e1) Optical Fiber Cabling Components Standard

TIA-569-B (2004) Commercial Building Standards for Telecommunications Pathways and Spaces

TIA/EIA-598-B (2001) Optical Fiber Cable Color Coding

TIA/EIA-604-10A (2002) FOCIS 10 Fiber Optic Connector Intermateability Standard Type LC

TIA-604-3-B (2004) FOCIS 3 Fiber Optic Connector Intermateability Standard - Type Type SC and SC-APC

TIA/EIA-604-3A (2000) FOCIS 3 Fiber Optic Connector Intermateability Standard

TIA/EIA-606-B (2012) Administration Standard for Telecommunications Infrastructure

U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)

FCC Part 68 Connection of Terminal Equipment to the Telephone Network (47 CFR 68)

UNDERWRITERS LABORATORIES (UL)

UL 1666 (2007) Standard for Test for Flame Propagation Height of Electrical and Optical-Fiber Cables Installed Vertically

SECTION 27 10 00 Page 4 in Shafts

UL 1863 (2004; R 2008) Standard for Communication Circuit Accessories

UL 444 (2008; R 2008) Communications Cables

UL 467 (2007) Grounding and Bonding Equipment

UL 50 (2007) Enclosures for Electrical Equipment, Non-environmental Considerations

UL 514C (1996; R 1998 thru 2009) Standard for Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers

UL 910 (1998) Test for Flame-Propagation and Smoke-Density Values for Electrical and Optical-Fiber Cables Used in Spaces Transporting Environmental Air

UL 969 (1995; R 1998 thru 2008) Standard for Marking and Labeling Systems

1.2 RELATED REQUIREMENTS

Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM and Section 33 82 00 TELECOMMUNICATIONS, OUTSIDE PLANT, apply to this section with additions and modifications specified herein.

1.3 DEFINITIONS

Unless otherwise specified or indicated, electrical and electronics terms used in this specification shall be as defined in TIA-568-C , TIA-568-C.3 , TIA-569-B , TIA/EIA-606-B and IEEE 100 and herein.

1.3.1 Campus Distributor (CD)

A distributor from which the campus backbone cabling emanates.

(International expression for main cross-connect (MC).)

1.3.2 Building Distributor (BD)

A distributor in which the building backbone cables terminate and at which connections to the campus backbone cables may be made. (International expression for intermediate cross-connect (IC).)

1.3.3 Floor Distributor (FD)

A distributor used to connect horizontal cable and cabling subsystems or equipment. (International expression for horizontal cross-connect (HC).)

1.3.4 Telecommunications Room (TR)

An enclosed space for housing telecommunications equipment, cable, terminations, and cross-connects. The room is the recognized cross-connect between the backbone cable and the horizontal cabling.

SECTION 27 10 00 Page 5

1.3.5 Entrance Facility (EF) (Telecommunications)

An entrance to the building for both private and public network service cables (including antennae) including the entrance point at the building wall and continuing to the entrance room or space.

1.3.6 Entrance Room (ER) (Telecommunications)

A centralized space for telecommunications equipment that serves the occupants of a building. Equipment housed therein is considered distinct from a telecommunications room because of the nature of its complexity.

1.3.7 Open Cable

Cabling that is not run in a raceway as defined by NFPA 70 . This refers to cabling that is "open" to the space in which the cable has been installed and is therefore exposed to the environmental conditions associated with that space.

1.3.8 Open Office

A floor space division provided by furniture, moveable partitions, or other means instead of by building walls.

1.3.9 Pathway

A physical infrastructure utilized for the placement and routing of telecommunications cable.

1.4 SYSTEM DESCRIPTION

The building telecommunications cabling and pathway system shall include permanently installed backbone and horizontal cabling, horizontal and backbone pathways, service entrance facilities, work area pathways, telecommunications outlet assemblies, conduit, raceway, and hardware for splicing, terminating, and interconnecting cabling necessary to transport telephone and data (including LAN) between equipment items in a building. The horizontal system shall be wired in a star topology from the telecommunications work area to the floor distributor or campus distributor at the center or hub of the star. The backbone cabling and pathway system includes intrabuilding and interbuilding interconnecting cabling, pathway, and terminal hardware. The intrabuilding backbone provides connectivity from the floor distributors to the building distributors or to the campus distributor and from the building distributors to the campus distributor as required.. The backbone system shall be wired in a star topology with the campus distributor at the center or hub of the star. The interbuilding backbone system provides connectivity between the campus distributors and is specified in Section 33 82 00, TELECOMMUNICATIONS OUTSIDE PLANT. Provide telecommunications pathway systems referenced herein as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. The telecommunications contractor must coordinate with the NMCI contractor concerning access to and configuration of telecommunications spaces. The telecommunications contractor may be required to coordinate work effort within the telecommunications spaces with the NMCI contractor.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

SECTION 27 10 00 Page 6 submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Telecommunications drawings; G M

Telecommunications Space Drawings; G M

In addition to Section 01 33 00 SUBMITTAL PROCEDURES, provide shop drawings in accordance with paragraph SHOP DRAWINGS.

SD-03 Product Data

Telecommunications cabling (backbone and horizontal); G M

Patch panels; G M

Telecommunications outlet/connector assemblies; G M

Equipment support frame; G M

Connector blocks; G M

Spare Parts; G R

Submittals shall include the manufacturer's name, trade name, place of manufacture, and catalog model or number. Include performance and characteristic curves. Submittals shall also include applicable federal, military, industry, and technical society publication references. Should manufacturer's data require supplemental information for clarification, the supplemental information shall be submitted as specified in paragraph REGULATORY REQUIREMENTS and as required in Section

01 33 00 SUBMITTAL PROCEDURES.

SD-06 Test Reports

Telecommunications cabling testing; G M

SD-07 Certificates

Telecommunications Contractor Qualifications; G R

Key Personnel Qualifications; G R

Manufacturer Qualifications; G R

Test plan; G R

SD-09 Manufacturer's Field Reports

Factory reel tests; G R

SD-10 Operation and Maintenance Data

Telecommunications cabling and pathway system Data Package 5; G R

SECTION 27 10 00 Page 7

SD-11 Closeout Submittals

Record Documentation; G M/R

1.6 QUALITY ASSURANCE

1.6.1 Shop Drawings

In exception to Section 01 33 00, SUBMITTAL PROCEDURES, submit shop drawings a minimum of 355 by 510 mm in size using a minimum scale of one mm per 100 mm. Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment.

Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices. Submittals shall include the nameplate data, size, and capacity. Submittals shall also include applicable federal, military, industry, and technical society publication references.

1.6.1.1 Telecommunications Drawings

Provide registered communications distribution designer (RCDD) approved, drawings in accordance with TIA/EIA-606-B . The identifier for each termination and cable shall appear on the drawings. Drawings shall depict final telecommunications installed wiring system infrastructure in accordance with TIA/EIA-606-B . The drawings should provide details required to prove that the distribution system shall properly support connectivity from the EF telecommunications and ER telecommunications, CD's, BD's, and FD's to the telecommunications work area outlets. Provide a plastic laminated schematic of the as-installed telecommunications cable system showing cabling, CD's, BD's, FD's, and the EF and ER for telecommunications keyed to floor plans by room number. Mount the laminated schematic in the EF telecommunications space as directed by the Contracting Officer. The following drawings shall be provided as a minimum:

a. T1 - Layout of complete building per floor - Building Area/Serving Zone Boundaries, Backbone Systems, and Horizontal Pathways.

Layout of complete building per floor. The drawing indicates location of building areas, serving zones, vertical backbone diagrams, telecommunications rooms, access points, pathways, grounding system, and other systems that need to be viewed from the complete building perspective.

b. T2 - Serving Zones/Building Area Drawings - Drop Locations and Cable Identification (ID’S). Shows a building area or serving zone. These drawings show drop locations, telecommunications rooms, access points and detail call outs for common equipment rooms and other congested areas.

c. T4 - Typical Detail Drawings - Faceplate Labeling, Firestopping, Americans with Disabilities Act (ADA), Safety, Department of Transportation (DOT). Detailed drawings of symbols and typicals such as faceplate labeling, faceplate types, faceplate population installation procedures, detail racking, and raceways.

SECTION 27 10 00 Page 8

1.6.1.2 Telecommunications Space Drawings

Provide T3 drawings in accordance with TIA/EIA-606-B that include telecommunications rooms plan views, pathway layout (cable tray, racks, ladder-racks, etc.), mechanical/electrical layout, and cabinet, rack, backboard and wall elevations. Drawings shall show layout of applicable equipment including incoming cable stub or connector blocks, building protector assembly, outgoing cable connector blocks, patch panels and equipment spaces and cabinet/racks. Drawings shall include a complete list of equipment and material, equipment rack details, proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work including clearance for maintenance and operation. Drawings may also be an enlargement of a congested area of T1 or T2 drawings.

1.6.2 Telecommunications Qualifications

Work under this section shall be performed by and the equipment shall be provided by the approved telecommunications contractor and key personnel.

Qualifications shall be provided for: the telecommunications system contractor, the telecommunications system installer, and the supervisor (if different from the installer). A minimum of 30 days prior to installation, submit documentation of the experience of the telecommunications contractor and of the key personnel.

1.6.2.1 Telecommunications Contractor

The telecommunications contractor shall be a firm which is regularly and professionally engaged in the business of the applications, installation, and testing of the specified telecommunications systems and equipment.

The telecommunications contractor shall demonstrate experience in providing successful telecommunications systems within the past 3 years.

Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for the telecommunications contractor.

1.6.2.2 Key Personnel

Provide key personnel who are regularly and professionally engaged in the business of the application, installation and testing of the specified telecommunications systems and equipment. There may be one key person or more key persons proposed for this solicitation depending upon how many of the key roles each has successfully provided. Each of the key personnel shall demonstrate experience in providing successful telecommunications systems within the past 3 years.

Supervisors and installers assigned to the installation of this system or any of its components shall be Building Industry Consulting Services International (BICSI) Registered Cabling Installers, Technician Level.

Submit documentation of current BICSI certification for each of the key personnel.

In lieu of BICSI certification, supervisors and installers assigned to the installation of this system or any of its components shall have a minimum of 3 years experience in the installation of the specified copper and fiber optic cable and components. They shall have factory or factory approved certification from each equipment manufacturer indicating that they are qualified to install and test the provided products. Submit

SECTION 27 10 00 Page 9 documentation for a minimum of three and a maximum of five successful telecommunication system installations for each of the key personnel.

Documentation for each key person shall include at least two successful system installations provided that are equivalent in system size and in construction complexity to the telecommunications system proposed for this solicitation. Include specific experience in installing and testing telecommunications systems and provide the names and locations of at least two project installations successfully completed using optical fiber and copper telecommunications cabling systems. All of the existing telecommunications system installations offered by the key persons as successful experience shall have been in successful full-time service for at least 18 months prior to the issuance date for this solicitation.

Provide the name and role of the key person, the title, location, and completed installation date of the referenced project, the referenced project owner point of contact information including name, organization, title, and telephone number, and generally, the referenced project description including system size and construction complexity.

Indicate that all key persons are currently employed by the telecommunications contractor, or have a commitment to the telecommunications contractor to work on this project. All key persons shall be employed by the telecommunications contractor at the date of issuance of this solicitation, or if not, have a commitment to the telecommunications contractor to work on this project by the date that the bid was due to the Contracting Officer.

Note that only the key personnel approved by the Contracting Officer in the successful proposal shall do work on this solicitation's telecommunications system. Key personnel shall function in the same roles in this contract, as they functioned in the offered successful experience. Any substitutions for the telecommunications contractor's key personnel requires approval from The Contracting Officer.

1.6.2.3 Minimum Manufacturer Qualifications

Cabling, equipment and hardware manufacturers shall have a minimum of 3 years experience in the manufacturing, assembly, and factory testing of components which comply with TIA-568-C.1 , TIA/EIA-568-B.2 and TIA-568-C.3 .

1.6.3 Test Plan

Provide a complete and detailed test plan for the telecommunications cabling system including a complete list of test equipment for the UTP and optical fiber components and accessories 60 days prior to the proposed test date. Include procedures for certification, validation, and testing.

1.6.4 Regulatory Requirements

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.

SECTION 27 10 00 Page 10

1.6.5 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.

1.6.5.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.6.5.2 Material and Equipment Manufacturing Date

Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.

1.7 DELIVERY AND STORAGE

Provide protection from weather, moisture, extreme heat, dirt, dust, and other contaminants for telecommunications cabling and equipment placed in storage.

1.8 ENVIRONMENTAL REQUIREMENTS

Connecting hardware shall be rated for operation under ambient conditions of 0 to 60 degrees C and in the range of 0 to 95 percent relative humidity, noncondensing.

1.9 WARRANTY

The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.10 MAINTENANCE

1.10.1 Operation and Maintenance Manuals

Commercial off the shelf manuals shall be furnished for operation, installation, configuration, and maintenance of products provided as a part of the telecommunications cabling and pathway system. Submit operations and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein not later than 2 months prior to the date of beneficial occupancy. In addition to requirements of Data package 5, include the requirements of paragraphs TELECOMMUNICATIONS DRAWINGS, TELECOMMUNICATIONS SPACE DRAWINGS, and RECORD

DOCUMENTATION.

SECTION 27 10 00 Page 11

1.10.2 Record Documentation

Provide T5 drawings including documentation on cables and termination hardware in accordance with TIA/EIA-606-B . T5 drawings shall include schedules to show information for cut-overs and cable plant management, patch panel layouts and cover plate assignments, cross-connect information and connecting terminal layout as a minimum. T5 drawings shall be provided on electronic media using Windows based computer cable management software. A licensed copy of the cable management software including documentation, shall be provided. Provide the following T5 drawing documentation as a minimum:

a. Cables - A record of installed cable shall be provided in accordance with TIA/EIA-606-B . The cable records shall include the required data fields for each cable and complete end-to-end circuit report for each complete circuit from the assigned outlet to the entry facility in accordance with TIA/EIA-606-B . Include manufacture date of cable with submittal.

b. Termination Hardware - A record of installed patch panels, cross-connect points, distribution frames, terminating block arrangements and type, and outlets shall be provided in accordance with TIA/EIA-606-B . Documentation shall include the required data fields as a minimum in accordance with TIA/EIA-606-B .

1.10.3 Spare Parts

In addition to the requirements of Section 01 78 23 OPERATION AND MAINTENANCE DATA, provide a complete list of parts and supplies, with current unit prices and source of supply, and a list of spare parts recommended for stocking.

PART 2 PRODUCTS

2.1 COMPONENTS

UL listed. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations, submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard. Provide a complete system of telecommunications cabling and pathway components using star topology. Provide support structures and pathways, complete with outlets, cables, connecting hardware and telecommunications cabinets/racks. Cabling and interconnecting hardware and components for telecommunications systems shall be UL listed and shall comply with NFPA 70 and conform to the requirements specified herein.

2.2 TELECOMMUNICATIONS PATHWAY

Provide telecommunications pathways in accordance with TIA/EIA-569-B and as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.

SECTION 27 10 00 Page 12

2.3 TELECOMMUNICATIONS CABLING

Cabling shall be UL listed for the application and shall comply with TIA-568-C.1 , TIA-568-C.3 and NFPA 70 . Provide a labeling system for cabling as required by TIA/EIA-606-B and UL 969 . Ship cable on reels or in boxes bearing manufacture date for UTP in accordance with ICEA S-90-661 and optical fiber cables in accordance with ICEA S-83-596 for all cable used on this project. Cabling manufactured more than 12 months prior to date of installation shall not be used.

2.3.1 Backbone Cabling

2.3.1.1 Backbone Copper

ICEA S-90-661 , TIA-568-C.1 , TIA/EIA-568-B.2 , NEMA WC 66 and UL 444 , copper backbone cable shall be solid conductor, 24 AWG, 100 ohm, number of pairs indicated UTP (Unshielded twisted pair), formed into 25 pair binder groups covered with a gray thermoplastic jacket. Cable shall be imprinted with manufacturers name or identifier, flammability rating, gauge of conductor, transmission performance rating (category designation) at regular intervals not to exceed 1 meter. The word "METER" or the abbreviation "M" shall appear after each length marking. Provide communications, communications plenum (CMP) or communications riser (CMR) rated cabling in accordance with NFPA 70 . Type may be substituted for type CMR in accordance with NFPA 70 . Color coding shall comply with industry standards for 25 pair cables.

2.3.1.2 Backbone Optical Fiber

Provide in accordance with ICEA S-83-596 , TIA-568-C.3 , UL 1666 and NFPA 70 .

Cable shall be imprinted with fiber count, fiber type and aggregate length at regular intervals not to exceed 1 meter. Hybrid fiber optic cable marking shall comply with TIA/EIA-598-B .

TIA-492AAAA-B , multimode, 62.5/125-um diameter, 0.275 numerical aperture and TIA-492CAAA , single-mode, 8/125-um diameter, 0.10 numerical aperture, tight buffered fiber optic cable. Provide nonconductive optical fiber plenum cable (OFNP), and nonconductive optical fiber riser cable (OFNR) rated cable in accordance with NFPA 70 and UL 910 . Type OFNP may be substituted for type OFNR in accordance with NFPA 70 . The cable cordage jacket, fiber, unit, and group color shall be in accordance with

TIA/EIA-598-B .

2.3.2 Horizontal Cabling

Provide horizontal cable in compliance with NFPA 70 and performance characteristics in accordance with TIA-568-C .

2.3.2.1 Horizontal Copper

Provide horizontal copper cable in accordance with TIA/EIA-568-B.2 , UL 444 , NEMA WC 66, ICEA S-90-661 UTP (unshielded twisted pair), 100 ohm. Provide four each individually twisted pair, 24 AWG conductors, Category 6, with a thermoplastic jacket. Cable shall be imprinted with manufacturers name or identifier, flammability rating, gauge of conductor, transmission performance rating (category designation) at regular intervals not to exceed 1 meter. The word "METER" or the abbreviation "M" shall appear after each length marking. Provide communications plenum (CMP) or communications riser (CMR) rated cabling in accordance with NFPA 70 . Type

SECTION 27 10 00 Page 13