RFP: W912ER-16-R-0009

PROJECT: P-976 Mina Salman Pier Replacement PROPOSER:

LOCATION: NAVSUPPACT BAHRAIN DATE:

Design in accordance with the contract documents

Mobilization and Demobilization in accordance with the contract documents

Steel Pier Construct in accordance with the contract documents

0003AA Substructure

0003AB Superstructure

0003AC Deck

0003AD Mooring and Berthing System

0003AE Appurtenances

Total Item 0003AA-AE

Water Front Electrical Utilities

Construct in accordance with the contract documents

Water Front Fire Protection Utilities

Construct in accordance with the contract documents

Water Front Demolition Construct in accordance with the contract documents

Water Front ATFP Construct in accordance with the contract documents

Operations and Maintenance in accordance with the contract documents

Total Base Bid Price

Option #1 Navigation Dredging and

Reclamation Construct in accordance with the contract documents

Total Options Price

OVERHEAD/

INDIRECT COST

PROFIT

TOTAL PROPOSED

COST

TOTAL BASE + OPTIONS PRICE (ITEMS 0001 - 0009)

COST BREAKDOWN

ITEM DESCRIPTION

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

DIRECT

MATERIALS COST

SUB

CONTRACTOR

COST

EXHIBIT 1 Page 1 of 1