v2.5_W912EP25R0007_Pre-Proposal_Teleconference_Slides_20250407_final.pdf
PDF 4 MB Posted
- Solicitation number
- W912EP25R0007
About this file
This document is a pre-proposal teleconference slide deck for a U.S. Army Corps of Engineers (USACE) Jacksonville District solicitation (W912EP25R0007) for an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for architectural and engineering (A-E) services. The solicitation aims to award eight contracts, with four reserved for small businesses and four for other than small businesses, with a total contract capacity of $83 million. The primary focus is on civil works projects within Florida and Georgia, including inland flood risk management, aquatic ecosystem restoration, coastal storm risk management, and navigation services.
Key details include a submission deadline of April 24, 2025, at 1:00 PM EDT, with anticipated contract awards in the fourth quarter of FY26. Offerors must submit Standard Form 330 (SF 330) electronically through the Procurement Integrated Enterprise Environment (PIEE) system. Selection will be based on criteria including specialized experience, qualified professional personnel, capacity to accomplish work, past performance, knowledge of locality, and geographic proximity. The contract will have a one-year base period with options to extend up to four additional years. Small businesses may compete for both small business and unrestricted pool contracts, but no firm will receive more than one base contract award.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL TELECONFERENCE
Solicitation #W912EP25R0007, Indefinite Delivery Contract for Multi-Discipline Misc. Civil Works (CW) And Other A-E Services Within the Boundaries of the Jacksonville District
Engineering Division/A-E Contract Administration Section
Date: April 7, 2025 Time: 1-2 PM EDT
AGENDA
BUILDING STRONG®
Introductions
Administrative Items
Contract and Reference
Information
Selection Procedures
Engineering & Design
Small Business Overview
Submission Requirements
Estimated Milestones
Q & A
Closing Remarks / Adjourn
ADMINISTRATIVE ITEMS
Introductions and Roll Call
Phones muted, unless taking or asking questions. Leave cameras off.
Hold questions until end of Presentation. Please type your Q into the Teams Chat.
Technical Questions ► Yes/No questions will be allowed ► Otherwise, it is the offerer’s responsibility to submit questions in writing to the POC
Submit questions in writing via email
Slides, roster, & Q&A will be posted to SAM.gov
The initial (25) Q’s & A’s were posted to SAM.gov on 1 Apr 25
Multiple Award Task Order Contract (MATOC) Info 1 of 2
BUILDING STRONG®
IAW PL 92-582-Selection of A-E’s/Brooks Act/FAR 36.6
SB = Small Business(es); OTSB = Other Than SB
Target is award of 8 contracts: 4 OTSB & 4 SB
Total capacity shared by all contracts = $83M
Period of Performance: 1 yr from date of award with options to extend up to 4 more yrs, not to exceed 5 yrs
Primary Project Area for A-E Services: SAJ AOR
Secondary Project Area for A-E Services: SAD AOR
Min. Guarantee for Each Contract = $10K
Multiple Award Task Order Contract (MATOC) Info 2 of 2
BUILDING STRONG®
SB Reserve Target is 10 awarded Task Orders to SB Pool of up to 4 SBs
Offerors responding to this solicitation MUST identify to which category (UNR/SB) they are submitting
Submit a separate SF 330 for each category in which the offeror wants consideration
SBs may compete for 1 of the SB pool contracts and one of the Unrestricted (UNR) pool contracts, but no 1 firm will receive more than 1 base contract award
All SF 330s (SB & UNR) will be evaluated together by the same Pre-Selection & Selection Boards to ensure equal treatment.
Important References – Slide 1 OF 3
• Engineer Pamphlet (EP) 715-1-7 (Feb 29, 2012) – Architect-Engineer Contracting in USACE, provides guidance and procedures for A-E services in accordance with the Selection of Architects and Engineers Statute.
• Selection of Architects and Engineers Statute (formerly the Brooks Act) – provides the policy and procedures for awarding architect-engineer contracts for the Federal Government.
o Public announcement for all architectural and engineering services o Annual company submission of qualifications statements o Selection of winning offeror based on demonstrated technical competence and professional qualifications directly related to the professional services required o Discussion with and a ranking of at least three firms in order of preference o Negotiation with the highest qualified firm o Negotiation with the second highest qualified offeror if a satisfactory agreement cannot be reached with the first ranked offeror o Negotiation of fair and reasonable prices
Important References – Slide 2 OF 3
• System for Award Management (SAM) - the Official U.S. Government System for contract opportunities. Every contract announcement is posted in the SAM.gov website. To receive an award with us you must be registered in SAM.
• Federal Acquisition Regulations System (FAR 1.101) - is established for the codification and publication of uniform policies and procedures for acquisition by all executive agencies.
The Federal Acquisition Regulations System consists of the Federal Acquisition Regulation (FAR), which is the primary document, and agency acquisition regulations that implement or supplement the FAR.
https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/browse/index/far
Important References – Slide 3 OF 3
•Procurement Integrated Enterprise Environment (PIEE), (Cont.)
oThe only authorized transmission method of proposals in response to the subject solicitation is electronically via the Procurement Integrated Enterprise Environment (PIEE) website. No other transmission methods, such as email, facsimile, hand-carried, proprietary or DOD SAFE submissions, proposals submitted by mail, etc. will be accepted. Offers submitted via any other transmission method other than the Procurement Integrated Enterprise Environment (PIEE) website will not be evaluated.
oThe Offeror’s bid/proposal must be received by the Government no later than the date/time specified in the solicitation and cited below.
Offerors shall submit their bid using the following link:
https://piee.eb.mil/ oResponses due April 24, 2025, 1:00 PM (EDT) https://piee.eb.mil/
Process is defined in EP 715-1-7, USACE HQ publications & FAR Part 36 (Brooks-Act)
Selection Board Panel
• Members of the Board are Subject Matter Experts / licensed professionals
Selection Criteria
• Strict adherence to selection criteria
• Every point in the solicitation is evaluated
• Entire package is reviewed by all board members
Overview of USACE A-E Selection Procedures
Process is defined in EP 715-1-7, USACE HQ publications & FAR Part 36 (Brooks-Act)
Evaluation and Determination
• All evaluations are discussed and consensus is reached
• Board Determines most highly qualified firms
• Report selection rationale to chain of command to ensure process is consistent and fair
Next Steps
• Notifications are sent to all applicants
• Debriefings are conducted
Overview of USACE A-E Selection Procedures
Solicitation Selection Criteria
► Primary Criteria
• Specialized Experience and Technical Competence
• Qualified Professional Personnel
• Capacity to Accomplish the Work
• Past Performance
• Knowledge of the Locality
• Geographic Proximity of Firm relative to the Worksite
► Secondary Criteria (tie-breakers)
• Extent of Participation of Small Businesses
• Volume of Past DoD Contracts Awarded to Firm
Tip: EP 715-1-4 Competing for AE Contracts with USACE
Selection Criteria
SAJ ENGINEERING DIVISION BRANCHES
THAT WILL BE USING THIS IDIQ MATOC:
BRANCH CHIEF
TASK ORDER
SIZE
UNR
POOL
SB
POOL
DESIGN DAVID DUDLEY, P.E. LARGER MORE
LIKELY
LESS
LIKELY
WATER
RESOURCES
JASON ENGLE, P.E. SMALLER LESS
LIKELY
MORE
LIKELY
WATERWAYS WILLIAM REILLY, P.E. SMALLER LESS
LIKELY
MORE
LIKELY
Pensacola Panama City
Sebring
Clewiston
DISTRICT
HEADQUARTERS
CIVIL WORKS AREA
OF RESPONSIBILITY (FLORIDA AREA)
Palatka
Ft. Myers
Tampa Cocoa
Melbourne
AREAS OF RESPONSIBILITY
CIVIL WORKS
Portions of Florida and Georgia
(defined by watersheds)
REGULATORY
Florida
REAL ESTATE AND MOBILIZATION
Portions of Florida and Georgia
JACKSONVILLE
DISTRICT
OFFICES
AND AREAS OF
RESPONSIBILITY
MiamiNaples
GEORGIA
FLORIDA
West Palm Beach Palm Beach Gardens
Wellington
Jacksonville Gainesville
CIVIL WORKS ENGINEERING & DESIGN
► Planning, design, construction management, monitoring, operation and maintenance of projects including:
1. Inland flood risk management
2. Aquatic ecosystem restoration
3. Coastal storm risk management
4. Navigation
BUILDING STRONG®
► Projects/features may include:
• Dams
• Levees
• Dikes
• Canals
• Water control structures (e.g. gates)
• Pumpstations
• Bridges
• Maintenance dredging for navigation channels
• Beach nourishment
• Dredge material management areas
• Coastal hard structures such as jetties, groins, revetments, breakwaters, and seawalls/bulkheads
► Services may include:
• Design reports
• Engineering for feasibility studies
• Numerical modeling for hydrology, hydraulics, and coastal
• Data collection and investigations
• Estimates of construction costs and schedules
• Calculations/analyses
• Site planning
• Construction plans/drawings and technical specifications
• Other areas of engineering and design required for a complete and useable project
INLAND FLOOD RISK
MANAGEMENT
“…includes but is not limited to, numerical modeling and analysis of surface water and groundwater, geotechnical investigations and analysis, field and laboratory material testing, ability to provide services and deliver products using the Autodesk suite of software, engineering and design support of dams, levees, dikes, canals, water control structures, pump stations and utility systems.”
S-477 Pump Station
AQUATIC ECOSYSTEM
RESTORATION
“…includes but is not limited to, numerical modeling of surface water and groundwater, engineering and design of features and projects that provide for restoration or improvement of the quantity, quality, timing and/or distribution of water. This includes the analysis of surface water and/or groundwater flows, hydrology, hydraulic design of canals, water control structures, and analysis of water quality.”
Ecosystem Restoration: Everglades Restoration
New Jersey
Everglades Water Conservation Area
BUILDING STRONG®
Planning in an area twice the size of New Jersey (18,000 square miles)
Intense stakeholder interest Strong federal and state partnership throughout program
South Florida Everglades Ecosystem Restoration Program
Kissimmee River
Restoration
Modified Water Deliveries to Everglades National Park (ENP)
Continuing Authorities Program
(1135, 206)
C-111
C-51 / STA-1E
Comprehensive Everglades Restoration Plan (CERP)Upper St. Johns
River Basin Everglades
Kissimmee River
After
Critical Projects Program
Central & Southern Florida Project
Manatee
Upper St. Johns
Kissimmee River Restoration
C-44 Reservoir
Water Resources Engineering
►Full-service District for HH&C engineering practice ►Robust District-based workload as well as Regional support ►Work encompasses Flood risk management Aquatic ecosystem restoration Coastal storm risk management Navigation
Water Resources Engineering ►Work we do:
Analyses of tidal inlet hydraulics and sediment transport, Numerical modeling of ocean and coastal waves and currents, Analysis and design of coastal hard structures and beach nourishment Surface water hydrology, hydraulics and hydrodynamics, 2-D and 3-D flow and integrated surface water and groundwater modeling, Sediment transport and scour studies, Water quality analyses and modeling, Integrated documentation and final reporting with final product delivery (all products)
Brevard Co. SPP – North Rch
PB Co. SPP – Jupiter/Carlin
Dade Co. BEC&HP – Haulover Bch Pk
St. Johns Co. CSRM - Vilano Bch
Nassau Co. SPP Duval Co. SPP
Broward Co. SPP – Segment II
Lee Co. SPP – Gasparilla Is.
Sarasota Co. HSDR – Venice
Manatee Co. SPP – Anna Maria Is.
Pinellas Co. BEC – Treasure Is.
GEORGIA
FLORIDA
COUNTIES WITH
PARTICIPATION IN
CSRM PROJECTS
Brevard Co. SPP – South Rch
Martin Co. SPP
Ft. Pierce SPP
Dade Co. BEC&HP – Miami Bch
Broward Co. SPP – Segment III
Pinellas Co. BEC – Sand Key
Pinellas Co. BEC – Long Key
PB Co. SPP – Delray Beach PB Co. SPP – North Boca Raton
Brevard Co. SPP – Mid Rch
PB Co. SPP – Ocean Ridge
Lido Key HSDR
Flagler Co. CSRM
PB Co. SPP – Mid Town
Dade Co. BEC&HP – Surfside
St. Johns Co. SPP – St. Augustine Bch
Patrick Spaceforce Base
St. Lucie Co. CSRM – S. Hutchinson Is.
Dade Co. BEC&HP – Sunny Isles Dade Co. BEC&HP – Bal Harbor
Monroe County CSRM
Lee Co. SPP – Captiva Is.
Lee Co. SPP – Estero Is.
Constructed CSRM
Unconstructed CSRM
Support for Others
Feasibility Study
Collier County CSRM
Miami-Dade Back Bay CSRM
Key Biscayne CSRM
Kennedy Space Center SPP
St. Augustine Back Bay CSRM
Charlotte County CSRM
St. Johns Co. CSRM - Ponte Vedra
Coastal Storm Risk Management
“…includes but it is not limited to, engineering and design of beach nourishment and coastal hard structures such as groins, revetments, breakwaters, and seawalls/bulkheads. This includes the analysis of coastal sediment transport and morphology, numerical modeling of coastal storm damages, and marine geotechnical investigations for borrow areas.”
Gulf of America
Atlantic Ocean
Jacksonville District has the largest CSRM Program in the nation
Coastal Storm Risk Management
ST. LUCIE COUNTYDADE COUNTY
BROWARD COUNTY
LIDO KEY
BREVARD COUNTYPALM BEACH COUNTY
Jacksonville District has the largest CSRM Program in the nation
Georgia
Florida
JACKSONVILLE
DISTRICT
(SAJ)
Jacksonville Harbor
Port Everglades
Miami Harbor
Tampa Harbor
Gulf of America
Atlantic Ocean
SAVANNAH
DISTRICT
(SAS)
Fernandina Harbor
St. Augustine Harbor
Port Canaveral
Ft. Pierce Harbor
Palm Beach Harbor
Key West
Port Manatee
St. Petersburg Harbor
13 Deep Draft Harbors
4 of Top 10 SAD Harbors (Tonnage/Cargo Value)
Shallow Draft Harbors Not Shown
Kings Bay
Navigation
“…includes but is not limited to, engineering and design for navigation channels, navigation structures such as jetties, maintenance dredging, and dredge material management areas, coastal ocean circulation modeling for water quality (associated with dredging events), inlet sediment budgets and management plans, and marine geotechnical investigations.”
Jacksonville District has the largest coastal navigation program in the nation
Navigation
OUTFALL
OUTFALL
WEIR
WEIR
DISCHARGE
DISCHARGE
Jacksonville District has the largest coastal navigation program in the nation
SMALL BUSINESS PROGRAM
ERNISE A. CUMMINGS
SMALL BUSINESS
DEPUTY
Facts to Know
Ensure registered in SAM.gov
Ensure registration is updated. Expires each year
Ensure the NAICS associated with the solicitation is in your
SAM.gov profile
Ensure proposals are uploaded in the Procurement Integrated
Enterprise Environment (PIEE) system
Ensure you read the entire solicitation
Ensure you review the responses from the Q&As
If there are any questions, reach out to the POC listed in the solicitation
SB Resources
• Business Opportunity Specialist (SBA)
• Procurement Center Representative (SBA)
• APEX Accelerators
Marketing Resources
• Contract Opportunities on SAM.gov
• Dynamic Small Business Search System
• Forecast of Contracting Opportunities
Other Resources
• USASpending
• DoD Prime Contracting Directory
JACKSONVILLE DISTRICT OFFICE OF
SMALL BUSINESS PROGRAMS
https://sam.gov/ http://web.sba.gov/pro-net/search/dsp_dsbs.cfm https://www.gsa.gov/small-business/forecast-of-contracting-opportunities?topnav=small-business https://www.usaspending.gov/ https://business.defense.gov/
JACKSONVILLE DISTRICT OFFICE OF
SMALL BUSINESS PROGRAMS
Alexandria Garza, Small Business Professional
USACE, Jacksonville District Office (904) 232-1005
Small Business Email: SAJ-SB@usace.army.mil
Kimberly (Kim) Daniel-Ray, Chief of Small Business Programs
USACE, Jacksonville District Mobile: (904) 318-6436
Small Business Email: SAJ-SB@usace.army.mil mailto:SAJ-SB@usace.army.mil mailto:SAJ-SB@usace.army.mil
ESTIMATED MILESTONES
MILESTONE
PROJECTED
DATE
SF 330 SUBMISSIONS DUE FROM
OFFERORS
24 APR 2025
PRE-SELECTION & SELECTION BOARDS 3rd QTR FY25 APPROVAL OF SELECTION BOARD REPORT 4th QTR FY25 ISSUE REQUEST FOR PROPOSAL 1st QTR FY26 COMPLETE NEGOTIATIONS 3rd QTR FY26 AWARD OF CONTRACTS 4th QTR FY26
QUESTIONS
The initial (25) Q’s & A’s were posted to SAM.gov on
1 Apr 25
General Questions OK. Please type your Q into the Teams Chat.
Technical Questions ► OK if yes/no ► Otherwise, it is the offeror’s responsibility to submit in writing to the POC
Submit questions in writing via email to the solicitation’s primary point of contact:
Peter.S.Barone@usace.army.mil
Slides, roster, and Q&A will be posted to www.SAM.gov website mailto:Peter.S.Barone@usace.army.mil http://www.sam.gov/
SUBMISSION REQUIREMENTS
RESPONSES MUST BE RECEIVED BY 1PM EDT ON APRIL 24.
► Only Electronic Copies Of All SF 330 Response Documents Will Be Accepted & MUST be Submitted in PIEE.
► Any Questions Regarding W912EP-25-R-0007 Must Be Emailed To Mr. Peter Barone (Peter.S.Barone@usace.army.mil), Contract Specialist, In Accordance With The Submission Requirements listed in the Solicitation on SAM.gov
CLOSING REMARKS/ADJOURN
| PRE-PROPOSAL TELECONFERENCE |
| AGENDA |
| ADMINISTRATIVE ITEMS |
| � Multiple Award Task Order Contract � (MATOC) Info 1 of 2 |
| � Multiple Award Task Order Contract � (MATOC) Info 2 of 2 |
| Important References – Slide 1 OF 3 |
| Important References – Slide 2 OF 3 |
| Important References – Slide 3 OF 3 |
| Overview of USACE |
A-E Selection Procedures Overview of USACE A-E Selection Procedures
| Selection Criteria |
| Slide Number 12 |
| JACKSONVILLE |
DISTRICT
| CIVIL WORKS ENGINEERING & DESIGN |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Ecosystem Restoration: Everglades Restoration |
| South Florida Everglades Ecosystem Restoration Program |
| Kissimmee River Restoration � |
| Slide Number 21 |
| Water Resources Engineering |
| Water Resources Engineering |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| � Facts to Know � |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Slide Number 33 |
| Slide Number 34 |
| Slide Number 35 |
File details come from the government source that posted it. Updated .