W912EP22R0042 - RFI.pdf

PDF 111 KB Posted

Attached to
Solicitation Number: W912EP-22-R-0042
Solicitation number
W912EP22R0042
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912EP22R0042 Indefinite Delivery (MATOC) for Multi-Discipline Miscellaneous Military Works Design and Other Architect and Engineering (A-E) Services within the Florida Boundaries of the Jacksonville District, Puerto Rico and the U.S. Virgin Islands

Questions:

1. QUALIFIED PROFESSIONAL PERSONNEL: The RFP lists requirements for Senior Architect/Engineer, Architect/Engineer, Technician, Senior Professional, and Professional. Are we required to show personnel in all 5 of these categories for each of the Engineering and Architecture disciplines listed in the RFP? For example, do we need to show Senior Architect, Architect, Architecture Senior Professional, and Architecture Professional resumes to cover the RFP requirements for the Architect discipline?

A resume is required for each person, showing relevant education and training, intended contract role(s) as defined in the solicitation to be filled by person, as well as experience both past and recent (within the last five years). Note one individual possessing the required expertise of more than one contract role is acceptable but the resume must clearly demonstrate meeting the required length of experience of each contract role via documented project assignments/experience.

2. QUALIFIED PROFESSIONAL PERSONNEL: Will Jacksonville District accept RAs and PEs who can demonstrate ability to obtain a PR license, or whose PR licensure is in process?

Key personnel must have a professional license in Engineering or Architecture. At least one key personnel must have a professional license for Engineering in the State of Florida and one with a license for Engineering in Puerto Rico.

3. QUALIFIED PROFESSIONAL PERSONNEL: Are we required to include a Cost Engineer and a Cost Estimator, or just one of the two?

Both, Cost Engineer and Cost Estimator

4. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE: The RFP states “additional projects may be included in SF 330 Section G.” Was this intended to reference Section H?

Yes, Section H

5. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE: The RFP states under (1) Relevant Experience “projects shall reflect the specialized experience and technical competence of the Offeror and/or proposed subcontractor(s), as prime contractors or subcontractors, performing the majority (less than 50%) of the work on the project.” Should that be (more than 50%)?

Yes, solicitation states: “performing the majority (>50%) of the work on the project”

File details come from the government source that posted it. Updated .