C.04.01 Bid Abstract, W912EP22B0009 Jax Harbor FY22.pdf

PDF 286 KB Posted

Attached to
JACKSONVILLE HARBOR, MAINTENANCE DREDGING, 47-FOOT, 40-FOOT, 38-FOOT & 34-FOOT PROJECT, DUVAL COUNTY, FLORIDA
Solicitation number
w912ep22b0009
Issued by

About this file

This document is an abstract of offers for the solicitation number W912EP22B0009 for maintenance dredging of portions of the Jacksonville Harbor channel in Duval County, Florida. The project consists of a base and four options to dredge approximately 1,700,000 cubic yards of material from the channel and dispose of it at two designated disposal sites. Work includes turbidity monitoring, endangered species observers for hopper dredges, marine animal observers for mechanical dredges, bird monitoring, and disposal area pumpout. Offerors were required to provide bid security and acknowledge any addenda by the closing date of August 22, 2022. Seven offerors provided pricing for line items to complete the base and optional work. The low offer was $17,215,800 and the high offer was $32,698,400. This project has a magnitude of construction between $20-35 million and is an unrestricted acquisition encouraging all responsible bidders to participate.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USA ENGINEER DISTRICT, JACKSONVILLE

PRUDENTIAL OFFICE BUILDING

701 SAN MARCO BLVD

ATTN: CESAJ-CT

JACKSONVILLE FL 32207-8175 OFFERS

NO. 1 NO. 2 NO. 3 NO. 4 NO. 5 NO. 6 NO. 7

OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR: OFFEROR:

B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY

(Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount)

C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE:

D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA

NUMBER OF AMENDMENTS ISSUED: 3 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

CLIN NO. DESCRIPTION OF OFFERED ITEM: QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

BASE (ENTRANCE CHANNEL)

MOBILI

MOBILIZATION AND DEMOBILIZATION 1 JOB 2,630,000.00$ $2,630,000.00 $3,100,000.00 $3,100,000.00 $5,650,000.00 $5,650,000.00 $3,100,000.00 $3,100,000.00 $3,988,542.00 $3,988,542.00 $4,150,000.00 $4,150,000.00 $2,250,000.00 $2,250,000.00 $0.00 $0.00 0002 EXCAVATION, UNCLASSIFIED BAR CUT-3 STATION 187+00 TO CUT-18 STATION 0+00 (ESTIMATED QUANTITY, SEE NOTE 1) 448,000 CUBIC YARD 14.10$ $6,316,800.00 $12.50 $5,600,000.00 $15.50 $6,944,000.00 $15.50 $6,944,000.00 $16.37 $7,333,760.00 $15.00 $6,720,000.00 $23.50 $10,528,000.00 $0.00 $0.00 0003 EXCAVATION, UNCLASSIFIED CUT-18 STATION 0+00 TO CUT-42 STATION 33+80 (ESTIMATED QUANTITY, SEE NOTE 1) 140,000 CUBIC YARD 13.45$ $1,883,000.00 $11.00 $1,540,000.00 $19.50 $2,730,000.00 $13.50 $1,890,000.00 $14.24 $1,993,600.00 $15.00 $2,100,000.00 $23.50 $3,290,000.00 $0.00 $0.00 0004 EXCAVATION, UNCLASSIFIED CUT-42 STATION 136+00 TO CUT-50 STATION 0+00 (ESTIMATED QUANTITY, SEE NOTE 1) 268,000 CUBIC YARD 11.70$ $3,135,600.00 $9.50 $2,546,000.00 $16.25 $4,355,000.00 $12.60 $3,376,800.00 $13.09 $3,508,120.00 $15.00 $4,020,000.00 $23.50 $6,298,000.00 $0.00 $0.00 0005 TURBIDITY MONITORING 1 JOB 725,000.00$ $725,000.00 $65,000.00 $65,000.00 $110,000.00 $110,000.00 $62,500.00 $62,500.00 $173,880.00 $173,880.00 $75,000.00 $75,000.00 $120,000.00 $120,000.00 $0.00 $0.00 0006 ENDANGERED SPECIES OBSERVERS (HOPPER DREDGES ONLY) 1 JOB 91,850.00$ $91,850.00 $45,000.00 $45,000.00 $0.00 $0.00 $60,000.00 $60,000.00 $108,192.00 $108,192.00 $50,000.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 0007 MARINE ANIMAL OBSERVERS (MECHANICAL DREDGING ONLY, SEE NOTE 4) 1 JOB -$ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $120,000.00 $120,000.00 $0.00 $0.00 0008 BIRD MONITORING (SEE NOTE 5) 1 JOB 43,000.00$ $43,000.00 $7,500.00 $7,500.00 $45,000.00 $45,000.00 $25,000.00 $25,000.00 $77,280.00 $77,280.00 $75,000.00 $75,000.00 $23,500.00 $23,500.00 $0.00 $0.00 0009 STANDBY TIME (SEE NOTE 6) 24 HOUR 6,000.00$ $144,000.00 $4,500.00 $108,000.00 $3,500.00 $84,000.00 $6,100.00 $146,400.00 $2,633.00 $63,192.00 $4,500.00 $108,000.00 $3,800.00 $91,200.00 $0.00 $0.00 0010 DISPOSAL AREA PUMPOUT (SEE NOTE 7) 30 DAY 3,200.00$ $96,000.00 $1,500.00 $45,000.00 $25,000.00 $750,000.00 $500.00 $15,000.00 $4,840.00 $145,200.00 $10,000.00 $300,000.00 $2,500.00 $75,000.00 $0.00 $0.00 0011 PARTNERING REGROUP 1 EACH 8,700.00$ $8,700.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $1,000.00 $1,000.00 $10,000.00 $10,000.00 $2,500.00 $2,500.00 $2,500.00 $2,500.00 $0.00 $0.00

TOTAL BASE (LINE ITEMS 0001 THROUGH 0011 $15,073,950.00 $13,059,500.00 $20,671,000.00 $15,620,700.00 $17,401,766.00 $17,600,500.00 $22,798,200.00 $0.00

OPTION A

0012 EXCAVATION, UNCLASSIFIEDCUT-50 STATION 0+00 TO CUT-55 STATION 0+00(ESTIMATED QUANTITY, SEE NOTE 1) 57,000 CUBIC YARD 16.50$ $940,500.00 12.80 $729,600.00 30.00 $1,710,000.00 8.50 $484,500.00 17.48 $996,360.00 10.00 $570,000.00 20.00 $1,140,000.00 $0.00 0013 TURBIDITY MONITORING 1 JOB 69,000.00$ $69,000.00 10,000.00 $10,000.00 5,000.00 $5,000.00 2,800.00 $2,800.00 14,040.00 $14,040.00 5,000.00 $5,000.00 8,100.00 $8,100.00 0014 ENDANGERED SPECIES OBSERVERS(HOPPER DREDGES ONLY) 1 JOB 7,500.00$ $7,500.00 7,500.00 $7,500.00 - $0.00 3,000.00 $3,000.00 8,736.00 $8,736.00 2,500.00 $2,500.00 $0.00 0015 MARINE ANIMAL OBSERVERS (MECHANICALDREDGING ONLY, SEE NOTE 4) 1 JOB -$ $0.00 - $0.00 - $0.00 - $0.00 - $0.00 - $0.00 8,100.00 $8,100.00 0016 BIRD MONITORING (SEE NOTE 5) 1 DAY 3,600.00$ $3,600.00 4,500.00 $4,500.00 1,000.00 $1,000.00 1,000.00 $1,000.00 6,240.00 $6,240.00 5,000.00 $5,000.00 4,500.00 $4,500.00

TOTAL OPTION A (LINE ITEMS 0012 THROUGH 0016) $1,020,600.00 $751,600.00 $1,716,000.00 $491,300.00 $1,025,376.00 $582,500.00 $1,160,700.00 $0.00 TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0016) $16,094,550.00 $13,811,100.00 $22,387,000.00 $16,112,000.00 $18,427,142.00 $18,183,000.00 $23,958,900.00 $0.00

OPTION B

0017 EXCAVATION, UNCLASSIFIED CUT-55 STATION 00+00 TO LOWER TERMINAL CHANNEL STATION 65+00 (ESTIMATED QUANTITY, SEE NOTE 1) 248,000 CUBIC YARD 13.05$ $3,236,400.00 9.00 $2,232,000.00 16.45 $4,079,600.00 7.40 $1,835,200.00 7.22 $1,790,560.00 10.00 $2,480,000.00 20.00 $4,960,000.00 $0.00

0018 TURBIDITY MONITORING 1 JOB 235,000.00$ $235,000.00 15,000.00 $15,000.00 30,000.00 $30,000.00 7,500.00 $7,500.00 24,840.00 $24,840.00 15,000.00 $15,000.00 36,000.00 $36,000.00 $0.00 0019 ENDANGERED SPECIES OBSERVERS (HOPPER DREDGES ONLY) 1 JOB 25,600.00$ $25,600.00 12,000.00 $12,000.00 - $0.00 7,600.00 $7,600.00 15,456.00 $15,456.00 10,000.00 $10,000.00 $0.00 $0.00 0020 MARINE ANIMAL OBSERVERS (MECHANICAL DREDGING ONLY, SEE NOTE 4) 1 JOB -$ $0.00 - $0.00 - $0.00 - $0.00 - $0.00 - $0.00 36,000.00 $36,000.00 $0.00 0021 BIRD MONITORING (SEE NOTE 5) 1 JOB 12,100.00$ $12,100.00 7,500.00 $7,500.00 5,000.00 $5,000.00 2,500.00 $2,500.00 11,040.00 $11,040.00 15,000.00 $15,000.00 19,500.00 $19,500.00 $0.00

TOTAL OPTION B (LINE ITEMS 00017 THROUGH 0021) $3,509,100.00 $2,266,500.00 $4,114,600.00 $1,852,800.00 $1,841,896.00 $2,520,000.00 $5,051,500.00 $0.00 TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0021) $19,603,650.00 $16,077,600.00 $26,501,600.00 $17,964,800.00 $20,269,038.00 $20,703,000.00 $29,010,400.00 $0.00

OPTION C

0022 EXCAVATION, UNCLASSIFIED CUT-F STATION 10+00 TO CUT-G STATION 91+24.49 (ESTIMATED QUANTITY, SEE NOTE 1) 181,000 CUBIC YARD 13.35$ $2,416,350.00 6.20$ $1,122,200.00 19.00 $3,439,000.00 12.00 $2,172,000.00 7.93 $1,435,330.00 10.00 $1,810,000.00 20.00 $3,620,000.00 $0.00 0023 TURBIDITY MONITORING 1 JOB 176,000.00$ $176,000.00 7,000.00$ $7,000.00 20,000.00 $20,000.00 8,000.00 $8,000.00 19,440.00 $19,440.00 10,000.00 $10,000.00 27,000.00 $27,000.00 $0.00 0024 ENDANGERED SPECIES OBSERVERS (HOPPER DREDGES ONLY) 1 JOB 20,000.00$ $20,000.00 5,000.00$ $5,000.00 - $0.00 9,000.00 $9,000.00 12,096.00 $12,096.00 7,500.00 $7,500.00 - $0.00 $0.00 0025 MARINE ANIMAL OBSERVERS (MECHANICAL DREDGING ONLY, SEE NOTE 4) 1 JOB -$ $0.00 -$ $0.00 - $0.00 - $0.00 - $0.00 - $0.00 27,000.00 $27,000.00 $0.00 0026 BIRD MONITORING (SEE NOTE 5) 1 JOB 9,000.00$ $9,000.00 4,000.00$ $4,000.00 5,000.00 $5,000.00 4,000.00 $4,000.00 8,640.00 $8,640.00 10,000.00 $10,000.00 14,000.00 $14,000.00 $0.00

TOTAL OPTION C (LINE ITEMS 0022 THROUGH 0026) $2,621,350.00 $1,138,200.00 $3,464,000.00 $2,193,000.00 $1,475,506.00 $1,837,500.00 $3,688,000.00 $0.00 TOTAL BASE PLUS OPTIONS A THROUGH C (LINES 0001 THROUGH 0026) $22,225,000.00 $17,215,800.00 $29,965,600.00 $20,157,800.00 $21,744,544.00 $22,540,500.00 $32,698,400.00

OPTION D

EXCAVATION, UNCLASSIFIED

LOWER TERMINAL CHANNEL STATION 65+00 TO

UPPER TERMINAL CHANNEL STATION 130+00

(ESTIMATED QUANTITY, SEE NOTE 1)

440,000 CUBIC YARD

12.45$ $5,478,000.00 10.60$ $4,664,000.00 16.22 $7,136,800.00 8.40 $3,696,000.00 9.06 $3,986,400.00 10.00 $4,400,000.00 20.00 $8,800,000.00 $0.00 0028 TURBIDITY MONITORING 1 JOB 384,000.00$ $384,000.00 27,000.00$ $27,000.00 500,000.00 $500,000.00 15,000.00 $15,000.00 54,000.00 $54,000.00 25,000.00 $25,000.00 63,000.00 $63,000.00 $0.00

0029 ENDANGERED SPECIES OBSERVERS

(HOPPER DREDGES ONLY)

1 JOB

43,500.00$ $43,500.00 25,000.00$ $25,000.00 - $0.00 14,000.00 $14,000.00 33,600.00 $33,600.00 20,000.00 $20,000.00 - $0.00 $0.00

0030 MARINE ANIMAL OBSERVERS (MECHANICAL

DREDGING ONLY, SEE NOTE 4)

1 JOB

-$ $0.00 -$ $0.00 - $0.00 - $0.00 - $0.00 - $0.00 63,000.00 $63,000.00 $0.00

0031 BIRD MONITORING (SEE NOTE 5) 1 JOB 20,500.00$ $20,500.00 12,500.00$ $12,500.00 10,000.00 $10,000.00 5,000.00 $5,000.00 24,000.00 $24,000.00 25,000.00 $25,000.00 35,000.00 $35,000.00 $0.00 TOTAL OPTION D (LINE ITEMS 0027 THROUGH 0031) $5,926,000.00 $4,728,500.00 $7,646,800.00 $3,730,000.00 $4,098,000.00 $4,470,000.00 $8,961,000.00 $0.00 TOTAL BASE PLUS OPTIONS A THROUGH D (LINES 0001 THROUGH 0031) $28,151,000.00 $21,944,300.00 $37,612,400.00 $23,887,800.00 $25,842,544.00 $27,010,500.00 $41,659,400.00

The Dutra Group

Yes 20% Yes 20%

Yes 3 Yes 3 Yes 3 Yes 3 Yes 3

Yes 20% Yes 20%

Yes 3

IGE OFFERS (Continued)

PROJECT TITLE

Cashman Dredging Weeks Marine

JACKSONVILLE HARBOR, MAINTENANCE DREDGING 47-FOOT, 40-FOOT, 38-FOOT & 34-FOOT PROJECT, DUVAL

COUNTY, FLORIDA

Original Government Estimate

Manson Construction Company Marinex Construction Inc. Great Lakes Dredge & Dock Company LLC.

Yes 20% Yes 20%

ABSTRACT OF OFFERS - CONSTRUCTION SOLICITATION NUMBER: W912EP22B0009

DATE ISSUED DATE CLOSED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation: ->

NAME AND TITLE OF CERTIFYING OFFICIAL:

ISSUING OFFICE

July 7, 2022 August 22, 2022 Tedra N. Thompson, Contracting Officer

Signature Date Signed: 23 August 2022

Bid Abstract

2022-08-23T13:20:27-0400
THOMPSON.TEDRA.NICOLE.1060180250

File details come from the government source that posted it. Updated .