B.08.03 Amendment 0003 W912EP22B0009 Jax Harbor FY22.pdf
PDF 885 KB Posted
- Solicitation number
- w912ep22b0009
About this file
This solicitation is for maintenance dredging services for portions of the Jacksonville Harbor channel in Duval County, Florida. The project consists of dredging approximately 1,700,000 cubic yards of material from the channel and disposing of it at two disposal sites. Services also include turbidity monitoring, endangered species observers for hopper dredges, sea turtle trawling for hopper dredges, marine animal observers for mechanical dredges, bird monitoring, and disposal area pumpouts. A pre-bid conference will be held on July 20, 2022 and bids are due under solicitation number W912EP22B0009. The period of performance is 255 calendar days from notice to proceed with a value between $20-35 million. The NAICS code is 237990 and businesses must meet the $30 million small business size standard. This is an unrestricted acquisition open to all responsible bidders.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Jacksonville Harbor, Maintenance Dredging 47-Foot, 40-Foot, 38-Foot & 34-Foot Project, Duval County, Florida.
A. See Continuation Sheet for Amendment Details.
B. Bid Opening Date of August 22, 2022 at 2:00pm, EDT, remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 76
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP22B0009
X 9B. DATED (SEE ITEM 11)
07-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Aug-2022
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Jacksonville Harbor, Maintenance Dredging, 47-Foot, 40-Foot, 38-Foot & 34-Foot Project
Duval County, Florida
W912EP22B0009 1 Amendment 0003
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this revision. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Volume 1 of 2 – Technical Specifications:
DELETE Section 00010A, and REPLACE with the attached revised Section 00010A.
Volume 2 of 2 – Technical Specifications:
DELETE Section 01 11 00, and REPLACE with the attached revised Section 01 11 00.
DELETE Section 01 22 00, and REPLACE with the attached revised Section 01 22 00.
DELETE Submittal Register, and REPLACE with the attached revised Submittal Register.
DELETE Section 01 57 20, and REPLACE with the attached revised Section 01 57 20.
DELETE Section 35 20 23, and REPLACE with the attached revised Section 35 20 23.
2. DRAWINGS: No change to drawings.
(End of Summary of Changes)
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
JACKSONVILLE HARBOR, MAINTENANCE DREDGING
47-FOOT, 40-FOOT, 38-FOOT & 34-FOOT PROJECT,
DUVAL COUNTY, FLORIDA
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________
0002 EXCAVATION, UNCLASSIFIED
BAR CUT-3 STATION 187+00 TO
CUT-18 STATION 0+00
(ESTIMATED QUANTITY, SEE NOTE 1) 448,000 CUBIC YARD $____________ $_______________
0003 EXCAVATION, UNCLASSIFIED
CUT-18 STATION 0+00 TO CUT-42 STATION 33+80
(ESTIMATED QUANTITY, SEE NOTE 1) 140,000 CUBIC YARD $____________ $_______________
0004 EXCAVATION, UNCLASSIFIED
CUT-42 STATION 136+00 TO CUT-50 STATION 0+00
(ESTIMATED QUANTITY, SEE NOTE 1) 268,000 CUBIC YARD $____________ $_______________
0005 TURBIDITY MONITORING JOB $_______________
0006 ENDANGERED SPECIES OBSERVERS
(HOPPER DREDGES ONLY) JOB $_______________
0007 MOBILIZATION AND DEMOBILIZATION FOR
SEA TURTLE/STURGEON TRAWL SWEEPING
(HOPPER DREDGES ONLY, SEE NOTE 3) JOB $_______________
0008 SEA TURTLE/STURGEON TRAWL SWEEPING
(HOPPER DREDGES ONLY, SEE NOTE 3) 1 DAY $____________ $_______________
0007 MARINE ANIMAL OBSERVERS (MECHANICAL
DREDGING ONLY, SEE NOTE 4) JOB $_______________
0008 BIRD MONITORING (SEE NOTE 5) JOB $_______________
0009 STANDBY TIME (SEE NOTE 6) 24 HOUR $____________ $_______________
0010 DISPOSAL AREA PUMPOUT (SEE NOTE 7) 30 DAY $____________ $_______________
0011 PARTNERING REGROUP 1 EACH $____________ $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0011) $_______________
OPTION A
0012 EXCAVATION, UNCLASSIFIED
CUT-50 STATION 0+00 TO CUT-55 STATION 0+00
(ESTIMATED QUANTITY, SEE NOTE 1) 57,000 CUBIC YARD $____________ $_______________
0013 TURBIDITY MONITORING JOB $_______________
0014 ENDANGERED SPECIES OBSERVERS
(HOPPER DREDGES ONLY) JOB $_______________
0015 MARINE ANIMAL OBSERVERS (MECHANICAL
DREDGING ONLY, SEE NOTE 4) JOB $_______________
0016 BIRD MONITORING (SEE NOTE 5) JOB $_______________
TOTAL OPTION A (LINE ITEMS 0012 THROUGH 0016) $_______________
TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0016) $_______________
W912EP22B0009 00010A-1 Amendment 0003
JACKSONVILLE HARBOR, MAINTENANCE DREDGING
47-FOOT, 40-FOOT, 38-FOOT & 34-FOOT PROJECT,
DUVAL COUNTY, FLORIDA
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
OPTION B
0017 EXCAVATION, UNCLASSIFIED
CUT-55 STATION 00+00 TO
LOWER TERMINAL CHANNEL STATION 65+00
(ESTIMATED QUANTITY, SEE NOTE 1) 248,000 CUBIC YARD $____________ $_______________
0018 TURBIDITY MONITORING JOB $_______________
0019 ENDANGERED SPECIES OBSERVERS
(HOPPER DREDGES ONLY) JOB $_______________
0020 MARINE ANIMAL OBSERVERS (MECHANICAL
DREDGING ONLY, SEE NOTE 4) JOB $_______________
0021 BIRD MONITORING (SEE NOTE 5) JOB $_______________
TOTAL OPTION B (LINE ITEMS 0017 THROUGH 0021) $_______________
TOTAL BASE PLUS OPTIONS A AND B (LINE ITEMS 0001 THROUGH 0021) $_______________
OPTION C
0022 EXCAVATION, UNCLASSIFIED
CUT-F STATION 10+00 TO
CUT-G STATION 91+24.49
(ESTIMATED QUANTITY, SEE NOTE 1) 181,000 CUBIC YARD $____________ $_______________
0023 TURBIDITY MONITORING JOB $_______________
0024 ENDANGERED SPECIES OBSERVERS
(HOPPER DREDGES ONLY) JOB $_______________
0025 MARINE ANIMAL OBSERVERS (MECHANICAL
DREDGING ONLY, SEE NOTE 4) JOB $_______________
0026 BIRD MONITORING (SEE NOTE 5) JOB $_______________
TOTAL OPTION C (LINE ITEMS 0022 THROUGH 0026) $_______________
TOTAL BASE PLUS OPTIONS A THROUGH C (LINE ITEMS 0001 THROUGH 0026) $_______________
SEE NEXT PAGE FOR OPTION D AND NOTES.
W912EP22B0009 00010A-2 Amendment 0003
JACKSONVILLE HARBOR, MAINTENANCE DREDGING
47-FOOT, 40-FOOT, 38-FOOT & 34-FOOT PROJECT,
DUVAL COUNTY, FLORIDA
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
OPTION D
0027 EXCAVATION, UNCLASSIFIED
LOWER TERMINAL CHANNEL STATION 65+00 TO
UPPER TERMINAL CHANNEL STATION 130+00
(ESTIMATED QUANTITY, SEE NOTE 1) 440,000 CUBIC YARD $____________ $_______________
0028 TURBIDITY MONITORING JOB $_______________
0029 ENDANGERED SPECIES OBSERVERS
(HOPPER DREDGES ONLY) JOB $_______________
0030 MARINE ANIMAL OBSERVERS (MECHANICAL
DREDGING ONLY, SEE NOTE 4) JOB $_______________
0031 BIRD MONITORING (SEE NOTE 5) JOB $_______________
TOTAL OPTION D (LINE ITEMS 0027 THROUGH 0031) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0031) $_______________
NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR MUST NOT PERFORM WORK IN EXCESS OF THE
TOTAL ESTIMATED QUANTITY GIVEN FOR EACH LINE ITEM WITHOUT PRIOR APPROVAL OF THE
CONTRACTING OFFICER. NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE
ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY BE EXCEEDED.
(2) OFFER MUST PRICE ALL LINE ITEMS. SEE SECTION 00100 "INSTRUCTIONS TO OFFERORS".
(3) SEA TURTLE/STURGEON TRAWL SWEEPING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING
OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(3) SEA TURTLE/STURGEON TRAWL SWEEPING IS NOT REQUIRED UNDER THIS CONTRACT.
(4) MARINE ANIMAL MONITORING IS REQUIRED FOR MECHANICAL DREDGING ONLY. SEE SECTION 01 57 20
ENVIRONMENTAL PROTECTION.
(5) NESTING SEASON SURVEYS MUST BEGIN ON APRIL 1 OR 10 DAYS PRIOR TO COMMENCEMENT OF WORK (INCLUDING SURVEYING ACTIVITIES), WHICHEVER IS LATER, AND MUST BE CONDUCTED DAILY
THROUGHOUT THE CONSTRUCTION PERIOD OR THROUGH AUGUST, WHICHEVER IS EARLIER.
(6) STANDBY TIME IS DEFINED AS WHEN, AT THE DIRECTION OF THE CONTRACTING OFFICER, THE DREDGE IS PUT OUT OF OPERATION FOR REASONS OUTSIDE THE REQUIREMENTS IN THE CONTRACT. SEE SECTION
01 22 00 MEASUREMENT AND PAYMENT.
(7) DISPOSAL AREA PUMPOUT TO PROTECT EXISTING BIRD NESTS IS REQUIRED WHEN DIRECTED BY THE CONTRACTING OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION. PAYMENT WILL ONLY BE
MADE FOR ACTUAL DISPOSAL AREA PUMPOUT REQUIRED BY THE CONTRACTING OFFICER.
* AMENDMENT NOTE: TWO LINE ITEMS ARE DELETED BY STRIKEOUT ON PAGE 00010A-1.
SUBSEQUENT LINE ITEMS HAVE BEEN RENUMBERED.
W912EP22B0009 00010A-3 Amendment 0003
Jacksonville Harbor, Maintenance Dredging
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.2.3 Safety Requirements
1.2.4 Work Performed by Others
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
1.5 PHYSICAL DATA
1.5.1 Physical Conditions
1.5.2 Weather, Water Stage and Tide Data
1.5.3 Contractor Investigation
1.5.4 Maritime Traffic
1.5.5 Obstruction of Channel
1.5.6 Hydrographic Surveys
1.6 LAYOUT OF WORK
1.6.1 Established Project Control
1.6.2 Layout
1.6.3 Survey
1.7 DAMAGE TO WORK
1.8 EXISTING WORK
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1 W912EP22B0009 Amendment 0003
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
GDR SECTION 00 31 32, Geotechnical Data Report for Jacksonville Harbor Maintenance Dredging, 47-Foot, 40-Foot, 38-Foot & 34-Foot Project, Duval County, Florida
EM 385-1-1 Safety and Health Requirements Manual
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
Project work consists of maintenance dredging portions of the Jacksonville Harbor channel between Bar Cut-3 and Upper Terminal Channel including portions of Cut-F and Cut-G. Work will be divided into a Base and four options as indicated in Section 00010A LINE ITEMS AND PRICING SCHEDULE and on the drawings. Disposal of materials will be at Buck Island Cell A and Bartram Island Cell A as shown on the drawings. Work also includes turbidity monitoring, endangered species observers (hopper dredges only), sea turtle and sturgeon trawl-sweeping (hopper dredges only), marine animal observer (mechanical dredges only), bird monitoring, and disposal area pumpout.
1.2.2 Location
The project is located in Duval County on the northeast coast of Florida in the St. Johns River.
1.2.3 Safety Requirements
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .
1.2.4 Work Performed by Others
See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE PROCEDURES. Coordinate operations in upland disposal areas with the Contracting Officer to avoid other ongoing dredging activities. See subparagraphs "Concurrent Offloading Operations by Others at Buck Island DMMA" and "Concurrent Use of Northwestern Staging Area at Bartram Island DMMA" of Section 35 20 23 DREDGING.
SECTION 01 11 00 Page 2
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5 PHYSICAL DATA
Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.1 Physical Conditions
The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in Section 00 31 32 GEOTECHNICAL DATA REPORT ( GDR) and the core boring locations are shown on the drawings. Also, see the GDR for instructions concerning availability of core borings for inspection.
1.5.2 Weather, Water Stage and Tide Data
See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.
1.5.3 Contractor Investigation
Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.4 Maritime Traffic
Marine Traffic in the project area consists of Naval, cruise ships, commercial, pleasure, and small recreational vessels of all types and sizes which can be accommodated by existing depths.
1.5.5 Obstruction of Channel
The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. Conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, promptly move said plant on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work, promptly remove the plant, including ranges, buoys, piles, and other marks placed under the Contract in navigable waters or on shore.
1.5.6 Hydrographic Surveys
Hydrographic surveys are provided on the eHydro web site:
https://www.arcgis.com/apps/opsdashboard/index.html#/4b8f2ba307684cf597617bf1b6d2f85d
SECTION 01 11 00 Page 3
Survey numbers are indicated on the drawings.
1.6 LAYOUT OF WORK
Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.6.1 Established Project Control
The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey Notes that must be duplicated if an attempt to recreate the subject survey is desired.
For navigation channels, the Government has established tidal calibration sites for projects constructed and maintained to a tidal datum. Each tidal calibration site is represented in the plan sheet drawings by Station ID, and is cited in the Survey Notes. Calibrate all projects constructed and maintained to a tidal datum to the Station ID specified in the plan sheet drawings. Information regarding the location and associated benchmarks of the referenced Station ID is included in the Monument Description section of these specifications.
See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.
1.6.2 Layout
From the monuments, control data and elevations established by the Government, complete the layout of the work and obtain all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.
1.6.3 Survey
Provide equipment, tools, material, labor for laying out any part of the work from the monuments, control data, and elevations established by the Government. Maintain and preserve all monuments, stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks or monuments are destroyed by the Contractor or through negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at their discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor.
The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.
1.7 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work will be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting
SECTION 01 11 00 Page 4
Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable Contract unit or job prices as fixed and established in the Contract. If, in the opinion of the Contracting Officer, there are no contract unit or job prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or job prices. Except as herein provided, repair damage to all work (including temporary construction), utilities, materials, equipment and plant to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.8 EXISTING WORK
In addition to FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
SECTION 01 11 00 Page 5
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Reference
1.2 RESIDENT MANAGEMENT SYSTEM (RMS)
1.2.1 Definition
1.2.2 Instructions
1.3 SUBMITTALS
1.4 JOB PAYMENT ITEMS
1.4.1 Mobilization and Demobilization (Line Item 0001)
1.4.2 Turbidity Monitoring (Line Items 0005, 0013, 0018, 0023 and
0028)
1.4.3 Endangered Species Observers (Hopper Dredges Only, Line Items
0006, 0014, 0019, 0024 and 0029)
1.4.4 Marine Animal Observers (Mechanical Dredging Only, Line Items
0007, 0015, 0020, 0025 and 0030)
1.4.5 Bird Monitoring (Line Items 0008, 0016, 0021, 0026 and
0031)
1.5 UNIT PRICE PAYMENT ITEMS
1.5.1 Excavation, Unclassified (Line Items 0002, 0003, 0004, 0012, 0017, 0022 and 0027)
1.5.1.1 Payment
1.5.1.2 Measurement
1.5.1.3 Unit of Measure
1.5.2 Standby Time (Line Item 0009)
1.5.2.1 Payment
1.5.2.2 Measurement
1.5.2.3 Unit of Measure
1.5.3 Disposal Area Pumpout (Line Item 0010)
1.5.3.1 Payment
1.5.3.2 Measurement
1.5.3.3 Unit of Measure
1.5.4 Partnering Regroup (Line Item 0011)
1.5.4.1 Payment
1.5.4.2 Measurement
1.5.4.3 Unit of Measure
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PAYMENT PROCEDURES
3.1.1 Requesting Progress Payment
3.1.2 Options and Modification CLINS
SECTION 01 22 00 Page 1
-- End of Section Table of Contents --
SECTION 01 22 00 Page 2
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
This section describes how Line Items will be measured and paid for when making progress payments. Work to be measured is described in specification sections listed for each Line Item. Measurement procedures for payment, required quantity survey or procurement documentation and payment restrictions are described in applicable specification sections.
Allocate costs for work not specifically mentioned to the Line Item most closely associated with work involved. Unless there is a specific Line Item for administrative costs, such as Quality Control and Safety, allocate such costs proportionally across all Line Items.
1.1.1 Reference
The publication listed below forms a part of this specification to the extent referenced. This publication is referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 1110-2-1003 (2013) Hydrographic Surveying
1.2 RESIDENT MANAGEMENT SYSTEM (RMS)
1.2.1 Definition
The terms Contract Line Item Number (CLIN) and Line Item are interchangeable herein (e.g.: CLIN 0001 is Line Item 0001). The term CLIN is a contracting term used in the Resident Management System (RMS) payment data base.
1.2.2 Instructions
See Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) for more information on CLINs, schedule of values of pay activities and construction schedule, and payment procedures. The Contractor mode user manual with in-depth instructions can be downloaded from the RMS web site indicated in Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE
(RMS CM).
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar
SECTION 01 22 00 Page 3 days after Notice to Proceed:
SD-01 Preconstruction Submittals
Schedule of Values; G, RO
SD-07 Certificates
Request for Progress Payment; G, RO
1.4 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE with the unit JOB and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, will be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
Progress payments for job CLINs will be made in accordance with the Payments Under Fixed-Price Construction Contracts clause of Section 00700 CONTRACT CLAUSES in Volume 1. Submit Schedule of Values for Government approval with the baseline schedule submittal (see Section 01 32 01 PROJECT SCHEDULE). Include a list of pay activities to breakdown bid for each job CLIN as part of the RMS Schedule. Schedule of Values will become basis for CLIN and Pay Activity data in the RMS payment data base. An unbalanced Schedule of Values and Pay Activity Schedule will be returned for revision. If this contract contains either the Continuing Contracts clause or the Continuing Contracts (Alternate) clause, take into account the amount reserved for contract payments when preparing the construction schedule.
1.4.1 Mobilization and Demobilization (Line Item 0001)
Payment will be made for costs associated with or incidental to mobilization and demobilization. In addition to mobilization of the Contractor's plant and associated equipment, this item covers minor preparation of disposal sites including, but not limited to minor repair of dike surfaces, access roadways, and ramp surfaces in the work area, only deemed necessary to perform work on this project. Costs associated with the establishment of initial project management and coordination are also included in this line item. See Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION of Section 00700 CONTRACT CLAUSES in Volume 1.
1.4.2 Turbidity Monitoring (Line Items 0005, 0015 0013 , 0020 0018 , 0025 0023 and 0030 0028 )
Payment will be made for costs associated with or incidental to obtaining, analyzing, and reporting the results of monitoring for turbidity. See Section 01 57 25 TURBIDITY AND DISPOSAL MONITORING.
SECTION 01 22 00 Page 4
1.4.3 Endangered Species Observers (Hopper Dredges Only, Line Items 0006, 0016 0014 , 0021 0019 , 0026 0024 and 0031 0029 )
Payment will be made for costs associated with or incidental to endangered species observers required with the use of a hopper dredge. See Section
01 57 20 ENVIRONMENTAL PROTECTION.
1.4.4 Mobilization and Demobilization for Sea Turtle/Sturgeon Trawl Sweeping (Hopper Dredge Only, Line Item 0007)
Payment will be made for costs associated with or incidental to mobilization and demobilization for sea turtle and sturgeon trawling and relocation (Hopper Dredge Only). See Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION of Section 00700 CONTRACT CLAUSES in Volume 1. See Section
01 57 20 ENVIRONMENTAL PROTECTION.
1.4.4 Marine Animal Observers (Mechanical Dredging Only, Line Items 0009 0007 , 0017 0015 , 0022 0020 , 0027 0025 and 0032 0030 )
Payment will be made for costs associated with or incidental to marine animal observers required when mechanical dredging. See Section 01 57 20
ENVIRONMENTAL PROTECTION.
1.4.5 Bird Monitoring (Line Items 0010 0008 , 0018 0016 , 0023 0021 , 0028 0026 and 0033 0031 )
Payment will be made for costs associated with or incidental to bird monitoring which includes nesting surveys throughout the nesting season and during construction as indicated in Section 01 57 20 ENVIRONMENTAL
PROTECTION.
1.5 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE and described below. The unit price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
Each Unit Price CLIN may be a single pay activity item or may be broken down into pay activities with smaller quantities equal to CLIN total.
Contract unit price multiplied by agreed quantity is full compensation.
1.5.1 Excavation, Unclassified (Line Items 0002, 0003, 0004, 0014 0012 , 0019 0017 , 0024 0022 and 0029 0027 )
1.5.1.1 Payment
a. Payment will be made for costs associated with or incidental to excavation, transportation, and disposal of materials; providing and maintaining access to the work site(s) and disposal area(s); noise control; and debris removal. See Sections 35 20 23 DREDGING and
01 57 20 ENVIRONMENTAL PROTECTION.
b. Insofar as consistent with the paragraph CONTINUITY OF WORK of Section 35 20 23 DREDGING, monthly partial payments will be based on
SECTION 01 22 00 Page 5 approximate quantities determined by soundings or sweepings performed by the Contractor behind the dredge. The term "area designated by the Contracting Officer" as used in the CONTINUITY OF WORK paragraph, is defined as "acceptance section".
c. Hydrographic surveys for final measurement and payment and for channel clearance will be made by the Government. All surveys will be performed in accordance with USACE EM 1110-2-1003 . Survey frequencies will be the same as those shown in the drawings and will remain consistent throughout the contract.
1.5.1.2 Measurement
a. The maps and/or drawings already prepared (clause CONTRACT DRAWINGS AND SPECIFICATIONS of Section 00700 CONTRACT CLAUSES in Volume 1) are believed to represent accurately average existing conditions, but the depths shown thereon may be verified and corrected by soundings taken before dredging. Once quantities within a specified reach or section have been determined through the use of in-place measurement, they will not be reopened except on evidence of collusion, fraud, or obvious error.
b. The total amount of material removed, and to be paid for under the contract, will be measured by the cubic yard in place. The volume computed will be between the bottom surface shown by soundings taken within 3 weeks before dredging and the bottom surface shown by the soundings taken within 2 weeks after the work specified in each acceptance section has been completed. The Contractor will give 10 days advance notice, in writing, to the Contracting Officer's Representative of the need for a pre-dredging survey or after-dredging survey for final acceptance for each acceptance section. The quantity will include the volume within the limits of the side slopes described in subparagraph "Side Slopes" of paragraph REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SIDE SLOPES of Section 35 20 23 DREDGING, less any deductions that may be required for misplaced material described in subparagraph "Misplaced Materials" of paragraph DISPOSAL OF EXCAVATED MATERIAL of Section 35 20 23 DREDGING.
1.5.1.3 Unit of Measure
Cubic yard.
1.5.2 Sea Turtle/Sturgeon Trawl Sweeping (Hopper Dredge Only, Line Item 0008)
1.5.2.1 Payment
Payment will be made for costs associated with or incidental to the sea turtle and sturgeon trawl sweeping. This price will include all costs for furnishing labor, equipment, fuel, oil, materials, and supplies required for trawl sweeping to clear and/or relocate sea turtles and sturgeon from in the vicinity of the dredge, and will include the cost of reporting as specified. See Section 01 57 20 ENVIRONMENTAL PROTECTION.
1.5.2.2 Measurement
Sea turtle and sturgeon trawl sweeping will be measured for payment based upon the duration of performance on a daily basis. A day of trawl sweeping is defined as 24 hours of continuous trawling. The Contractor
SECTION 01 22 00 Page 6 will conduct trawl sweeping as described in Section 01 57 20 ENVIRONMENTAL
PROTECTION.
1.5.2.3 Unit of Measure
Day.
1.5.2 Standby Time (Line Item 0011 0009 )
1.5.2.1 Payment
Payment will be made for costs associated with or incidental to standby of dredge plant only upon implementation of this line item. Standby time is defined as when, at the direction of the Contracting Officer, the dredge is put out of operation for reasons outside the requirements in the contract.
1.5.2.2 Measurement
Standby time, when exercised by the Contracting Officer, will be measured for payment by each hour, or part thereof, that the plant is not in operation.
1.5.2.3 Unit of Measure
Hour.
1.5.3 Disposal Area Pumpout (Line Item 0012 0010 )
1.5.3.1 Payment
Payment will be made for costs associated with or incidental to pumping out the disposal area to protect existing bird nests from flooding. This price will include all costs for furnishing labor, equipment, fuel, oil, materials, and supplies required to pump out the disposal area as specified. See Section 01 57 20 ENVIRONMENTAL PROTECTION.
1.5.3.2 Measurement
Disposal area pumpout will be measured for payment based upon the duration of performance on a daily basis. A day of pumping is defined as 24 hours of continuous pumping. One (1) day for pump mobilization, pipeline installation, and startup will be afforded if this line item is enacted.
The Contractor will conduct the disposal area pumpout as described in Section 01 57 20 ENVIRONMENTAL PROTECTION.
1.5.3.3 Unit of Measure
Day.
1.5.4 Partnering Regroup (Line Item 0013 0011 )
1.5.4.1 Payment
Payment will be made for costs associated with or incidental to conducting a partnering regroup. The Contractor will only be paid for the actual number of partnering regroups conducted. See Section 01 30 00 ADMINISTRATIVE PROCEDURES. The initial partnering meeting will not be paid for under this line item as it is a distributed cost mandatory
SECTION 01 22 00 Page 7 administrative action.
1.5.4.2 Measurement
The basis for payment will be for the completion of each partnering regroup meeting and Government receipt of all completed work products.
1.5.4.3 Unit of Measure
Each.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PAYMENT PROCEDURES
Upon receiving initial Resident Management System import file, go to PAY ACTIVITIES and establish a link between bid breakdown schedule of values of PAY ACTIVITIES to contract CLINs using SCHEDULE ACTIVITIES data entry page.
3.1.1 Requesting Progress Payment
For progress payments, ensure ACTIVITY SCHEDULE, FEATURE SCHEDULE, submittal register, and punchlists are all up to date. Use PROGRESS PAYMENTS to REQUREST ACTIVITY for both ACTIVITY EARNINGS data entry page and OTHER EARNING. Provide hard copies of supporting invoices and quantity measurements to support all requested earnings. Ensure that sums of payment activities do not exceed contract award CLIN funding amounts, or unbalanced CLINs error will prevent processing the payment. Submit a request for progress payment monthly in accordance with Clause 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS of Section 00700 CONTRACT CLAUSES. In addition to the items listed in Clause 52.232-5(b)(1), submit the following in the request for progress payment:
a. Approved construction schedule.
b. Up-to-date payroll records.
c. Current submittal register.
d. Professional Land Surveyor report and supporting data.
e. QA/QC deficiency tracking list.
f. Environmental reports.
Once the complete pay application package is received to include the Contractor's signed ENG 93, the 14 calendar days will commence.
3.1.2 Options and Modification CLINS
When additional work is added by modification, existing CLINs funding amounts must be updated, or new CLINs for modification will be created.
If contract has option CLINs not yet awarded, option CLINs will appear as zero dollar CLINs until option is awarded by modification. No payment may be requested for Options or Modification CLINs until contract modification has been funded and signed.
-- End of Section --
SECTION 01 22 00 Page 8
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
Jacksonville Hbr, M/D, 47-Ft,40-Ft,38-Ft&34-Ft Project (Am 0003)
01 22 00 SD-01 Preconstruction Submittals
1.4 G ROSchedule of Values
SD-07 Certificates
3.1.1 G RORequest for Progress Payment
01 30 00 SD-01 Preconstruction Submittals
1.6.3Draft Joint Risk Register
1.6.4List of Subcontractors
SD-07 Certificates
1.7.1.2 G ROPartnering Meeting(s) Written
Synopsis
3.3Signature Authority
3.4Drug-Free Work Place Record
01 32 01 SD-01 Preconstruction Submittals
1.2 G ROProject Scheduler Qualifications
1.3 G ROInitial Construction Schedule
1.3.1 G ROInitial Project Schedules
SD-07 Certificates
1.4 G ROConstruction Progress Schedule
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 25 SD-01 Preconstruction Submittals
1.7 G DODive Operations Plan
SD-07 Certificates
1.6.3 G DODive Personnel Qualifications
01 35 26 SD-01 Preconstruction Submittals
1.7 G DOAccident Prevention Plan (APP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
01 35 26 1.16 G DOAccident Prevention Plan (APP)
1.6.1.1 G DOSite Safety and Health Officer
SD-06 Test Reports
1.4Monthly Exposure Reports
1.4.1Monthly Qualification Summary
Report
1.12.1Mishap Notification
1.12.2 G DOMishap Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.2 G DOCompetent Person
1.6.1.4 G DOCrane Operators/Riggers
1.7.2.2 G DOStandard Lift Plan
1.7.2.3 G DOCritical Lift Plan
1.7.2.4 G DONaval Architecture Analysis
1.8 G DOActivity Hazard Analysis (AHA)
1.9.1 G DOConfined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.12.5 G DOCrane Inspection Reports
01 45 05 SD-01 Preconstruction Submittals
3.2 G ROQuality Control Plan
SD-07 Certificates
3.2.2Letter of Authority
3.2.2 G ROPersonnel Qualifications
01 50 02 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
01 50 02 1.4.1 G ROMobilization/Demobilization Plan
1.4.2 G ROSecurity Plan
3.4 G ROSecurity Plan
1.4.3 G RODocumentation of Existing
Conditions and Post Construction
Restoration
SD-02 Shop Drawings
2.1Contractor's Temporary Facilities
3.3Contractor's Temporary Facilities
01 57 20 SD-01 Preconstruction Submittals
1.6 G DOEnvironmental Protection Plan
SD-02 Shop Drawings
3.1.5.6 G DOTurtle Deflector Device
SD-06 Test Reports
3.1.5.3 G DOProtected Listed Species Sighting
Reports
SD-07 Certificates
1.7.1 G DOBird Monitoring Qualifications
1.7.2 G DOMarine Animal Observer
Qualifications
1.7.3 G DOEndangered Species Observer
1.7.4 G DOSturgeon Protected Species
Observer (PSO)(Cutterhead Only)
SD-11 Closeout Submittals
3.1.5.5 G DOProtected Species Summary
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
01 57 20 3.1.5.8 G DOLogs/Summary Of Bird Nesting
Monitoring Report
3.1.5.2 G DOEndangered Species Observer
Program Final Report
3.4.2.1 G DOInvasive And Nuisance Species
Report
01 57 25 SD-01 Preconstruction Submittals
1.3 G DOTurbidity Monitor Qualifications
1.4 G DOTurbidity Monitoring Plan
1.5 G DODraft Turbidity Sampling Map
3.2.2.1 G DODraft Turbidity Sampling Map
SD-03 Product Data
3.1.1.1Calibration Standard
SD-06 Test Reports
3.2.2Turbidity Monitoring Reports
3.2.3Turbidity Exceedance Report
3.2.4Updated Turbidity Exceedance
Report
SD-07 Certificates
3.1.1.1Testing Equipment And
Procedure
35 20 23 SD-01 Preconstruction Submittals
1.4Notice of Intent to Dredge
3.2.1Relocation of Navigation Aids
3.13.2Marine Survey Inspection
Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
35 20 23 SD-02 Shop Drawings
3.9.2Drag Bar
3.6.1 G DOAcceptance Sections Plan
SD-07 Certificates
1.8Historical Period Shipwreck Sites
3.7Surveys
3.1Daily/Monthly Report of
Operations
3.5.7Misplaced Material
1.11.1Declaration of Inspection
35 20 26 SD-07 Certificates
1.4 G RONational Dredging Quality
Management Program Certification
35 20 27 SD-07 Certificates
1.4 G RONational Dredging Quality
Management Program Certification
35 20 28 SD-07 Certificates
1.4 G RONational Dredging Quality
Management Program Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 57 20
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 SCOPE
1.2 ENVIRONMENTAL LAWS, REGULATIONS AND DOCUMENTS
1.2.1 Miscellaneous Environmental Laws And Regulations
1.2.2 NEPA Reference
1.3 QUALITY CONTROL
1.4 PERMITS AND AUTHORIZATIONS
1.5 SUBMITTALS
1.6 ENVIRONMENTAL PROTECTION PLAN
1.7 QUALIFICATIONS
1.7.1 Bird Monitoring Qualifications
1.7.2 Marine Animal Observer Qualifications (Clamshell/Mechanical
Only)
1.7.3 Endangered Species Observer (For Hopper Dredges Only)
1.7.4 Sturgeon Protected Species Observer (PSO)(Cutterhead Only)
1.8 SUBCONTRACTORS
1.9 NOTIFICATION
1.10 CONTRACTOR PERSONNEL QUALIFICATIONS IN POLLUTION CONTROL
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 PROTECTION OF ENVIRONMENTAL RESOURCES
3.1.1 General Project Environmental Design and Installation Criteria
3.1.1.1 Sewage-Based Systems Environmental Design and Installation
Criteria
3.1.2 Protection of Land Resources
3.1.2.1 Work Area Limits
3.1.2.2 Unprotected Erodible Soils
3.1.2.3 Contractor Facilities and Other Work Areas
3.1.2.4 Solid Wastes
3.1.2.5 Fuel, Oil, and Lubricants
3.1.2.6 Hazardous Waste
3.1.2.7 Hazardous Materials
3.1.2.8 Disposal of Other Materials
3.1.3 Preservation and Recovery of Historic, Archeological, and
Cultural Resources
3.1.3.1 Applicable Law
3.1.3.2 Known Resources
3.1.3.3 Inadvertent Discoveries
3.1.3.4 Claims for Downtime due to Inadvertent Discoveries
3.1.4 Protection of Water Resources
3.1.4.1 Monitoring of Water Areas
3.1.4.2 Turbidity
3.1.4.3 Oil, Fuel, and Hazardous Substance Spill Prevention and
SECTION 01 57 20 Page 1
Mitigation
3.1.5 Protection of Fish and Wildlife Resources
3.1.5.1 Listed Species Protection
3.1.5.2 Endangered Species Observers (Hopper Dredge Only)
3.1.5.3 Protected Listed Species Sighting Reports
3.1.5.4 Disposition of Endangered or Threatened Species Carcasses
3.1.5.5 Protected Species Summary Report
3.1.5.6 Hopper Dredge Equipment
3.1.5.7 Sturgeon Monitoring (Cutterhead Only)
3.1.5.8 Protection of Migratory Bird Species
3.1.5.9 Protection of Gopher Tortoise (GT) Populations (Gopherus polyphemus)
3.1.6 Protection of Air Resources
3.1.6.1 Particulates
3.1.6.2 Burning
3.1.6.3 Odors
3.1.7 Protection of Sound Intrusions
3.2 POSTCONSTRUCTION CLEANUP
3.3 PRESERVATION AND RESTORATION OF LANDSCAPE AND MARINE VEGETATION
DAMAGES
3.4 INVASIVE AND NUISANCE SPECIES
3.4.1 Prevention of Invasive and Nuisance Species Transfer
3.4.2 Invasive and Nuisance Species Reporting
3.4.2.1 Invasive And Nuisance Species Report
3.5 MAINTENANCE OF POLLUTION CONTROL FACILITIES
3.6 CONSTRUCTION FORMS AND DETAILS
-- End of Section Table of Contents --
SECTION 01 57 20 Page 2
SECTION 01 57 20
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 SCOPE
This Section covers prevention of environmental damage as the result of construction operations under this contract and for those measures set forth in other Technical Requirements of these specifications. For the purpose of this specification, environmental damage is defined as the presence of hazardous, physical, chemical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances; affect other species, biological communities, or ecosystems; or degrade the quality of the environment for aesthetic, cultural, and/or historical purposes. The control of environmental damage requires consideration of land, water, and air, and includes management of visual aesthetics, noise, solid waste, radiant energy and radioactive materials, as well as other pollutants.
1.2 ENVIRONMENTAL LAWS, REGULATIONS AND DOCUMENTS
1.2.1 Miscellaneous Environmental Laws And Regulations
There are numerous environmental laws and regulations. At the Federal level, the applicable laws and regulations include compliance with the Clean Water Act (CWA); Clean Air Act (CAA); Coastal Zone Management Act (CZMA); Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Endangered Species Act (ESA); Fish and Wildlife Coordination Act (FWCA); Marine Protection, Research, and Sanctuaries Act (MPRSA);
Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA);
National Environmental Policy Act (NEPA); National Historic Preservation Act (NHPA); National Pollutant Discharge Elimination System (NPDES);
Research and Sanctuaries Act (RSA); Native American Graves Protection and Repatriation Act (NAGPRA); Resource Conservation and Recovery Act (RCRA);
Rivers and Harbors Act (R&H); Safe Drinking Water Act (SDWA); Toxic Substance Control Act (TSCA); Wild and Scenic Rivers Act (WSRA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Marine Mammal Protection Act (MMPA); Migratory Bird Treaty Act (MBTA); Code of Federal Regulations (CFRs); Executive Orders (EO); and, Environmental Protection Agency (EPA) requirements.
1.2.2 NEPA Reference
Commitments for the Contractor made in the NEPA document have been incorporated into these specifications. For additional background information, the NEPA document can be found at the following website:
http://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Documents/
1.3 QUALITY CONTROL
Establish and maintain quality control for environmental protection of all items set forth herein. Record on daily quality control reports or
SECTION 01 57 20 Page 3 attachments thereto, any problems in complying with laws, regulations and ordinances, and corrective action taken.
1.4 PERMITS AND AUTHORIZATIONS
Comply with all requirements under the terms and conditions set out in the following permit(s) and authorization(s) obtained by the Corps of Engineers listed below.
a. Florida Department of Environmental Protection Permit No.
0303186-001-JC; issued Date: May 23, 2012; Expiration Date: May 23, 2027 and modification 0303186-005-JN issued September 16, 2020.
b. Florida Department of Environmental Protection Operation Permit No. 16-255718-003-SI; effective Date: June 20, 2013.
c. Florida Department of Environmental Protection Operation Permit No. 16-297486-002-ES; effective Date: August 15, 2012.
d. NMFS South Atlantic Regional Biological Opinion (SARBO);
https://www.fisheries.noaa.gov/content/endangered-species-act-section-7-biological -opinions-southeast
The above permits indicate issuing agency approval of work required by this contract. Permits are available at the following web address:
https://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Compliance/
Obtain and comply with the requirements of all other permits or licenses required for construction of this project in accordance with the Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following will be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.
SD-01 Preconstruction Submittals
Environmental Protection Plan; G, DO
SD-02 Shop Drawings
Turtle Deflector Device; G, DO
Weekly Logs/Summary Of FWC Hopper Dredge Reports; G, DO
SD-06 Test Reports
Protected Listed Species Sighting Reports; G, DO
SD-07 Certificates
Bird Monitoring Qualifications; G, DO
Marine Animal Observer Qualifications (Clamshell/Mechanical Only);
SECTION 01 57 20 Page 4
G, DO
Endangered Species Observer and Trawl Supervisor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .