C.04.01 Abstract W912EP21B0003, KB Sub Base FY21 (002).pdf

PDF 283 KB Posted

Attached to
Naval Submarine Base Kings Bay, Maintenance Dredging 44, 45, And 47-Foot Project, Camden County, Georgia
Solicitation number
W912EP21B0003
Issued by

About this file

This document summarizes an invitation for bid for maintenance dredging services at Naval Submarine Base Kings Bay in Camden County, Georgia. The solicitation number is W912EP21B0003 and bids are due by December 29, 2020. The U.S. Army Corps of Engineers Engineering District Jacksonville seeks a contractor to perform maintenance dredging of shoal material from various locations around the base to required depths ranging from 39 to 47 feet. The base scope of work includes dredging from station 31+800 to 48+175 and disposal at designated areas. Optional work includes additional dredging, field cut weir boards, bird monitoring, and standby time. The estimated value is between $10-25 million and the period of performance is 400 days after notice to proceed. This is a total small business set-aside solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER: W912EP21B0003

USA ENGINEER DISTRICT, JACKSONVILLE

PRUDENTIAL OFFICE BUILDING

701 SAN MARCO BLVD

ATTN: CESAJ-CT

JACKSONVILLE FL 32207-8175 BIDS

NO. 1 NO. 2 NO. 3

BIDDER: BIDDER: BIDDER:

B. BID SECURITY B. BID SECURITY B. BID SECURITY

(Type & amount) (Type & amount) (Type & amount)

C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE:

D. ADDENDA D. ADDENDA D. ADDENDA

NUMBER OF AMENDMENTS ISSUED: 2 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

CLIN NO. 7B DESCRIPTION OF OFFERED ITEM: QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

BASE BID

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $2,415,000.00 $1,391,000.00 $2,000,000.00 $0.00

EXCAVATION, UNCLASSIFIED;

STATION 43+300 TO STATION 48+175

AND UPPER TURNING BASIN

(ESTIMATED QUANTITY - SEE NOTE 2)

300,000 CUBIC YARD $6.40 $1,920,000.00 $4.49 $1,347,000.00 $5.28 $1,584,000.00 $0.00

EXCAVATION, UNCLASSIFIED; STATION 39+141 TO STATION 43+300

AND EXPLOSIVE HANDLING BASIN

(ESTIMATED QUANTITY - SEE NOTE 2)

600,000 CUBIC YARD $4.85 $2,910,000.00 $3.20 $1,920,000.00 $3.30 $1,980,000.00 $0.00

EXCAVATION, UNCLASSIFIED;

STATION 31+800 TO STATION 39+141 AND

MAGNETIC SILENCING FACILITY (MSF) NORTH

(ESTIMATED QUANTITY - SEE NOTE 2)

230,000 CUBIC YARD $8.80 $2,024,000.00 $5.75 $1,322,500.00 $7.22 $1,660,600.00 $0.00

EXCAVATION, UNCLASSIFIED; SITE SIX NORTH

STATION 36+850 TO STATION 38+800

(ESTIMATED QUANTITY - SEE NOTE 2)

90,000 CUBIC YARD $3.30 $297,000.00 $3.00 $270,000.00 $3.04 $273,600.00 $0.00

EXCAVATION, UNCLASSIFIED; SITE SIX SOUTH

AND ARDM YOKE;

STATION 34+233.1 TO STATION 36+548;

(ESTIMATED QUANTITY - SEE NOTE 2)

40,000 CUBIC YARD $7.75 $310,000.00 $7.00 $280,000.00 $11.45 $458,000.00 $0.00

EXCAVATION, UNCLASSIFIED;

EXPLOSIVE HANDLING WHARVES (EHW)

STATION 41+420 TO STATION 43+320

(ESTIMATED QUANTITY - SEE NOTE 2)

25,000.00 CUBIC YARD $12.65 $316,250.00 $10.00 $250,000.00 $15.75 $393,750.00 $0.00

EXCAVATION, UNCLASSIFIED;

REFIT WHARVES

STATION 45+850.4 TO STATION 48+175

(ESTIMATED QUANTITY - SEE NOTE 2)

15,000.00 CUBIC YARD $9.65 $144,750.00 $8.00 $120,000.00 $18.26 $273,900.00 $0.00

EXCAVATION, UNCLASSIFIED;

DRY DOCK CAISSON GATE SILL AND

DRY DOCK CAISSON GATE MOORING FACILITY

1.00 JOB $57,000.00 $57,000.00 $30,000.00 $30,000.00 $45,000.00 $45,000.00 $0.00

STANDBY TIME (SEE NOTE 4)

(ESTIMATED QUANTITY)

120.00 HOUR $2,500.00 $300,000.00 $1,400.00 $168,000.00 $1,660.00 $199,200.00 $0.00

0011 BIRD MONITORING (SEE NOTE 6) 1.00 JOB $120,500.00 $120,500.00 $2,000.00 $2,000.00 $50,000.00 $50,000.00 $0.00 0012 PARTNERING REGROUP 1.00 EACH $7,500.00 $7,500.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 $0.00

$10,822,000.00 $7,105,500.00 $8,933,050.00 $0.00

OPTION A

FIELD-CUT WEIR RISER BOARDS

(ESTIMATED QUANTITY)

200 EACH $35.00 $7,000.00 $20.00 $4,000.00 $50.00 $10,000.00 $0.00

$7,000.00 $4,000.00 $10,000.00 $0.00

$10,829,000.00 $7,109,500.00 $8,943,050.00 $0.00

OPTION B

SECONDARY MAINTENANCE DREDGING

0014 MOBILIZATION AND DEMOBILIZATION 1 JOB $2,415,000.00 $1,100,000.00 $1,100,000.00 $1,500,000.00 $1,500,000.00 $0.00

EXCAVATION, UNCLASSIFIED;

SITE SIX SOUTH AND ARDM YOKE

(ESTIMATED QUANTITY - SEE NOTE 2)

25,000 CUBIC YARD $7.75 $193,750.00 $6.00 $150,000.00 $16.00 $400,000.00 $0.00

EXCAVATION, UNCLASSIFIED;

EXPLOSIVE HANDLING WHARVES (EHW)

(ESTIMATED QUANTITY - SEE NOTE 2)

35,000 CUBIC YARD $12.65 $442,750.00 $9.00 $315,000.00 $15.75 $551,250.00 $0.00

EXCAVATION, UNCLASSIFIED;

REFIT WHARVES

(ESTIMATED QUANTITY - SEE NOTE 2)

20,000 CUBIC YARD $9.65 $193,000.00 $7.00 $140,000.00 $13.76 $275,200.00 $0.00

EXCAVATION, UNCLASSIFIED;

DRY DOCK CAISSON GATE SILL AND

DRY DOCK CAISSON GATE MOORING FACILITY

1 JOB $57,000.00 $57,000.00 $30,000.00 $30,000.00 $45,000.00 $45,000.00 $0.00

EXCAVATION, UNCLASSIFIED; SITE SIX NORTH

STATION 36+850 TO STATION 38+800

(ESTIMATED QUANTITY - SEE NOTE 2)

35,000 CUBIC YARD $3.30 $115,500.00 $6.00 $210,000.00 $3.95 $138,250.00 $0.00

0020 BIRD MONITORING (SEE NOTE 6) 1 JOB $25,000.00 $25,000.00 $2,000.00 $2,000.00 $30,000.00 $30,000.00 $0.00

0021 STANDBY TIME (SEE NOTE 4) 24 HOUR $2,500.00 $60,000.00 $1,400.00 $33,600.00 $1,660.00 $39,840.00 $0.00

$3,502,000.00 $1,980,600.00 $2,979,540.00 $0.00

$14,331,000.00 $9,090,100.00 $11,922,590.00 $0.00

OPTION C

SITE SIX NORTH EXPANDED BASIN

EXCAVATION, UNCLASSIFIED

SITE SIX NORTH EXPANDED BASIN

(ESTIMATED QUANTITY - SEE NOTE 2)

461,000 CUBIC YARD $4.40 $2,028,400.00 $5.00 $2,305,000.00 $4.40 $2,028,400.00 $0.00

0023 BIRD MONITORING (SEE NOTE 6) 1 JOB $25,600.00 $25,600.00 $2,000.00 $2,000.00 $10,000.00 $10,000.00 $0.00

$2,054,000.00 $2,307,000.00 $2,038,400.00 $0.00

TOTAL BID AMOUNT (LINE ITEMS 0001 THROUGH 0023) $16,385,000.00 $11,397,100.00 $13,960,990.00 $0.00

NAME AND TITLE OF

CERTIFYING OFFICIAL:

20% 20%

Anelis I. Nazario Castillo

Signature

TOTAL BASE (LINE ITEM 0001 THROUGH 0012)

PROJECT TITLE

IGE

NAVAL SUBMARINE BASE KINGS BAY, MAINTENANCE DREDGING, 44, 45, AND 47-

FOOT PROJECT, CAMDEN COUNTY, GEORGIA

Original Government Estimate

ABSTRACT OF BIDS

DATE ISSUED DATE CLOSED

I CERTIFY that I have opened, read, and recorded on this abstract all bids received in response to this solicitation: ->

ISSUING OFFICE

November 24, 2020 December 29, 2020

Yes Yes

BIDS (Continued)

CCottrell Contracting Corp. Southern Dredging Co., Inc.

TOTAL OPTION A (LINE ITEM 0013)

TOTAL BASE PLUS OPTION A (LINE ITEM 0001 THROUGH 0013)

TOTAL OPTION B (LINE ITEM 0014 THROUGH 0021)

TOTAL BASE PLUS OPTION A AND B (LINE ITEM 0001 THROUGH 0021)

TOTAL OPTION C (LINE ITEM 0022 THROUGH 0023)

2020-12-29T15:32:15-0500
NAZARIO CASTILLO.ANELIS.I.1368799315

File details come from the government source that posted it. Updated .