This document provides details on a federal contract solicitation for maintenance dredging services. The U.S. Army Corps of Engineers Engineering District Jacksonville is seeking bids for dredging of the Kings Bay Entrance Channel from Cut-1N through Range-E in Camden County, Georgia and Nassau County, Florida. The base project involves maintenance dredging and disposal of excavated materials in approved ocean and nearshore disposal sites. An optional scope of work consists of pre-placement debris removal at Fort Clinch. Bids are due by October 23, 2020. The contractor must begin work within 45 days of notice to proceed and complete all work within 180 days, including 175 days for the base work and 5 days for the option. A Coast Guard certified hopper dredge is required to perform the dredging. The magnitude of construction work is estimated between $15-25 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
NAVAL SUBMARINE BASE KINGS BAY - ENTRANCE CHANNEL, MAINTENANCE DREDGING - CUT - 1N THROUGH RANGE-E, 49,45, AND
44-FOOT PROJECT, CAMDEN COUNTY, GEORGIA & NASSAU COUNTY, FLORIDA
A.SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.
B.THE PROPOSAL DUE DATE REMAINS UNCHANGED AT OCTOBER 23, 2020 @ 2:00 P.M. LOCAL TIME. LOCAL TIME.
1. CONTRACT ID CODE PAGE OF PAGES
1 81
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP20B0004
X 9B. DATED (SEE ITEM 11)
02-Sep-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Sep-2020
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Naval Submarine Base Kings Bay – Entrance Channel, Maintenance Dredging – Cut-1N Though Range-E, 49, 45, and 44-Foot Project, Camden County, Georgia & Nassau County, Florida
W912EP20B0004 2 Amendment 0001
SUMMARY OF CHANGES
1. SPECIFICATIONS:
Volume 1 text changes are in underline green lettering only and deleted text is simply removed to maintain neatness in the Line Items and Pricing Schedule. Volume 2 text changes have been updated with additions noted by underlined text (green in PDF) and deletions noted by line/cross-outs (red in PDF). These text changes pertain only to changes made by this amendment.
DELETE Section 00100 INSTRUCTIONS TO OFFERORS/EVALUATION FACTORS FOR AWARD and REPLACE with the attached revised Section 00100 INSTRUCTIONS TO OFFERORS/EVALUATION FACTORS FOR
AWARD.
Volume 2
DELETE Section 35 20 23 and REPLACE with the attached revised Section 35 20 23.
2. DRAWINGS:
DELETE Sheet ID G-03 and REPLACE with the attached revised Sheet ID G-03.
DELETE Sheet ID G-06 and REPLACE with the attached revised Sheet ID G-06.
DELETE Sheet ID C-01 and REPLACE with the attached revised Sheet ID C-01.
DELETE Sheet ID C-02 and REPLACE with the attached revised Sheet ID C-02.
DELETE Sheet ID C-03 and REPLACE with the attached revised Sheet ID C-03.
DELETE Sheet ID C-04 and REPLACE with the attached revised Sheet ID C-04.
DELETE Sheet ID C-05 and REPLACE with the attached revised Sheet ID C-05.
DELETE Sheet ID C-06 and REPLACE with the attached revised Sheet ID C-06.
DELETE Sheet ID C-07 and REPLACE with the attached revised Sheet ID C-07.
DELETE Sheet ID C-08 and REPLACE with the attached revised Sheet ID C-08.
DELETE Sheet ID C-09 and REPLACE with the attached revised Sheet ID C-09.
DELETE Sheet ID C-10 and REPLACE with the attached revised Sheet ID C-10.
DELETE Sheet ID C-11 and REPLACE with the attached revised Sheet ID C-11.
DELETE Sheet ID C-12 and REPLACE with the attached revised Sheet ID C-12.
DELETE Sheet ID C-13 and REPLACE with the attached revised Sheet ID C-13.
DELETE Sheet ID C-14 and REPLACE with the attached revised Sheet ID C-14.
DELETE Sheet ID C-15 and REPLACE with the attached revised Sheet ID C-15.
DELETE Sheet ID C-16 and REPLACE with the attached revised Sheet ID C-16.
DELETE Sheet ID C-17 and REPLACE with the attached revised Sheet ID C-17.
DELETE Sheet ID C-18 and REPLACE with the attached revised Sheet ID C-18.
DELETE Sheet ID C-19 and REPLACE with the attached revised Sheet ID C-19.
DELETE Sheet ID C-20 and REPLACE with the attached revised Sheet ID C-20.
DELETE Sheet ID C-21 and REPLACE with the attached revised Sheet ID C-21.
DELETE Sheet ID C-22 and REPLACE with the attached revised Sheet ID C-22.
DELETE Sheet ID C-23 and REPLACE with the attached revised Sheet ID C-23.
DELETE Sheet ID C-24 and REPLACE with the attached revised Sheet ID C-24.
DELETE Sheet ID C-25 and REPLACE with the attached revised Sheet ID C-25.
DELETE Sheet ID C-26 and REPLACE with the attached revised Sheet ID C-26.
DELETE Sheet ID C-27 and REPLACE with the attached revised Sheet ID C-27.
DELETE Sheet ID C-28 and REPLACE with the attached revised Sheet ID C-28.
DELETE Sheet ID C-29 and REPLACE with the attached revised Sheet ID C-29.
(End of Summary of Changes)
Section 00100 - INSTRUCTIONS TO OFFERORS/EVALUATION FACTORS FOR AWARD
52.204-7 System for Award Management OCT 2018 52.211-2
52.214-3
Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST) Amendments To Invitations For Bids
APR 2014
DEC 2016
52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.216-1 Type Of Contract APR 1984 52.222-5 Construction Wage Rate Requirements--Secondary Site of the MAY 2014
52.222-23 Work Notice of Requirement for Affirmative Action to Ensure FEB 1999
52.222-38 Equal Employment Opportunity for Construction Compliance With Veterans' Employment Reporting FEB 2016
52.225-12 Requirements Notice of Buy American Requirement - Construction MAY 2014
52.225-25 Materials Under Trade Agreements Prohibition on Contracting with Entities Engaging in Certain AUG 2018
52.233-2
Activities or Transactions Relating to Iran-- Representation and Certifications.
SERVICE OF PROTEST (SEP 2006)
OCT 2006
52.236-27 (Alt I) SITE VISIT (CONSTRUCTION) (FEB 1995) MAY 2003
52.252-5
(ALTERNATE I) (FEB 1995)
Authorized Deviations In Provisions APR 1984
252.204-7008 Compliance With Safeguarding Covered Defense Information OCT 2016
252.225-7031 Controls Secondary Arab Boycott Of Israel JUN 2005
W912EP20B0004 00100-i Amendment 0001
Section 00100 - INSTRUCTIONS TO OFFERORS/EVALUATION FACTORS FOR AWARD
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at w ww.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
W912EP20B0004 00100-1 Amendment 0001 http://www.sam.gov/
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.
(End of Provision)
52.211-2 AVAILABILITY OF SPECIFICATIONS, STANDARDS, AND DATA ITEM DESCRIPTIONS
LISTED IN THE ACQUISITION STREAMLINING AND STANDARDIZATION INFORMATION SYSTEM
(ASSIST) (APR 2014)
(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(1) ASSIST (https://assist.dla.mil/online/start/);
(2) Quick Search (http://quicksearch.dla.mil/);
(3) ASSISTdocs.com (http://assistdocs.com).
(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--
(1) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone
(215) 697-2667/2179, Facsimile (215) 697-1462.
(End of provision)
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 2016)
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) (1) Bidders shall acknowledge receipt of any amendment to this solicitation--
(i) By signing and returning the amendment;
(ii) By identifying the amendment number and date in space provided for this purpose on the form for submitting a bid;
W912EP20B0004 00100-2 Amendment 0001 http://www.sam.gov/ http://quicksearch.dla.mil/)%3B
(iii) By letter;
(iv) By facsimile, if facsimile bids are authorized in the solicitation; or
(v) By email, if email bids are authorized in the solicitation.
(2) The Government must receive the acknowledgement by the time and at the place specified for receipt of bids.
52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)
Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments.
The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.
52.214-5 SUBMISSION OF BIDS (DEC 2016)
(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.
(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.
(c) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.
(d) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
W912EP20B0004 00100-3 Amendment 0001
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)
(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.
(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--
(1) Lump sum bidding;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of subparagraphs (1) through (3) above.
(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is
W912EP20B0004 00100-4 Amendment 0001 not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.
(d) Alternate bids will not be considered unless this solicitation authorizes their submission.
52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)
(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.
(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.
(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.
(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.
(End of provison)
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.
dollars shall be rejected.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
W912EP20B0004 00100-5 Amendment 0001
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade Goals for female participation for each trade
Camden 22.2% Nassau 21.8%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in
W912EP20B0004 00100-6 Amendment 0001 excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Camden County Georgia & Nassau County, Florida.
52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS (FEB 2016)
By submission of its offer, the offeror represents that, if it is subject to the reporting requirements of 38 U.S.C.
4212(d) (i.e., if it has any contract containing Federal Acquisition Regulation clause 52.222-37, Employment Reports on Veterans), it has filed the most recent VETS-4212 Report required by that clause.
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
W912EP20B0004 00100-7 Amendment 0001
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR
TRANSACTIONS RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS. (AUG 2018)
(a) Definitions. As used in this provision--
Person--
(1) Means--
(i) A natural person;
(ii) A corporation, business association, partnership, society, trust, financial institution, insurer, underwriter, guarantor, and any other business organization, any other nongovernmental entity, organization, or group, and any governmental entity operating as a business enterprise; and
(iii) Any successor to any entity described in paragraph (1)(ii) of this definition; and
(2) Does not include a government or governmental entity that is not operating as a business enterprise.
Sensitive technology--
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically--
(i) To restrict the free flow of unbiased information in Iran; or
(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
W912EP20B0004 00100-8 Amendment 0001
(b) The offeror shall email questions concerning sensitive technology to the Department of State at CISADA106@state.gov.
(c) Except as provided in paragraph (d) of this provision or if a waiver has been granted in accordance with 25.703- 4, by submission of its offer, the offeror—
(1) Represents, to the best of its knowledge and belief, that the offeror does not export any sensitive technology to the government of Iran or any entities or individuals owned or controlled by, or acting on behalf or at the direction of, the government of Iran;
(2) Certifies that the offeror, or any person owned or controlled by the offeror, does not engage in any activities for which sanctions may be imposed under section 5 of the Iran Sanctions Act. These sanctioned activities are in the areas of development of the petroleum resources of Iran, production of refined petroleum products in Iran, sale and provision of refined petroleum products to Iran, and contributing to Iran's ability to acquire or develop certain weapons or technologies; and
(3) Certifies that the offeror, and any person owned or controlled by the offeror, does not knowingly engage in any transaction that exceeds $3,500 with Iran's Revolutionary Guard Corps or any of its officials, agents, or affiliates, the property and interests in property of which are blocked pursuant to the International Emergency Economic Powers Act (50 U.S.C. 1701 et seq.) (see OFAC's Specially Designated Nationals and Blocked Persons List at https://www.treasury.gov/resource-center/sanctions/SDN-List/Pages/default.aspx).
(d) Exception for trade agreements. The representation requirement of paragraph (c)(1) and the certification requirements of paragraphs (c)(2) and (c)(3) of this provision do not apply if—
(1) This solicitation includes a trade agreements notice or certification (e.g., 52.225-4, 52.225-6, 52.225-12, 52.225- 24, or comparable agency provision); and
(2) The offeror has certified that all the offered products to be supplied are designated country end products or designated country construction material.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the person identified in item 10 of the Standard Form 33 (if this solicitation is for non-commercial supplies or services), in item 9A of the Standard Form 1442 (if this solicitation is for construction or dredging), in item 7 of the Standard Form 1449 (if this solicitation is for commercial items), or in item 7 of the DA Form 4069-R (if this solicitation is for work funded by a non-appropriated funds instrumentality) at the address shown in item 7 of the SF 33, item 7 of the SF 1442, item 9 of the SF 1449, or item 5 of the DA Form 4069-R.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
W912EP20B0004 00100-9 Amendment 0001 mailto:CISADA106@state.gov http://www.treasury.gov/resource-center/sanctions/SDN-List/Pages/default.aspx)
(b) An organized site visit has been scheduled for -- Wednesday, 23 September Thursday, October 1, 2020 @
9:00 AM Local Time.
(c) Participants will meet at -- (Location will be provided by the contract administration office via telephone. See
(d) below.)
(d) In order to attend the site visit, Participants must email the completed attached form SECNAC5512 NLT 16 September 2020 to Jim Vecchitto at James.J.Vecchitto@usace.army.mil. If you have any questions call Jim Vecchitto at 904-604-5847 Participants should call Jen Tyler @ 904-524-3166 on or before 30 September 2020 to make arrangements.
(e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 01 11 00 of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)
(f) After the site visit, a memorandum summarizing the visit will be posted to beta.sam.gov website (www.beta.sam.gov) under the solicitation number. This posting will be strictly for informational purposes only.
The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors.
Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Standard Form 1442.
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense FAR Supplement (48 CFR Chapter 2 ) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS
(OCT 2016)
Controlled technical information, covered contractor information system, covered defense information, cyber incident, information system, and technical information are defined in clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting.
(b) The security requirements required by contract clause 252.204-7012 shall be implemented for all covered defense information on all covered contractor information systems that support the performance of this contract.
(c) For covered contractor information systems that are not part of an information technology service or system operated on behalf of the Government (see 252.204-7012(b)(2))--
(1) By submission of this offer, the Offeror represents that it will implement the security requirements specified by National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, ``Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations'' (see
W912EP20B0004 00100-10 Amendment 0001 mailto:James.J.Vecchitto@usace.army.mil http://dx.doi.org/10.6028/NIST.SP.800-171) that are in effect at the time the solicitation is issued or as authorized by the contracting officer not later than December 31, 2017.
(2)(i) If the Offeror proposes to vary from any of the security requirements specified by NIST SP 800-171 that are in effect at the time the solicitation is issued or as authorized by the Contracting Officer, the Offeror shall submit to the Contracting Officer, for consideration by the DoD Chief Information Officer (CIO), a written explanation of—
(A) Why a particular security requirement is not applicable; or
(B) How an alternative but equally effective, security measure is used to compensate for the inability to satisfy a particular requirement and achieve equivalent protection.
(ii) An authorized representative of the DoD CIO will adjudicate offeror requests to vary from NIST SP 800-171 requirements in writing prior to contract award. Any accepted variance from NIST SP 800-171 shall be incorporated into the resulting contract.
252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005)
(1) Foreign person means any person (including any individual, partnership, corporation, or other form of association) other than a United States person.
(2) United States means the 50 States, the District of Columbia, outlying areas, and the outer Continental Shelf as defined in 43 U.S.C. 1331.
(3) United States person is defined in 50 U.S.C. App. 2415(2) and means--
(i) Any United States resident or national (other than an individual resident outside the United States who is employed by other than a United States person);
(ii) Any domestic concern (including any permanent domestic establishment of any foreign concern); and
(iii) Any foreign subsidiary or affiliate (including any permanent foreign establishment) of any domestic concern that is controlled in fact by such domestic concern.
(b) Certification. If the offeror is a foreign person, the offeror certifies, by submission of an offer, that it--
(1) Does not comply with the Secondary Arab Boycott of Israel; and
(2) Is not taking or knowingly agreeing to take any action, with respect to the Secondary Boycott of Israel by Arab countries, which 50 U.S.C. App. 2407(a) prohibits a United States person from taking.
W912EP20B0004 00100-11 Amendment 0001 http://dx.doi.org/10.6028/NIST.SP.800-171)
SF 30 CONTINUATION SHEET
Naval Submarine Base Kings Bay – Entrance Channel, Maintenance Dredging – Cut-1N Though Range-E, 49, 45, and 44-Foot Project, Camden County, Georgia & Nassau County, Florida
W912EP20B0004 2 Amendment 0001
SUMMARY OF CHANGES
1. SPECIFICATIONS:
Volume 1 text changes are in underline green lettering only and deleted text is simply removed to maintain neatness in the Line Items and Pricing Schedule. Volume 2 text changes have been updated with additions noted by underlined text (green in PDF) and deletions noted by line/cross-outs (red in PDF). These text changes pertain only to changes made by this amendment.
DELETE Section 35 20 23 and REPLACE with the attached revised Section 35 20 23.
2. DRAWINGS:
DELETE Sheet ID G-03 and REPLACE with the attached revised Sheet ID G-03.
DELETE Sheet ID G-06 and REPLACE with the attached revised Sheet ID G-06.
DELETE Sheet ID C-01 and REPLACE with the attached revised Sheet ID C-01.
DELETE Sheet ID C-02 and REPLACE with the attached revised Sheet ID C-02.
DELETE Sheet ID C-03 and REPLACE with the attached revised Sheet ID C-03.
DELETE Sheet ID C-04 and REPLACE with the attached revised Sheet ID C-04.
DELETE Sheet ID C-05 and REPLACE with the attached revised Sheet ID C-05.
DELETE Sheet ID C-06 and REPLACE with the attached revised Sheet ID C-06.
DELETE Sheet ID C-07 and REPLACE with the attached revised Sheet ID C-07.
DELETE Sheet ID C-08 and REPLACE with the attached revised Sheet ID C-08.
DELETE Sheet ID C-09 and REPLACE with the attached revised Sheet ID C-09.
DELETE Sheet ID C-10 and REPLACE with the attached revised Sheet ID C-10.
DELETE Sheet ID C-11 and REPLACE with the attached revised Sheet ID C-11.
DELETE Sheet ID C-12 and REPLACE with the attached revised Sheet ID C-12.
DELETE Sheet ID C-13 and REPLACE with the attached revised Sheet ID C-13.
DELETE Sheet ID C-14 and REPLACE with the attached revised Sheet ID C-14.
DELETE Sheet ID C-15 and REPLACE with the attached revised Sheet ID C-15.
DELETE Sheet ID C-16 and REPLACE with the attached revised Sheet ID C-16.
DELETE Sheet ID C-17 and REPLACE with the attached revised Sheet ID C-17.
DELETE Sheet ID C-18 and REPLACE with the attached revised Sheet ID C-18.
DELETE Sheet ID C-19 and REPLACE with the attached revised Sheet ID C-19.
DELETE Sheet ID C-20 and REPLACE with the attached revised Sheet ID C-20.
DELETE Sheet ID C-21 and REPLACE with the attached revised Sheet ID C-21.
DELETE Sheet ID C-22 and REPLACE with the attached revised Sheet ID C-22.
DELETE Sheet ID C-23 and REPLACE with the attached revised Sheet ID C-23.
DELETE Sheet ID C-24 and REPLACE with the attached revised Sheet ID C-24.
DELETE Sheet ID C-25 and REPLACE with the attached revised Sheet ID C-25.
DELETE Sheet ID C-26 and REPLACE with the attached revised Sheet ID C-26.
DELETE Sheet ID C-27 and REPLACE with the attached revised Sheet ID C-27.
DELETE Sheet ID C-28 and REPLACE with the attached revised Sheet ID C-28.
DELETE Sheet ID C-29 and REPLACE with the attached revised Sheet ID C-29.
(End of Summary of Changes)
Naval Submarine Base Kings Bay - Entrance Channel, M/D - Cut-1N Through Range-E, 49, 45, and 44-Foot Project
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23
DREDGING
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DREDGING RESTRICTIONS
1.4.1 Order of Work
1.4.2 Hopper Restriction
1.4.3 Transportation of Material
1.5 SPECIAL INSTRUCTIONS
1.5.1 Insitu Rock
1.5.2 Security Operations
1.6 PUMPING OF BILGES
1.7 HISTORICAL PERIOD SHIPWRECK SITES
1.8 UTILITY CROSSINGS
1.8.1 General
1.9 PERMITS
1.10 FUEL OIL TRANSFER OPERATIONS
1.11 SIGNAL LIGHTS
1.12 NOTICE TO MARINERS -- DREDGING CONTRACTS
1.13 FINAL CLEANUP
1.14 WORK VIOLATIONS
1.15 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SYSTEM)
1.15.1 System Requirements
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 NOTIFICATION OF COAST GUARD
3.1.1 Navigation Aids
3.1.2 Dredging Aids
3.1.3 Surveillance of Ocean Disposal
3.2 WORK AREA
3.2.1 Access
3.2.2 Protection of Existing Waterways
3.2.3 Adjacent Property and Structures
3.2.4 Subaqueous Cable Crossings
3.3 OVERALL WORK AREA PROVISIONS
3.3.1 Construction Plans and Contract Documents
3.3.2 Staging and Access Areas
3.3.3 Public Protection
3.3.3.1 Work Area Signs and Barriers
3.3.3.2 Dedicated Safety and Flag Person
3.3.4 Noise Control
SECTION 35 20 23 Page 1 W912EP20B0004 Amendment 0001
3.3.4.1 Hauling and Excavating Equipment
3.3.4.2 Booster Pumps Noise Control
3.3.4.3 Sound Pressure Measurements
3.3.5 Buoy and Anchoring Inventory
3.3.6 Protection of Existing Vegetation
3.4 EXCAVATION
3.4.1 Required Depth
3.4.2 Allowable Overdepth
3.4.3 Side Slopes
3.4.4 Excessive Dredging
3.4.5 Areas to be Dredged
3.4.6 Acceptance Sections
3.4.7 Character of Materials
3.5 TRANSPORTATION
3.5.1 Dredge Discharge Pipeline
3.5.2 Submerged Pipeline
3.5.3 Floating Pipeline
3.5.4 South Jetty
3.5.5 Pipeline Access
3.6 DISPOSAL OF EXCAVATED MATERIAL
3.6.1 General
3.6.2 Placing of Dredged Material
3.6.3 Disposal of Beach Quality Material
3.6.3.1 Order of Placement
3.6.3.2 Debris Removal
3.6.3.3 Beach Placement
3.6.3.4 Beach Placement Work Restrictions
3.6.3.5 Ramps and Walkways
3.6.3.5.1 Handicap Beach Access Area
3.6.3.6 Grade Stake Installation and Recovery Operations
3.6.3.7 Control of Fill
3.6.3.8 Rehandled Materials
3.6.3.9 Misplaced Materials
3.6.3.10 Dressing and Final Acceptance
3.6.3.11 Tolerances
3.6.4 Nearshore Disposal
3.6.4.1 Barges
3.6.4.2 Logs
3.6.4.3 Mis-Dump
3.6.5 Ocean Disposal
3.6.5.1 Release and No Release Zones
3.6.5.2 Post-Dump Closure of Release Mechanisms
3.6.5.3 Spillage/Leakage During Transport to Disposal Site
3.6.5.4 Mis-Dump
3.6.6 Misplaced Material
3.7 FORT CLINCH
3.7.1 Fort Clinch State Park Use Agreement Special Conditions
3.8 QUALITY CONTROL FOR BEACH PLACEMENT OF SAND
3.8.1 Beach Placement Sediment Criteria
3.8.2 Contingency Plan
3.8.3 Beach Observation
3.8.4 Laboratory Analysis
3.8.5 Remediation
3.9 SURVEYS
3.9.1 General
3.9.2 Contractor Representative
3.9.3 Survey Certification
3.9.4 Tide Data
3.9.4.1 Real Time Kinematic (RTK) GPS
SECTION 35 20 23 Page 2
3.9.4.2 Kinematic Tidal Datum
3.9.4.3 Non-Operational Reference Station
3.9.5 Beach Placement Survey
3.10 INSPECTION
3.10.1 Quality Assurance Representative (QAR)
3.10.2 Failure to Comply
3.11 FINAL EXAMINATION AND ACCEPTANCE
3.11.1 Final Examination of Work
3.11.2 Bed Leveling
3.11.3 Bed Leveling - Reporting and Documenting
3.11.4 Final Acceptance
3.11.5 Shoaling
3.12 CONTINUITY OF WORK
3.13 NOISE CONTROL
3.14 DREDGE CERTIFICATION
3.15 GENERAL DREDGING SAFETY REQUIREMENTS
3.15.1 Dredge Plant Restriction Definitions
3.15.1.1 Certification Required Line - Coast Guard Inspected
(CRL-C)
3.15.1.2 Certification Required Line - Load Line (CRL-L)
3.15.1.3 Certification Required Line - Hopper (CRL-H)
3.15.2 Certification of Attendant and Auxiliary Plant
3.15.3 Minimum Tow-Boat Requirements
3.15.4 Harbor Specific Dredging Restrictions
3.15.4.1 Kings Bay Entrance Channel
3.16 CONSTRUCTION FORMS AND DETAILS
-- End of Section Table of Contents --
SECTION 35 20 23 Page 3
SECTION 35 20 23
DREDGING
PART 1 GENERAL
1.1 SCOPE
The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all excavation and disposal of all material as specified herein or indicated on the drawings. This scope also includes all necessary measures for protection of the environment.
Environmental protection requirements under this contract are as important to overall completion of the work as other technical aspects. Failure to meet the requirements of these specifications for environmental protection may result in work stoppages or termination for default. No part of the time lost due to any such work stoppages shall be made the subject of claims for extensions of time or for excess costs or damages by the Contractor. If the Contractor fails or refuses to promptly repair any damage caused by violation of the provisions of these specifications, the Contracting Officer may have the necessary work performed and charge the cost thereof to the Contractor.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D422 (1963; R 2007; E 2014; E 2014)
Particle-Size Analysis of Soils
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
EM 1110-1-1000 (2015) Photogrammetric and LiDAR Mapping
EM 1110-1-1002 (2012) Survey Markers and Monumentation
EM 1110-1-1003 (2013) NAVSTAR Global Positioning System Surveying
EM 1110-1-1005 (2007) Control and Topographic Surveying
EM 1110-1-2909 (2012) Geospatial Data and Systems
EM 1110-2-1003 (2013) Hydrographic Surveying
FLORIDA BOARD OF PROFESSIONAL SURVEYORS AND MAPPERS (FBPSM)
FBPSM Minimum Technical Standards, Chapters 177, 472, 61G17
SECTION 35 20 23 Page 4
TRI-SERVICE STANDARDS (TSS)
TSS (2006) A/E/C CADD Standards
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Notice of Intent to Dredge
Prior to commencement of work on this contract, notify the Commander, Seventh Coast Guard District of his intended operations to dredge and request that it be published in the Local Notice to Mariners. This notification must be given in sufficient time so that it appears in the Notice to Mariners at least two weeks prior to the commencement of this dredging operation. Provide a copy of the notification to the Contracting Officer.
Relocation of Navigation Aids
Do not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with any aid to navigation.
Within 7 calendar days following receipt of Notice to Proceed, notify the Commander, Seventh Coast Guard District, Miami, Florida, of his plan to dredge adjacent to any aids which require relocation to facilitate dredging. Send the notification via Fax to 305-415-6757, ATTN: Mr. Gene Stratten. This notification shall be immediately followed by a formal written request with a copy to the Contracting Officer. Also contact the U.S. Coast Guard, 305-415-6750, for information concerning the position to which the aids will be relocated.
SD-02 Shop Drawings
Acceptance Sections Plan ; G, DO
Submit an acceptance sections plan for approval by the Government prior to commencement of work. See subparagraph "Acceptance Sections" in paragraph REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SIDE SLOPES below.
Progress Maps ; G, DO
Provide a progress schedule map of the Contractor's design. The progress schedule map shall be a plan view drawing depicting the beach fill site and access areas to used on the project. Show all acceptance sections (AS), access/staging areas, R-monuments, adjacent street names, and pipeline landings anticipated to be used on the project. For each AS, the information shall list the following: Anticipated quantity of material per acceptance section, projected dates for fill to be placed and completed.
Provide dates when access areas are to be used and ready for
SECTION 35 20 23 Page 5 public use. The map will be color coordinated with the following color scheme: Red depicting an area not ready for construction;
Orange depicting an area currently being worked, and Green…