Black Water Divers, Inc.

1610 Newport Ave. Deland Florida, 32724

Pipe Inspection Report

Structures S252F & S252E 27th September 2018

S252F Pipe #1 Pipe Length 100 Ft 2 Inches 72” Diameter CMP

Divers inspected the pipe from north to south.

The pipe has numerous holes and major deterioration outside of the levy, which continues throughout the pipe. This pipe is a candidate for a HDPE pipe liner. All metal pipe that is not under the levy should be cut out prior to installing pipe liner. Please see field report.

S252F Pipe # 2 Pipe Length 98 Ft 1Inch 72” Diameter CMP

Divers inspected the pipe from North to South.

The pipe has numerous holes and major deterioration outside of the levy, which continues throughout the pipe. This pipe is a candidate for a HDPE pipe liner. All metal pipe that is not under the levy should be cut out prior to installing pipe liner. Please see field

With The Amount of deterioration (50% or More) found at S252E, we highly recommend keeping all heavy equipment off of this section of levy due to the high likely hood of collapse. The pipes are no longer supporting the soils.

S252E #1 Pipe Length 142 Ft 72” Diameter CMP

Divers inspected the pipe from West To East.

Pipe is out of round 75 Inches Wide 67 Inches Height Heavy Equipment Driving Over this pipe may cause pipe to collapse.

Hand Winch is broken on gate.

The pipe has numerous holes and major deterioration outside of the levy, which continues throughout the pipe. This pipe is a candidate for a HDPE pipe liner. All metal pipe that is not under the levy should be cut out prior to installing pipe liner. Please see field report.

S252E #2 Pipe Length 141 Ft 72” Diameter CMP

Divers inspected the pipe from West To East.

Pipe is out of round 75 Inches Wide 67 Inches Height Heavy Equipment Driving Over this pipe may cause pipe to collapse.

Hand Winch is broken on gate.

The pipe has numerous holes and major deterioration outside of the levy, which continues throughout the pipe. This pipe is a candidate for a HDPE pipe liner. All metal pipe that is not under the levy should be cut out prior to installing pipe liner. Please see field

S252E #3 Pipe Length 144 Ft 72” Diameter CMP

Divers inspected the pipe from West To East.

Pipe is out of round

Heavy Equipment Driving Over this pipe may cause pipe to collapse.

Hand Winch is missing on gate.

Gate is Attached to pipe with less than 10% The pipe has numerous holes and major deterioration outside of the levy, which continues throughout the pipe. This pipe is a candidate for a HDPE pipe liner. All metal pipe that is not under the levy should be cut out prior to installing pipe liner. Please see field

S252E #4 Pipe Length 141 Ft 72” Diameter CMP

Divers inspected the pipe from West To East.

Pipe is out of round Heavy Equipment Driving Over this pipe may cause pipe to collapse.

Hand Winch is missing on gate.

Gate attached to pipe by 30 % The pipe has numerous holes and major deterioration outside of the levy, which continues throughout the pipe. This pipe is a candidate for a HDPE pipe liner. All metal pipe that is not under the levy should be cut out prior to installing pipe liner. Please see field

S252E #5 Pipe Length 141 Ft 72” Diameter CMP

Divers inspected the pipe from West To East.

Pipe is out of round Heavy Equipment Driving Over this pipe may cause pipe to collapse.

Hand Winch is broken on gate.

Gate is Cracked at 12:00 The pipe has numerous holes and major deterioration outside of the levy, which continues throughout the pipe. This pipe is a candidate for a HDPE pipe liner. All metal pipe that is not under the levy should be cut out prior to installing pipe liner. Please see field

SJRWMD S252E, S252F Inspection Report
SJRWMD Pipe Insp. Job #28200