Picayune_Strand_Maps.pdf
PDF 1 MB Posted
- Attached to
- PICAYUNE STRAND RESTORATION PROJECT, MILLER TRAM AND ROAD REMOVAL AND ASSOCIATED WORKS, COLLIER COUNTY, FL
- Solicitation number
- W912EP19B0021
About this file
W912EP19B0021 Maps
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"S
Merritt Pump Station (S-488)
"S
Faka Union Pump Station
(S-487)"S
Miller Pump Station (S-486)
118th
Mi lle r C an al
Fa ka
U nio n C an al
Protect Remediation
Sites
I-75
Mi lle r
Ev erg lad es
52nd
Lynch
58th 60th
68th 66th
62nd
42nd
134 th
64th
Stewart 98th 96th
94th
90th
84th
Tamiami
88th
78th 80th
74th
86th
70th
76th
56th
126th
48th
54th
92nd
50th
118th
114th
82nd
124th
112th
72nd
116th
106th
110th
120th
104th
108th
122nd
La ge r
102nd
De so to
Go sh en
La ert es Tom ato
La dy bu g
La fay ett e
United States Highway 41
County Road 92
Snake
Sunnygrove
58th
64th
56th
Ev erg lad es
Mi lle r
60th
52nd
Stewart
62nd
64th
Stewart
54th
PSRP Remaining Earthwork
IMPORTANT DISCLAIMER:
This map is a conceptual or planning tool only.
The South Florida Water Management District does not guarantee or make any representation regarding the information contained herein. It is not self-executing or binding, and does not affect the interests of any persons or properties, including any present or future right or use of real property.
G u l f o f
M e x i c o
L a k e O k e e c h o b e e
Fa ka
U nio n C an al Mi lle r C an al
1 C an al
C-1
I-7 5 C an al
Ai rp or t R d C an al
SR
C an al
He nd er so n C ree k
0 1 2
Miles
PSRP_Roads_Jun_2018.mxd
Collier County, Florida
BIG CYPRESS BASIN
SFWMD
2660 Horseshoe Dr. N.
Naples, Florida 34104 239-263-7615 µ
Everglades south of 62nd, Stewart and Lynch shown for reference
Asphalt needs to be removed whole lenght of
Miller Blvd and from 100th and 128th west of
Miller Canal
Legend Logging Trams to be Removed Canal Spoil North of Pump Stations to be Removed Miller Blvd and East West Roads & Adjacent Spoil to be Removed Roads & Adjacent Spoil to be Removed North of TB Levee Roads to Remain, Adjacent Spoil to be Removed Private Lands Canal - Finish Clearing / Filling / Leveling Levee and Spreader Basins Proposed SW Protection Feature
Areas need Leveling
UPDATED
Jun 2018
Figure 2. Project Location Map Showing Soil Remediation Sites
| Scope of Work 28 JAN 2019 FINAL |
| Scope with Maps FINAL |
| Scope of Work 28 JAN 2019 FINAL |
| Figure 1. PSRP_Remaining_Earthwork_Jun_29_2018_Final |
| Figure 2. Remediation Sites |
| Figure 3. Example of Culvert Locations along Miller Blvd |
| Slide Number 1 |
File details come from the government source that posted it.