AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 45
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
30-Aug-2019
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(Ifapplicable)
6. ISSUED BY CODE W912EP 7. ADMINISTERED BY (Ifother than item 6) CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W912EP19B0020
X 9B. DATED (SEE ITEM 11)
08-Aug-2019
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning copies ofthe amendment; (b) By acknowledging receipt ofthis amendment on each copy ofthe offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Manatee Harbor, Maintenance Dredging, 40-Foot Project, Entrance Channel, Turning Basin, and South Access Channel, Manatee County, Florida
This Amendment is being issued to DELETE Sections 01 22 00, 01 50 02 and 35 20 23 in their entirety and REPLACE w ith Sections 01 22 00, 01 50 02 and 35 20 23; to DELETE Draw ing Numbers C-02, and C-12 in their entirety and REPLACE w iith Draw ing Numbers C-02, and C-12;
and finally to DELETE SECTION 00010a-1 and REPLACE with the attached revised SECTION 00010A-1.
The receipt of bids remain unchanged 10 September 2019 @ 2:00 PM Local Time.
All other conditions remain the same.
Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
30-Aug-2019
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912EP-19-B-0014 Amendment 0002
SF 30 CONTINUATION
SHEET
Manatee Harbor, Maintenance Dredging, 40-Foot Project, Entrance Channel, Turning
Basin, and South Access Channel
Amendment 0002
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Changes to Specifications:
Volume 1 of 2 – Technical Specifications:
DELETE Section 00010A-1 and REPLACE with the attached revised Section 00010A-1.
Volume 2 of 2 – Technical Specifications:
DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.
DELETE Section 01 50 02 and REPLACE with the attached revised Section 01 50 02.
DELETE Section 35 20 23 and REPLACE with the attached revised Section 35 20 23.
2. DRAWINGS:
DELETE Drawing No. C-02 and REPLACE with the attached revised Drawing No. C-02.
DELETE Drawing No. C-12 and REPLACE with the attached revised Drawing No. C-12.
(End of Summary of
Changes)
SECTION 0010A
LINE ITEM AND PRICING SCHEDULE
MANATEE HARBOR, MAINTENANCE DREDGING, 40-FOOT PROJECT
ENTRANCE CHANNEL, TURNING BASIN, AND SOUTH ACCESS CHANNEL
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
ENTRANCE CHANNEL & TURNING BASIN
0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________
0002 EXCAVATION, UNCLASSIFIED 121,000 CUBIC YARD $___________ $_______________
(ESTIMATED QUANTITY, SEE NOTE 1)
0003 TURBIDITY MONITORING JOB $_______________
0004 ENDANGERED SPECIES OBSERVERS JOB $_______________
0005 STANDBY TIME (SEE NOTE 4) 24 HOUR $______________ $_______________
0006 BIRD MONITORING JOB $_______________
0007 PARTNERING REGROUP MEETING 1 EACH $______________ $_______________
0008 BUOY SINKER AND CHAIN REMOVAL JOB $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0008) $_______________
NOTES:
1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING.
THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANITITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY BE EXCEEDED.
2) ALL BIDS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.
(3) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101 AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE ARAGRAPH 999.214-4018 OF SECTION 00100. SEE
CLAUSE 52.214-18 PREPARATION OF BIDS--CONSTRUCTION OF SECTION 00100.
4) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANITITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT AND
SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
W912EP19B0020 00010A-1 AMENDMENT 0002
k3endwih Underline
Manatee Harbor, Maintenance Dredging, 40-Foot Project Entrance Channel, Turning Basin, and South Access Channel
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 31 32 GEOTECHNICAL DATA REPORT (SEE SEPARATE)
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 25 OWNER SAFETY REQUIREMENTS - DIVING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 05 DREDGING - CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23 DREDGING
35 20 26 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW -
ULLAGE PROFILE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1 W912EP19B0020 Amendment 0002
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 RESIDENT MANAGEMENT SYSTEM (RMS)
1.3.1 Definition
1.3.2 Instructions
1.4 SUBMITTALS
1.5 JOB PAYMENT ITEMS
1.5.1 Mobilization and Demobilization (Line Item 0001)
1.5.2 Turbidity Monitoring (Line Item 0003)
1.5.3 Endangered Species Observers (Line Item 0004)
1.5.4 Bird Monitoring (Line Item 0006)
1.5.5 Buoy Sinker and Chain Removal (Line Item 0008)
1.6 UNIT PRICE PAYMENT ITEMS
1.6.1 Excavation, Unclassified (Line Item 0002)
1.6.1.1 Payment
1.6.1.2 Measurement
1.6.1.3 Unit of Measure
1.6.2 Standby Time (Line Item 0005)
1.6.2.1 Payment
1.6.2.2 Measurement
1.6.2.3 Unit of Measure
1.6.3 Partnering Regroup Meeting (Line Item 0007)
1.6.3.1 Payment
1.6.3.2 Measurements
1.6.3.3 Unit of Measure
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 PAYMENT PROCEDURES
3.1.1 Requesting Progress Payment
3.1.2 Options and Modification CLINS
-- End of Section Table of Contents --
SECTION 01 22 00 Page 1
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
This section describes how Line Items will be measured and paid for when making progress payments. Work to be measured is described in specification sections listed for each Line Item. Measurement procedures for payment, required quantity survey or procurement documentation and payment restrictions are described in applicable specification sections.
Allocate costs for work not specifically mentioned to the Line Item most closely associated with work involved. Unless there is a specific Line Item for administrative costs, such as Quality Control and Safety, allocate such costs proportionally across all Line Items.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 1110-2-1003 (2013) Hydrographic Surveying
1.3 RESIDENT MANAGEMENT SYSTEM (RMS)
1.3.1 Definition
The terms "Contract Line Item Number (CLIN)" and "Line Item" are interchangeable herein (e.g.: CLIN 0001 is Line Item 0001). The term "CLIN" is a contracting term used in the Resident Management System (RMS) payment data base.
1.3.2 Instructions
See Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) for more information on CLINs, schedule of values of pay activities and construction schedule, and payment procedures. The Contractor mode user manual with in-depth instructions can be downloaded from the RMS web site indicated in Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE
(RMS CM).
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar
SECTION 01 22 00 Page 2 days after Notice to Proceed:
SD-01 Preconstruction Submittals
Schedule of Values ; G, RO
Provide a breakdown of job items into proposed pay activities as part of the initial project schedule. Schedule of Values will become basis for CLIN and Pay Activity data in the RMS payment data base.
SD-07 Certificates
Request for Progress Payment ; G, RO
Submit monthly in accordance with subparagraph "Requesting Progress Payment" below.
1.5 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE with the unit "JOB" and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
Progress payments for job CLINs will be made in accordance with the Payments Under Fixed-Price Construction Contracts clause of Section 00700 CONTRACT CLAUSES in Volume 1. Submit a list of pay activities, (Schedule of Values) to breakdown bid for each job CLIN. The Schedule of Values shall be submitted for Government approval with the baseline schedule submittal (see Section 01 32 01 PROJECT SCHEDULE). An unbalanced Schedule of Values and Pay Activity Schedule will be returned for revision. If this contract contains either the Continuing Contracts clause or the Continuing Contracts (Alternate) clause, the Contractor should take into account the amount reserved for contract payments when preparing the construction schedule.
1.5.1 Mobilization and Demobilization (Line Item 0001)
Payment will be made for costs associated with or incidental to mobilization and demobilization and establishment of initial project management and coordination. See Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.2 Turbidity Monitoring (Line Item 0003)
Payment will be made for costs associated with or incidental to obtaining, analyzing, and reporting the results of monitoring for turbidity. See Section 01 57 25 TURBIDITY AND DISPOSAL MONITORING.
SECTION 01 22 00 Page 3
1.5.3 Endangered Species Observers (Line Item 0004)
Payment will be made for costs associated with or incidental to endangered species observers. See Section 01 57 20 ENVIRONMENTAL PROTECTION.
1.5.4 Bird Monitoring (Line Item 0006)
Payment will be made for costs associated with or incidental to furnishing a Bird Monitor. See Section 01 57 20 ENVIRONMENTAL PROTECTION.
1.5.5 Buoy Sinker and Chain Removal (Line Item 0008)
Payment will be made for costs associated with or incidental to locating and disposing of buoy sinker and chain. See Section 35 20 23 DREDGING.
1.6 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
Each Unit Price CLIN may be a single pay activity item or may be broken down into pay activities with smaller quantities equal to CLIN total.
Contract unit price multiplied by agreed quantity is full compensation.
1.6.1 Excavation, Unclassified (Line Item 0002)
1.6.1.1 Payment
a. Payment will be made for costs associated with or incidental to excavation, transportation, and disposal of materials; operation of disposal area; providing and maintaining access to the work site(s) and disposal area; noise control; debris removal; and installation.
See Sections 35 20 23 DREDGING and 01 57 20 ENVIRONMENTAL PROTECTION.
b. Insofar as consistent with the paragraph CONTINUITY OF WORK of Section 35 20 23 DREDGING, monthly partial payments will be based on approximate quantities determined by soundings or sweepings performed by the Contractor behind the dredge. The term "area designated by the Contracting Officer" as used in the CONTINUITY OF WORK paragraph, is defined as "acceptance section".
c. Hydrographic surveys for final measurement and payment and for channel clearance will be made by the Government. All surveys will be performed in accordance with EM 1110-2-1003 . Survey frequencies will be the same as those shown in the drawings and will remain consistent throughout the contract.
1.6.1.2 Measurement
a. The maps and/or drawings already prepared (clause CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS of Section 00700 CONTRACT CLAUSES in Volume 1) are believed to represent accurately average existing conditions, but the depths shown thereon may be verified and corrected
SECTION 01 22 00 Page 4 by soundings taken before dredging. Once quantities within a specified reach or section have been determined through the use of in-place measurement, they will not be reopened except on evidence of collusion, fraud, or obvious error.
b. The total amount of material removed, and to be paid for under the contract, will be measured by the cubic yard in place and quantities determined by the surface-to-surface difference method.
The volume computed shall be between the bottom surface shown by soundings taken within 3 weeks before dredging and the bottom surface shown by the soundings taken within 3 weeks after the work specified in each acceptance section indicated on the drawings has been completed. The Contractor shall give 10 days advance notice, in writing, to the Contracting Officer's Representative of the need for a pre-dredging survey or after-dredging survey for final acceptance for each acceptance section. The quantity shall include the volume within the limits of the side slopes described in subparagraph "Side Slopes" of paragraph REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SIDE SLOPES of Section 35 20 23 DREDGING, less any deductions that may be required for misplaced material described in subparagraph "Misplaced Materials" of paragraph DISPOSAL OF EXCAVATED MATERIAL of Section 35 20 23
DREDGING.
1.6.1.3 Unit of Measure
Cubic yard.
1.6.2 Standby Time (Line Item 0005)
1.6.2.1 Payment
Standby time is defined as when the dredge plant is not in operation at the direction of the Contracting Officer or Administrative Contracting Officer. Standby time shall be utilized only due to the presence of endangered species in the immediate area of the dredging operations, differing site conditions, security operations or other conditions as determined by the Contracting Officer. Standby time is not afforded for delays caused by adverse weather conditions. This line item is not subject to the variation in estimated quantity clause, and payment will only be made for actual standby time required by the Contracting Officer. See Section 01 57 20 ENVIRONMENTAL PROTECTION.
1.6.2.2 Measurement
Standby Time, if required and implemented as described in payment above, will be measured and paid for each hour or part thereof in 1/6 hour increments that the plant is not in operation by request of the Contracting Officer.
1.6.2.3 Unit of Measure
Hour.
1.6.3 Partnering Regroup Meeting (Line Item 0007)
1.6.3.1 Payment
Payment will be made for costs associated with or incidental to conducting a partnering regroup. The initial partnering meeting will not be paid for
SECTION 01 22 00 Page 5 under this line item as it is a distributed cost mandatory administrative action.
1.6.3.2 Measurements
The basis for payment will be for the completion of each partnering regroup meeting and Government receipt of all completed work products.
1.6.3.3 Unit of Measure
Each.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 PAYMENT PROCEDURES
Upon receiving initial Resident Management System import file, go to "Pay Activities" and establish a link between bid breakdown schedule of values of "Pay Activities" to contract CLINs using "Schedule Activities" data entry page.
3.1.1 Requesting Progress Payment
For progress payments, ensure "Activity Schedule", "Feature Schedule", submittal register, and punchlists are all up to date. Use "Progress Payments" to "Request Activity Earnings" for both "Activity Earnings" data entry page and "Other Earning". Provide hard copies of supporting invoices and quantity measurements to support all requested earnings.
Ensure that sums of payment activities do not exceed contract award CLIN funding amounts, or "unbalanced" CLINs error will prevent processing the payment. Submit a request for progress payment monthly in accordance with Clause 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS of Section 00700 CONTRACT CLAUSES. In addition to the items listed in Clause 52.232-5(b)(1), submit the following in the request for progress payment:
a. Approved construction schedule.
b. Up-to-date payroll records.
c. Current submittal register.
d. Approved submittals on installed property.
e. QA/QC deficiency tracking list.
Once the complete pay application package is received to include the Contractor's signed ENG 93, the 14 calendar days will commence.
3.1.2 Options and Modification CLINS
When additional work is added by modification, existing CLINs funding amounts must be updated, or new CLINs for modification will be created.
If contract has option CLINs not yet awarded, option CLINs will appear as zero dollar CLINs until option is awarded by modification. No payment may be requested for Options or Modification CLINs until contract modification has been funded and signed.
-- End of Section --
SECTION 01 22 00 Page 6
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 50 02
TEMPORARY CONSTRUCTION FACILITIES
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 EXISTING UTILITIES
1.4.1 Water
1.4.2 Electricity
1.5 BRIDGE-TO-BRIDGE COMMUNICATION
1.6 STAGING AND ACCESS AREAS
PART 2 PRODUCTS
2.1 CONSTRUCTION PROJECT SIGNS
2.1.1 Haul Road Traffic and Construction Warning Signs
2.2 STORAGE CONTAINERS
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Identification of Employees
3.1.2 Employee Parking
3.1.3 Onsite Information
3.1.4 Janitorial Services
3.2 AVAILABILITY AND USE OF UTILITY SERVICES
3.2.1 Lighting
3.2.2 Heating and Cooling
3.2.3 Water
3.2.4 Fire Extinguisher
3.2.5 Utility Lines
3.2.6 Electric Power
3.3 BULLETIN BOARD, PROJECT SIGN, AND PROJECT SAFETY SIGN
3.3.1 Bulletin Board
3.3.2 Project and Safety Signs
3.4 PROTECTION AND MAINTENANCE OF TRAFFIC
3.4.1 Barricades
3.5 HAUL AND ACCESS ROADS
3.6 MAINTENANCE OF HAUL AND ACCESS ROADS
3.7 CONTRACTOR'S TEMPORARY FACILITIES
3.7.1 Contractor Field Office
3.7.1.1 Office Space for Government Personnel
3.7.2 Appearance of Trailer(s)
3.7.3 Storage Area
3.7.3.1 Maintenance of Storage Area
3.7.4 Waste Storage
3.7.5 Fuel Storage and Fueling Operations
SECTION 01 50 02 Page 1
3.8 SECURITY PLAN
3.8.1 Visitors
3.9 TEMPORARY PROJECT SAFETY FENCING
3.10 CONSTRUCTION FENCING AND DANGER SIGNS
3.11 ACCOMMODATIONS AND MEALS FOR INSPECTORS
3.12 CLEANUP
3.13 RESTORATION OF STORAGE AREA
3.14 CONSTRUCTION FORMS AND DETAILS
-- End of Section Table of Contents --
SECTION 01 50 02 Page 2
SECTION 01 50 02
TEMPORARY CONSTRUCTION FACILITIES
PART 1 GENERAL
1.1 SUMMARY
In addition to Construction Facilities this Section covers:
Temporary Utilities Construction Aids Vehicular Access and Parking Project Identification
See Section 01 57 20 ENVIRONMENTAL PROTECTION for requirements including silt control, trailer placement, fueling restrictions, dust control, solid waste, and cleanup. Upon completion of project, clean up and restore area in accordance with Clause CLEANING UP of Section 00700 CONTRACT CLAUSES in Volume 1.
a. Construction Facilities include, but are not limited to, the following:
(1) Contractor Offices
(2) Information Bulletin Board
(3) Material and Equipment Storage Area
(4) Fueling Area
(5) Secured Storage Area
(6) Employee Parking Area
(7) Debris Container (dumpster)
(8) Construction Signage to include Project Sign; Safety Sign; and, Construction Warning Signs
b. Temporary Utilities include, but are not limited to, the following:
(1) Water
(2) Electric
(3) Sewage
(4) Communications
(i) Telephone
(ii) Internet (4 Mbps or higher speed)
(5) Lighting
1.2 REFERENCES
The publications listed below form a part of this specification to extent referenced. The publications are referred to in text by basic designation only.
FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT)
FDOT Specifications (2018) Standard Specifications for Road
SECTION 01 50 02 Page 3 and Bridge Construction
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National Electrical Safety Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14) National Electrical Code
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar days after Notice to Proceed:
SD-01 Preconstruction Submittals
Mobilization/Demobilization Plan
Plan shall include, but not be limited to, the following:
a. Mobilization Requirements:
(1) Methods, equipment and materials
(2) Connection of utilities
(3) Placement of site facilities and temporary controls
(4) Construction of facilities
b. Demobilization Requirements (methods, equipment and materials required to clean-up and restore site at project conclusion):
(1) Collection, recycle and disposal of solid waste
(2) Contract-generated material
(3) Utility disconnection
(4) Removal of Contractor facilities
(5) Repair and restoration of site (i.e., fences, roads, or permanent facilities)
Security Plan
Prepare a Security Plan for Contracting Officer describing site security as follows:
a. Day and night security
b. Weekend and holiday security
c. General security duties
SECTION 01 50 02 Page 4
SD-02 Shop Drawings
Contractor's Temporary Facilities
General layout sketch of temporary site facilities shall include, but not be limited to, the following:
a. Trailer locations
b. Parking areas
c. Material storage
d. Equipment lay down area
e. Areas for gravel
f. Fuel areas
g. Supplemental or other staging area
h. Temporary well, water supply
i. Septic field or holding tanks, port-a-lets
j. Contaminated water handling
k. Concrete cleaning area and methods of disposal
l. Fences -- location and dimensions, entrance and exit points, and details of installation
m. Utilities (poles, connections and services)
n. Explosives storage
Temporary Electric Drawings
Electricity supply and lighting - from transformer source sketch layout locations, fixtures, and materials, to include outdoor lighting as described in subparagraph "Electric Power" below.
1.4 EXISTING UTILITIES
The Contractor is responsible for investigating the availability of utilities at the project site. Contractor shall provide potable water, sanitary sewer, electricity from transformer, communications and optional utilities the Contractor may require at the project site. Provide internet services with 4 Mbps minimum speed and wireless capabilities to the Contractor's Field Office complex.
1.4.1 Water
In addition to the above, the Contractor shall provide and maintain at his own expense an adequate supply of water for his use for construction, and to install and maintain necessary supply connections and piping for same, but only at such locations and in such manner as may be approved by the Contracting Officer. The Contractor shall also provide and maintain his own temporary toilet and washing facilities. Toilet and washing facilities shall be installed and maintained in a location approved by the Contracting Officer. Refer to paragraph AVAILABILITY AND USE OF UTILITY SERVICES below.
1.4.2 Electricity
In addition to the above, all electric current required by the Contractor shall be furnished at his own expense. All temporary lines will be furnished, installed, connected, and maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner at his expense prior to
SECTION 01 50 02 Page 5 completion of the construction. Refer to paragraph AVAILABILITY AND USE OF UTILITY SERVICES below.
1.5 BRIDGE-TO-BRIDGE COMMUNICATION
In order that radio communication may be made with passing vessels, all dredges/marine equipment engaged in work under this contract shall be equipped with bridge-to-bridge radio telephone equipment. The radio equipment shall operate on a single channel very high frequency (VHF), FM, on a frequency of 156.55 MC per second with low power output having a communication range of approximately ten miles. The frequency has been approved by the Federal Communications Commission. Channels #13 and #16 must be monitored at all times.
1.6 STAGING AND ACCESS AREAS
Staging and access areas indicated on the contract drawings have been identified for the Contractor's use. Contractor shall investigate and evaluate the conditions of any additional areas which may be necessary for the construction operations at the Contractor's expense. The final limits of the staging and access areas shall be field rectified by the Contractor; the final determination of the staging and access areas are subject to the approval of the Contracting Officer in coordination with the Local Sponsor.
PART 2 PRODUCTS
2.1 CONSTRUCTION PROJECT SIGNS
Refer to paragraph BULLETIN BOARD, PROJECT SIGN, AND PROJECT SAFETY SIGN below and the web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below.
2.1.1 Haul Road Traffic and Construction Warning Signs
1/2 inch HDO plywood, or aluminum sheet, conforming to FDOT Specifications Section 700 Uniform Traffic Manual Standard Signs, non-standard signage high visibility orange with black lettering. Orange fabric mesh acceptable for temporary survey crew use.
2.2 STORAGE CONTAINERS
Welded steel construction, locking, shipping containers or equal.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Identification of Employees
The Contractor shall be responsible for furnishing to each employee, and for requiring each employee engaged on the work to display, identification as approved and directed by the Contracting officer. Prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon release of any employee. When required, the Contractor shall obtain and provide fingerprints of persons employed on the project. Contractor and subcontractor personnel shall wear identifying markings on hard hats clearly identifying the company for whom the employee works.
SECTION 01 50 02 Page 6
3.1.2 Employee Parking
a. Park employee's vehicles in areas designated by Contractor, away from construction traffic, within reasonable walking distance of site. Maintain area free of ruts, mud holes and puddles. Place gravel where required by deteriorated conditions.
b. Contractor should protect unattended equipment as it may be subject to vandalism.
c. Storage trailers and storage area with Government material should be locking type with lighting.
3.1.3 Onsite Information
Keep copy of contract drawings, specifications, and other contract documents at Contractor's Office onsite, available for use at all times.
3.1.4 Janitorial Services
a. Daily -- Sweep; empty wastebaskets; service toilets
b. Weekly -- Mop floors; sanitize toilet seats
c. Monthly -- Wash floors, windows (inside and out)
d. Cut grass as needed to keep below 3 inches high
3.2 AVAILABILITY AND USE OF UTILITY SERVICES
Install temporary facilities and utilities in accordance with IEEE C2 , EM 385-1-1 , NFPA 70 . Obtain necessary construction, building, zoning, or soil erosion and sediment control approvals required by local authorities and utility companies. Equip trailer(s) with wind tie downs in accordance with local wind and building code requirements.
3.2.1 Lighting
Electric light, non-glare type luminaries to provide a minimum illumination, level of 30-foot candles at desk height level. Comply with temporary lighting, wiring and Ground Fault Circuit Interrupter (GFCI) requirements found in EM 385-1-1 .
3.2.2 Heating and Cooling
Adequate equipment to maintain internal ambient air temperature of 75 degrees F in 105 degrees F and 70 degrees F in 30 degrees F. Equip trailer(s) with smoke alarms. If bottled gas is used to heat, equip trailer(s) with carbon monoxide alarms.
3.2.3 Water
Non-potable well water may be used to flush toilets, and for dish and hand washing. Provide bulk potable water in storage tanks or bottled water for drinking.
3.2.4 Fire Extinguisher
Refer to EM 385-1-1 . Non-toxic, dry chemical, fire extinguisher meeting Underwriters Laboratories, Inc., approval for Class A, Class B, and Class C fires with a minimum rating of 2A; 10B; and 10C.
SECTION 01 50 02 Page 7
3.2.5 Utility Lines
Install, connect and modify temporary lines as coordinated with owning utility. Conform requirements in accordance with IEEE C2 and NFPA 70 for Temporary Electric Lines. Remove temporary line at completion of project.
3.2.6 Electric Power
Provide electrical service and transformers sufficient to operate heating/air conditioning units. Electrical power shall be purchased directly by Contractor.
3.3 BULLETIN BOARD, PROJECT SIGN, AND PROJECT SAFETY SIGN
3.3.1 Bulletin Board
Immediately upon beginning of work, the Contractor shall provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. The bulletin board shall be located at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.
Legible copies of the aforementioned data shall be displayed until work is completed. Upon completion of work the bulletin board shall be removed by and remain the property of the Contractor.
3.3.2 Project and Safety Signs
The requirements for the signs, their content, and location shall be as indicated on the web site provided in paragraph CONSTRUCTION FORMS AND DETAILS below. On the Safety Performance Sign, replace the Safety Green First Aid Logo with the Safety Pays Logo indicated on the web site provided in paragraph CONSTRUCTION FORMS AND DETAILS below with the color pattern as shown. The Safety Pays Logo shall have a bottom width of 8 inches, and be placed 2 inches from the top of the sign and centered between Legend Group 1 and the right edge. The signs shall be erected within 15 days after receipt of the Notice to Proceed. The data required by the safety sign shall be corrected daily, with light colored metallic or non-metallic numerals. Upon completion of the project, the signs shall be removed from the site.
3.4 PROTECTION AND MAINTENANCE OF TRAFFIC
During construction the Contractor shall provide access and temporary relocated roads as necessary to maintain traffic. The Contractor shall maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the State and local authorities having jurisdiction. The traveling public shall be protected from damage to person and property.
The Contractor's traffic on roads selected for hauling material to and from the site shall interfere as little as possible with public traffic.
The Contractor shall investigate the adequacy of existing roads and the allowable load limit on these roads. The Contractor shall be responsible
SECTION 01 50 02 Page 8 for the repair of any damage to roads caused by construction operations.
3.4.1 Barricades
The Contractor shall erect and maintain temporary barricades to limit public access to hazardous areas. Such barricades shall be required whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic.
Barricades shall be securely placed, clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.
3.5 HAUL AND ACCESS ROADS
The Contractor shall, at its own expense, construct access and haul roads necessary for proper prosecution of the work under this contract. Haul roads shall be constructed with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic shall be avoided. The Contractor shall provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control shall be adequate to ensure safe operation at all times.
Location, grade, width, and alignment of construction and hauling roads shall be subject to approval by the Contracting Officer. Lighting shall be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations. Upon completion of the work and as directed by the Contracting Officer, remove and dispose of portions of any contractor constructed access and haul roads. The Contracting Officer will require removal of road segments which, in his determination, impede proper function or maintenance of the permanent project features; adversely impact local stormwater drainage; or adversely impact environmentally sensitive areas. The access and haul road portions removed shall be graded to approximately match the original ground contours.
Where haul roads traverse an environmentally sensitive area or if located on the crest of an earthen embankment, one-way haul roads are preferred.
Haul roads built and maintained for this work shall comply with the following:
a. One-way haul roads for off-the-road equipment; e.g., belly dumps, scrapers, and off-the-road trucks shall have a minimum usable width of 25 ft. One-way haul roads for over-the-road haulage equipment only (e.g., dump trucks, etc.) may be reduced to a usable width of 15 feet. When the Contracting Officer determines that it is impractical to obtain the required width for one-way haul roads (e.g., a road on top of a levee), a usable width of not less than 10 feet may be approved by the Contracting Officer, provided a positive means of traffic control is implemented. Such positive means shall be signs, signals, and/or signalman and an effective means of speed control.
b. Two-way haul roads for off-the-road haulage equipment shall have a usable width of 60 feet. Two-way haul roads for over-the-road haulage equipment only may be reduced to a usable width of 30 feet.
c. Vertical and horizontal curvature, and sight distance shall be designed in accordance with AASHTO design criteria. When conditions make it impractical to obtain the required design criteria, a positive means of traffic control shall be implemented. All requirements of
SECTION 01 50 02 Page 9
EM 385-1-1 concerning access and haul roads shall apply.
d. Dust abatement shall permit observation of objects on the roadway at a minimum distance of 300 feet.
e. Haul roads shall have the edges of the usable portion marked with posts at intervals of 50 feet on curves and 200 feet maximum elsewhere. Such markers shall extend 6 feet above the road surface, and for nighttime haulage, be provided with reflectors in both directions.
3.6 MAINTENANCE OF HAUL AND ACCESS ROADS
The Contractor shall be responsible for providing and maintaining safe and passable means of ingress and egress to the site and to all project features on the site for Contractor, Government, and third party entities. Requirements herein shall apply to haul and access roads that are both new and existing. Haul and access roads shall be repaired and re-graded as necessary. Roadway drainage shall be maintained, including maintaining roadway crown and profile and keeping drainage ditches clear.
Potholes, mud holes, ruts, and/or depressions of 6 inches deep or more shall be repaired within 24 hours of discovery. Condition of haul and access roads shall be checked at least weekly and after any severe weather event. All requirements of EM 385-1-1 concerning access and haul roads also apply, see section 04.B.
3.7 CONTRACTOR'S TEMPORARY FACILITIES
The Contractor's field offices, staging areas, stockpile storage, and temporary buildings shall be placed in areas as directed by the Contracting Officer in accordance with Section 01 57 20 ENVIRONMENTAL PROTECTION. Temporary movement or relocation of Contractor facilities shall be made when approved by the Contracting Officer.
3.7.1 Contractor Field Office
Provide on-site field office of sufficient size and staff capability to manage project activities. Provide communications and computer capabilities to manage the work, including implementing RMS, facsimile, electronic mail, reproduction, to track schedule and cost. Contractor's field office should include a conference area with table and chairs to accommodate a minimum of 8 people. Provide handicap access with a 1 on 12 ramp and gravel parking spot marked with handicap parking sign. Provide high-speed internet services (4 Mbps or higher speed rate) and wireless capabilities to the field office facilities/compound to facilitate RMS, SharePoint (file transfer) and visitor usage.
3.7.1.1 Office Space for Government Personnel
The Contractor's field office shall also contain a 10-foot by 10-foot partitioned space (with locking door) to be made available for use by Government personnel in the Contractor's trailer with the following:
a. Two office desks with lockable drawers (60 inches by 30 inches, laminated top) and two swivel office chairs.
b. Five drawer, legal size, lockable filing cabinet.
c. A microwave oven and refrigerator.
SECTION 01 50 02 Page 10
3.7.2 Appearance of Trailer(s)
Trailer(s), used for both office and material storage purposes, shall be clean, neat exterior appearance and in good repair. Trailer(s) requiring exterior painting or maintenance will not be allowed on site until determined satisfactory by Contracting Officer.
3.7.3 Storage Area
Provide temporary six-foot high chain link fence for storage containers, trailers or sheds containing Government property. Fence posts may be driven. Ground chain link fence against lightning. Store Contracting Officer's property, owned materials and equipment within fenced storage area. Store small size Government property, equipment, tools, and materials in locked steel containers. No Government property and materials shall be stockpiled outside fence in preparation for next day's work. Park mobile equipment, tractors, wheeled lifting equipment, cranes, trucks, and like equipment, within fenced areas on weekends.
3.7.3.1 Maintenance of Storage Area
Fencing shall be kept in a state of good repair and proper alignment.
Should the Contractor elect to traverse, with construction equipment or other vehicles, grassed or unpaved areas which are not established roadways, such areas shall be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways; gravel gradation shall be at the Contractor's discretion. Grass located within the boundaries of the construction site shall be mowed for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers shall be edged or trimmed neatly.
3.7.4 Waste Storage
Provide dumpsters or suitable debris containers. Prevent windblown trash;
cover as needed. Dispose of offsite when needed. Refer to Section
01 57 20 ENVIRONMENTAL PROTECTION.
3.7.5 Fuel Storage and Fueling Operations
Refer to Section 01 57 20 ENVIRONMENTAL PROTECTION. Provide light when fueling at night.
3.8 SECURITY PLAN
Provide site security person at all times when there are no on-site activities. Maintain 24-hour security during weekends and holidays. Site security shall include, but not be limited, to:
a. Limit vehicular access to authorized vehicles and personnel only.
b. Limit public access to travel along access road only. Access road shall be kept closed at all times except for passage of authorized personnel and vehicles.
c. Maintain a list of authorized personnel and subcontractors available at site offices.
SECTION 01 50 02 Page 11
d. Maintain a sign-in log documenting visitors, deliveries, and security incidents. Include date, name, address, company, time in and time out for each employee and visitor.
e. Check fenced areas, equipment, trailers on a daily basis. If damage is observed or vandalism is found report to Contracting Officer.
3.8.1 Visitors
No visitors will be allowed on site without knowledge of Contractor and permission of Contracting Officer. Direct visitors to report upon arrival to Contractor's Field Office for site safety and accident prevention briefing. Provide visitors appropriate protective equipment (i.e., ear plugs, safety glasses, etc.).
3.9 TEMPORARY PROJECT SAFETY FENCING
As soon as practicable, but not later than 15 days after the date established for commencement of work, the Contractor shall furnish and erect temporary project safety fencing at the work site. The safety fencing shall be a high visibility orange colored, high density polyethylene grid or approved equal, a minimum of 42 inches high, supported and tightly secured to steel posts located on maximum 10 foot centers, constructed at the approved location. The safety fencing shall be maintained by the Contractor during the life of the contract and, upon completion and acceptance of the work, shall become the property of the Contractor and shall be removed from the work site.
3.10 CONSTRUCTION FENCING AND DANGER SIGNS
a. The Contractor shall furnish, install, and maintain barbed wire fencing along the entire right-of-way lines. The fence shall be installed prior to construction. The fence shall contain a minimum of four strands of barbed wire and be at least 4 feet in height. Access gates (size and quantity determined by the Contractor) shall be provided to permit movement of machinery and equipment. The fence shall be grounded to reduce possibilities of electrical shock. The fence shall be maintained to restrain the public until completion of construction.
b. The Contractor shall furnish 28 danger signs, as indicated on the sketch on the web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below, and post them on the fence at locations directed by the Contracting Officer. The signs shall be of the format, style, and minimum size indicated, shall be neatly and sturdily constructed, and shall be securely erected in a workmanlike manner to support the sign properly for the life of the contract.
c. Upon completion of construction and when so directed by the Contracting Officer, the fencing and signs shall be removed by the Contractor during the final cleanup process. The fencing and signs shall be disposed of by the Contractor in a manner satisfactory to the Contracting Officer.
3.11 ACCOMMODATIONS AND MEALS FOR INSPECTORS
a. The Contractor shall furnish regularly to inspectors, for office purposes, a suitable separate room on board the dredge or other craft upon which they are employed or, if not available thereon, shall
SECTION 01 50 02 Page 12 furnish suitable alternate accommodations ashore at a location approved by the Contracting Officer, and furnish suitable transportation between the alternate accommodations and the dredge or other craft upon which they are employed.
b. If the Contractor maintains on this work an establishment for the subsistence of the Contractor's own employees, the Contractor shall, when required, furnish to inspectors employed on the work, and to all Government agents who may visit the work on official business, meals of a quality satisfactory to the Contracting Officer. The meals furnished will be paid for by the Government employees at a rate no greater than the JTR meal rate per person for the county in which work is performed.
3.12 CLEANUP
Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away. Materials resulting from demolition activities which are salvageable shall be stored within the fenced area described above or at the supplemental storage area. Stored material not in trailers, whether new or salvaged, shall be neatly stacked when stored. Refer to Section 01 57 20 ENVIRONMENTAL PROTECTION for solid waste and post construction cleanup.
3.13 RESTORATION OF STORAGE AREA
Upon completion of the project and after removal of trailers, materials, and equipment from within the fenced area, the fence shall be removed and will become the property of the Contractor. Areas used by the Contractor for the storage of equipment or material, or other use, shall be restored to the original or better condition. Gravel used to traverse grassed areas shall be removed and the area restored to its original condition, including top soil and seeding as necessary.
3.14 CONSTRUCTION FORMS AND DETAILS
See the "Construction Forms & Details" module at the following web address:
http://www.saj.usace.army.mil/About/Divisions-Offices/Engineering/Design-Branch/ Specifications-Section/
-- End of Section --
SECTION 01 50 02 Page 13
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 20 23
DREDGING
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DREDGING RESTRICTIONS
1.4.1 Order of Work
1.4.2 Transportation of Material
1.5 SPECIAL INSTRUCTIONS
1.5.1 Debris Removal
1.6 PUMPING OF BILGES
1.7 HISTORICAL PERIOD SHIPWRECK SITES
1.8 UTILITY…