AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

HERBERT HOOVER DIKE REHABILITATION, STRUCTURE REPLACEMENT S-284 (HP-5) RECONSTRUCTION, GLADES COUNTY, FLORIDA

A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.

B. THE PROPOSAL DUE DATE REMAIN UNCHANGED 29 JANUARY 2019 @ 2:00 P.M. LOCAL TIME.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED

1. CONTRACT ID CODE PAGE OF PAGES

1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP18R0042

X 9B. DATED (SEE ITEM 11)

06-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jan-2019

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EP-18-R-0042 Amendment 0004

SF 30 CONTINUATION

SHEET

Herbert Hoover Dike Rehabilitation, Structure Replacement S-284 (HP-5) Reconstruction

Amendment 0004

SUMMARY OF CHANGES

1. SPECIFICATIONS:

The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.

Changes to Specifications:

The changes includes the following:

Revised section 02 41 00 to clarify stockpiling of existing stone existing stone for

Government use and to revise drawing S-67 due to a change of the cofferdam length.

Volume 1 of 2 – Technical Specifications:

N/A.

Volume 2 of 2 – Technical Specifications:

DELETE Section 02 41 00 and REPLACE with the attached revised Section 02 41 00.

2. DRAWINGS:

DELETE Drawing S-67 and REPLACE with the attached revised Drawing S-67.

(End of Summary of

Changes)

Her ber t Hoover Di ke Rehabi l i t at i on, St r uct ur e Repl acement s S- 284 ( HP- 5) Reconst r uct i on, Gl ades Count y, Fl or i da

SECTI ON TABLE OF CONTENTS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

SECTI ON 02 41 00

DEMOLITION

PART 1 GENERAL

1. 1 REFERENCES

1. 2 PROJECT DESCRI PTI ON

1. 2. 1 Demol i t i on/ Deconst r uct i on Pl an

1. 2. 2 Gener al Requi r ement s

1. 3 BURNI NG

1. 4 SUBMI TTALS

1. 5 QUALI TY ASSURANCE

1. 5. 1 Dust and Debr i s Cont r ol

1. 6 PROTECTI ON

1. 6. 1 Pr ot ect i on of Per sonnel

PART 2 PRODUCTS

2. 1 FI LL MATERI AL

PART 3 EXECUTI ON

3. 1 EXI STI NG FACI LI TI ES TO BE REMOVED

3. 1. 1 St r uct ur es

3. 1. 2 Chai n Li nk Fenci ng

3. 1. 3 Concr et e

3. 1. 4 St r uct ur al St eel

3. 1. 5 St one

3. 2 DI SPOSI TI ON OF MATERI AL

3. 2. 1 Ti t l e t o Mat er i al s

3. 2. 2 Sal vaged Mat er i al s and Equi pment

3. 2. 3 Unsal vageabl e and Non- Recycl abl e Mat er i al

3. 3 CLEANUP

3. 4 DI SPOSAL OF REMOVED MATERI ALS

3. 4. 1 Regul at i on of Removed Mat er i al s

3. 4. 2 Bur ni ng on Gover nment Pr oper t y

3. 4. 3 Removal f r om Gover nment Pr oper t y

3. 5 REUSE OF SALVAGED I TEMS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 02 41 00 Page 1

SECTI ON 02 41 00

DEMOLITION

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF SAFETY ENGI NEERS ( ASSE/ SAFE)

ASSE/ SAFE A10. 6 ( 2006) Saf et y Requi r ement s f or Demol i t i on Operations

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

The most r ecent USACE EM 385- 1- 1 can be v i ewed at t he web si t e i ndi cat ed i n Section 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS.

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

40 CFR 61 Nat i onal Emi ssi on St andar ds f or Hazar dous Ai r Pol l ut ant s

1. 2 PROJECT DESCRI PTI ON

1. 2. 1 Demol i t i on/ Deconst r uct i on Pl an

Pr epar e a Demol i t i on Pl an and submi t pr oposed demol i t i on and r emoval pr ocedur es f or appr oval bef or e wor k i s st ar t ed. Ref er t o const r uct i on and r esour ce dr awi ngs. I ncl ude i n t he pl an pr ocedur es f or car ef ul r emoval and di sposi t i on of mat er i al s speci f i ed t o be sal vaged, coor di nat i on wi t h ot her wor k i n pr ogr ess, a det ai l ed descr i pt i on of met hods and equi pment t o be used f or each oper at i on and of t he sequence of oper at i ons. I dent i f y component s and mat er i al s t o be sal vaged f or r eused or r ecycl i ng wi t h r ef er ence t o subpar agr aph " Exi st i ng Faci l i t i es t o be Removed" . Append t r acki ng f or ms f or al l r emoved mat er i al s i ndi cat i ng t ype, quant i t i es, condi t i on, dest i nat i on, and end use. Coor di nat e wi t h Wast e Management Pl an. Pr ovi de pr ocedur es f or saf e conduct of t he wor k i n accor dance wi t h EM 385- 1- 1. Pl an shal l be appr oved by t he Cont r act i ng Of f i cer pr i or t o wor k begi nni ng.

1. 2. 2 Gener al Requi r ement s

Do not begi n demol i t i on unt i l aut hor i zat i on i s r ecei ved f r om t he Cont r act i ng Of f i cer . Remove r ubbi sh and debr i s f r om t he pr oj ect s i t e; do not al l ow accumul at i ons. The wor k i ncl udes demol i t i on, sal vage of i dent i f i ed i t ems and mat er i al s, and r emoval of r esul t i ng r ubbi sh and debr i s. Remove r ubbi sh and debr i s f r om Gover nment pr oper t y dai l y, unl ess

SECTI ON 02 41 00 Page 2 ot her wi se di r ect ed. St or e mat er i al s t hat cannot be r emoved dai l y i n ar eas speci f i ed by t he Cont r act i ng Of f i cer . I n t he i nt er est of occupat i onal saf et y and heal t h, per f or m t he wor k i n accor dance wi t h EM 385- 1- 1, Sect i on 23, Demol i t i on, and ot her appl i cabl e Sect i ons.

1. 3 BURNING

Compl y wi t h Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

Demol i t i on Pl an; G, RO

1. 5 QUALI TY ASSURANCE

Submi t t i mel y not i f i cat i on of demol i t i on pr oj ect s t o Feder al , St at e, r egi onal , and l ocal aut hor i t i es i n accor dance wi t h 40 CFR 61, Subpar t M.

Not i f y t he Cont r act i ng Of f i cer i n wr i t i ng 10 wor ki ng days pr i or t o t he commencement of wor k i n accor dance wi t h 40 CFR 61, Subpar t M. Compl y wi t h f eder al , st at e, and l ocal haul i ng and di sposal r egul at i ons. I n addi t i on t o t he r equi r ement s of t he " Cont r act Cl auses, " conf or m t o t he saf et y r equi r ement s cont ai ned i n ASSE/ SAFE A10. 6. Use of expl osi ves wi l l not be permitted.

1. 5. 1 Dust and Debr i s Cont r ol

Pr event t he spr ead of dust and debr i s and avoi d t he cr eat i on of a nui sance or hazar d i n t he sur r oundi ng ar ea. Do not use wat er i f i t r esul t s i n hazar dous or obj ect i onabl e condi t i ons such as, but not l i mi t ed t o, i ce, f l oodi ng, or pol l ut i on.

1. 6 PROTECTION

1. 6. 1 Pr ot ect i on of Per sonnel

Bef or e, dur i ng and af t er t he demol i t i on wor k, cont i nuousl y eval uat e t he condi t i on of t he st r uct ur e bei ng demol i shed and t ake i mmedi at e act i on t o pr ot ect al l per sonnel wor ki ng i n and ar ound t he pr oj ect s i t e. No ar ea, sect i on, or component of f l oor s, r oof s, wal l s, col umns, pi l ast er s, or ot her st r uct ur al el ement wi l l be al l owed t o be l ef t st andi ng wi t hout suf f i c i ent br aci ng, shor i ng, or l at er al suppor t t o pr event col l apse or f ai l ur e whi l e wor kmen r emove debr i s or per f or m ot her wor k i n t he i mmedi at e ar ea.

PART 2 PRODUCTS

2. 1 FI LL MATERI AL

a. Compl y wi t h excavat i ng, backf i l l i ng, and compact i ng pr ocedur es f or soi l s used as backf i l l mat er i al t o f i l l voi ds, depr essi ons or excavat i ons r esul t i ng f r om demol i t i on of st r uct ur es.

SECTI ON 02 41 00 Page 3

Herbert Hoover Dike Rehabilitation, Structure Replacements S-284 (HP-5) Reconstruction, Glades County, Florida

b. Fill material shall conform to Section 35 41 00 EMBANKMENT

CONSTRUCTION.

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Inspect and evaluate existing structures onsite, and review construction and resource drawings. Existing construction scheduled to be removed for salvage shall be disassembled. Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.

3.1.1 Structures

a. Remove existing structures above excavation grades shown on construction drawings, except those items to be salvaged.

b. Demolish structures in a systematic manner from the top of the structure to the ground. Demolish concrete in small sections.

c. Locate demolition equipment throughout the structure and remove materials so as to not impose excessive loads to supporting members.

3.1.2 Chain Link Fencing

Salvage existing chain link fencing in a manner to prevent damage.

Transport fencing and components to a designated area as directed by the Contracting Officer. Scrap metal shall become the Contractor's property.

3.1.3 Concrete

Saw or break concrete and dispose off site.

3.1.4 Structural Steel

Dismantle and remove structural steel sheet pile at field connections and in a manner that will prevent bending or damage. Existing sheet pile may have tie backs and anchors. Salvage for reuse or recycle structural steel sheet pile, cap, tie rods and dead man anchors. Flame-cutting torches are permitted when other methods of dismantling are not practical. Transport structural steel shapes to a designated area as directed by the Contracting Officer, stacked according to size, type of member and length, and stored off the ground, protected from the weather.

3.1.5 Stone

Remove existing stone riprap and stockpile onsite. and stockpile for Government use.

3.2 DISPOSITION OF MATERIAL

3.2.1 Title to Materials

Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting

SECTION 02 41 00 Page 4 from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

3.2.2 Salvaged Materials and Equipment

Remove materials and equipment that are indicated in the drawings and specified herein to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site, as directed within 45 miles of the work site.

a. Salvage items and material to the maximum extent possible.

b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. On site sales of salvaged material is prohibited.

c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and pack or crate to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers. Deliver the following items reserved as property of the Government to the areas designated:

(1) Stockpile existing riprap for Government use. (1) Existing riprap shall be stockpiled for reuse by the South Florida Operations Office.

(2) Culvert flap gates, winch assembly including cables, hoists, and sheaves. Deliver to South Florida Operations Office (SFOO).

(3) Culvert slide gates, gate frame, actuators, associated telemeter and instrumentation, and associated control equipment.

Coordinate with the Contracting Officer for delivery location.

3.2.3 Unsalvageable and Non-Recyclable Material

Dispose of unsalvageable and non-recyclable material off the site in accordance with federal, state and local laws and regulations.

3.3 CLEANUP

Remove debris and rubbish from excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas.

Apply local regulations regarding hauling and disposal.

3.4 DISPOSAL OF REMOVED MATERIALS

3.4.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations off the site in accordance with federal, SECTION 02 41 00 Page 5 state and local laws and regulations. Storage of removed materials on the project site is prohibited.

3.4.2 Burning on Government Property

Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.

3.4.3 Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed by the Contracting Officer and in accordance with Section 01 57 20 ENVIRONMENTAL PROTECTION.

3.5 REUSE OF SALVAGED ITEMS

Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.