About this file

18R0042 Plans 03 HHDRCRHP5

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

040' 40' 80'

N

LANDSIDE

C-41

HARNEY POND CANAL

LAKESIDE

A C -0

S D

ROAD/COFFERDAM

CREST OF BY-PASS

ROAD/COFFERDAM

TOE OF BY-PASS

R.O.W.

FEDERAL

CONSTRUCTION

LIMITS OF

PLUG CREST

EARTHEN

ACCESS

CONSTRUCTION

EASEMENT

CONSTRUCTION

SEE NOTE 9

BARRIER

CONCRETE

ELEVATION

EXISTING

MATCH

ELEVATION

MATCH EXISTING

CATTLE FENCE

EXISTING

CONNECT TO

AREAS

STORAGE

RIPRAP TO

RELOCATE

NOTES:

C-01

C

IV

IL

M C

C W

H C

D R

B Y -P

A S

S R

O A

D /C

O F F

E R

D A

M P

L A

N

P H

A S

E I

-H

H D

R C

R H

P -C

.D

G N

12. POSTED SPEED LIMIT ALONG BYPASS ROAD SHALL NOT EXCEED 15 MPH.

MATCH LENGTH SHOWN.

11. POSITION GATE ACROSS EMBANKMENT CREST. ADD GUARDRAIL AS NECCESSARY TO

SEMINOLE TRIBE OF FLORIDA THROUGHOUT THE DURATION OF CONSTRUCTION.

ACCESSIBLE FOR VEHICULAR TRAFFIC TO THE GOVERMENT, STATE OF FLORIDA AND

THROUGHOUT THE DURATION OF CONSTRUCTION. THE BY-PASS ROAD MUST REMAIN

10. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE BY-PASS ROAD

BY-PASS ROAD AS SHOWN. SEE DRAWING C-03.

9. INSTALL FDOT TEMPORARY CONCRETE BARRIERS ON BOTH SIDES OF COFFERDAM

CONSTRUCTION.

8. CLEAR AND GRUB AREAS OF EARTHEN PLUGS AND COFFERDAM PRIOR TO

COFFERDAM.

7. REFER TO STRUCTURAL DRAWINGS FOR ELEVATIONS OF LAKESIDE DRIVEN PILE

INCLUDING TURBIDITY BARRIERS PER THE SPECIFICATIONS.

6. CONTRACTOR SHALL PROVIDE A TURBIDITY CONTROL AND MONITORING PLAN,

INFRASTRUCTURE. SET ASIDE FOR SEMINOLE TRIBE OF FLORIDA TO COLLECT.

5. DISASSEMBLE PUMP STATION, PUMP, ENGINE AND ALL APPURTENANT

EARTHEN AND SHEET PILE COFFERDAMS.

COR. THE EMBANKMENT SHALL NOT BE GRADED OUTSIDE THE LIMITS OF THE

UNTIL THE COFFERDAM SYSTEMS ARE IN PLACE, COMPLETE AND APPROVED BY THE

4. NO PORTION OF THE EXISTING EMBANKMENT SHALL BE DEGRADED OR EXCAVATED

INSTALLATION OF THE TEMPORARY COFFERDAM.

3. BY-PASS PUMPING SYSTEM SHALL BE FULLY OPERATIONAL BEFORE BEGINNING

ON SITE FOR GOVERNMENT USE. SEE DRAWING G-04 FOR STORAGE AREA.

2. EXISTING RIPRAP REMOVED TO ACCOMMODATE CONSTRUCTION TO BE STOCKPILED

NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88).

1. ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND ARE REFERENCED TO THE

F C

E

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

IC

T

C O

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

R

E

C -03

R 0'

E 632545.88

N 980789.61

PC STA. 3+24.52

E

.7

N

.7

P

T S

T A . 4

.2

E .5

N .9

P T S

T A .8

E 6

6.5

N

.39

PC

STA.

9+ .23

E

.9

N

.9

P

C S

T A . 5

.7

E .4

N .9

P T S

T A .4

E .9

N .6

P C S

T A .2

E 6

1.9

N

.63

PT S

TA.

8+ .21

R 80'

C

C -0

E .4

N .0

P C S

T A .1 .8

R

24'

R

R

E

.8

N

.0

P T S

T A .5

E

.1

N

.0

S T

A .7

E N

D C

O N

S T on T Y P

1 on 4 (TYP.)

D

C-03

TOP EL. 25.0

COFFERDAM

DRIVEN PILE

E 632917.24

N 981059.15

COFFERDAM

DRIVEN PILE

CENTERLINE

E 632682.91

N 980561.00

E 632611.03

N 980795.07

TRANSITION

BEGIN ROADWAY

E 632588.08

N 980800.41

TRANSITION

END ROADWAY

E 632748.71

N 980769.05

PT STA. 1+20.64

E

.1

N

.6

S

T A . 0

.0

B

E G

IN

C

O N

S T .0

R 100'

E 632917.24

N 980882.81

COFFERDAM

DRIVEN PILE

CENTERLINE

E 632898.58

N 981107.76

COFFERDAM

DRIVEN PILE

CENTERLINE

E 632898.58

N 981189.22

COFFERDAM

DRIVEN PILE

CENTERLINE

E 632897.89

N 981156.93

EARTHEN PLUG

CENTERLINE

E 632839.23

N 981217.09

EARTHEN PLUG

CENTERLINE

E 632794.59

N 981414.00

E 632840.87

N 981450.50

E 632851.09

N 981454.45

E 632857.72

N 981501.57

REMOVED WITHIN LIMITS SHOWN

WIRE CATTLE FENCE TO BE

EXISTING 5 STRAND BARBED

PASS ROAD/COFFERDAM

NECESSARY TO CONSTRUCT BY-

CATTLE FENCE AND 12' GATE AS

CONSTRUCT NEW 4' GALVANIZED

E 632752.68

N 981361.30

TRANSITION

BEGIN ROADWAY

E 632775.21

N 981389.89

TRANSITION

END ROADWAY

STATION. SEE NOTE 5

DISASSEMBLE PUMP

LIMITS

WETLAND

FENCE

EXISTING CATTLE

LOCATION OF

APPROXIMATE

ASIDE, SEE NOTE 5

REMOVE AND SET FUEL TANK

REMOVE AND DISPOSE OF FUEL,

COFFERDAM WALL

FENCE TO VERTICAL

EXTEND EXISTING CATTLE

@ STA. 7+81.35

END VERTICAL WALL

@ STA. 7+75.68

END VERTICAL WALL

E 632407.40

N 980972.62

OF VERTICAL WALL

FENCE AT BEGINNING

GALVANIZED CATTLE

TERMINATE NEW 4'

@ STA. 5+97.48

BEGIN VERTICAL WALL

PLUG TOE

EARTHEN

PLUG TOE

EARTHEN

E 632894.05

N 980831.66

COFFERDAM

DRIVEN PILE

CENTERLINE

E 632893.36

N 980864.13

EARTHEN PLUG

CENTERLINE

E 632834.64

N 980864.13

EARTHEN PLUG

CENTERLINE

E 632894.05

N 980824.05

COFFERDAM

DRIVEN PILE

CENTERLINE

PLUG CREST

EARTHEN

EMBANKMENT

TOP OF EXISTING

ELEVATION

MATCH EXISTING

(TYP.)

SEE NOTE 2

SLOPE

1 ON 3

SLOPE

1 ON 1 1/2

SLAB, TO BE REMOVED

EXISTING CONCRETE

R 100'

SLOPE

1 ON 3

SEE NOTE 11.

WITHIN LIMITS SHOWN,

GATE TO BE RELOCATED

EXISTING GUARDRAIL AND

SLOPE

1 ON 3

TO STORAGE AREAS

RELOCATE RIPRAP

AND GATE. SEE NOTE 11

RELOCATED GUARDRAIL

B

C-03

1+00

2+00

3+00

E 632852.65

N 981509.98

E 632838.50

N 981566.66

E 632841.57

N 981626.25

E 632939.42

N 980639.42

PUMP LOCATION

SUGGESTED BY-PASS

PUMP LOCATION

SUGGESTED BY-PASS

PUMP PIPE ALIGNMENT

SUGGESTED BY-PASS

E 632730.73 N 981381.75

TRANSITION

BEGIN ROADWAY

E 632757.65 N 981406.25

TRANSITION

END ROADWAY

-1

D

IR

T

R

O A

D

DIRT ROAD

-1

-10 -10

-10

-10

-1

-10

-10

-10

-10

-10

-5

-5

-5

-5

-5

-5

-5 -5

-5

-5

-5

-5 -5

-5 -5

-5 -5-5

-5

LANDSIDE

C-41

HARNEY POND CANAL

LAKESIDE

EMBANKMENT

TOP OF EXISTING

CONSTRUCTION

LIMITS OF

EASEMENT

CONSTRUCTION

F E

N C

E

FENCE

G R

A V

E L

NOTES:

C-02

C

IV

IL

N

M C

C W

H C

D R

B Y -P

A S

S R

O A

D /C

O F F

E R

D A

M C

O N

T O

U R P

L A

N

P H

A S

E I

80'40'040'

PER THE SPECIFICATIONS.

AND MONITORING PLAN, INCLUDING TURBIDITY BARRIERS

4. CONTRACTOR SHALL PROVIDE A TURBIDITY CONTROL

LIMITS OF THE EARTHEN AND SHEET PILE COFFERDAMS.

THE EMBANKMENT SHALL NOT BE GRADED OUTSIDE THE

SYSTEMS ARE IN PLACE, COMPLETE AND APPROVED.

DEGRADED OR EXCAVATED UNTIL THE COFFERDAM

3. NO PORTION OF THE EXISTING EMBANKMENT SHALL BE

SHOWN DASHED.

CONTOURS ARE SHOWN BOLD. EXISTING CONTOURS ARE

2. PROPOSED EARTHEN PLUG, BYPASS ROAD/COFFERDAM

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

1. ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

-H

H D

R C

R H

P -C

.D

G N

F C

E

S D

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

5 5

101010

15 15

15 15

20 20

20 20 2

25 25

25 25

30 30

TOP EL. 25.0

COFFERDAM

DRIVEN PILE

CONSTRUCTION

AND POLE DURING

PROTECT GUY WIRE

R.O.W.

FEDERAL

ROAD/COFFERDAM

CREST OF BY-PASS

ROAD/COFFERDAM

TOE OF BY-PASS

PLUG TOE

EARTHEN

PLUG TOE

EARTHEN

CREST

PLUG

EARTHEN

CREST

PLUG

EARTHEN

LIMITS

WETLAND

C

DRIVEN PILE COFFERDAM

EL. 26.0'

EL. 22.0

EL. 22.0

24'

EL. 22.0

30'

30'

C

C

C

C

C

C

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

GRADE

EXISTING

GRADE

EXISTING

EL. 26.0

PLUG

EARTHEN

FILL TYPE

SEE NOTE 6 FOR

EMBANKMENT FILL

COFFERDAM

BY-PASS ROAD/

TO FDOT INDEX 415

BARRIER, REFER

FDOT TYPE NJ SHAPE

GRADE

EXISTING

OF SLOPE

GEOTEXTILE 6" FROM FACE

BOTTOM OF FILL. TERMINATE

GEOTEXTILE @ 3' O.C. FROM

EMBANKMENT FILL

REINFORCED FILL

EMBANKMENT FILL

(THIS SHEET)

SEE DETAIL

BARRIER

TEMPORARYCOFFERDAM

BY-PASS ROAD/

COFFERDAM

BY-PASS ROAD/

(THIS SHEET)

SEE DETAIL

BARRIER

TEMPORARY

CONTRACTOR

AND CONSTRUCTED BY THE

VERTICAL WALL DESIGNED

WALL FILL, SEE NOTE 7

REINFORCED VERTICAL

NOTES:

-H

H D

R C

R H

P -C

F .D

G N

C

IV

IL

P H

A S

E I C

O F F

E R

D A

M C

R O

S S S

E C

T

IO

N S

C-03

40'20'020'

LANDSIDE LAKESIDE

EL. 25.0

SEE STRUCTURAL DRAWINGS.

5' MIN. SHEET PILE TIE BACK.

EL. 25.0

DRIVEN PILE COFFERDAM

EARTHEN PLUG

M C

C W

H C

D R

DRIVEN PILE COFFERDAM

1.5

10'

VERTICAL WALL DESIGN.

REINFORCED VERTICAL WALL FILL WILL BE SPECIFIED BY THE CONTRACTOR AS PART OF THE

GROUNDWATER, THEN TRANSITION TO EMBANKMENT FILL.

REFER TO SPECIFICATION FOR PLACEMENT OF FILL IN WET AREAS. SELECT FILL TO 2 FEET ABOVE

REFER TO STRUCTURAL DRAWINGS FOR ELEVATIONS OF LAKE SIDE DRIVEN PILE COFFERDAM.

ELEVATION SHOWN SHALL BE MAINTAINED THROUGHOUT THE SERVICE LIFE OF THESE FEATURES.

NOT DISPLACED/REMOVED DURING INSTALLATION OF THE LANDSIDE COFFERDAM. CREST

MENT DUE TO CONSOLIDATION OF ORGANIC OR UNCONSOLIDATED FINE FOUNDATION SOILS

FOR FILL PLACED IN THE WET, THE CONTRACTOR SHALL ANTICIPATE UP TO 2 FEET OF SETTLE-

IN LAKE OKEECHOBEE/C-41 CANAL.

REFER TO SPECIFICATIONS FOR OPERATIONAL AND HISTORICAL RANGE OF WATER LEVELS

TURBIDITY BARRIERS PER THE SPECIFICATIONS.

CONTRACTOR SHALL PROVIDE A TURBIDITY CONTROL AND MONITORING PLAN, INCLUDING

AMERICAN VERTICAL DATUM 1988 (NAVD88).

ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND ARE REFERENCED TO THE NORTH

7.

6.

5.

4.

3.

2.

1.

-10

0+00 1+00 2+00 3+00 4+00

E L

E V

A T

IO

N

-10

-10

0+00 1+00

E L

E V

A T

IO

N

E L

E V

A T

IO

N

-10

-10

0+00 1+00

E L

E V

A T

IO

N

E L

E V

A T

IO

N

-10

E L

E V

A T

IO

N

5+25

-10

-10

0+00

E L

E V

A T

IO

N

E L

E V

A T

IO

N

5+00

1+00 1+25

-10

-10

0+00

E L

E V

A T

IO

N

E L

E V

A T

IO

N

1+00 1+25

COFFERDAM CROSS SECTION

C-01

A

C-01

B EARTHEN PLUG CROSS SECTION

C-01

C EARTHEN PLUG CROSS SECTION

C-01

D

FDOT TEMPORARY CONCRETE BARRIER

LANDSIDE COFFERDAM CROSS SECTION

C-01

E LANDSIDE COFFERDAM CROSS SECTION

SECTION

NOTE 4

RECP, SEE

GEOTEXTILE

STONE

6" BEDDING

GEOTEXTILE

TYPE I

IMPORT RIPRAP NOTE 4

RECP, SEE

C-04

E

NOT TO SCALE5'

6" LIMEROCK

30'

C-04

D

NOT TO SCALE

6" LIMEROCK

30'

6" LIMEROCK

30' 5'

1' 1'

LANDSIDE

LANDSIDE

LAKESIDE

COFFERDAM ARMORING PLAN

KEY DETAIL

KEY DETAIL

EARTHEN PLUG CROSS SECTION

EARTHEN PLUG CROSS SECTION

SECTION

80'40'40' 0

"A"

"B" 010' 10' 20'

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

STONE

6" BEDDING

GEOTEXTILE

GEOTEXTILE

12" KEY-IN

STONE

6" BEDDING

GEOTEXTILE

GEOTEXTILE

12" KEY-IN

SOD

HPTRM AND

SOD

HPTRM AND

STONE

6" BEDDING

SOD

HPTRM AND

IMPORT RIPRAP, TYPE I

STONE

6" BEDDING

SOD

HPTRM AND

IN PHASE II

TOP OF GEOTEXTILE

TO BE SHINGLED ON

EXTEND 3' HPTRM

AND SOD

HPTRM

EXTEND 3'

TYPE I

IMPORT RIPRAP

IMPORT RIPRAP, TYPE I

STONE

6" BEDDING

GEOTEXTILE

RIPRAP

IMPORT

TYPE I

RIPRAP

IMPORT

TYPE I

G R

A V

E L

G U

Y

A

C H

O R

S

W O

D

P

W E

R

L E

F E

N C

E

FENCE

C-04

SCALE: A

LANDSIDE

LAKESIDE

SCALE: BC-04

B

C-04

C-04

C-04

NOT TO SCALE

5'

10'

10'

1.5

MIN.

12"

MIN.

12"

M

IN

C-04

NOT TO SCALE

M

IN

MIN.

12"

MIN.

12"

SCALE: BC-04

A

5'

5'

C-08

C-04

C

NOT TO SCALE

STRUCTURE

EXISTING

EXISTING RIPRAP

TOE

EARTHEN PLUG

CREST

EARTHEN PLUG

EXISTNG GRADE

TOE

EARTHEN PLUG

CREST

PLUG

EARTHEN

GRADE

EXISTING

EXISTNG FENCE

EXISTNG FENCE

WALL

VERTICAL

GRADE

EXISTING

BARRIER

TEMP. SEDIMENT

LINE

WETLAND

EASEMENT

CONST.

COFFERDAM

DRIVEN PILE

R.O.W.

FEDERAL

LEGEND

GEOTEXTILE

GEOTEXTILE

COFFERDAM

EDGE OF

MIN. 10' FROM

EASEMENT

CONSTRUCTION

STRUCTURE

EXISTING

AND BEDDING STONE

TYPE I, RIPRAP, GEOTEXTILE

@ STA. 7+92 ±

BEGIN RIPRAP

@ STA. 9+50 ±

END RIPRAP

LAKESIDE

LIMITS

WETLAND

NOTES:

C-04

HPTRM AND SOD

C -0

D

LIMEROCK

RECP (SEE NOTE 4)

5.

4.

3.

2.

1.

JERSEY BARRIER.

KEYED IN ALONG BOTH EDGES, APPROXIMATELY UNDER

GEOTEXTILE ACROSS COFFERDAM CREST ROAD SHALL BE

RECOMMENDATION.

ANCHOR AND INSTALL RECP PER MANUFACTURER'S

INSTALLATION MAY REQUIRE PLACEMENT IN THE WET.

TION, SOME GEOTEXTILE, BEDDING STONE AND RIPRAP

DEPENDING ON WATER LEVELS AT THE TIME OF CONSTRUC-

THE SPECIFICATIONS.

MONITORING PLAN, INCLUDING TURBIDITY BARRIERS PER

CONTRACTOR SHALL PROVIDE A TURBIDITY CONTROL AND

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

A

C -04

B

C -0

E

C -0

4C

EMBANKMENT

TOP OF

-H

H D

R C

R H

P -C

F .D

G N

C

IV

IL

P H

A S

E I C

O F F

E R

D A

M A

M O

R

IN

G

J

U L

Y

P L

A N A

N D S

E C

T

IO

N S

M C

C W

H C

D

D

IR

T

R

O A

D

D

IR

T

R

O A

D

1 on 4

A C -0

A C -0

B C -0

B C -0 on

C-41

HARNEY POND CANAL

1 on 3 on

FENCE

G R

A V

E L

C

C-07

FENCE

S D

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

R

IP

R

A P

E D

G E O

F

C A N

A L

LANDSIDE

LAKESIDE

EXCAVATION

LIMITS OF

EL. 25.0

COFFERDAM

DRIVEN PILE

DISCHARGE PIPE

EXISTING 48"

ELECTRIC

EXISTING BURIED

ELECTRIC

EXISTING BURIED

ELECTRIC

EXISTING OVERHEAD

TRANSITION

SLOPE

TRANSITION

SLOPE

EL. 25.0

COFFERDAM

DRIVEN PILE

E 632617.58

N 981158.69

COFFERDAM

DRIVEN PILE

CENTERLINE

E 632617.58

N 981013.10

COFFERDAM

DRIVEN PILE

CENTERLINE

R-04 TO R-13

CONSTRUCTION. SEE DRAWINGS

AND THRUSTBLOCK DURING

PROTECT 48" DISCHARGE PIPE

(PHASE I)

EXISTING EARTHEN PLUG CREST

(PHASE I)

EXISTING EARTHEN PLUG TOE

(PHASE I)

EXISTING EARTHEN PLUG CREST

(PHASE I)

EXISTING EARTHEN PLUG TOE

R.O.W.

FEDERAL

(PHASE I)

ROAD/COFFERDAM

EXISTING BY-PASS

C

IV

IL

C-05

P H

A S

E I I

E X

C A

V A

T

IO

N P

L A

N

N

-H

H D

R C

R H

P -C

F .D

G N

60'30'030'

NOTES:

M C

C W

H C

D R

3.

2.

1.

SECTION 35 41 00 EMBANKMENT CONSTRUCTION.

SECTIONS 01 57 20 ENVIRONMENTAL PROTECTION AND

CONTRACTOR'S RESPONSIBILITY. SEE SPECIFICATION

THE REQUIRED DEWATERING PERMITTING IS THE

REQUIRED DEWATERING OF THE CONSTRUCTION SITE.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

STRUCTURES.

LOCATION DETAILS AND DEMOLITION OF EXISTING

SEE AS-BUILT DRAWINGS R-01 THROUGH R-03 FOR

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

D

IR

T

R

O A

D

-1

-10 -10

-10

-10

-1

-10

-10

-10

-10

-5

-5

-5

-5

-5 -5

-5 -5

-5

-5

-5

C-41

HARNEY POND CANAL

LAKESIDE

0 0

0 0

0 0

FENCE

G R

A V

E L

S D

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

C A N

A L

25 25

LANDSIDE

EXCAVATION

LIMITS OF

EXCAVATION

LIMITS OF

R.O.W.

FEDERAL

EASEMENT

CONSTRUCTION

EL. 25.0

COFFERDAM

DRIVEN PILE

(PHASE 1)

COFFERDAM

DRIVEN PILE

(PHASE I)

ROAD/COFFERDAM

EXISTING BY-PASS

(PHASE I)

ROAD/COFFERDAM

CREST OF BY-PASS

ROAD/COFFERDAM

TOE OF BY-PASS

1+00

2+00

3+00

(PHASE I)

EXISTING EARTHEN PLUG CREST

(PHASE I)

EXISTING EARTHEN PLUG TOE

(PHASE I)

EXISTING EARTHEN PLUG CREST

(PHASE I)

EXISTING EARTHEN PLUG TOE

AND GUY WIRES

EXISTING POWER POLE

C

IV

IL

C-06

P H

A S

E I I

E X

C A

V A

T

IO

N C

O N

T O

U R P

L A

N

N

-H

H D

R C

R H

P -C

F .D

G N

60'30'030'

NOTES:

SECTION 35 41 00 EMBANKMENT CONSTRUCTION.

SECTIONS 01 57 20 ENVIRONMENTAL PROTECTION AND

CONTRACTOR'S RESPONSIBILITY. SEE SPECIFICATION

THE REQUIRED DEWATERING PERMITTING IS THE

REQUIRED DEWATERING OF THE CONSTRUCTION SITE.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

SHOWN DASHED.

CONTOURS AFTER COFFERDAM CONSTRUCTION ARE

2. EXCAVATION CONTOURS ARE SHOWN BOLD. EXISTING

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

1. ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

M C

C W

H C

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

EMBANKMENT

EXISTING

PLUG

EXISTING

COFFERDAM

DRIVEN PILE

EMBANKMENT

EXISTING

EL. 0.0'

EXCAVATION GRADE

EL. 0.0'

EXCAVATION GRADE

EMBANKMENT

EXISTING

COFFERDAM

DRIVEN PILE

EL. 0.0'

GRADE

EXCAVATION

C-07

C

IV

IL

-H

H D

R C

R H

P -C

F .D

G N

NOTES:

J

U L

Y

4.

3.

2.

1.

P H

A S

E I I

E X

C A

V A

T

IO

N C

R O

S S S

E C

T

IO

N S

GRADE LINES SHOWN WITHOUT COR APPROVAL.

NO EXCAVATION SHALL EXTEND BELOW EXCAVATION

OF DRIVEN PILE COFFERDAM.

REFER TO STRUCTURAL DRAWINGS FOR ELEVATIONS

INFORMATION.

SEE R-01 THROUGH R-03 FOR EXISTING STRUCTURE

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

M C

C W

H C

D R

COFFERDAM

BY-PASS ROAD/

"A" 60'30'030'

SECTION

SCALE: A

A

C-05

SECTION

SCALE: A

B

C-05

1 1

VARIES

LANDSIDE LAKESIDE

184.00' ±

EL. 25.0'

VARIES

105.00' ±

142.53' ± 59.20' ±

SECTION

SCALE: A

C

C-05

EL. 25.0'

28.00' ±

-10

-10

E L

E V

A T

IO

N

E L

E V

A T

IO

N

-10

-10

E L

E V

A T

IO

N

E L

E V

A T

IO

N

-10

-10

E L

E V

A T

IO

N

E L

E V

A T

IO

C-08

80'40'40' 0

"A"

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

GEOTEXTILE

STONE

6" BEDDING

PHASE I

GEOTEXTILE

FILL

EMBANKMENT

STONE

6" BEDDING

C-08

C

C-08

C-08

C-08

E

.3

N

.7

LEGEND

AND RIPRAP

PHASE I - GEOTEXTILE, BEDDING STONE

NOTES:

2.

1.

STONE

PHASE II - GEOTEXTILE AND BEDDING

TURF REINFORCEMENT MAT) AND SOD

PHASE II - HPTRM (HIGH PERFORMANCE

RECOMMENDATION.

THE CONTRACTOR. ANCHOR PER THE MANUFACTURES

ANCHORING OF THE RECP IS THE RESPONSIBILITY OF

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

A

C-08

C -08

B

C

IV

IL

P H

A S

E I I

E X

C A

V A

T

IO

N S

E E

P A

G E P

R O

T E

C T

IO

N P

L A

N

M C

C W

H C

D R

-H

H D

R C

R H

P -C

F .D

G N

E 632871.28

N 981059.35

E 632810.44

N 981121.67

N

E 632780.39

N 980961.77

STONE

6" BEDDING PHASE I

HPTRM AND SOD

GEOTEXTILE

GEOTEXTILE

PHASE I

HPTRM AND SOD

DESIGN GRADE

DESIGN GRADE

STONE

6" BEDDING

COFFERDAM

DRIVEN PILE

FILL

EMBANKMENT

2'

2'

COFFERDAM

DRIVEN PILE

PHASE I

OVERLAP

HPTRM 3 FT.

PLUG

EARTHEN

EL. 15.0

EL. 0.0

EL. 0.0

EL. 15.0

PLUG

EARTHEN

HPTRM

PHASE I

HPTRM

PHASE I

PHASE II

HPTRM AND SOD

GEOTEXTILE

OVERLAP WITH

HPTRM TO 3 FT.

EXTEND PHASE I

SECTION

N.T.S.

A

C-08

SECTION

N.T.S.

B

C-08

SECTION

N.T.S.

C

C-08

DETAIL

N.T.S.

C-08

DETAIL

N.T.S.

C-08

FILTER SOIL

SOIL-BENTONITE FILL

10'

23'

10'

23'

STRUCTURE

WINGWALL

LANDSIDE

DRAIN PIPE

8" HDPE DRAIN PIPE

8" HDPE

BLANKET

DRAINAGE

DRAIN

CHIMNEY

CORE

SOIL-BENTONITE

COLLAR

FILTER

EL. 0.0

EXCAVATION

BOTTOM OF

G R

A V E L

G

U Y

A

N C

H O

R S

W O

O D

P

O W

E R

P

O L E

NOTES:

LEGEND:

DRAINAGE BLANKET

2.

1.

E: E 759,074.26

N: 878,117.64

WORK POINT AT CENTERLINE OF STRUCTURE AT LAKE SIDE FACE END OF SILL.

CENTERLINE BEARING: S 47°02'54" E

E: 632816.7

N: 981025.1

LAKESIDE FACE OF END SILL.

WORK POINT AT CENTERLINE OF STRUCTURE ATWP

40'20'020'

C-09

C

IV

IL

P H

A S

E I

II

S

T R

U C

T U

R E I

N S

T A

L L

A T

IO

N P

L A

N

C D

R C

W H

M C

F

C-10

E

C-10

D

C-10

B

C-10

B

C-10

D

C-10

E

C-10

F

C-10

DETAILS OF S-284 STRUCTURE.

REFER TO STRUCTURAL DRAWINGS FOR CONSTRUCTION

1988 (NAVD88).

REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM

ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND ARE

-H

H D

R C

R H

P -C

F .D

G N

C

C-10

C

C-10

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -0

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

N

PERIMETER AT ELEV. 6.00

DRAINAGE BLANKET

C

C

STRUCTURE

WINGWALL

LAKESIDE

STRUCTURE

BARREL

LAKESIDE

LANDSIDE

WP

A

C-10

C-10

EL. 1.0

HEADWALL

BOTTOM OF

SOIL FILTER

BOTTOM OFEL. 2.0

WINGWALL

BOTTOM OF

D

C-09C-09

C

C-09

SECTION

E

C-09

F

C-09

B

SCALE: B

A

C-09

18" FILTER SOIL

STRUCTURE

INVERT LAKESIDE

EL. 6.5

(TYP)

INV EL. 7.0 4" MUD MAT

4" MUD MAT

40'20'020'

20'10'010'

"A"

"B"

WP

WP

SEE SHEET C-09 FOR WORK POINT LOCATION

18" FILTER SOIL

EMBANKMENT FILL

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

M

C-10

C

IV

IL

C R

O S

S S

E C

T

IO

N S

P H

A S

E I

II

S

T R

U C

T U

R E I

N S

T A

L L

A T

IO

N

C D

R C

W H

M C

-H

H D

R C

R H

P -C

F .D

G N

STRUCTURE

EMBANKMENT FILL

MAT

4" MUD

MAT

4" MUD

SOIL

12" FILTER

12" FILTER SOIL GRAVEL

24" NO. 89 FILTER

SECTION

SECTION

SECTION SECTION

SCALE: B

SCALE: B

SCALE: B SCALE: B

NOTES:

SCALE: A

WITH EMBANKMENT FILL.

AT NO INSTANCE WILL No. 89 FILTER GRAVEL BE IN CONTACT

4. ENVELOPE No. 89 FILTER GRAVEL WITH 12" OF FILTER SOIL.

DIMENSIONS SHALL BE THAT REQUIRED FOR CONSTRUCTABILITY.

3. DIMENSIONS OF FILTER SOIL ARE MINIMUM VALUES. FINAL

CONSTRUCTION DETAILS.

2. REFER TO STRUCTURAL DRAWINGS FOR STRUCTURE

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

1. ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

EMBANKMENT FILL

EMBANKMENT FILL

FILL (TYP)

EMBANKMENT

(TYP)

EMBANKMENT FILL

EMBANKMENT FILL 4" MUD MAT

EL. 0.0

EL. 7.0 EL. 6.5

EL. 32.0

EXCAVATION

BOTTOM OF

INVERT OF BARREL

EXCAVATION

BOTTOM OF

EL. 0.0

INV. EL. 7.0'

BENTONITE FILL

8' SOIL-

(18" FILTER SOIL)

32.5'

4' FILTER SOIL

81.0' PLATFORM

EL. 32.0

BOTTOM OF WINGWALL

BOTTOM OF HEADWALL

EL. 6.5

EL. 3.0

EL. 2.5

EL. 0.0

EXCAVATION

BOTTOM OF

EL. 21.5'

EL. 32.0

EL. 22.0

STRUCTURE

LANDSIDE

EL. 6.5 INVERT

27' (18" FILTER SOIL)

SEE STRUCTURAL DRAWINGS

SCOUR CUTOFF WALL,

MAT

4" MUD

FILL (TYP)

EMBANKMENT

SEE STRUCTURAL DRAWINGS

SCOUR CUTOFF WALL,FILL

SOIL BENTONITE

LANDSIDE LAKESIDE

INV. EL. 7.0

8' BARREL

INV EL. 8.2

HDPE DRAIN PIPE

8" PERFORATED

SHEET C-12

42" DIP,SEE

GRADE

EXISTING

GRADE

EXCAVATION

PILE COFFERDAM

LAKESIDE DRIVEN

LANDSIDE COFFERDAM

BYPASS ROAD/EARTHEN

-10

-10

E L

E V

A T

IO

N

E L

E V

A T

IO

N

EXCAVATION

BOTTOM OF

EL. 0.0

16.67'

STRUCTURE

SOIL BENTONITE FILL

15'

10' 10'

8'

8'

8'

BOTTOM OF WINGWALL

BOTTOM OF HEADWALL

EL. 3.0

EL. 2.5

GRAVEL

FILTER

24" NO. 89

EL. 0.0

EXCAVATION

BOTTOM OF

EL. 6.0

EL. 0.0

EXCAVATION

BOTTOM OF

SLAB 6" THICK

24" SQUARE CONC.

HEADWALL STRUCTURE

RECONSTRUCTED

PE DRAIN PIPE

8" DIA PERFORATED

HDPE DRAIN PIPE

8" DIA SOLID

MESH, 12" DIAMETER

TYPE 304 SST WIRE

IN SS PLATE

8" DIA. OPENING " PLATE8

112" SST

Ø 10" B.C.

HARDWARE

SS CONC. ANCHOR &

"x3" POST INSTALLED4

(BEHIND SST PLATE)

DIA., 12" DIAMETER

" OPENING, 0.063" WIRE 4

TYPE 304 SST WIRE MESH,

8"

FILL

SOIL BENTONITE

CONSTRUCTION

TO FACILITATE

SLOPE AS NEEDED

C-11

EL. 32.0

EL. 21.5

EL. 21.5

INV. EL. 8.2

EL. VARIES

C

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

(FILTER SOIL)

CHIMNEY DRAIN

(TYP)

EMBANKMENT FILL

(TYP)

EMBANKMENT FILL

HEADWALL

STRUCTURE

HEADWALL

RECONSTRUCTED

BARREL

FILTER SOIL

WINGWALL

RECONSTRUCTED

MAT

4" MUD

WINGWALL

RECONSTRUCTED

MAT

4" MUD

BEND

BEND

BEND

BEND

MAT

4" MUD

4" MUD MAT

WALL

CUTOFF

SCOUR

27' (18" FILTER SOIL)

PIPE

DRAIN

8" HDPE

FILTER SOIL

BOTTOM EL. 0.0

EMBANKMENT FILL

CLEANOUT

8" HDPE DRAIN PIPE

TOP ELEVATION

SEE SHT. C-14 FOR

FINISHED GRADE

HDPE DRAIN PIPE (TYP.)

8" DIA PERFORATED

INV. 7.0

WALL

CUTOFF

SCOUR

WALL

CUTOFF

SCOUR

WALL

CUTOFF

SCOUR

PLUG

RAISED HEAD CLEANOUT

THREADED PVC SEWER

C-11

C

IV

IL

SECTION

SECTION

A

C-11

B

C-11

"A"

10'5'05'

"B"

20'10'010'

N.T.S.

N.T.S.

SCALE "B"

A

C-11

B

C-11

MESH CAP DETAIL

STAINLESS STEEL

CLEANOUT DETAIL

DRAINAGE BLANKET

S T

R U

C T

U R

E I

N S

T A

L L

A T

IO

N D

E T

A

IL

S D

R A

IN

A G

H

A S

E I

II

EL. 6.5

EL. 3.0

EL. 0.0

SECTIONS 416 & 937. (TYPICAL)

2013 FDOT STANDARD SPECIFICATIONS

BONDING SYSTEM IN ACCORDANCE WITH

RECOMMENDATION) WITH AN ADHESIVE

PER BONDING MATERIAL MANUFACTURER'S

WASHERS SET IN DRILLED HOLES (DIA.

FULL LENGTH WITH HEX NUTS AND

" DIA. x 4" ANCHOR BOLTS THREADED4

H H

D R

C R

C -C

F .D

G N

9' 9'

EL. 6.5

NOTE:

EL. 3.0

EL. 0.0

8'

4'

EL. VARIESEL. VARIES

INV. EL. 8.2

(TYP)

WINGWALL

OF SOIL FILTER

EL. 6.0 BOTTOM

C D

R C

W H

M C

C

C-11

DIMENSIONS ASSOCIATED WITH THE STRUCTURE.

REFER TO STRUCTURAL DRAWINGS FOR ALL OTHER

DETAILS ARE FOR DRAINAGE FEATURES ONLY.

PLAN AT SPRINGLINE OF 8" HDPE DRAIN PIPE

LANDSIDE CHIMNEY DRAIN AND DRAINAGE BLANKET

(TYP)

WINGWALL

BLANKET (TYP)

DRAINAGE

HDPE DRAIN PIPE (TYP.)

8" DIA PERFORATED

(FILTER SOIL)

FILTER COLLAR

(FILTER SOIL)

CHIMNEY DRAIN

FILL)

(SOIL-BENTONITE

SOIL-BENTONITE CORE

SOIL

12" FILTER

GRAVEL

24" No. 89 FILTER

SCALE "A"C-11

SCALE "B"

SCALE "B"

LANDSIDE

C SECTION

SCALE "A"C-11

1 DETAIL

LANDSIDE

LANDSIDELANDSIDE

SOIL

12" FILTER

GRAVEL

24" No. 89 FILTER

SOIL

12" FILTER

CLEANOUT

D

IR

T

R

O A

D

DIRT ROAD

LANDSIDE

C-41

HARNEY POND CANAL

LAKESIDE

Y=981110.06 X=632634.55

Y=980946.47 X=632810.16

F E

N C

E

FENCE

NOTES:

C-12

C

IV

IL

R E

C O

N S

T R

U C

T

IO

N P

L A

N

P H

A S

E I

V E

M B

A N

K M

E N

T

N

80'40'040'

M C

C W

H C

R D

-H

H D

R C

R H

P -C

.D

G N o n o n

1 on 3 o n

1 on 3

1 on 3

1 on 3 o n

M

IN

o n

V A

R

IE

S

ELECTRICAL DETAILS.

3. SEE ELECTRICAL DRAWINGS FOR INSTALLATION AND

THE COR.

AND EMBANKMENT ARE IN PLACE AND APPROVED BY

DEGRADED OR REMOVED UNTIL THE STRUCTURES

LAKESIDE COFFERDAM SYSTEMS SHALL BE

2. NO PORTION ON THE EXISTING LANDSIDE AND

VERTICAL DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN

1. ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

E L E

C

S D

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

E

.1

N

.4

P T S

T A .7

BANK

TOP OF

BANK

TOP OF

EMBANKMENT GRADE

MATCH EXISTING

EMBANKMENT GRADE

MATCH EXISTING

EMBANKMENT GRADE

MATCH EXISTING

BANK

TOP OF

WALKWAY

PLATFORM AND

STILLING WELL

(SEE PROFILE ON C-16)

SUPPLY PIPE (DIP)

240 LF OF WATER

EMBANKMENT GRADE

MATCH EXISTING

NOTE 3)

ELECTRIC (SEE

UNDERGROUND

BANK

TOP OF

BOAT RAMP

CONCRETE

COUNTY ELECTRIC

INSTALLED BY GLADES

POWER POLE TO BE

BOX

PULL

M

IN

. 1 o n

V A

R

IE

S

E

.2

N

.3

S

T A . 0

.0

C

O N

S T

R U

C T

IO

N B

E G

IN

E

.0

N

.0

P

C S

T A . 0

.8

E

.3

N

.5

P T S

T A . 1

.1

E

.9

N

.1

P C S

T A . 3

.8

E .0

N .0

P T S

T A .8

R

R 'R

R

R

E .8

N .3

P C S

T A .4

E

.7

N

.5

P

T S

T A . 5

.5

E

.9

N

.7

P

C S

T A . 8

.1

E

.3

N

.4

P T S

T A .1

E

.6

N

.5

P C S

T A .0

E

.7

N

.8

P T S

T A .1

E

.9

N

.8

P C S

T A .0

E

.0

N

.2

S T

A .6

C O

N S

T R

U C

T

IO

N

E N

D O

F

R

WP SEE SHEET C-09 FOR WORK POINT DATA.

C-16

EL. 32.80

E 632764.03

N 981074.20

N

INFORMATION.

CAMERA POLES, ANTENNA POLE AND STRUCTURE

1. SEE STRUCTURAL DRAWINGS FOR LOCATIONS OF

NOTES:

C

C

C C

LAKESIDE

LANDSIDE

E 632575.51

N 980733.24

PT

EL. 23.00

E 632609.80

N 980868.97

PC

EL. 23.00

E 632591.33

N 980884.29

PT

E 632538.15

N 981184.56 E 632542.68

N 981194.00

E 632562.98

N 981161.68

E 632569.65

N 981169.06

WP

EL. 23.00

E 632692.36

N 981296.34

EL. 23.00

E 632680.69

N 981307.19

EL. 32.00

E 632757.24

N 981389.49

E 632612.09

N 981110.27

E 632619.91

N 981116.50

EL. 32.00

E 632761.00

N 981370.06

B

C-16

SEE SHT S-64

CENTERLINE BEARING:

E 632697.67

N 981212.77

WORKING POINT

STILLING WELL

E

C-16

D

C-16

GRADE

MATCH EXISTING

C

C-16

E 632858.25

N 981501.37

PT

E 632551.98

N 980728.58

PC

R 75'

R 75'

EL. 31.67

E 632812.04

N 981605.13

PC

EL. 32.00

E 632742.44

N 980947.92

PC

EL. 32.20

E 632801.69

N 981079.05

EL. 32.20

E 632812.11

N 981069.34

EL. 32.00

E 632822.71

N 981040.36

EL. 32.20

E 632802.60

N 981059.10

EL. 32.00

E 632788.97

N 981004.13

EL. 32.00

E 632803.28

N 981019.49

EL. 32.60

E 632769.44

N 981115.96

EL. 32.00

E 632705.33

N 981108.00

EL. 32.40

E 632735.71

N 981079.73

E 632768.61

N 981115.07

PC

EL. 32.00

E 632793.59

N 981202.27

PT

EL. 32.00

E 632822.00

N 981160.87

PT

EL. 32.00

E 632680.32

N 980991.83

PC

EL. 32.00

E 632684.08

N 980958.74

PT

EL. 32.00

E 632717.75

N 980954.15

PC

EL. 33.00

E 632711.10

N 981998.41

E 632731.11

N 981074.79

PT

EL. 32.00

E 632687.97

N 981030.21

PT

E 632755.58

N 981029.15

PT

EL. 32.00

E 632728.42

N 981095.38

EL. 32.00

E 632681.01

N 981022.82

PT

EL. 32.00

E 632705.34

N 981032.80

PC

EL. 32.00

E 632799.62

N 981052.98

EL. 32.60

E 632758.60

N 981032.41

R 100'

R 100'

R 350'

R 125.5'

R 75'

R 25'

R 10'

GRADE

EXISTING

MATCH

GRADE

EXISTING

MATCH

GRADE

EXISTING

MATCH

GRADE

EXISTING

MATCH

R 20'

EL. 32.00

E 632782.73

N 981363.11

PC

E 632851.64

N 981454.66

EL. 26.79

E 632840.43

N 981450.70

PT

EL. 14.00

E 632662.83

N 981212.40

60'30'030'

C-13

C

IV

IL

A C

C E

S S A

N D P

L A

T F

O R

M P

L A

N

P H

A S

E I

V E

M B

A N

K M

E N

T R

E C

O N

S T

R U

C T

IO

N

M C

C W

H C

D R

-H

H D

R C

R H

P -C

.D

G N

A

C -16

EL. 32.30

E 632736.93

N 980990.82

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

E 632797.02

N 981073.68

PC

EL. 32.00

E 632787.69

N 981040.17

EL. 32.00

E 632739.08

N 981144.24

EL. 32.00

E 632724.75

N 981128.86

EL. 32.00

E 632740.35

N 981108.18

EL. 22.50

E 632699.03

N 981251.29

-10 -10

-10

-10

-10

-10

-10

-10

-10

-10

-5

-5

-5

-5

-5

-5

-5 -5

-5

-5

-5

-5-5 -5-5

-5

-5

-5

-5

LANDSIDE

C-41

HARNEY POND CANAL

LAKESIDE

0 0

0 0

0 0

0 0

0000000

NOTES:

C-14

C

IV

IL

N

80'40'040'

C O

N T

O U

R P

L A

N

P H

A S

E I

V E

M B

A N

K M

E N

T R

E C

O N

S T

R U

C T

IO

N

M C

C W

H C

D R

-H

H D

R C

R H

P -C

.D

G N

VERTICAL DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN

1. ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

E L E

C

S D

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

5 5 5 5 5 5 5

55555

10 10

5 15

15 15

20 20

GRADE

EXISTING

MATCH

BANK

TOP OF

BANK

TOP OF

BANK

TOP OF

TOP EL. 23.5 ±

CLEANOUT

TOP EL. 23.0 ±

CLEANOUT

GRADE

EMBANKMENT

EXISTING

MATCH

GRADE

EXISTING

MATCH

GRADE

EXISTING

MATCH

GRADE

EXISTING

MATCH

PROPOSED GRADE +0.25 FT

AND IRON LID TO MATCH

REPLACE CONCRETE BOX

DROP CURB

20 LF OF FDOT

FLUME

CONC.

20 LF OF

DROP CURB

10 LF OF FDOT

FLUME

CONC.

65 LF OF

DROP CURB

20 LF OF FDOT

DROP CURB

20 LF OF FDOT

DROP CURB

20 LF OF FDOT

DRAIN

TRENCH

20 LF OF

DRAIN

TRENCH

47 LF OF

GRADE

EMBANKMENT

MATCH EXISTING

FILL IN ANY RUTTING

MATCH EXISTING GRADE

o n

1 on 12 on

1 on 13

1 on 24

1 on

16%

D

IR

T

R

O A

D

DIRT ROAD

LANDSIDE

C-41

HARNEY POND CANAL

LAKESIDE

C-15

C

IV

IL

N

80'40'040'

S U

R F

A C

IN

G P

L A

N

P H

A S

E I

V E

M B

A N

K M

E N

T R

E C

O N

S T

R U

C T

IO

N

POINT NORTHING EASTING

RIPRAP LIMITS

STONE LIMITS

GEOTEXTILE AND BEDDING

10 980992.14 632770.96

9 980985.22 632764.52

8 980974.32 632776.23

7 981066.51 632862.11

6 981077.42 632850.40

5 981064.28 632838.16

4 981169.00 632759.41

3 981175.13 632752.83

2 981081.84 632665.92

1 981075.70 632672.51

4 981169.00 632759.41

16 981164.23 632764.53

15 981140.82 632742.73

14 981104.60 632708.99

13 981070.93 632677.63

1 981075.70 632672.51

5 981064.28 632838.16

12 981043.76 632819.05

11 981007.55 632785.32

10 980992.14 632770.96

M C

C W

H C

D R

-H

H D

R C

R H

P -C

.D

G N

E L E

C

S D

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

GRAPHIC SCALE

W E

P -1

-R -0

M .C

EMBANKMENT GRADE

MATCH EXISTING

RIPRAP

TYPE I

10'X10'

BANK

TOP OF

BANK

TOP OF

BANK

TOP OF

EMBANKMENT GRADE

MATCH EXISTING

RAMP

ACCESS

LEVEE

TOE OF

LEVEE

TOE OF

DIRT ROAD GRADE

MATCH EXISTING

BANK

TOP OF

EMBANKMENT GRADE

MATCH EXISTING

(SEE PROFILE ON C-16)

SUPPLY PIPE (DIP)

240 LF OF WATER

DIRT ROAD GRADE

MATCH EXISTING

DIRT ROAD GRADE

MATCH EXISTING

BOAT RAMP

CONCRETE

EXISTING FENCE

CONNECT TO

EXISTING FENCE

CONNECT TO

E 980827.73 N 632517.59

E 980838.72 N 632550.74

12' GATE

CATTLE FENCE

4' GALVANIZED

CATTLE FENCE

4' GALVANIZED

Y 981006.37 N 632681.02

EXISTING FENCE

CONNECT TO

BAR, SEE NOTE 4

24" WHITE STOP

BAR, SEE NOTE 4

24" WHITE STOP

BAR, SEE NOTE 4

24" WHITE STOP

SEE NOTE 4

6" SOLID YELLOW

SEE NOTE 4

STOP SIGN R1-1

NOTE 4

R1-1, SEE

STOP SIGN

NOTE 4

R1-1, SEE

STOP SIGN

GRADE

EMBANKMENT

EXISTING

MATCH DROP CURB

20 LF OF FDOT

DROP CURB

10 LF OF FDOT

DROP CURB

20 LF OF FDOT

DROP CURB

20 LF OF FDOT

DROP CURB

20 LF OF FDOT

RIPRAP

TYPE I

10'X10'

DRAIN

20 LF OF TRENCH

FLUME

CONC.

20 LF OF

FLUME

CONC.

65 LF OF

DRAIN

47 LF OF TRENCH

SOD

NOTES:

LIMEROCK CONC. BLDG. PAD

ASPHALT

BEDDING STONE

GEOTEXTILE AND

FOR RIP RAP TYPE

RIPRAP SEE C-17

INDEX 300.

5. DROP CURB IN ACCORDANCE WITH FDOT DESIGN STANDARD

THEMOPLASTIC.

WITH FDOT, ALL PAVEMENT MARKINGS SHALL BE STANDARD

4. PAVEMENT MARKINGS AND TRAFFIC SIGNS IN ACCORDANCE

3. SOD TO WATERS EDGE WHERE WATER IS ENCOUNTERED.

CONSTRUCTION, EXCEPT WHERE OTHERWISE NOTED.

2. SOD ALL DISTURBED AREAS WITHIN THE LIMITS OF

GOVERNMENT USE.

ANY EXCESS IMPORT RIPRAP SHALL BE STOCKPILED FOR

1. AFTER PLACEMENT OF IMPORT RIPRAP ON EMBANKMENT,

LEGEND

10'

12'

42" DIP

OF EMBANKMENT

CENTERLINE TOP

T

Y P

12" TYP.

TRENCH DETAIL

UGE SECONDARY CONDUIT

DIAMETER BRASS/BRONZE

RECESSED LETTERS 3-1/2 INCH

ASPHALT SURFACE

TYPICAL STRUCTURE PLATFORM

TRENCH DRAIN

GRATE SEAT

CONCRETE FLUME

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

W E

P -1

-R -0

M .C

C-16

C

IV

L

H H

D R

C R

C -C

F .D

G N

M .C

C .W .H

C .D .R

S E

C T

IO

N S A

N D D

E T

A

IL

S

H

A S

E I

V E

M A

B A

N K

M E

N T R

E C

O N

S T

R U

C T

IO

N

AGENCY

C O

R P S

O

F

ENGINEERS-U.S

A

R M

Y

SURVEY MARK

F

IN

E O

R IMPRISON

M E N T

F O

R

D

ISTURBING THI

S

M A

R K

S

TA

TI

ON

DESIGNATIO

N

6" COMPACTED LIMEROCK

EMBANKMENT FILL

PRINTED ON IT

ELECTRICAL LINE BELOW"

MARKER TAPE W/ "CAUTION

DETECTABLE MAGNETIC

SOD SOD

SOD

SOD

CONDUIT

SECONDARY

4" PVC

SOD

PROCTOR PER ASTM D1557

MAXIMUM DENSITY MODIFIED

FILL AND COMPACT TO 95%

BACKFILL W/ EMBANKMENT

SEE NOTE 2

VEHICULAR TRAFFIC

FOR AREAS UNDER

CONCRETE 3" AROUND

CONDUIT ENCASED IN

2" ASPHALT

SOD

SOD

CAP

BEND

BEND

BEND

BEND

BEND

CAP

16.8 ±

INV. EL.

13.3 ±

INV. EL.

GRADE

FINISHED

PRINTED ON IT

BURIED WATER LINE BELOW"

MARKER TAPE W/ "CAUTION

DETECTABLE MAGNETIC

SOD

SOD

SOD SOD

ENCASEMENT

CONCRETE

EMBANKMENT

TOP OF

42" DIP, SEE NOTE 3

CONCRETE BOX

PREFABRICATED

VALVE INSIDE

AIR RELEASE

BREAK WITH

SIPHON/VACUUM

VARIES

24" MAX.

NOTES:

L

6" COMPACTED LIMEROCK

E M

B A

N K

M E

N

S-36

SECTION

N.T.S.

E

C-16

N.T.S.

C

C-13

TYPICAL ACCESS RAMP ASPHALT SURFACE

N.T.S.

E

C-13

TYPICAL RAMP LIMEROCK SURFACE

R A

M

6" COMPACTED LIMEROCK

N.T.S.

B

C-13

TYPICAL ACCESS ROAD ASPHALT SURFACE

N.T.S.

A

C-13

TYPICAL EMBANKMENT ASPHALT CREST SURFACE

A C

C E

S S R

O A

N.T.S.

C-13

TYPICAL CONCRETE BOAT RAMP

3' 3'

E

C-16

LIMITS OF REINFORCEMENT50.8' ± 49.4' ±

LIMITS OF CONCRETE ENCASEMENT

H-20 LOADING.

5. GALVANIZED GRATE SHALL BE ABLE TO WITHSTAND

AND LID SHALL BE ABLE TO WITHSTAND H-20 LOADING.

BE HOUSED WITHIN A CONCRETE BOX. CONCRETE BOX

4. SIPHON/VACUUM BREAK AND AIR RELEASE VALVE SHALL

3. ALL PIPE CONNECTIONS SHALL BE FLANGED STYLE.

ELECTRICAL DETAILS.

2. SEE ELECTRICAL DRAWINGS FOR INSTALLATION AND

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

1. ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

0+00 1+00 2+00 3+00

E L

E V

A T

IO

N

E L

E V

A T

IO

N

0 0

-10-10

N.T.S.

N.T.S.

(SEE STRUCTURAL DRAWINGS FOR PLACEMENT)N.T.S.

N.T.S.

N.T.S.

N.T.S.

6" 6"11.5"

2 1/2"

11.5"6" 6"

EL. VARIES

2%

2'2' 6'6'

16'

2%2%

2'2' 8'8'

20'

2%2%

2'2'

24'

2% 2%

10' 10'

DUCTILE IRON WATER SUPPLY PIPE PROFILE

6" COMPACTED LIMEROCK

EMBANKMENT FILL

2" ASPHALT

MIN. 12" EMBANKMENT FILL

LIMEROCK

6" COMPACTED

EMBANKMENT FILL

MINIMUM 12"

MIN. 12" EMBANKMENT FILL

EMBANKMENT FILL

(TYP.)

AROUND PERIMETER

18" TURNDOWN

MESH

WELDED WIRE

6X6 W1.4/W1.4

TO TRAVEL

FINISH PERPENDICULAR

WITH RAKE SURFACE

6" 2500 PSI CONCRETE

GRATE SEAT.

ANGLE GALV.

#4 @ 12" E.W.

SEAT

GALVANIZED GRATE

2"x2"x1/2" ANGLE

@ 12" O.C.

3"x1/2" WELDED STUD

2" ASPHALT

2" ASPHALT

#4 @ 12" E.W.

GRATE SEE NOTE 5

16" WIDE GALVANIZED

VARIES

VARIES

VARIES

VARIES

VARIES

VARIES

VARIES

1 1

4 4

N.T.S.

LANDSIDE LAKESIDE

10" MIN.

EMBANKMENT RIPRAP

EL. 22.0 TOP OF

EL. VARIES

TYPE I RIPRAP

TRANSITION TO

EL. VARIES

TOP OF WINGWALL

C-17

5'

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

W E

P -1

-R -0

M .C

C-17

C

IV

L

H H

D R

C R

C -C

F .D

G N

M .C

C .W .H

C .D .R

C A

N A

L R

IP

R A

P S

E C

T

IO

N S

P H

A S

E I

V E

M A

B A

N K

M E

N T R

E C

O N

S T

R U

C T

IO

N

9" BEDDING STONE

NEEDED

SLOPE AS

EMBANKMENT

GEOTEXTILE

GRADE

PHASE 4 DESIGN EMBANKMENT FILL

TYPE I RIPRAP

18" IMPORTED

TYPE II RIPRAP

24" IMPORTED

TYPE I RIPRAP

18" IMPORTED

SOD

NOTES:

VARIES

A

C-17

5'

5'

SECTION

N.T.S.

B

C-17

SECTION

N.T.S.

C

C-17

SECTION

N.T.S.

A

C-17

DETAIL

N.T.S.

C-17

(SEE NOTE 2)

SCALE: 1" = 10'

3 TO 6 INCHES BELOW GRADE ALONG THE 1H : 1V SLOPE.

SOIL COVER OVER GEOTEXTILE. TERMINATE GEOTEXTILE

STONE AND/OR RIPRAP. MAINTAIN 3 INCHES MINIMUM

BEDDING STONE AND/OR RIPRAP, TO TOP OF BEDDING

2. EXTEND GEOTEXTILE UP BETWEEN CONCRETE AND

DATUM 1988 (NAVD88).

ARE REFERENCED TO THE NORTH AMERICAN VERTICAL

1. ELEVATIONS ARE IN FEET AND TENTHS OF A FOOT AND

LANDSIDE

TYPICAL CANAL SURFACE TREATMENT

B

C-17

C

C-17

C

C-17

9" BEDDING STONE

STONE

9" BEDDING

STONE

9" BEDDING

GEOTEXTILE

9" BEDDING STONE

FOUNDATION

STRUCTURE

WP

SEE NOTE 2

GEOTEXTILE

SEE NOTE 2

GEOTEXTILE

SEE NOTE 2

GEOTEXTILE

WINGWALL

TOP OF

WINGWALL

TOP OF

STRUCTURE

TYPE II RIPRAP

24" IMPORTED

TYPE I RIPRAP

18" IMPORTED

SOD

ASPHALT

2'

IV

IL

C-18

-H

H D

R C

R

IP

-C

F

F E

B R

U A

R Y

M .J .B

M .J .B

E .G .M

TYPICAL PANEL

N.T.S.

N.T.S.

N.T.S.

N.T.S.

6'-6"

BRACING AS REQUIRED.

OF POSTS SHALL BE ALTERED TO PROVIDE ADEQUATE

OR TWO CORNER PANELS CONFLICT, BRACING AND SPACING

CONFLICTS WITH GATE OR CATTLE GUARD BRACE PANELS,

OF 10' AND 9' IS MAXIMUM. WHEN CORNER OR END PANEL

1. THE SPACING OF END OR CORNER PANEL AND BRACE PANEL

NOTES:

TYPICAL CORNER

WOVEN FIELD FENCE

GALVANIZED GATE

12'-0"

C A

T T

L E F

E N

C E D

E T

A

IL

S

P H

A S

E I

V E

M B

A N

K M

E N

T R

E C

O N

S T

R U

C T

IO

N

GROUND LINE

FENCE

WOVEN FIELD

6" - 7" DIA LINE POST (TYP)

(T

Y P

BRACE POST

6'-6"

6'-6" 6'-6

6'-6

GRADE

EXISTING

6" - 7" DIA POST (TYP.)

8' (TYP.)

A

B

C

D

1234567

D

C

B

A

8 7 6 5 4 3 2

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D R

A W

IN

G D

A T

E

F

IL

E N

U M

B E

R

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O of Engineers

US Army Corps

Jacksonville District

DEPENDS ON YOU

SAFETY ON THIS JOB

DRAWING NO.

D E

S C

R

IP

T

IO

N N o

S Y

M Z

O N

E

J A

C K

S O

N V

IL

L E F

L O

R

ID

A

J A

C K

S O

N V

IL

L E D

IS

T R

R P

S O

F E

N G

IN

E E

R S

A B

C D

D E

P A

R T

M E

N T O

F T

H E A

R M

Y D

E S

IG

N E

D B

Y p w \C

O E -S

A J P

W P J

A X .s a j.

d s .u s a c e .a rm y .m il :S

A J P

W \D o c u m e n ts \C

S

F \H e rb e rt H o o v e r

D ik e R e h a b il it a ti o n \0

-C u lv e rt R e h a b il it a ti o n \S -2

H P -5

P la n s \0

C iv il \C -1

A -N

A N

S -2

H P -5

R E

C O

N S

T R

U C

T

IO

N

S T

R U

C T

U R

E R

E P

L A

C E

M E

N T

H E

R B

E R

T H

O O

V E

R D

IK

E R

E H

A B

IL

IT

A T

IO

N

N /A

N /A

/3

/2

A S S

H O

W N

W E

P -1

-R -0

M .C

6" PULLOUT

10 GAUGE

10 GAUGE

(2) HINGES

DETAIL

FENCE, SEE

WOVEN FIELD

DETAIL

FENCE, SEE

WOVEN FIELD

(TYP.)

LINE POST

6" - 7" DIA

8"

7"

6"

5"

4"

3"

5.5"

4.5"

3.5"

" G

A U

G E F

IL

L E

R W

IR

E

G A

U G

E F

IL

L E

R W

IR

E

" O

F C

L A

S S I, G

A L

V A

N

IZ

E D W

IR

E F

E N

C-01
C-02
C-03
C-04
C-05
C-07
C-08
C-09
C-10
C-11
C-16
C-17
C-18