W912EP18R0042_Amendment_0003.pdf
PDF 500 KB Posted
- Solicitation number
- W912EP18R0042
About this file
W912EP18R0042 Amendment 0003
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
HERBERT HOOVER DIKE REHABILITATION, STRUCTURE REPLACEMENT S-284 (HP-5) RECONSTRUCTION, GLADES COUNTY, FLORIDA
A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.
B. THE PROPOSAL DUE DATE CHANGED TO 29 JANUARY 2019 @ 2:00 P.M. LOCAL TIME.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
1. CONTRACT ID CODE PAGE OF PAGES
1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP18R0042
X 9B. DATED (SEE ITEM 11)
06-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jan-2019
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EP-18-R-0042 Amendment 0003
SF 30 CONTINUATION
SHEET
Herbert Hoover Dike Rehabilitation, Structure Replacement S-284 (HP-5) Reconstruction
Amendment 0003
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Changes to Specifications:
The changes includes the following:
Revised import riprap, limerock surface and asphalt surface quantities on section 00010A to accurately reflect the plan sheet quantities. Clarification to the limerock surface, asphalt pavement and site signage measurement and payment on section 01 22 00.
Volume 1 of 2 – Technical Specifications:
DELETE Section 00010A and REPLACE with the attached revised Section 00010A.
Volume 2 of 2 – Technical Specifications:
DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.
2. DRAWINGS:
N/A
(End of Summary of Changes)
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
HERBERT HOOVER DIKE REHABILITATION, STRUCTURE REPLACEMENTS
S-284 (HP-5) RECONSTRUCTION
GLADES COUNTY, FLORIDA
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 ACCESS JOB $_______________
0002 TURBIDITY MONITORING JOB $_______________
0003 SHEET PILE COFFERDAM JOB $_______________
0004 EARTHEN COFFERDAM AND PLUGS 7,265 CUBIC YARD $___________ $_______________
0005 IMPORT RIPRAP 2,060 SQUARE YARD $___________ $_______________
0006 HPTRM & SOD 1,214 SQUARE YARD $___________ $_______________
0007 ROLLED EROSION CONTROL PRODUCT 2,702 SQUARE YARD $___________ $_______________
0008 COFFERDAM SEEPAGE PROTECTION 1,710 SQUARE YARD $___________ $_______________
(ESTIMATED QUANTITY)
0009 DEWATERING JOB $_______________
0010 EXCAVATION JOB $_______________
0011 DEMOLITION JOB $_______________
0012 SHEETPILE SCOUR CUTOFF WALLS JOB $_______________
0013 MUD MAT JOB $_______________
0014 LAKESIDE HEADWALL REINFORCED CONCRETE JOB $_______________
0015 LAKESIDE WING WALLS REINFORCED CONCRETE JOB $_______________
0016 LANDSIDE HEADWALL REINFORCED CONCRETE JOB $_______________
0017 LANDSIDE WING WALLS REINFORCED CONCRETE JOB $_______________
0018 CULVERT STRUCTURE REINFORCED CONCRETE JOB $_______________
0019 LAKESIDE HEADWALL EMBEDDED METALS JOB $_______________
0020 LANDSIDE HEADWALL EMBEDDED METALS JOB $_______________
0021 MISCELLANEOUS METALS JOB $_______________
0022 COMBINATION SLIDE/FLAP GATE WITH ACTUATOR 1 EACH $___________ $_______________
0023 MANATEE SCREEN/DEBRIS BARRIER 2 EACH $___________ $_______________
0024 EMBANKMENT FILL (ESTIMATED QUANTITY) 47,331 CUBIC YARD $___________ $_______________
0025 SOIL-BENTONITE CORE JOB $_______________
W912EP-18-R-0042 00010A-1 Amendment 0003
HERBERT HOOVER DIKE REHABILITATION, STRUCTURE REPLACEMENTS
S-284 (HP-5) RECONSTRUCTION
GLADES COUNTY, FLORIDA
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0026 CHIMNEY DRAIN, DRAINAGE BLANKET AND
FILTER COLLAR JOB $_______________
0027 LIMEROCK SURFACE (ESTIMATED QUANTITY) 4,600 SQUARE YARD $___________ $_______________
0028 ASPHALT SURFACE (ESTIMATED QUANTITY) 5,800 SQUARE YARD $___________ $_______________
0029 VERTICAL WALL AND REINFORCED VERTICAL
WALL FILL (ESTIMATED QUANTITY) 1,293 CUBIC YARD $___________ $_______________
0030 INTAKE AND OUTLET CHANNEL JOB $_______________
0031 SITE SIGNAGE JOB $_______________
0032 CONTROL BUILDING JOB $_______________
0033 ELECTRICAL AND TELECOMMUNICATIONS WORK JOB $_______________
AND EQUIPMENT
0034 SODDING (ESTIMATED QUANTITY) 20,587 SQUARE YARD $___________ $_______________
0035 STILLING WELLS JOB $_______________
0036 DUAL LEAF GATES 1 EACH $___________ $_______________
0037 CONTRACTING OFFICER'S FIELD OFFICE 26 MONTH $___________ $_______________
0038 BY PASS PUMP(S) OPERATION JOB $_______________
0039 BY PASS PUMP(S) STANDBY TIME JOB $_______________
0040 ELECTRICAL UTILITIES JOB 44,000.00$
0041 PARTNERING REGROUP MEETING 6 EACH $___________ $_______________
0042 PARTNERING REGROUP VENUE 6 EACH $___________ $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0042) $_______________
NOTES: (1) See Section 00100 INSTRUCTIONS TO OFFERORS.
(2) Quantities shown are estimated, actual quantities may vary. See Clause 52.211-18 "Variation in Estimated Quantity" of Section 00700 CONTRACT CLAUSES.
(3) All specification references to "LUMP SUM" shall apply to line items indicating "JOB" as a unit.
(4) Offerors must price all line items.
(5) Failure to complete and return all required submissions (see Section 00100A) could render your proposal ineligible for award.
W912EP-18-R-0042 00010A-2 Amendment 0003
HERBERT HOOVER DIKE REHABILITATION, STRUCTURE REPLACEMENTS
S-284 (HP-5) RECONSTRUCTION
GLADES COUNTY, FLORIDA
(6) Digital Terrain Models (DTM) and requisite raw data in XLM format are available for informational purposes only.
The Government assumes no responsibility for any apparent errors that may be present in the DTM or raw data;
nor does the Government assume responsibility for any conclusions or interpretations made by the Contractor based on the provided DTM or raw data. The DTM and raw data are available in compressed (zip) format for download by offerors with the solicitation on the Federal Business Opportunities (www.fbo.gov) web site.
The available information may include DTM surfaces for the existing site grades, excavation grades, and finished grades. The excavation DTM may not fully define surfaces related to temporary cuts required for site features such as stormwater management and erosion control components. Further, the excavation DTM may not reflect embankment foundation details such as soil benching. The finished DTM may not fully define surfaces related to site features such as stormwater management and erosion control components. Further, the finished grade DTM may not reflect embankment penetrations, internal embankment components such as seepage collection systems, nor embankment slope protection.
W912EP-18-R-0042 00010A-3 Amendment 0003
Her ber t Hoover Di ke Rehabi l i t at i on, St r uct ur e Repl acement s S- 284 ( HP- 5) Reconst r uct i on, Gl ades Count y, Fl or i da
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Def i ni t i on
1. 2. 2 I nst r uct i ons
1. 3 SUBMI TTALS
1. 4 PAYMENT PROCEDURES
1. 4. 1 Job
1. 4. 2 Uni t Pr i ce
1. 5 LI NE I TEMS
1. 5. 1 Access ( Li ne I t em 0001)
1. 5. 2 Tur bi di t y Moni t or i ng ( Li ne I t em 0002)
1. 5. 3 Sheet Pi l e Cof f er dam ( Li ne I t em 0003)
1. 5. 4 Ear t hen Cof f er dam and Pl ugs ( Li ne I t em 0004)
1. 5. 5 I mpor t Ri p Rap ( Li ne I t em 0005)
1. 5. 6 HPTRM & Sod ( Li ne I t em 0006)
1. 5. 7 Rol l ed Er osi on Cont r ol Pr oduct ( Li ne I t em 0007)
1. 5. 8 Cof f er dam Seepage Pr ot ect i on ( Li ne I t em 0008)
1. 5. 9 Dewat er i ng ( Li ne I t em 0009)
1. 5. 10 Excavat i on ( Li ne I t em 0010)
1. 5. 11 Demol i t i on ( Li ne I t em 0011)
1. 5. 12 Sheet pi l e Scour Cut of f Wal l s ( Li ne I t em 0012)
1. 5. 13 Mud Mat ( Li ne I t em 0013)
1. 5. 14 Lakesi de Headwal l Rei nf or ced Concr et e ( Li ne I t em 0014)
1. 5. 15 Lakesi de Wi ng Wal l s Rei nf or ced Concr et e ( Li ne I t em 0015)
1. 5. 16 Landsi de Headwal l Rei nf or ced Concr et e ( Li ne I t em 0016)
1. 5. 17 Landsi de Wi ng Wal l s Rei nf or ced Concr et e ( Li ne I t em 0017)
1. 5. 18 Cul ver t St r uct ur e Rei nf or ced Concr et e ( Li ne I t em 0018)
1. 5. 19 Lakesi de Headwal l Embedded Met al s ( Li ne I t em 0019)
1. 5. 20 Landsi de Headwal l Embedded Met al s ( Li ne I t em 0020)
1. 5. 21 Mi scel l aneous Met al s ( Li ne I t em 0021)
1. 5. 22 Combi nat i on Sl i de/ Fl ap Gat e wi t h Act uat or ( Li ne I t em 0022)
1. 5. 23 Manat ee Scr een/ Debr i s Bar r i er ( Li ne I t em 0023)
1. 5. 24 Embankment Fi l l ( Li ne I t em 0024)
1. 5. 25 Soi l - Bent oni t e Cor e ( Li ne I t em 0025)
1. 5. 26 Chi mney Dr ai n, Dr ai nage Bl anket and Fi l t er Col l ar ( Li ne I t em
0026)
1. 5. 27 Li mer ock Sur f ace ( Li ne I t em 0027)
1. 5. 28 Asphal t Sur f ace ( Li ne I t em 0028)
1. 5. 29 Ver t i cal Wal l and Rei nf or ced Ver t i cal Wal l Fi l l ( Li ne I t em
0029)
1. 5. 30 I nt ake and Out l et Channel ( Li ne I t em 0030)
1. 5. 31 Si t e Si gnage ( Li ne I t em 0031)
1. 5. 32 Cont r ol Bui l di ng ( Li ne I t em 0032)
1. 5. 33 El ect r i cal and Tel ecommuni cat i ons Wor k and Equi pment ( Li ne
SECTI ON 01 22 00 Page 1
I t em 0033)
1. 5. 34 Soddi ng ( Li ne I t em 0034)
1. 5. 35 St i l l i ng Wel l s ( Li ne I t em 0035)
1. 5. 36 Dual Leaf Gat es ( Li ne I t em 0036)
1. 5. 37 Cont r act i ng Of f i cer ' s Fi el d Of f i ce ( Li ne I t em 0037)
1. 5. 38 Bypass Pump( s) Oper at i on ( Li ne I t em 0038)
1. 5. 39 Bypass Pump( s) St andby Ti me ( Li ne I t em 0039)
1. 5. 40 El ect r i cal Ut i l i t i es ( Li ne I t em 0040)
1. 5. 41 Par t ner i ng Regr oup Meet i ng ( Li ne I t em 0041)
1. 5. 42 Par t ner i ng Regr oup Venue ( Li ne I t em 0042)
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
3. 1. 1 Request i ng Pr ogr ess Payment
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00 Page 2
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on descr i bes how Li ne I t ems wi l l be measur ed and pai d f or when maki ng pr ogr ess payment s. Wor k t o be measur ed i s descr i bed i n speci f i cat i on sect i ons l i s t ed f or each Li ne I t em. Measur ement pr ocedur es f or payment , r equi r ed quant i t y sur vey or pr ocur ement document at i on and payment r est r i c t i ons ar e descr i bed i n appl i cabl e speci f i cat i on sect i ons.
Al l ocat e cost s f or wor k not speci f i cal l y ment i oned t o t he Li ne I t em most c l osel y associ at ed wi t h wor k i nvol ved. Unl ess t her e i s a speci f i c Li ne I t em f or admi ni st r at i ve cost s, such as Qual i t y Cont r ol and Saf et y, al l ocat e such cost s pr opor t i onal l y acr oss al l Li ne I t ems.
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Definition
The t er ms " Cont r act Li ne I t em Number ( CLI N) " and " Li ne I t em" ar e i nt er changeabl e her ei n ( e. g. : CLI N 0001 i s Li ne I t em 0001) . The t er m " CLI N" i s a cont r act i ng t er m used i n t he Resi dent Management Syst em ( RMS) payment dat a base.
1. 2. 2 Instructions
See Sect i on 01 45 04 CONTRACTOR QUALI TY CONTROL f or i nst r uct i ons on l i nki ng a CLI N t o a schedul e of val ues of pay act i v i t i es and const r uct i on schedul e, and i n- dept h payment pr ocedur e.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed:
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Val ues; G, RO
Pr ovi de a br eakdown of Job i t ems i nt o pr oposed pay act i v i t i es as par t of t he i ni t i al pr oj ect schedul e. Schedul e of Val ues wi l l become basi s f or CLI N and Pay Act i v i t y dat a i n t he RMS payment dat a base.
SD- 07 Cer t i f i cat es
SECTI ON 01 22 00 Page 3
Ut i l i t y I nvoi ces; G, RO
Submi t i nvoi ces f r om t he ut i l i t y company i ndi cat i ng payment f or ser vi ces cover ed i n Li ne I t em 0037 " El ect r i cal Ut i l i t i es" .
Payment under t hi s l i ne i t em wi l l not be made pr i or t o submi ssi on of val i d i nvoi ces t o t he Gover nment . The Cont r act or wi l l be r ei mbur sed f or cost s i ndi cat ed on t hese i nvoi ces onl y.
Request f or Pr ogr ess Payment ; G, RO
Submi t mont hl y i n accor dance wi t h subpar agr aph " Request i ng Pr ogr ess Payment " bel ow.
1. 4 PAYMENT PROCEDURES
Payment i t ems f or t he wor k i n t hi s cont r act on whi ch t he cont r act payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. The pr i ce and payment made f or each i t em l i s t ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar payment i t em, shal l be i ncl uded i n t he l i s t ed i t em most c l osel y associ at ed wi t h t he wor k involved.
1. 4. 1 Job
Pr ogr ess payment s f or Job CLI Ns wi l l be made i n accor dance wi t h t he Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s c l ause of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Submi t a l i s t of pay act i v i t i es, ( Schedul e of Val ues) t o br eakdown bi d f or each Job CLI N. The Schedul e of Val ues shal l be submi t t ed f or Gover nment appr oval wi t h t he basel i ne schedul e submi t t al ( see Sect i on 01 32 01 PROJECT SCHEDULE. An unbal anced Schedul e of Val ues and Pay Act i v i t y Schedul e wi l l be r et ur ned f or r evi s i on. I f t hi s cont r act cont ai ns ei t her t he Cont i nui ng Cont r act s c l ause or t he Cont i nui ng Cont r act s ( Al t er nat e) c l ause, t he Cont r act or shoul d t ake i nt o account t he amount r eser ved f or cont r act payment s when pr epar i ng t he const r uct i on schedule.
1. 4. 2 Uni t Pr i ce
Each Uni t Pr i ce CLI N may be a s i ngl e pay act i v i t y i t em or may be br oken down i nt o pay act i v i t i es wi t h smal l er quant i t i es equal t o CLI N t ot al .
Cont r act uni t pr i ce mul t i pl i ed by agr eed quant i t y i s f ul l compensat i on.
1. 5 LI NE I TEMS
Li ne i t ems wi l l be pai d i n accor dance wi t h t he par agr aph PAYMENT PROCEDURES above and as r equi r ed bel ow. The f ol l owi ng l i ne i t ems ar e i ncl uded i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i n Vol ume 1:
1. 5. 1 Access ( Li ne I t em 0001)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o c l ear i ng and gr ubbi ng; s i l t f ence; t empor ar y f enci ng; and t he const r uct i on, mai nt enance and r emoval of s i t e access as shown. See Sect i on 35 41 00
EMBANKMENT CONSTRUCTI ON.
SECTI ON 01 22 00 Page 4
1. 5. 2 Tur bi di t y Moni t or i ng ( Li ne I t em 0002)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o obt ai ni ng, anal yzi ng, and r epor t i ng t he r esul t s of moni t or i ng f or t ur bi di t y. See Sect i on 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG.
1. 5. 3 Sheet Pi l e Cof f er dam ( Li ne I t em 0003)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o const r uct i on, mai nt enance and r emoval of pi l e cof f er dams, i ncl udi ng cut t i ng and abandoni ng i n pl ace.
1. 5. 4 Ear t hen Cof f er dam and Pl ugs ( Li ne I t em 0004)
Uni t pr i ce payment wi l l be made f or cost associ at ed wi t h and i nci dent al t o pl acement , mai nt enance and r emoval of t he ear t hen cof f er dam and pl ugs.
Ver t i cal r ei nf or ced f i l l wi l l not be pai d under t hi s l i ne i t em. The uni t of measur e i s cubi c yar d. Thi s CLI N does not i ncl ude sur f ace t r eat ment s.
1. 5. 5 I mpor t Ri p Rap ( Li ne I t em 0005)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement , mai nt enance and r emoval of Type I and Type I I i mpor t r i pr ap, beddi ng st one and geot ext i l e. Measur ement wi l l be made by t he ar ea pl aced. The uni t of measur e i s squar e yar d.
1. 5. 6 HPTRM & Sod ( Li ne I t em 0006)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement , mai nt enance and r emoval of hi gh per f or mance t ur f r ei nf or cement mat ( HPTRM) & sod, and i r r i gat i on as r equi r ed t o est abl i sh sod gr owt h.
Measur ement wi l l be made by t he ar ea pl aced. The uni t of measur e i s squar e yard.
1. 5. 7 Rol l ed Er osi on Cont r ol Pr oduct ( Li ne I t em 0007)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement and i nst al l at i on of t he er osi on cont r ol pr oduct s. Al so i ncl uded i s i r r i gat i on as r equi r ed t o est abl i sh veget at i on gr owt h. Measur ement wi l l be made by t he ar ea pl aced. The uni t of measur e i s squar e yar d.
1. 5. 8 Cof f er dam Seepage Pr ot ect i on ( Li ne I t em 0008)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement , mai nt enance and r emoval of seepage pr ot ect i on, i ncl udi ng beddi ng st one and geot ext i l e. Measur ement wi l l be made by t he ar ea pl aced. The uni t of measur e i s squar e yar d.
1. 5. 9 Dewat er i ng ( Li ne I t em 0009)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o i nst al l at i on, oper at i on, mai nt enance and r emoval of dewat er i ng equi pment and dr ai nage f aci l i t i es. Thi s i ncl udes per mi t t i ng and pr epar at i on of t he Dewat er i ng Wor k Pl an.
1. 5. 10 Excavat i on ( Li ne I t em 0010)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o
SECTI ON 01 22 00 Page 5 excavat i on, t r anspor t at i on, and di sposal of al l mat er i al s not ot her wi se def i ned; excavat i on, haul i ng and st ockpi l i ng of t opsoi l ; pr ovi di ng and mai nt ai ni ng access t o t he wor k s i t e( s) and di sposal ar ea( s) ; noi se cont r ol ;
er osi on cont r ol ; and debr i s r emoval .
1. 5. 11 Demol i t i on ( Li ne I t em 0011)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o demol i t i on, haul i ng, of f s i t e di sposal , and st ockpi l i ng of exi st i ng st r uct ur es and f eat ur es, i ncl udi ng exi st i ng r i pr ap and exi st i ng pavement , necessar y t o compl et e wor k. Demol i t i on shal l al so i ncl ude cost of decommi ssi oni ng exi st i ng moni t or i ng wel l s/ pi ezomet er s.
1. 5. 12 Sheet pi l e Scour Cut of f Wal l s ( Li ne I t em 0012)
Job payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o const r uct i on and compl et i on of t he sheet pi l e scour cut of f wal l s under t he headwal l s and t he wi ngwal l s on bot h s i des of each cul ver t .
1. 5. 13 Mud Mat ( Li ne I t em 0013)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement and compl et i on of t he unr ei nf or ced concr et e mud mat r equi r ed f or t he ent i r e cul ver t st r uct ur e f oundat i on as shown on t he dr awi ngs.
1. 5. 14 Lakesi de Headwal l Rei nf or ced Concr et e ( Li ne I t em 0014)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement and compl et i on of r ei nf or ced concr et e r equi r ed f or t he st r uct ur e.
1. 5. 15 Lakesi de Wi ng Wal l s Rei nf or ced Concr et e ( Li ne I t em 0015)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement and compl et i on of r ei nf or ced concr et e r equi r ed f or t he st r uct ur e.
1. 5. 16 Landsi de Headwal l Rei nf or ced Concr et e ( Li ne I t em 0016)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement and compl et i on of r ei nf or ced concr et e r equi r ed f or t he st r uct ur e.
1. 5. 17 Landsi de Wi ng Wal l s Rei nf or ced Concr et e ( Li ne I t em 0017)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement and compl et i on of r ei nf or ced concr et e r equi r ed f or t he st r uct ur e.
1. 5. 18 Cul ver t St r uct ur e Rei nf or ced Concr et e ( Li ne I t em 0018)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement and compl et i on of r ei nf or ced concr et e r equi r ed f or t he st r uct ur e.
1. 5. 19 Lakesi de Headwal l Embedded Met al s ( Li ne I t em 0019)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o f ur ni shi ng and i nst al l at i on of embedded met al s r equi r ed f or bul khead sl ot s, s i l l s and ar mor s as shown on t he dr awi ngs.
1. 5. 20 Landsi de Headwal l Embedded Met al s ( Li ne I t em 0020)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o
SECTI ON 01 22 00 Page 6 f ur ni shi ng and i nst al l at i on of embedded met al s r equi r ed f or bul khead sl ot s, s i l l s and ar mor s as shown on t he dr awi ngs.
1. 5. 21 Mi scel l aneous Met al s ( Li ne I t em 0021)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o f ur ni shi ng and i nst al l at i on of mi scel l aneous met al s not pai d f or under t he l i ne i t em " Embedded Met al s" above.
1. 5. 22 Combi nat i on Sl i de/ Fl ap Gat e wi t h Act uat or ( Li ne I t em 0022)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o f ur ni shi ng and i nst al l at i on of combi nat i on s l i de/ f l ap gat es wi t h act uat or s. Measur ement wi l l be by t he number of gat es i nst al l ed. Uni t of measur e i s each.
1. 5. 23 Manat ee Scr een/ Debr i s Bar r i er ( Li ne I t em 0023)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o f ur ni shi ng and i nst al l at i on of manat ee scr een/ debr i s bar r i er s. Measur ement wi l l be by t he number of scr een/ bar r i er s i nst al l ed. Uni t of measur e i s each.
1. 5. 24 Embankment Fi l l ( Li ne I t em 0024)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o bor r ow, t r anspor t at i on, and pl acement of embankment or ot her f i l l t o t he l i nes and gr ades shown, f i nal const r uct i on of t he new S- 284 St r uct ur e and f i nal r est or at i on of t he s i t e; noi se cont r ol ; er osi on cont r ol ; and debr i s r emoval . Payment under t hi s l i ne i t em i ncl udes compact i on and pl acement of subgr ades f or r oads, f oundat i ons and r evet ment , embankment and pl acement of t opsoi l . Payment under t hi s l i ne i t em does not i ncl ude Soi l - Bent oni t e Cor e, Chi mney Dr ai n, Dr ai nage Bl anket , or Fi l t er Col l ar .
The t ot al amount of mat er i al pl aced, and t o be pai d f or under t hi s cont r act , wi l l be measur ed by t he vol ume i n- pl ace wi t h quant i t i es det er mi ned by di gi t al t er r ai n model ( DTM) sur f ace t o sur f ace comput at i ons.
The Gover nment wi l l per f or m i ni t i al and f i nal sur veys i n accor dance wi t h t he c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
The i ni t i al and f i nal DTM sur f aces used f or cal cul at i on of f i nal quant i t i es wi l l be det er mi ned f r om t he or i gi nal ( i ni t i al sur f ace) sur vey per f or med by t he Gover nment af t er excavat i on and pl acement of concr et e cul ver t st r uct ur es, headwal l s and wi ng wal l s, and bef or e f i l l pl acement , and t he f i ni shed gr ades ( f i nal sur f ace) as shown on t he dr awi ngs. The f i nal sur vey per f or med by t he Gover nment wi l l be used t o ver i f y t hat f i l l pl acement i s compl et e t o t he r equi r ed f i ni shed gr ades, and t hat t ol er ances have not been exceeded. Fi l l above r equi r ed f i ni shed gr ades wi l l not be i ncl uded i n quant i t i es cal cul at ed f or f i nal payment . The est i mat ed quant i t y f or t hi s l i ne i t em does not i ncl ude t ol er ances. The Cont r act or i s r esponsi bl e f or consi der i ng t he cost of r equi r ed t ol er ances, and i ncl udi ng t hi s cost i n t he uni t pr i ce f or t hi s l i ne i t em ( see Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i n Vol ume 1) . DTM sur f aces used f or cal cul at i on of quant i t i es f or pr ogr ess payment s wi l l be det er mi ned f r om t he or i gi nal sur vey per f or med by t he Gover nment , and el evat i ons bel ow f i ni shed gr ade obt ai ned f r om pr ogr ess sur veys per f or med by t he Cont r act or i n accor dance wi t h t he c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. The cal cul at ed vol umes of f eat ur es l ocat ed bet ween i ni t i al and f i nal DTM and pai d f or under ot her l i ne i t ems wi l l be deduct ed f r om t he cal cul at ed vol ume bet ween i ni t i al and f i nal DTM. The uni t of measur e i s cubi c yar d.
SECTI ON 01 22 00 Page 7
1. 5. 25 Soi l - Bent oni t e Cor e ( Li ne I t em 0025)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o bor r ow, t r anspor t at i on, mi x i ng, pl acement and t est i ng of Soi l - Bent oni t e Fi l l t o t he l i nes and gr ades shown; pr ovi di ng and mai nt ai ni ng access t o t he wor k s i t e( s) and bor r ow ar ea( s) ; noi se cont r ol ; and debr i s r emoval .
1. 5. 26 Chi mney Dr ai n, Dr ai nage Bl anket and Fi l t er Col l ar ( Li ne I t em 0026)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o bor r ow, t r anspor t at i on, pl acement and t est i ng of al l component s of t he Chi mney Dr ai n, Dr ai nage Bl anket , Fi l t er Col l ar and i nt er nal dr ai nage syst em, i ncl udi ng Fi l t er Soi l , Fi l t er Gr avel and dr ai n pi pe t o t he l i nes and gr ades shown on t he dr awi ngs; pr ovi di ng and mai nt ai ni ng access t o t he wor k s i t e( s) and bor r ow ar ea( s) ; noi se cont r ol ; and debr i s r emoval .
1. 5. 27 Li mer ock Sur f ace ( Li ne I t em 0027)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pr ocessi ng, t r anspor t at i on, and pl acement of temporary aggr egat e l i mer ock t o t he l i nes and gr ades shown. Compact i on and pl acement of t he subgr ade wi l l not be pai d f or under t hi s l i ne i t em. Measur ement wi l l be made by t he ar ea pl aced. The uni t of measur e i s squar e yar d.
1. 5. 28 Asphal t Sur f ace ( Li ne I t em 0028)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pr ocessi ng, t r anspor t at i on, and pl acement of aggr egat e base coar se, t ack coat and asphal t sur f ace cour se t o t he l i nes and gr ades shown. Compact i on and pl acement of t he subgr ade wi l l not be pai d f or under t hi s l i ne i t em.
Al so i ncl uded i n t hi s l i ne i t em ar e concr et e sur f aces, l i mer ock sur f aces, concr et e cur bi ng and r oadway dr ai nage f eat ur es as shown. Measur ement wi l l be made by t he ar ea pl aced. The uni t of measur e i s squar e yar d.
1. 5. 29 Ver t i cal Wal l and Rei nf or ced Ver t i cal Wal l Fi l l ( Li ne I t em 0029)
Uni t pr i ce payment wi l l be made f or cost associ at ed wi t h and i nci dent al t o pl acement , mai nt enance, and r emoval of ver t i cal wal l s and r ei nf or ced ver t i cal wal l f i l l associ at ed wi t h t he bypass r oad and cof f er dam t o t he l i mi t s and el evat i ons shown. Li mer ock wi l l not be pai d under t hi s l i ne i t em. The uni t of measur e i s cubi c yar d.
1. 5. 30 I nt ake and Out l et Channel ( Li ne I t em 0030)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o excavat i on, t r anspor t at i on, and di sposal of mat er i al s; excavat i on, haul i ng and st ockpi l i ng of t opsoi l ; pr ovi di ng and mai nt ai ni ng access t o t he wor k s i t e( s) and di sposal ar ea( s) ; i nst al l at i on of t he bul kheads, associ at ed gr adi ng; noi se cont r ol ; and, debr i s r emoval .
1. 5. 31 Si t e Si gnage ( Li ne I t em 0031)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o f ur ni shi ng and i nst al l at i on of s i t e s i gnage and pavement mar ki ngs as shown, i ncl udi ng al l necessar y assembl i es and appur t enances.
SECTI ON 01 22 00 Page 8
1. 5. 32 Cont r ol Bui l di ng ( Li ne I t em 0032)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o f ur ni shi ng and i nst al l at i on of t he cont r ol bui l di ng t o i ncl ude f enci ng and gate.
1. 5. 33 El ect r i cal and Tel ecommuni cat i ons Wor k and Equi pment ( Li ne I t em 0033)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o f ur ni shi ng and i nst al l at i on of el ect r i cal and t el ecommuni cat i on equi pment i ncl udi ng ant enna and sol ar panel pol e.
1. 5. 34 Soddi ng ( Li ne I t em 0034)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pl acement and est abl i shment of sod. Measur ement wi l l be made by t he ar ea pl aced. The uni t of measur e i s squar e yar d.
1. 5. 35 St i l l i ng Wel l s ( Li ne I t em 0035)
Job payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o f ur ni shi ng and i nst al l at i on of st i l l i ng wel l s, i nc l udi ng met al gr at es, pr e- cast concr et e pi l es, hand- r ai l s and debr i s bar r i er .
1. 5. 36 Dual Leaf Gat es ( Li ne I t em 0036)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o i nst al l at i on of t he el ect r i cal l y oper at ed doubl e l eaf gat e syst ems i ncl udi ng gat e har dwar e and accessor i es. Measur ement wi l l be by t he number of gat es i nst al l ed. Uni t of measur e i s each.
1. 5. 37 Cont r act i ng Of f i cer ' s Fi el d Of f i ce ( Li ne I t em 0037)
Uni t pr i ce payment wi l l be made f or cost s associ at ed wi t h and i nci dent al t o pr ovi di ng, mai nt ai ni ng, and f i nal di sposi t i on of t he Cont r act i ng Of f i cer ' s f i el d of f i ce i nc l udi ng al l cost s f or r ent and pr ovi s i on of al l ser v i ces i ndi cat ed i n Sect i on 01 52 10 CONTRACTI NG OFFI CER' S FI ELD OFFI CE. Cost s f or such pr ovi s i on and mai nt enance of t he Cont r act or ' s own f i el d of f i ce and ot her f aci l i t i es wi l l not be pai d f or under t hi s l i ne i t em. Measur ement wi l l be t he amount of t i me t hat t he Cont r act i ng Of f i cer ' s f i el d of f i ce i s avai l abl e t o t he Gover nment wi t hi n t he dur at i on of t he cont r act . Uni t of measur e i s by mont h.
1. 5. 38 Bypass Pump( s) Oper at i on ( Li ne I t em 0038)
Job payment wi l l be made f or cost associ at ed wi t h and i nci dent al t o oper at i ng of t he bypass pumpi ng syst em i ncl udi ng l abor , mat er i al and equi pment used t o r eposi t i on, oper at e, mai nt ai n and secur e bypass pumpi ng syst em af t er oper at i on. Cost s i ndi cat ed under l i ne i t em " Bypass Pump( s) St andby Ti me" wi l l not be pai d f or under t hi s l i ne i t em. For pur poses of bi ddi ng, Cont r act or shal l assume 1440 hour s of bypass pump oper at i on.
1. 5. 39 Bypass Pump( s) St andby Ti me ( Li ne I t em 0039)
Job payment wi l l be made f or cost associ at ed wi t h and i nci dent al t o pur chase and i nst al l at i on of bypass pump( s) and appur t enant equi pment on st andby. Pump( s) shal l become Gover nment pr oper t y at t he concl usi on of t he const r uct i on cont r act . Upon accept ance by t he Gover nment of subst ant i al compl et i on, Cont r act or shal l t r anspor t ( l oad, del i ver , and unl oad) bypass
SECTI ON 01 22 00 Page 9 pump( s) per t he di r ect i on of t he Cont r act i ng Of f i cer t o a l ocat i on wi t hi n 100 mi l es of t he pr oj ect s i t e.
1. 5. 40 El ect r i cal Ut i l i t i es ( Li ne I t em 0040)
Payment wi l l i nc l ude f ul l compensat i on f or t he char ges pai d t o t he ut i l i t y company by t he Cont r act or f or f ur ni shi ng al l mat er i al s, equi pment , and l abor r equi r ed t o i nst al l el ect r i cal ser vi ces as shown and i n accor dance wi t h Gl ades El ect r i cal Cooper at i ve. Payment wi l l be made f or act ual cost i ncur r ed f or t he el ect r i cal ser vi ce i nst al l at i on. Act ual cost i ncur r ed wi l l be based on ut i l i t y i nvoi ces i ndi cat ed i n par agr aph SUBMI TTALS above.
1. 5. 41 Par t ner i ng Regr oup Meet i ng ( Li ne I t em 0041)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o conduct i ng a par t ner i ng r egr oup meet i ng. Thi s l i ne i t em i s not subj ect t o t he VARI ATI ON I N ESTI MATED QUANTI TY c l ause, and t he Cont r act or wi l l onl y be pai d f or t he act ual number of par t ner i ng r egr oups conduct ed. See Sect i on 01 30 00 ADMI NI STRATI VE PROCEDURES. The i ni t i al par t ner i ng meet i ng wi l l not be pai d f or under t hi s l i ne i t em as i t i s a di st r i but ed cost mandat or y admi ni st r at i ve act i on. The basi s f or payment wi l l be f or t he compl et i on of each par t ner i ng r egr oup meet i ng and Gover nment r ecei pt of al l compl et ed wor k pr oduct s.
1. 5. 42 Par t ner i ng Regr oup Venue ( Li ne I t em 0042)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o pr ovi de t he par t ner i ng r egr oup venue. Thi s l i ne i t em i s not subj ect t o t he VARI ATI ON I N ESTI MATED QUANTI TY cl ause, and t he Cont r act or wi l l onl y be pai d f or t he act ual number of par t ner i ng r egr oups conduct ed. See Sect i on 01 30 00 ADMI NI STRATI VE PROCEDURES. The basi s f or payment wi l l be f or t he compl et i on of each par t ner i ng r egr oup venue.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
Upon r ecei v i ng i ni t i al Resi dent Management Syst em i mpor t f i l e, go t o " Pay Act i v i t i es" and est abl i sh a l i nk bet ween bi d br eakdown schedul e of val ues of " Pay Act i v i t i es" t o cont r act CLI Ns usi ng " Schedul e Act i v i t i es" dat a ent r y page.
3. 1. 1 Request i ng Pr ogr ess Payment
For pr ogr ess payment s, ensur e " Act i v i t y Schedul e" , " Feat ur e Schedul e" , submi t t al r egi st er , and punch l i s t s ar e al l up t o dat e. Use " Pr ogr ess Payment s" t o " r equest Act i v i t y Ear ni ngs" f or bot h " Act i v i t y Ear ni ngs" dat a ent r y page and " Ot her Ear ni ng" . Pr ovi de har d copi es of suppor t i ng i nvoi ces and quant i t y measur ement s t o suppor t al l r equest ed ear ni ngs. Ensur e t hat sum of payment act i v i t i es do not exceed cont r act awar d CLI N f undi ng amount s, or " unbal anced" CLI Ns er r or wi l l pr event pr ocessi ng t he payment .
Submi t a r equest f or pr ogr ess payment mont hl y i n accor dance wi t h Cl ause
52. 232- 5 PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS of Sect i on 00700 CONTRACT CLAUSES. I n addi t i on t o t he i t ems l i s t ed i n Cl ause
52. 232- 5( b) ( 1) , submi t t he f ol l owi ng i n t he r equest f or pr ogr ess payment :
a. Appr oved const r uct i on schedul e.
SECTI ON 01 22 00 Page 10
b. Up- t o- dat e payr ol l r ecor ds.
c. Cur r ent submi t t al r egi st er .
d. Appr oved submi t t al s on i nst al l ed pr oper t y.
e. QA/ QC def i c i ency t r acki ng l i s t .
f . Cur r ent as- bui l t dr awi ngs.
Once t he compl et e pay appl i cat i on package i s r ecei ved t o i ncl ude t he Cont r act or ' s s i gned ENG 93, t he 14 cal endar days wi l l commence.
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
When addi t i onal wor k i s added by modi f i cat i on, exi st i ng CLI Ns f undi ng amount s must be updat ed, or new CLI Ns f or modi f i cat i on wi l l be cr eat ed. I f cont r act has opt i on CLI Ns not yet awar ded, opt i on CLI Ns wi l l appear as zer o dol l ar CLI Ns unt i l opt i on i s awar ded by modi f i cat i on. No payment may be r equest ed f or Opt i ons or Modi f i cat i on CLI Ns unt i l cont r act modi f i cat i on has been f unded and si gned.
- - End of Sect i on - -
SECTI ON 01 22 00 Page 11
File details come from the government source that posted it.